Fire WaterApplication rate (l/min/m2) 3
Diameter (m) 8
Height (m) 10
Senario Half Wall+Half Roof
Diameter (m) 8
Height (m) 10
Senario Half Wall+Total Roof
Diameter (m) 8
Height (m) 10
Senario Total Wall+Without Roof
Diameter (m) 9
Height (m) 10
Senario Total Wall+Without Roof
Diameter (m) 8
Height (m) 10
Senario Total Wall+Total Roof
Diameter (m) 8
Height (m) 10
Senario Total Wall+Without Roof
Diameter (m) 8
Height (m) 12
Senario Half Wall+Half Roof
Diameter (m) 6
Height (m) 8
Senario Half Wall+Without Roof
Total Fire Water Required 299.556
Fire water required for storage tanks with flammable liquids:
The code is designed to protect 1-8 tanks around of fire case tank with protection types selectivity.
Hamidreza Forutan
Procces safety design engineer
E-mail: Hrfoorutan@gmail.com
27.1296TK-1
31.6512
TK-3 Area (m
2
) 251.2 Requested Flow Rate (m
3
/h) 45.216
TK-2 Area (m2
) 175.84 Requested Flow Rate (m3
/h)
Area (m2
) 150.72 Requested Flow Rate (m3
/h)
50.868
TK-5 Area (m2
) 301.44 Requested Flow Rate (m3
/h) 54.2592
TK-4 Area (m2
) 282.6 Requested Flow Rate (m3
/h)
13.5648
TK-6 Area (m2
) 251.2 Requested Flow Rate (m3
/h) 45.216
TK-7 Area (m
2
) 175.84 Requested Flow Rate (m
3
/h) 31.6512
TK-8 Area (m2
) 75.36 Requested Flow Rate (m3
/h)

More Related Content

Similar to Fire Water Demand for Tank Protection

Leisure Centre
Leisure CentreLeisure Centre
Leisure CentreEdel Fox
 
Fire Related Design in Civil Eng R01.pdf
Fire Related Design in Civil Eng R01.pdfFire Related Design in Civil Eng R01.pdf
Fire Related Design in Civil Eng R01.pdfssuserbc0115
 
Cbecl tunnel kiln and dryer auto brick machinery-100000pcs
Cbecl tunnel kiln and dryer auto brick machinery-100000pcsCbecl tunnel kiln and dryer auto brick machinery-100000pcs
Cbecl tunnel kiln and dryer auto brick machinery-100000pcsLucky Meme
 
Cbecl tunnel kiln and dryer auto brick machinery-100000pcs
Cbecl tunnel kiln and dryer auto brick machinery-100000pcsCbecl tunnel kiln and dryer auto brick machinery-100000pcs
Cbecl tunnel kiln and dryer auto brick machinery-100000pcsAbu Rayhan
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal ashleyyeap
 

Similar to Fire Water Demand for Tank Protection (6)

Leisure Centre
Leisure CentreLeisure Centre
Leisure Centre
 
Fire Related Design in Civil Eng R01.pdf
Fire Related Design in Civil Eng R01.pdfFire Related Design in Civil Eng R01.pdf
Fire Related Design in Civil Eng R01.pdf
 
Cbecl tunnel kiln and dryer auto brick machinery-100000pcs
Cbecl tunnel kiln and dryer auto brick machinery-100000pcsCbecl tunnel kiln and dryer auto brick machinery-100000pcs
Cbecl tunnel kiln and dryer auto brick machinery-100000pcs
 
Cbecl tunnel kiln and dryer auto brick machinery-100000pcs
Cbecl tunnel kiln and dryer auto brick machinery-100000pcsCbecl tunnel kiln and dryer auto brick machinery-100000pcs
Cbecl tunnel kiln and dryer auto brick machinery-100000pcs
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
 
5th batch.pptx
5th batch.pptx5th batch.pptx
5th batch.pptx
 

Fire Water Demand for Tank Protection

  • 1. Fire WaterApplication rate (l/min/m2) 3 Diameter (m) 8 Height (m) 10 Senario Half Wall+Half Roof Diameter (m) 8 Height (m) 10 Senario Half Wall+Total Roof Diameter (m) 8 Height (m) 10 Senario Total Wall+Without Roof Diameter (m) 9 Height (m) 10 Senario Total Wall+Without Roof Diameter (m) 8 Height (m) 10 Senario Total Wall+Total Roof Diameter (m) 8 Height (m) 10 Senario Total Wall+Without Roof Diameter (m) 8 Height (m) 12 Senario Half Wall+Half Roof Diameter (m) 6 Height (m) 8 Senario Half Wall+Without Roof Total Fire Water Required 299.556 Fire water required for storage tanks with flammable liquids: The code is designed to protect 1-8 tanks around of fire case tank with protection types selectivity. Hamidreza Forutan Procces safety design engineer E-mail: Hrfoorutan@gmail.com 27.1296TK-1 31.6512 TK-3 Area (m 2 ) 251.2 Requested Flow Rate (m 3 /h) 45.216 TK-2 Area (m2 ) 175.84 Requested Flow Rate (m3 /h) Area (m2 ) 150.72 Requested Flow Rate (m3 /h) 50.868 TK-5 Area (m2 ) 301.44 Requested Flow Rate (m3 /h) 54.2592 TK-4 Area (m2 ) 282.6 Requested Flow Rate (m3 /h) 13.5648 TK-6 Area (m2 ) 251.2 Requested Flow Rate (m3 /h) 45.216 TK-7 Area (m 2 ) 175.84 Requested Flow Rate (m 3 /h) 31.6512 TK-8 Area (m2 ) 75.36 Requested Flow Rate (m3 /h)