Work 2003+

317 views

Published on

Some projects I\'ve worked on in my time to date at Orangebox

  • Be the first to comment

  • Be the first to like this

Work 2003+

  1. 1. work 2003 - 2009 some past
  2. 2. work 2003 - 2009 project management concept design detail design development CAD modelling prototyping supplier liaison tooling procurement product testing assembly planning product marketing
  3. 3. Principally, these are projects which I have managed from concept to production with design input along the way but acknowledgments to Gerry Taylor and the Orangebox design and development team who have had a hand in pretty much all the projects shown www. .com
  4. 7. Concept design - Gerry Taylor
  5. 8. Concept design - Gerry Taylor
  6. 14. Seat inners and covers Spray booth for Seats Upholstery press for Seats Arm to arm bar jig Arm and seat plastic outer jig Handles and back stem jig Finishing / cleaning station Handles / fasteners / arm-bars Instruction booklets etc Mechanisms Back inners and covers Spray booth for backs Upholstery press for Backs Gas lifts bases Bags Arm assemblies Seat Plastic outer Back-stems & height adjust mechs. bases OP1 OP2 OP3 OP4 OP5 OP6 Production Line Concept 2 : 16m x 3.5m conveyor part location work space OP1 operator 1 task number 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Seat Plastic outer
  7. 15. Concept design - Gerry Taylor
  8. 23. Concept design - Gerry Taylor

×