TEMP-TO-PERM NEIGHBORHOOD (TPN)



  An Additional Group Site Approach to Meeting
        Temporary Disaster Housing Needs
& Facilitating Recovery of Permanent Housing and
                   Communities




                                           Prepared by
                                        Jorge Quintero
                     FEMA Long Term Community Recovery
                                       Birmingham, AL
                                                6-07-11
TEMP-TO-PERM NEIGHBORHOOD (TPN)

•Additional option to the traditional FEMA Group Site when private
and commercial temporary housing sites and other temporary
housing such as hotels are inadequate to meet demand.

•Appropriate in situations where the time required to repair or
rebuild permanent homes will be protracted and where suitable
property for traditional groups sites is scarce or considered
unacceptable for temporary housing.

•Facilitates securing sites and obtaining local government
approvals by providing a clear exit strategy for the temporary
housing facility and provides long term community infrastructure.

•By providing a head start on developing permanent housing, the
temporary housing period can be shortened.

•Cognizant of practical issues facing FEMA IA
TEMP-TO-PERM NEIGHBORHOOD (TPN)
  REUSABLE INFRASTRUCTURE                   •Infrastructure (roadways, water, sewer,
                                            electric, etc.) installed so as to be
                                            reused for future permanent housing
                                            on the same site.

                                            •Full permanent infrastructure (asphalt
                                            paving, sidewalks, etc.) is not
                                            necessary at the temporary stage
                                            although what is installed needs to
                                            meet the standards for permanent
                                            placement.

•Initial higher cost offset by elimination of cost to restore site.
•Added value of infrastructure to property owner may reduce or eliminate the land
acquisition expense to FEMA.
•Not-profit housing organizations excellent candidates to take advantage of these
opportunities.
•Reuse of infrastructure material is a Green approach to the utilization of scarce
resources.
TEMP-TO-PERM NEIGHBORHOOD (TPN)
DUAL USE LOTS

•TPN designed with the end-use in
mind while considering the efficient
use of the property initially to
maximize housing opportunities for
survivors during the temporary
stage

•Lots are dimensioned to
accommodate both temporary and
permanent structures

•Exact dimensions depend on
specific community standards and
the intended temporary and
                                       •Resulting density for either the temporary or
permanent housing products
                                       permanent use stages need only be
                                       marginally different from that which would
                                       have occurred had the dual purpose
                                       approach not been taken
TEMP-TO-PERM NEIGHBORHOOD (TPN)
MIXED-USE

•TPNs incorporate community-
serving open space and, where
appropriate, the potential for
commercial services both
temporary and long term.

•Civic and Commercial facilities
can be housed in tents or
prefabricated structures during
the temporary use stage.
                                   •TPNs can accommodate
                                   civic and religious functions
                                   preserving the social fabric of
                                   the community and support
                                   and retain small business
                                   owners within the affected
                                   community.
TEMP-TO-PERM NEIGHBORHOOD (TPN)
PHASE I (A): Aerial View of a Traditional FEMA Group Site (GS) with
manufactured homes, park models or trailers installed.

•Traditional GS have little to no potential for transitioning into a
non-MH permanent housing site and community.




                                                   Utility chase down middle
                                                   of lots of and lot size of
                                                   typical FEMA group site
                                                   precludes alternative
                                                   future uses.
TEMP-TO-PERM NEIGHBORHOOD (TPN)

PHASE I (B): Aerial View of a Temp-to-
Perm Neighborhood with manufactured
homes placed initially along with
temporary community services.

•The TPNs reusable infrastructure, site
plan, and lot size and arrangement are
designed to be leveraged for permanent
housing and community redevelopment.
TEMP-TO-PERM NEIGHBORHOOD (TPN)

PHASE Il (C): Aerial View of a
Temp-to-Perm Neighborhood
after manufactured homes
have been replaced with
mixed-use housing and
commercial facilities through
a public private partnership
TEMP-TO-PERM NEIGHBORHOOD (TPN)

Comparative Cost
In 2005, an analysis was prepared for the
FEMA’s Joint Housing Solution Center by
FEMA’s designated Group Site contractor
comparing the infrastructure cost of a
conventional FEMA Mobile Home (MH) Group
Site to a TPN approach. For the 16.3 AC
Louisiana site in question, the infrastructure cost
of the traditional approach was $41,592 per MH
not including the cost to restore the site at close-
out. The cost utilizing the TPN approach was
$43,243 per MH not considering the likely
reduced land acquisition cost to FEMA due to
the residual value of the infrastructure to the
property owner. The difference in direct
infrastructure cost was attributed to the slightly
lower density achieved with the TPN approach
during the temporary stage as compared to the
TPN approach. Comparable density and costs
will vary depending on the specific site.
TEMP-TO-PERM NEIGHBORHOOD (TPN)

More Related Content

Viewers also liked

Parenteral Nutrition
Parenteral NutritionParenteral Nutrition
Parenteral NutritionDRKUB99
 
Total parenteral nutrition(TPN)
Total parenteral nutrition(TPN)Total parenteral nutrition(TPN)
Total parenteral nutrition(TPN)Armin Eisazaei
 
Total enteral nutrition and total parenteral nutrition in critically ill pat...
Total enteral nutrition  and total parenteral nutrition in critically ill pat...Total enteral nutrition  and total parenteral nutrition in critically ill pat...
Total enteral nutrition and total parenteral nutrition in critically ill pat...Prof. Mridul Panditrao
 
Total parenteral nutrition
Total parenteral nutritionTotal parenteral nutrition
Total parenteral nutritionJitendra Shukla
 

Viewers also liked (6)

Parenteral Nutrition
Parenteral NutritionParenteral Nutrition
Parenteral Nutrition
 
7. tpn for critically ill patients
7. tpn  for critically ill patients7. tpn  for critically ill patients
7. tpn for critically ill patients
 
Total parenteral nutrition(TPN)
Total parenteral nutrition(TPN)Total parenteral nutrition(TPN)
Total parenteral nutrition(TPN)
 
Parentral nutrition
Parentral nutritionParentral nutrition
Parentral nutrition
 
Total enteral nutrition and total parenteral nutrition in critically ill pat...
Total enteral nutrition  and total parenteral nutrition in critically ill pat...Total enteral nutrition  and total parenteral nutrition in critically ill pat...
Total enteral nutrition and total parenteral nutrition in critically ill pat...
 
Total parenteral nutrition
Total parenteral nutritionTotal parenteral nutrition
Total parenteral nutrition
 

Temp to Perm Neighborhoods

  • 1. TEMP-TO-PERM NEIGHBORHOOD (TPN) An Additional Group Site Approach to Meeting Temporary Disaster Housing Needs & Facilitating Recovery of Permanent Housing and Communities Prepared by Jorge Quintero FEMA Long Term Community Recovery Birmingham, AL 6-07-11
  • 2. TEMP-TO-PERM NEIGHBORHOOD (TPN) •Additional option to the traditional FEMA Group Site when private and commercial temporary housing sites and other temporary housing such as hotels are inadequate to meet demand. •Appropriate in situations where the time required to repair or rebuild permanent homes will be protracted and where suitable property for traditional groups sites is scarce or considered unacceptable for temporary housing. •Facilitates securing sites and obtaining local government approvals by providing a clear exit strategy for the temporary housing facility and provides long term community infrastructure. •By providing a head start on developing permanent housing, the temporary housing period can be shortened. •Cognizant of practical issues facing FEMA IA
  • 3. TEMP-TO-PERM NEIGHBORHOOD (TPN) REUSABLE INFRASTRUCTURE •Infrastructure (roadways, water, sewer, electric, etc.) installed so as to be reused for future permanent housing on the same site. •Full permanent infrastructure (asphalt paving, sidewalks, etc.) is not necessary at the temporary stage although what is installed needs to meet the standards for permanent placement. •Initial higher cost offset by elimination of cost to restore site. •Added value of infrastructure to property owner may reduce or eliminate the land acquisition expense to FEMA. •Not-profit housing organizations excellent candidates to take advantage of these opportunities. •Reuse of infrastructure material is a Green approach to the utilization of scarce resources.
  • 4. TEMP-TO-PERM NEIGHBORHOOD (TPN) DUAL USE LOTS •TPN designed with the end-use in mind while considering the efficient use of the property initially to maximize housing opportunities for survivors during the temporary stage •Lots are dimensioned to accommodate both temporary and permanent structures •Exact dimensions depend on specific community standards and the intended temporary and •Resulting density for either the temporary or permanent housing products permanent use stages need only be marginally different from that which would have occurred had the dual purpose approach not been taken
  • 5. TEMP-TO-PERM NEIGHBORHOOD (TPN) MIXED-USE •TPNs incorporate community- serving open space and, where appropriate, the potential for commercial services both temporary and long term. •Civic and Commercial facilities can be housed in tents or prefabricated structures during the temporary use stage. •TPNs can accommodate civic and religious functions preserving the social fabric of the community and support and retain small business owners within the affected community.
  • 6. TEMP-TO-PERM NEIGHBORHOOD (TPN) PHASE I (A): Aerial View of a Traditional FEMA Group Site (GS) with manufactured homes, park models or trailers installed. •Traditional GS have little to no potential for transitioning into a non-MH permanent housing site and community. Utility chase down middle of lots of and lot size of typical FEMA group site precludes alternative future uses.
  • 7. TEMP-TO-PERM NEIGHBORHOOD (TPN) PHASE I (B): Aerial View of a Temp-to- Perm Neighborhood with manufactured homes placed initially along with temporary community services. •The TPNs reusable infrastructure, site plan, and lot size and arrangement are designed to be leveraged for permanent housing and community redevelopment.
  • 8. TEMP-TO-PERM NEIGHBORHOOD (TPN) PHASE Il (C): Aerial View of a Temp-to-Perm Neighborhood after manufactured homes have been replaced with mixed-use housing and commercial facilities through a public private partnership
  • 9. TEMP-TO-PERM NEIGHBORHOOD (TPN) Comparative Cost In 2005, an analysis was prepared for the FEMA’s Joint Housing Solution Center by FEMA’s designated Group Site contractor comparing the infrastructure cost of a conventional FEMA Mobile Home (MH) Group Site to a TPN approach. For the 16.3 AC Louisiana site in question, the infrastructure cost of the traditional approach was $41,592 per MH not including the cost to restore the site at close- out. The cost utilizing the TPN approach was $43,243 per MH not considering the likely reduced land acquisition cost to FEMA due to the residual value of the infrastructure to the property owner. The difference in direct infrastructure cost was attributed to the slightly lower density achieved with the TPN approach during the temporary stage as compared to the TPN approach. Comparable density and costs will vary depending on the specific site.