Lakeview Schools: Facilities Improvement Plan Presented by: James I. Doig Director of Education
Mission:  To develop and implement an improved facility space for the purposes of the Lakeview Elementary School and the Lakeview Wellness Center
Proposed Facilities Improvement :  Lakeview will be renovating the lower level of high school building one for use as the new home for Lakeview Elementary School and the Lakeview Wellness Center.  This site offers tremendous potential for our students with : a. Two beautifully modern classroom spaces,  complete with a mix of natural and artificial  lighting and  improved ventilation; b. Access to technology capabilities; c. A new playground space dedicated to elementary  school student usage; d. Easier access to the barn and farm animals; e. Continued in-house access to Speech/language  and Occupational Therapy Rooms in their new  rooms; and g. New in-house access to the Lakeview Wellness  Center.
Floorplan of the proposed renovation of the lower level of high school building #1
Elementary School:   Lakeview Elementary School will enjoy two new classrooms.  The classrooms will be adjoining, with a dedicated space of 20 x 22’ each.  They will be separated by a partitioning wall that can be easily moved in order to enjoy a larger single space for whole school activities. Calming areas have been designed into each of the classrooms in order to maintain personal safety protocols for students and staff.  Students and staff will experience improved environmental attributes with access to natural and artificial light as well as improved ventilation.
Wellness Center:   Lakeview Schools will be introducing a Wellness Program as part of its overall physical education curriculum.  The Wellness Center will be a dedicated 30 x 32’ space and is designed to promote the components of wellness, with a focus upon the individual.  This includes technology access, stretching and walking areas and an academic configuration for the research and development aspects of the curriculum.  The Wellness center will have designated egress point for elementary and high school students.
3-D Version of the floorplan Classroom Classroom Wellness Center O.T. Room Speech Restrooms Storage Storage Oil
Let’s transition from paper to a practical application
Current view of exterior entrance to the lower level of high school building #1
Current view of proposed setting for Lakeview Elementary School and Lakeview Wellness Center
A new playground space dedicated to elementary school student usage
Easier access to the barn and farm animals
Current view of dedicated entrance to main level of high school building #1
The interior views on the following slides depict the level of excellence in the worksmanship of our maintenance staff.  Lakeview Maintenance Staff will perform a majority of the renovation work on this project
Elementary School will feature two beautifully modern classroom spaces, complete with a mix of natural and artificial lighting and improved ventilation.
Continued in-house access to Speech/language and Occupational Therapy Rooms in their new rooms; and to the new Lakeview Wellness Center
Access to technology capabilities
Lakeview Wellness Center will be a dedicated 30 x 32’ space and is designed to promote the components of wellness, with a focus upon the individual.  This includes technology access, stretching and walking areas and an academic configuration for the research and development aspects of the curriculum.
The Clients and Staff of the Lakeview Schools look forward to the promising potential of this facilities renovation plan!!

More Related Content

Similar to Renovation Project

Facility Plan A Thornton Cannon
Facility Plan A Thornton CannonFacility Plan A Thornton Cannon
Facility Plan A Thornton Cannonladiluck26
 
Lab organiztion & Management presentation.pptx
Lab organiztion & Management presentation.pptxLab organiztion & Management presentation.pptx
Lab organiztion & Management presentation.pptxchristopherMasters5
 
First Half of 2019 LEED Schools: Leading the Green Schools Movement
First Half of 2019 LEED Schools: Leading the Green Schools Movement First Half of 2019 LEED Schools: Leading the Green Schools Movement
First Half of 2019 LEED Schools: Leading the Green Schools Movement USGBC
 
Impacts of School and Furniture Design
Impacts of School and Furniture DesignImpacts of School and Furniture Design
Impacts of School and Furniture DesignStantec
 
Hillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron ConstructionHillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron ConstructionMiron Construction
 
Whitescape State Education Case Study
Whitescape State Education Case StudyWhitescape State Education Case Study
Whitescape State Education Case StudyAndrew White
 
Case Study: School Renovations
Case Study: School RenovationsCase Study: School Renovations
Case Study: School RenovationsStudioGarchitects
 
Innovative technology educational center
Innovative technology educational centerInnovative technology educational center
Innovative technology educational centerRyan Gunhold
 
Project 3 edtc_6325_2[1]
Project 3 edtc_6325_2[1]Project 3 edtc_6325_2[1]
Project 3 edtc_6325_2[1]AGON75
 
Final grant
Final grantFinal grant
Final grantAGON75
 
Final grant
Final grantFinal grant
Final grantAGON75
 
Final grant
Final grantFinal grant
Final grantAGON75
 
Final grant
Final grantFinal grant
Final grantAGON75
 
Project 3 edtc_6325_2[1]
Project 3 edtc_6325_2[1]Project 3 edtc_6325_2[1]
Project 3 edtc_6325_2[1]AGON75
 
Project 3 edtc_6325_2[1]
Project 3 edtc_6325_2[1]Project 3 edtc_6325_2[1]
Project 3 edtc_6325_2[1]AGON75
 
Celebrating LEED-certified Schools from 2019
Celebrating LEED-certified Schools from 2019Celebrating LEED-certified Schools from 2019
Celebrating LEED-certified Schools from 2019USGBC
 

Similar to Renovation Project (20)

Facility Plan A Thornton Cannon
Facility Plan A Thornton CannonFacility Plan A Thornton Cannon
Facility Plan A Thornton Cannon
 
Lab organiztion & Management presentation.pptx
Lab organiztion & Management presentation.pptxLab organiztion & Management presentation.pptx
Lab organiztion & Management presentation.pptx
 
First Half of 2019 LEED Schools: Leading the Green Schools Movement
First Half of 2019 LEED Schools: Leading the Green Schools Movement First Half of 2019 LEED Schools: Leading the Green Schools Movement
First Half of 2019 LEED Schools: Leading the Green Schools Movement
 
Measure A Status Report, 2010
Measure A Status Report, 2010Measure A Status Report, 2010
Measure A Status Report, 2010
 
Faqs test
Faqs testFaqs test
Faqs test
 
Impacts of School and Furniture Design
Impacts of School and Furniture DesignImpacts of School and Furniture Design
Impacts of School and Furniture Design
 
Hillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron ConstructionHillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron Construction
 
USGBC LEED sheet Watertown 040411
USGBC LEED sheet Watertown 040411USGBC LEED sheet Watertown 040411
USGBC LEED sheet Watertown 040411
 
Whitescape State Education Case Study
Whitescape State Education Case StudyWhitescape State Education Case Study
Whitescape State Education Case Study
 
Case Study: School Renovations
Case Study: School RenovationsCase Study: School Renovations
Case Study: School Renovations
 
Innovative technology educational center
Innovative technology educational centerInnovative technology educational center
Innovative technology educational center
 
Grant Questions 2012
Grant Questions 2012Grant Questions 2012
Grant Questions 2012
 
Project 3 edtc_6325_2[1]
Project 3 edtc_6325_2[1]Project 3 edtc_6325_2[1]
Project 3 edtc_6325_2[1]
 
Final grant
Final grantFinal grant
Final grant
 
Final grant
Final grantFinal grant
Final grant
 
Final grant
Final grantFinal grant
Final grant
 
Final grant
Final grantFinal grant
Final grant
 
Project 3 edtc_6325_2[1]
Project 3 edtc_6325_2[1]Project 3 edtc_6325_2[1]
Project 3 edtc_6325_2[1]
 
Project 3 edtc_6325_2[1]
Project 3 edtc_6325_2[1]Project 3 edtc_6325_2[1]
Project 3 edtc_6325_2[1]
 
Celebrating LEED-certified Schools from 2019
Celebrating LEED-certified Schools from 2019Celebrating LEED-certified Schools from 2019
Celebrating LEED-certified Schools from 2019
 

Renovation Project

  • 1. Lakeview Schools: Facilities Improvement Plan Presented by: James I. Doig Director of Education
  • 2. Mission: To develop and implement an improved facility space for the purposes of the Lakeview Elementary School and the Lakeview Wellness Center
  • 3. Proposed Facilities Improvement : Lakeview will be renovating the lower level of high school building one for use as the new home for Lakeview Elementary School and the Lakeview Wellness Center. This site offers tremendous potential for our students with : a. Two beautifully modern classroom spaces, complete with a mix of natural and artificial lighting and improved ventilation; b. Access to technology capabilities; c. A new playground space dedicated to elementary school student usage; d. Easier access to the barn and farm animals; e. Continued in-house access to Speech/language and Occupational Therapy Rooms in their new rooms; and g. New in-house access to the Lakeview Wellness Center.
  • 4. Floorplan of the proposed renovation of the lower level of high school building #1
  • 5. Elementary School: Lakeview Elementary School will enjoy two new classrooms. The classrooms will be adjoining, with a dedicated space of 20 x 22’ each. They will be separated by a partitioning wall that can be easily moved in order to enjoy a larger single space for whole school activities. Calming areas have been designed into each of the classrooms in order to maintain personal safety protocols for students and staff. Students and staff will experience improved environmental attributes with access to natural and artificial light as well as improved ventilation.
  • 6. Wellness Center: Lakeview Schools will be introducing a Wellness Program as part of its overall physical education curriculum. The Wellness Center will be a dedicated 30 x 32’ space and is designed to promote the components of wellness, with a focus upon the individual. This includes technology access, stretching and walking areas and an academic configuration for the research and development aspects of the curriculum. The Wellness center will have designated egress point for elementary and high school students.
  • 7. 3-D Version of the floorplan Classroom Classroom Wellness Center O.T. Room Speech Restrooms Storage Storage Oil
  • 8. Let’s transition from paper to a practical application
  • 9. Current view of exterior entrance to the lower level of high school building #1
  • 10. Current view of proposed setting for Lakeview Elementary School and Lakeview Wellness Center
  • 11. A new playground space dedicated to elementary school student usage
  • 12. Easier access to the barn and farm animals
  • 13. Current view of dedicated entrance to main level of high school building #1
  • 14. The interior views on the following slides depict the level of excellence in the worksmanship of our maintenance staff. Lakeview Maintenance Staff will perform a majority of the renovation work on this project
  • 15. Elementary School will feature two beautifully modern classroom spaces, complete with a mix of natural and artificial lighting and improved ventilation.
  • 16. Continued in-house access to Speech/language and Occupational Therapy Rooms in their new rooms; and to the new Lakeview Wellness Center
  • 17. Access to technology capabilities
  • 18. Lakeview Wellness Center will be a dedicated 30 x 32’ space and is designed to promote the components of wellness, with a focus upon the individual. This includes technology access, stretching and walking areas and an academic configuration for the research and development aspects of the curriculum.
  • 19. The Clients and Staff of the Lakeview Schools look forward to the promising potential of this facilities renovation plan!!