SlideShare a Scribd company logo
1 of 26
Download to read offline
Step 1 Assemble Base Frame
Parts:
2040 Aluminium profile 250mm – 1pcs
Base Plate – 1pcs
M4-8mm screw – 3pcs
M4 T-Nut – 3pcs
 Put the aluminium profile on the base plate,
secure them with 3pcs M4-10mm screws & T-Nut
Step 2 Assemble Base Frame
Parts:
2020 Aluminium profile 70mm – 1pcs
Corner bracket – 2pcs
M4-8mm screw – 5pcs
M4 T-Nut – 5pcs
 Put the ‘2020 aluminium profile 70mm’ on the
base plate, secure them with 1pcs M4-8mm
screws & T-Nut
 Fix the aluminium profiles using 2pcs corner
bracket, secure them with M4-8mm screws and
M4 T-Nuts.
Step 3 Install Z Slide rail
Parts:
2040 Aluminium profile 310mm – 1pcs
Corner bracket – 1pcs
M5-10mm screw -2pcs
M5-40mm screw – 1pcs
M4-8mm screw – 2pcs
M4 T-Nut – 2pcs
 Place ‘2040 aluminium profile 310mm’ on the
base plate , secure them with 2pcs M5-10mm
screws.
 Fix the 2pcs aluminium profile with 1pcs corner
bracket, secure them with 2pcs M4-8mm screws
and M4 T-Nut.
 Use 1pcs M5-40mm screw to make them more
stable
Step 4 Fix the Z slide rail
Parts:
L-shape Acrylic block – 1pcs
M4-8mm screw – 4pcs
M4 T-Nut – 4pcs
 Place 1pcs L-shape acrylic block on the
aluminium profile, secure them with 4pcs
M4-8mm screws & T-Nut
Step 5 Assemble Y axis Motor
Parts:
42 stepper motor – 1pcs
GT2-16 Pulley (with grub screw in it)– 1pcs
Limit switch – 1pcs
Y motor mount (Acrylic) – 1pcs
M3-8mm screws – 4pcs
M4-8mm screw – 3pcs
M4 T-Nut - 3pcs
M2-10mm screw – 2pcs
M2 Nut – 2pcs
 Insert the GT2-16 pulley to the motor shaft,
tighten the grub screw in the pulley. Next
assemble the 42 stepper motor and the Y motor
mount(Acrylic) with 4pcs M3-8mm screws .
 Secure the limit switch to motor mount using
2pcs M2-10mm screws and nuts.
 secure the motor mount to the back of the Y
slide rail using 3pcs M4-8mm screws and T-nuts.
Step 6 Assemble Bed Frame
Parts:
Bed frame (acrylic) – 1pcs
Wheel – 3pcs
Plastic pillar – 3pcs
M5-30mm- 3pcs
M5 nut – 3pcs
GT2 Timing belt – 1pcs
Zip-ties – 1pcs
 Secure the wheels in place using M5-30mm
screws and nuts ,using plastic pillar between
wheel and bed frame.
 Tighten one end of the timing belt to the bed
frame using a zip-ties.
 Next slide the base frame to the 2040 aluminium
profile .
Step 7 Assemble Y-axis Belt Pulley
Parts:
Y Pulley mount (acrylic) – 1pcs
Belt pulley – 1pcs
M5-25mm screw – 1pcs
M5 Nut – 2pcs
M6 washer – 2pcs
M5 washer – 2pcs
M4-8mm screw – 3pcs
M4 T-Nut - 3pcs
 Take 1pcs M5-25mm screw and insert the Pulley
mount, secure it with M5 nut , then insert the
washers and belt pulley , secure them using M5
nut.
 Secure the Y belt pulley assembly to the front of
the Y slide rail using 3pcs M4-8mm screws and
nuts.
 Tighten screws gently to avoid damaging the
acrylic.
Step 8 Install Y axis Timing Belt
Parts:
Zip-ties – 1pcs
 Run the other end of timing belt along the
aluminium profile, through the Y-GT2-16 Pulley
and Belt pulley . Then tighten it to the bed frame
using zip-ties as shown in the picture .
Step 9 Assemble Z Carriage
Parts:
2020 Aluminium profile 285mm – 1pcs
X-motor mount (acrylic) – 1pcs
Extruded bracket – 1pcs
Brass nut – 1pcs
Plastic pillar – 6pcs
Wheel – 3pcs
M5-40mm screw – 3pcs
M5 Locknut – 3pcs
M3-8mm screw – 3pcs
M4-8mm screw – 2pcs
M4 T-Nut - 2pcs
 Insert 3pcs M5-40mm screws to X-motor mount ,
and then scure it to the aluminium profile using
2pcs M4-8mm screws and T-nuts.
 Put the wheels into M5-40mm screws, using
plastic pillars between wheel and acrylic, secure
the Extruded bracket using M5 nuts.
 Place the brass nut on the extruded bracket,
scure it using 3pcs M3-8mm screws .
Step 10 Install Z carriage
Parts:
42 stepper motor – 1pcs
GT2-16 Pulley (with grub screw in it)– 1pcs
M3-8mm screws – 4pcs
 Carefully insert the X-axis assembly to the Z slide
rail
 Insert the GT2-16 pulley to the motor shaft,
tighten the grub screw in the pulley, then place
the X stepper motor to the motor mount, secure
them with 4pcs M3-8mm screws .
Step 11 Insert Extruder Assembly
Parts:
Extruder assembly – 1pcs
 Carefully insert the extruder assembly to the X
slide rail.
Step 12 Assemble X axis Endstop & Pulley
Parts:
Belt pulley – 1pcs
Limit switch – 1pcs
X Pulley mount (acrylic) – 1pcs
X endstop mount (acrylic) – 1pcs
M5-25mm screw – 1pcs
M5 Nut – 1pcs
M5 Locknut – 1pcs
M6 washer – 2pcs
M5 washer – 2pcs
M4-8mm screw – 4pcs
M4 T-Nut - 4pcs
M2-10mm screw – 2pcs
M2 Nut – 2pcs
 Secure the limit switch to X endstop mount using
2pcs M2-10mm screws and nuts. Then place the
X endstop mount to the left end of the X slide rail
using 2pcs M4-8mm screw and T-nuts.
 Take 1pcs M5-25mm screw and insert the Pulley
mount, secure it with M5 nut , then insert the
washers and belt pulley , secure them using M5
locknut.
 Secure the X belt pulley assembly on the right of
the X slide rail using 2pcs M4-8mm screws and
nuts.
Step 13 Install X axis Timing Belt
Parts:
GT2 Timing belt – 1pcs
Zip-ties – 2pcs
 Tighten one end of the timing belt to the belt
hole using a zip-ties which back of the extruder
 Run the other end of timing belt along the
aluminium profile, through the X-GT2-16 Pulley
and Belt pulley . Then tighten it to another belt
hole using a zip-ties, as shown in the picture .
Step 14 Assemble Z motor
Parts:
42 Stepper motor – 1pcs
Z-motor seat – 1pcs
Coupling (with grub screw in it) – 1pcs
Threaded rod 260mm – 1pcs
M3-8mm screw – 4pcs
M4-12mm screw – 2pcs
M4 T-Nut – 2pcs
 Place 1pcs 42 stepper motor back of the Z slide
rail , put the motor seat on the motor and then
secure them with 4pcs M3-8mm screws.
 Install them to the Z slide rail using 2pcs M4-
12mm screws and T-Nuts.
 Take 1pcs threaded rod through the brass
nut ,then insert to the coupling and tighten up.
Step 15 Install Filament Feeder
Parts:
42 Stepper motor – 1pcs
Feeding gear (with grub screw in it)– 1pcs
Extrution clip - 1pcs
Extrution seat – 1pcs
M3-22mm – 2pcs
M3-16mm – 1pcs
M5-10mm Hex screw – 1pcs
Spring – 1pcs
 Insert the feeding gear to the motor shaft and
them tighten up .
 Place the Extrution seat and motor to the bracket
as shown in the picture, secure them using 2pcs
M3-22mm screws.
 Put one M5-10mm hex screw and spring
between extrution clip and extrution seat , next
secure the extrution clip with motor using M3-
16mm screw.
Step 16 Install handle
Parts:
Handle – 1pcs
Handle seat (Acrylic) – 1pcs
M5-10mm screw – 2pcs
M4-12mm screw – 2pcs
 Put the handle seat on the top of Z slide rail,
secure them with 2pcs M5-10mm screws .
 Secure the handle to the seat using 2pcs
M4-12mm screws .
Step 17 Install Z endstop
Parts:
Limit switch – 1pcs
Z endstop mount – 1pcs
M4-8mm screw – 1pcs
M4 T-Nut – 1pcs
M2-10mm screw – 2pcs
M2 Nut – 2pcs
 Secure the limit switch to Z endstop mount using
2pcs M2-10mm screws and nuts.
 Place the Z endstop mount to the left Z slide rail,
using one M4-8mm screw and T-nut.
Step 18 Assemble Print bed
Parts:
Bed plate – 1pcs
M3-30mm screw – 4pcs
Thumb nut – 4pcs
Spring – 4pcs
 Place the Bed plate on the bed frame use 4pcs
springs between them, and then through 4pcs
M3-30mm screws, then top 4pcs thumb nuts
under the bed frame.
Step 19 Install Teflon hose
Parts:
Teflon hose – 1pcs
Connector – 1pcs
 Install a connector to the filament feeder , and
then insert a teflon hose between feeder and
extruder .
Step 20-1 Assemble Electronic Box
Parts:
Electronic box bottom plate (acrylic) – 1pcs
Electronic box side plate – 2pcs
Mainboard– 1pcs
M3-20mm screws – 6pcs
M3 nuts – 6pcs
Plastic pillar – 4pcs
 Place the mainboard on the bottom plate using
M3-20mm and nuts , insert the plactic pillar
between them.
 Assemble the side plates to the bottom plate as
picture , secure them using M3-20mm screw&nut
Step 20-2 Assemble Electronic Box
Parts:
Electronic box front plate – 1pcs
LCD display assembly – 1pcs
M3-20mm screws – 4pcs
M3 nuts – 4pcs
 Assemble the front plate using M3-20mm screws
and M3 nuts.
 Place the LCD display assembly to the box , using
2pcs M3-20mm screws and nuts.
Step 20-3 Assemble Electronic Box
Parts:
Electronic box Back plate (left) – 1pcs
DC power jack – 1pcs
M3-20mm screws – 1pcs
M3 nuts – 1pcs
 Assemble the back plate to the bottom plate as
picture , secure them using M3-20mm screw&nut.
 Insert the DC power jack to the back plate.
Step 20-4 Assemble Electronic Box
Parts:
Electronic box top plate – 1pcs
M3-20mm screws – 3pcs
M3 nuts – 3pcs
 Cover the top plate using M3-20mm screws and
M3 nuts.
Step 23 Control Board Wiring Diagram
Parts:
Mainboard – 1pcs
 The method of connecting wire is as picture
 There is only 1pcs cooler fan , please connect to
‘CFAN’ on board
 There do not have heatbed and the thermistor ,
so there's no connection on ‘Hotbed’ and ‘BTEMP’.
x
x
x
x
DC power jack

More Related Content

Similar to 430635547-Tronxy-x1-assembly-guide.pdf

Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)fikkskemdmd
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)udfjjsjefkkekmm
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)fhsjejkdm
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)ufjjdfkkskemm
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)fjskekfoselkkkm
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)fjsiefkkskemm
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)fusejfksekmme
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)fusjefjkskem
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)fusjejfjskekem
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)fjjsjekdmmme
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)udfjjjsekkmem
 
Cembre Cable Crimp Lugs (Single Hole - Copper Conductors) - A Range
Cembre Cable Crimp Lugs (Single Hole - Copper Conductors) - A RangeCembre Cable Crimp Lugs (Single Hole - Copper Conductors) - A Range
Cembre Cable Crimp Lugs (Single Hole - Copper Conductors) - A RangeThorne & Derrick International
 
Bmw k1200 lt service repair manual
Bmw k1200 lt service repair manualBmw k1200 lt service repair manual
Bmw k1200 lt service repair manualjfkseksmemqw
 
Toughbox-Assembly-Instructions
Toughbox-Assembly-InstructionsToughbox-Assembly-Instructions
Toughbox-Assembly-InstructionsGlenda Hernandez
 
Hitachi ex600 lch 5 excavator service repair manual
Hitachi ex600 lch 5 excavator service repair manualHitachi ex600 lch 5 excavator service repair manual
Hitachi ex600 lch 5 excavator service repair manualudfjjdjkskkem
 
Hitachi ex550 lc 5 excavator service repair manual
Hitachi ex550 lc 5 excavator service repair manualHitachi ex550 lc 5 excavator service repair manual
Hitachi ex550 lc 5 excavator service repair manualudfjjdjkskkem
 
Hitachi ex600 h 5 excavator service repair manual
Hitachi ex600 h 5 excavator service repair manualHitachi ex600 h 5 excavator service repair manual
Hitachi ex600 h 5 excavator service repair manualudfjjdjkskkem
 
Hitachi ex550 5 excavator service repair manual
Hitachi ex550 5 excavator service repair manualHitachi ex550 5 excavator service repair manual
Hitachi ex550 5 excavator service repair manualudfjjdjkskkem
 

Similar to 430635547-Tronxy-x1-assembly-guide.pdf (20)

Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
Jcb 65 r 1 compact excavator service repair manual (sn from 1913904 to 1914244)
 
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
Jcb 65 r 1 compact excavator service repair manual (sn from 1914246 to 1914904)
 
Cembre Cable Crimp Lugs (Single Hole - Copper Conductors) - A Range
Cembre Cable Crimp Lugs (Single Hole - Copper Conductors) - A RangeCembre Cable Crimp Lugs (Single Hole - Copper Conductors) - A Range
Cembre Cable Crimp Lugs (Single Hole - Copper Conductors) - A Range
 
Manual tranaxle
Manual tranaxleManual tranaxle
Manual tranaxle
 
Manual tranaxle
Manual tranaxleManual tranaxle
Manual tranaxle
 
Bmw k1200 lt service repair manual
Bmw k1200 lt service repair manualBmw k1200 lt service repair manual
Bmw k1200 lt service repair manual
 
Toughbox-Assembly-Instructions
Toughbox-Assembly-InstructionsToughbox-Assembly-Instructions
Toughbox-Assembly-Instructions
 
Hitachi ex600 lch 5 excavator service repair manual
Hitachi ex600 lch 5 excavator service repair manualHitachi ex600 lch 5 excavator service repair manual
Hitachi ex600 lch 5 excavator service repair manual
 
Hitachi ex550 lc 5 excavator service repair manual
Hitachi ex550 lc 5 excavator service repair manualHitachi ex550 lc 5 excavator service repair manual
Hitachi ex550 lc 5 excavator service repair manual
 
Hitachi ex600 h 5 excavator service repair manual
Hitachi ex600 h 5 excavator service repair manualHitachi ex600 h 5 excavator service repair manual
Hitachi ex600 h 5 excavator service repair manual
 
Hitachi ex550 5 excavator service repair manual
Hitachi ex550 5 excavator service repair manualHitachi ex550 5 excavator service repair manual
Hitachi ex550 5 excavator service repair manual
 

Recently uploaded

Hot Modals Call Girls (Delhi) Dwarka9711199171✔️ High Class Service 100% Saf...
Hot Modals Call Girls (Delhi) Dwarka9711199171✔️ High Class  Service 100% Saf...Hot Modals Call Girls (Delhi) Dwarka9711199171✔️ High Class  Service 100% Saf...
Hot Modals Call Girls (Delhi) Dwarka9711199171✔️ High Class Service 100% Saf...shivangimorya083
 
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdfSales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdfAggregage
 
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Delhi Call girls
 
Bandra Escorts, (*Pooja 09892124323), Bandra Call Girls Services
Bandra Escorts, (*Pooja 09892124323), Bandra Call Girls ServicesBandra Escorts, (*Pooja 09892124323), Bandra Call Girls Services
Bandra Escorts, (*Pooja 09892124323), Bandra Call Girls ServicesPooja Nehwal
 
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdfJohn Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdfExcavator
 
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111Sapana Sha
 
Lucknow 💋 (Genuine) Escort Service Lucknow | Service-oriented sexy call girls...
Lucknow 💋 (Genuine) Escort Service Lucknow | Service-oriented sexy call girls...Lucknow 💋 (Genuine) Escort Service Lucknow | Service-oriented sexy call girls...
Lucknow 💋 (Genuine) Escort Service Lucknow | Service-oriented sexy call girls...anilsa9823
 
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
Chapter-1.3-Four-Basic-Computer-periods.pptx
Chapter-1.3-Four-Basic-Computer-periods.pptxChapter-1.3-Four-Basic-Computer-periods.pptx
Chapter-1.3-Four-Basic-Computer-periods.pptxAnjieVillarba1
 
如何办理美国西雅图大学毕业证(Seattle毕业证书)成绩单(学位证)原版一比一
如何办理美国西雅图大学毕业证(Seattle毕业证书)成绩单(学位证)原版一比一如何办理美国西雅图大学毕业证(Seattle毕业证书)成绩单(学位证)原版一比一
如何办理美国西雅图大学毕业证(Seattle毕业证书)成绩单(学位证)原版一比一meq5nzfnk
 
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile GirlsVip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girlsshivangimorya083
 
What Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To AppearWhat Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To AppearJCL Automotive
 
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...Hot Call Girls In Sector 58 (Noida)
 
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberVip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Numberkumarajju5765
 
Innovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC TechnologyInnovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC Technologyquickpartslimitlessm
 
What Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop WorkingWhat Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop WorkingBruce Cox Imports
 
Why Won't Your Subaru Key Come Out Of The Ignition Find Out Here!
Why Won't Your Subaru Key Come Out Of The Ignition Find Out Here!Why Won't Your Subaru Key Come Out Of The Ignition Find Out Here!
Why Won't Your Subaru Key Come Out Of The Ignition Find Out Here!AutoScandia
 

Recently uploaded (20)

Hot Modals Call Girls (Delhi) Dwarka9711199171✔️ High Class Service 100% Saf...
Hot Modals Call Girls (Delhi) Dwarka9711199171✔️ High Class  Service 100% Saf...Hot Modals Call Girls (Delhi) Dwarka9711199171✔️ High Class  Service 100% Saf...
Hot Modals Call Girls (Delhi) Dwarka9711199171✔️ High Class Service 100% Saf...
 
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdfSales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
 
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
 
Bandra Escorts, (*Pooja 09892124323), Bandra Call Girls Services
Bandra Escorts, (*Pooja 09892124323), Bandra Call Girls ServicesBandra Escorts, (*Pooja 09892124323), Bandra Call Girls Services
Bandra Escorts, (*Pooja 09892124323), Bandra Call Girls Services
 
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdfJohn Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
 
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
 
Lucknow 💋 (Genuine) Escort Service Lucknow | Service-oriented sexy call girls...
Lucknow 💋 (Genuine) Escort Service Lucknow | Service-oriented sexy call girls...Lucknow 💋 (Genuine) Escort Service Lucknow | Service-oriented sexy call girls...
Lucknow 💋 (Genuine) Escort Service Lucknow | Service-oriented sexy call girls...
 
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Chapter-1.3-Four-Basic-Computer-periods.pptx
Chapter-1.3-Four-Basic-Computer-periods.pptxChapter-1.3-Four-Basic-Computer-periods.pptx
Chapter-1.3-Four-Basic-Computer-periods.pptx
 
Call Girls in Shri Niwas Puri Delhi 💯Call Us 🔝9953056974🔝
Call Girls in  Shri Niwas Puri  Delhi 💯Call Us 🔝9953056974🔝Call Girls in  Shri Niwas Puri  Delhi 💯Call Us 🔝9953056974🔝
Call Girls in Shri Niwas Puri Delhi 💯Call Us 🔝9953056974🔝
 
如何办理美国西雅图大学毕业证(Seattle毕业证书)成绩单(学位证)原版一比一
如何办理美国西雅图大学毕业证(Seattle毕业证书)成绩单(学位证)原版一比一如何办理美国西雅图大学毕业证(Seattle毕业证书)成绩单(学位证)原版一比一
如何办理美国西雅图大学毕业证(Seattle毕业证书)成绩单(学位证)原版一比一
 
Call Girls In Kirti Nagar 7042364481 Escort Service 24x7 Delhi
Call Girls In Kirti Nagar 7042364481 Escort Service 24x7 DelhiCall Girls In Kirti Nagar 7042364481 Escort Service 24x7 Delhi
Call Girls In Kirti Nagar 7042364481 Escort Service 24x7 Delhi
 
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile GirlsVip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
 
Call Girls In Kirti Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Kirti Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In Kirti Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Kirti Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
What Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To AppearWhat Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To Appear
 
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...
 
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberVip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
 
Innovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC TechnologyInnovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC Technology
 
What Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop WorkingWhat Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop Working
 
Why Won't Your Subaru Key Come Out Of The Ignition Find Out Here!
Why Won't Your Subaru Key Come Out Of The Ignition Find Out Here!Why Won't Your Subaru Key Come Out Of The Ignition Find Out Here!
Why Won't Your Subaru Key Come Out Of The Ignition Find Out Here!
 

430635547-Tronxy-x1-assembly-guide.pdf

  • 1.
  • 2.
  • 3. Step 1 Assemble Base Frame Parts: 2040 Aluminium profile 250mm – 1pcs Base Plate – 1pcs M4-8mm screw – 3pcs M4 T-Nut – 3pcs  Put the aluminium profile on the base plate, secure them with 3pcs M4-10mm screws & T-Nut
  • 4. Step 2 Assemble Base Frame Parts: 2020 Aluminium profile 70mm – 1pcs Corner bracket – 2pcs M4-8mm screw – 5pcs M4 T-Nut – 5pcs  Put the ‘2020 aluminium profile 70mm’ on the base plate, secure them with 1pcs M4-8mm screws & T-Nut  Fix the aluminium profiles using 2pcs corner bracket, secure them with M4-8mm screws and M4 T-Nuts.
  • 5. Step 3 Install Z Slide rail Parts: 2040 Aluminium profile 310mm – 1pcs Corner bracket – 1pcs M5-10mm screw -2pcs M5-40mm screw – 1pcs M4-8mm screw – 2pcs M4 T-Nut – 2pcs  Place ‘2040 aluminium profile 310mm’ on the base plate , secure them with 2pcs M5-10mm screws.  Fix the 2pcs aluminium profile with 1pcs corner bracket, secure them with 2pcs M4-8mm screws and M4 T-Nut.  Use 1pcs M5-40mm screw to make them more stable
  • 6. Step 4 Fix the Z slide rail Parts: L-shape Acrylic block – 1pcs M4-8mm screw – 4pcs M4 T-Nut – 4pcs  Place 1pcs L-shape acrylic block on the aluminium profile, secure them with 4pcs M4-8mm screws & T-Nut
  • 7. Step 5 Assemble Y axis Motor Parts: 42 stepper motor – 1pcs GT2-16 Pulley (with grub screw in it)– 1pcs Limit switch – 1pcs Y motor mount (Acrylic) – 1pcs M3-8mm screws – 4pcs M4-8mm screw – 3pcs M4 T-Nut - 3pcs M2-10mm screw – 2pcs M2 Nut – 2pcs  Insert the GT2-16 pulley to the motor shaft, tighten the grub screw in the pulley. Next assemble the 42 stepper motor and the Y motor mount(Acrylic) with 4pcs M3-8mm screws .  Secure the limit switch to motor mount using 2pcs M2-10mm screws and nuts.  secure the motor mount to the back of the Y slide rail using 3pcs M4-8mm screws and T-nuts.
  • 8. Step 6 Assemble Bed Frame Parts: Bed frame (acrylic) – 1pcs Wheel – 3pcs Plastic pillar – 3pcs M5-30mm- 3pcs M5 nut – 3pcs GT2 Timing belt – 1pcs Zip-ties – 1pcs  Secure the wheels in place using M5-30mm screws and nuts ,using plastic pillar between wheel and bed frame.  Tighten one end of the timing belt to the bed frame using a zip-ties.  Next slide the base frame to the 2040 aluminium profile .
  • 9. Step 7 Assemble Y-axis Belt Pulley Parts: Y Pulley mount (acrylic) – 1pcs Belt pulley – 1pcs M5-25mm screw – 1pcs M5 Nut – 2pcs M6 washer – 2pcs M5 washer – 2pcs M4-8mm screw – 3pcs M4 T-Nut - 3pcs  Take 1pcs M5-25mm screw and insert the Pulley mount, secure it with M5 nut , then insert the washers and belt pulley , secure them using M5 nut.  Secure the Y belt pulley assembly to the front of the Y slide rail using 3pcs M4-8mm screws and nuts.  Tighten screws gently to avoid damaging the acrylic.
  • 10. Step 8 Install Y axis Timing Belt Parts: Zip-ties – 1pcs  Run the other end of timing belt along the aluminium profile, through the Y-GT2-16 Pulley and Belt pulley . Then tighten it to the bed frame using zip-ties as shown in the picture .
  • 11. Step 9 Assemble Z Carriage Parts: 2020 Aluminium profile 285mm – 1pcs X-motor mount (acrylic) – 1pcs Extruded bracket – 1pcs Brass nut – 1pcs Plastic pillar – 6pcs Wheel – 3pcs M5-40mm screw – 3pcs M5 Locknut – 3pcs M3-8mm screw – 3pcs M4-8mm screw – 2pcs M4 T-Nut - 2pcs  Insert 3pcs M5-40mm screws to X-motor mount , and then scure it to the aluminium profile using 2pcs M4-8mm screws and T-nuts.  Put the wheels into M5-40mm screws, using plastic pillars between wheel and acrylic, secure the Extruded bracket using M5 nuts.  Place the brass nut on the extruded bracket, scure it using 3pcs M3-8mm screws .
  • 12. Step 10 Install Z carriage Parts: 42 stepper motor – 1pcs GT2-16 Pulley (with grub screw in it)– 1pcs M3-8mm screws – 4pcs  Carefully insert the X-axis assembly to the Z slide rail  Insert the GT2-16 pulley to the motor shaft, tighten the grub screw in the pulley, then place the X stepper motor to the motor mount, secure them with 4pcs M3-8mm screws .
  • 13. Step 11 Insert Extruder Assembly Parts: Extruder assembly – 1pcs  Carefully insert the extruder assembly to the X slide rail.
  • 14. Step 12 Assemble X axis Endstop & Pulley Parts: Belt pulley – 1pcs Limit switch – 1pcs X Pulley mount (acrylic) – 1pcs X endstop mount (acrylic) – 1pcs M5-25mm screw – 1pcs M5 Nut – 1pcs M5 Locknut – 1pcs M6 washer – 2pcs M5 washer – 2pcs M4-8mm screw – 4pcs M4 T-Nut - 4pcs M2-10mm screw – 2pcs M2 Nut – 2pcs  Secure the limit switch to X endstop mount using 2pcs M2-10mm screws and nuts. Then place the X endstop mount to the left end of the X slide rail using 2pcs M4-8mm screw and T-nuts.  Take 1pcs M5-25mm screw and insert the Pulley mount, secure it with M5 nut , then insert the washers and belt pulley , secure them using M5 locknut.  Secure the X belt pulley assembly on the right of the X slide rail using 2pcs M4-8mm screws and nuts.
  • 15. Step 13 Install X axis Timing Belt Parts: GT2 Timing belt – 1pcs Zip-ties – 2pcs  Tighten one end of the timing belt to the belt hole using a zip-ties which back of the extruder  Run the other end of timing belt along the aluminium profile, through the X-GT2-16 Pulley and Belt pulley . Then tighten it to another belt hole using a zip-ties, as shown in the picture .
  • 16. Step 14 Assemble Z motor Parts: 42 Stepper motor – 1pcs Z-motor seat – 1pcs Coupling (with grub screw in it) – 1pcs Threaded rod 260mm – 1pcs M3-8mm screw – 4pcs M4-12mm screw – 2pcs M4 T-Nut – 2pcs  Place 1pcs 42 stepper motor back of the Z slide rail , put the motor seat on the motor and then secure them with 4pcs M3-8mm screws.  Install them to the Z slide rail using 2pcs M4- 12mm screws and T-Nuts.  Take 1pcs threaded rod through the brass nut ,then insert to the coupling and tighten up.
  • 17. Step 15 Install Filament Feeder Parts: 42 Stepper motor – 1pcs Feeding gear (with grub screw in it)– 1pcs Extrution clip - 1pcs Extrution seat – 1pcs M3-22mm – 2pcs M3-16mm – 1pcs M5-10mm Hex screw – 1pcs Spring – 1pcs  Insert the feeding gear to the motor shaft and them tighten up .  Place the Extrution seat and motor to the bracket as shown in the picture, secure them using 2pcs M3-22mm screws.  Put one M5-10mm hex screw and spring between extrution clip and extrution seat , next secure the extrution clip with motor using M3- 16mm screw.
  • 18. Step 16 Install handle Parts: Handle – 1pcs Handle seat (Acrylic) – 1pcs M5-10mm screw – 2pcs M4-12mm screw – 2pcs  Put the handle seat on the top of Z slide rail, secure them with 2pcs M5-10mm screws .  Secure the handle to the seat using 2pcs M4-12mm screws .
  • 19. Step 17 Install Z endstop Parts: Limit switch – 1pcs Z endstop mount – 1pcs M4-8mm screw – 1pcs M4 T-Nut – 1pcs M2-10mm screw – 2pcs M2 Nut – 2pcs  Secure the limit switch to Z endstop mount using 2pcs M2-10mm screws and nuts.  Place the Z endstop mount to the left Z slide rail, using one M4-8mm screw and T-nut.
  • 20. Step 18 Assemble Print bed Parts: Bed plate – 1pcs M3-30mm screw – 4pcs Thumb nut – 4pcs Spring – 4pcs  Place the Bed plate on the bed frame use 4pcs springs between them, and then through 4pcs M3-30mm screws, then top 4pcs thumb nuts under the bed frame.
  • 21. Step 19 Install Teflon hose Parts: Teflon hose – 1pcs Connector – 1pcs  Install a connector to the filament feeder , and then insert a teflon hose between feeder and extruder .
  • 22. Step 20-1 Assemble Electronic Box Parts: Electronic box bottom plate (acrylic) – 1pcs Electronic box side plate – 2pcs Mainboard– 1pcs M3-20mm screws – 6pcs M3 nuts – 6pcs Plastic pillar – 4pcs  Place the mainboard on the bottom plate using M3-20mm and nuts , insert the plactic pillar between them.  Assemble the side plates to the bottom plate as picture , secure them using M3-20mm screw&nut
  • 23. Step 20-2 Assemble Electronic Box Parts: Electronic box front plate – 1pcs LCD display assembly – 1pcs M3-20mm screws – 4pcs M3 nuts – 4pcs  Assemble the front plate using M3-20mm screws and M3 nuts.  Place the LCD display assembly to the box , using 2pcs M3-20mm screws and nuts.
  • 24. Step 20-3 Assemble Electronic Box Parts: Electronic box Back plate (left) – 1pcs DC power jack – 1pcs M3-20mm screws – 1pcs M3 nuts – 1pcs  Assemble the back plate to the bottom plate as picture , secure them using M3-20mm screw&nut.  Insert the DC power jack to the back plate.
  • 25. Step 20-4 Assemble Electronic Box Parts: Electronic box top plate – 1pcs M3-20mm screws – 3pcs M3 nuts – 3pcs  Cover the top plate using M3-20mm screws and M3 nuts.
  • 26. Step 23 Control Board Wiring Diagram Parts: Mainboard – 1pcs  The method of connecting wire is as picture  There is only 1pcs cooler fan , please connect to ‘CFAN’ on board  There do not have heatbed and the thermistor , so there's no connection on ‘Hotbed’ and ‘BTEMP’. x x x x DC power jack