2. PROGRESS...
• Tomorrow, on the 18th of November we are planning to film the rest of
our performance scenes with Hollie. Ideally, we would prefer to use the
lesson time to film more narrative sections of our video as we still have a
lot left to film, however, as Aaron is still at school this makes it impossible
for us to use him on Tuesday. As a result of this, we have all arranged to
meet on the 22nd of November to film the rest of our narrative sections.
• Personally, I need to finish my locations and health & safety post in more
detail, which I am aiming to finish and post by Tuesday 18th of November.
3. Below I have circled on my calendar upcoming tasks that will
be completed .
4. The weather for
Tuesday looks to be
cloudy with a
chance of showers.
This will not effect
us as we will be
filming indoors.
5. • However, there is also a chance of
rain on Saturday, which is when we
are planning to film our outdoor
narrative sections of our music
video. Whilst this does not
interfere with the actual narrative
of our music video - as the
narrative sections are flashbacks,
(although as the flashbacks are
supposed to indicate happier times
in the couple's relationship, if it is
raining some audience members
may view it as pathetic fallacy), it
will be hazardous for us to use the
electrical equipment in the rain.