A significant number of our projects has been behavioral health. This has resulted in a honed skill set for these complex and unique projects. Please take a look at some of our projects ranging from small renovation to large new construction.
2
Shumake Architecture, PA has built a reputation by maintaining a stable client
base and creating a record of successfully completed projects for healthcare and
educational facilities. Project scopes range from small to medium size including
complex renovations and major new projects up to $11 million.
Exceptional client service is the key to successful projects and our small firm
assures that the principal in charge has an active role in each phase of the
project from start to finish, assisted by highly skilled staff and consultants.
Our approach is to integrate sustainability principles from the early stages of the
design process through the construction phase. We support new or improved
technologies, products and materials derived from renewable resources or with
low environmental impact.
We understand each projects unique energy needs and recommend the right
systems, materials and methods to achieve a customized balance of
environmental performance for each project budget.
With the entire professional career in the Central Florida area, we are familiar
with the local market and natural environment and have the capacity and
resources in place for a successful project delivery.
Over thirty years of extensive project management experience, mostly with
small to medium sized institutional projects provided the foundation necessary
to manage your project from start to finish. We have the ability, experience and
drive to respond to your projects unique needs, and deliver a customized,
practical, quality solution that will stand the test of time.
INTRODUCTION
SCHEDULE
We have developed efficient design and
production methods and utilizes a time tested
systematic service delivery approach to assure
challenges are met and overcome with
minimal impact to the schedule.
95% of our projects were delivered on time
and had a change order rate of less than 3%.
BUDGET
Meeting the clients budget is one of the most
fundamental aspect of our service.
We provide a cost estimate with a breakdown
of foreseeable construction costs and propose
cost saving options. Ideally, value engineering
occurs prior to bid and construction contract.
Service-Oriented Results-Driven Time-Tested
ADVOCATE
An often overlooked aspect of successful
project delivery is the Architect’s attention
through the construction phase. We allocate
a significant portion of each project’s budgeted
time to Construction Administration. This
assures the Owner is properly represented at
this critical time in the project delivery
process.
A significant amount of our work has been
behavioral centers and related projects. This
has resulted in a honed skill set for these
complex and unique projects.
EXPERTISE
LifeStream Behavioral Center
20-Bed CSU & 32-Bed RTF
2160 North Don Wickham Drive, Clermont, Florida 34711
Completion: 2020
3
Administration:
Lobby
Offices
Intake
Conference Room
Pharmacy
Dining:
Interior & Exterior Dining
Serving
Prep/Holding
Storage
CSU & RTF Wings
• Patient Suites with toilet room
• Observation Area(s)
• Nourishment Room
• Nurses Station
Break Room
Clean & Dry Linen
Exam Rooms
Seclusion Rooms
Med Room
AREA: 28,833 SF
Conditioned: 24,315 SF
Covered Outdoor: 4,518 SF
ON THE MEDIA:
•LifeStream to open center at South Lake Hospital in Clermont
•Hospital, mental-health provider partner to offer services in Clermont
5
LifeStream Behavioral Center
Hope and Recovery Center
2018 Tally Road, Leesburg, Florida 34748
Area: 36,8000 SF
Completed: 2008
State-of-the-Art Residential Treatment Facility
providing mental health and substance use
disorder programs
Four Residential Wings:
Short-Term Residential Treatment (SRT)
Geriatric Residential Treatment (GRT)
Adult Substance Abuse Residential
Adult Detoxification units
Outpatient Services Suites
Case Management Suites
Energy-Efficient Design
72 inpatient beds
ON THE MEDIA:
•Centers out, LifeStream in as Citrus mental-health provider’
•As LifeStream prepares to take on mental-health role, county's chiefs find renewed focus
•LifeStream lays out timeline for mental health and addiction services
6
LSBC Hope and Recovery Center
Patient RoomAlternate Entry
Dining
Nurses Station
Observation
7
LifeStream Behavioral Center
South Lake Outpatient Clinic
2140 Don Wickham Drive, Clermont, Florida 34711
Area: 8,500 SF
Completed: August 2014
6,400 SF: Behavioral, substance use and
wellness services
2,100 SF: Non-emergency medical health
care clinic, including exam rooms and
offices.
The center’s “homelike” appearance and scale
provides patients with the perception of a
comfortable and inviting outpatient visit.
Centerstone of Florida
Crisis Center
2020 26th Avenue East, Bradenton, Florida 34208
Addition: 1,813 SF
Interior Renovation: 9,935 SF
Exterior/Site Improvements: 2,300 SF
Completed: 2017
Cost: $3,368,000
This second project for Centerstone of Florida is
an addition and renovation to their existing
building, expanding its Crisis Center by
constructing a new south wing with three 2-bed
rooms, and an additional 2-bed rooms to each of
the existing east and west wings. Each room has
an adjacent bathroom, and the south wing houses
the new dayroom. Upgrades were also made in
other areas of the Crisis Center, such as a new
Nurses Station and a play yard, and reflooring and
bathroom renovations of the existing bedrooms.
9
EXISTING
HOSPITAL
ON THE MEDIA:
•Design Focus: Removing Barriers to Care
•Centerstone debuts remodeled crisis center
in Bradenton
•Centerstone cuts ribbon on needed Manatee Expansion
•Manatee’s Centerstone becoming ‘lighter, warmer,
softer’
Centerstone of Florida
Crisis Center
2020 26th Avenue East, Bradenton, Florida 34208
Addition: 1,813 SF
Interior Renovation: 9,935 SF
Exterior/Site Improvements: 2,300 SF
Completed: 2017
Cost: $3,368,000
This second project for Centerstone of Florida is
an addition and renovation to their existing
building, expanding its Crisis Center by
constructing a new south wing with three 2-bed
rooms, and an additional 2-bed rooms to each of
the existing east and west wings. Each room has
an adjacent bathroom, and the south wing houses
the new dayroom. Upgrades were also made in
other areas of the Crisis Center, such as a new
Nurses Station and a play yard, and reflooring and
bathroom renovations of the existing bedrooms.
10
EXISTING
HOSPITAL
ON THE MEDIA:
•Design Focus: Removing Barriers to Care
•Centerstone debuts remodeled crisis center
in Bradenton
•Centerstone cuts ribbon on needed Manatee Expansion
•Manatee’s Centerstone becoming ‘lighter, warmer,
softer’
Robert C. Shumake, AIA NCARB
President
(813) 425-3350
rcs@shumakearchitecture.net
Shumake Architecture, PA
2907 W Bay to Bay Blvd, Suite 210
Tampa, Florida 33629
www.shumakearchitecture.net
Find out more about how we can help bring your next project to life