2. Shutdown SIS
Previous Screen
Product: TRACK-TYPE TRACTOR
Model: D11T TRACK-TYPE TRACTOR GEB
Configuration: D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 Engine
Disassembly and Assembly
D11T Track-Type Tractor Power Train
Media Number -RENR8226-03 Publication Date -01/06/2011 Date Updated -24/06/2011
i07255461
Track Roller - Remove and Install
SMCS - 4180-010
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 105-3349 Strap 1
B
504-9791 Lift Gp (60Hz)(1)
2
OR
504-9793 Lift Gp (50Hz)(2)
2
C 183-4799 Lifting Fork 1
(1)
High-Voltage (480V) Low-Voltage (240V)
(2)
High-Voltage (400V) Low-Voltage (200V)
1. Release the track tension. Refer to Operation and Maintenance Manual, "Track -
Check/Adjust".
1/5D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
3. Illustration 1 g01413323
2. Attach Tooling (A) to hold the major bogies in position.
Illustration 2 g06266811
Typical Example
3. Use Tooling (B) to lift the tractor. Use Tooling (B) to support the tractor during the removal
procedure. Refer to Tool Operating Manual, NEHS1303, "Lift Group (Stand - 25 Ton)" for
more information.
2/5D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
4. Illustration 3 g01413340
4. Use Tooling (C) and a suitable lifting device to support track roller (3) during the removal
procedure. The weight of track roller (3) is approximately 171 kg (377 lb).
5. Remove bolts (2) and cap (1). Bolts (2) and cap (1) hold the track roller to the minor bogie.
Repeat Step 5 for the bolts and the cap on the other side of the track roller.
6. Use Tooling (C) and the suitable lifting device to remove track roller (3) from the minor
bogie.
Installation Procedure
Table 2
Required Tools
Tool Part Number Part Description Qty
A 105-3349 Strap 1
B
504-9791 Lift Gp (60Hz)(1)
2
OR
504-9793 Lift Gp (50Hz)(2)
2
C 183-4799 Lifting Fork 1
D - Loctite C5A Copper Anti-Seize -
(1)
High-Voltage (480V) Low-Voltage (240V)
(2)
High-Voltage (400V) Low-Voltage (200V)
3/5D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
5. Illustration 4 g01413340
1. Use Tooling (C) and a suitable lifting device to position track roller (3) on the minor bogie.
The weight of track roller (3) is approximately 171 kg (377 lb).
Note: Tighten bolts (2) on the abutment side first.
2. Apply Tooling (D) to the threads of bolts (2). Install cap (1) and bolts (2). Tighten bolts (2)
to a torque of 2200 ± 200 N·m (1623 ± 148 lb ft). Repeat Step 2 for the cap and for the bolts
on the other side of the track roller.
Illustration 5 g06266811
Typical Example
3. Use Tooling (B) to lower the tractor to the ground. Remove Tooling (B). Refer to Tool
Operating Manual, NEHS1303, "Lift Group (Stand - 25 Ton)" for more information.
4/5D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
6. Illustration 6 g01413323
4. Remove Tooling (A).
5. Tighten the track tension. Refer to Operation and Maintenance Manual, "Track -
Check/Adjust".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sun Feb 9 17:48:28 UTC+0800 2020
5/5D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
7. Shutdown SIS
Previous Screen
Product: TRACK-TYPE TRACTOR
Model: D11T TRACK-TYPE TRACTOR GEB
Configuration: D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 Engine
Disassembly and Assembly
D11T Track-Type Tractor Power Train
Media Number -RENR8226-03 Publication Date -01/06/2011 Date Updated -24/06/2011
i02832645
Track Roller Frame (Front) - Remove
SMCS - 4151-011
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 105-3349 Strap 1
B
4C-6486 Stand 2
8S-7621 Tube 2
8S-8048 Saddle 2
8S-7615 Pin 2
C
8B-7548 Push-Puller Tool Gp 1
5P-4808 Cap 1
9X-8887 Bolt 2
8S-9089 Bolt 2
5P-8245 Hard Washer 2
5P-8248 Hard Washer 4
D 1U-9200 Lever Puller Hoist 1
E 8T-5071 Seal Guard 1
1. Loosen the track. Refer to Operation and Maintenance Manual, "Track - Check/Adjust".
1/5D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
8. Illustration 1 g01425301
2. Remove step assembly (1) from the radiator guard.
Illustration 2 g01412775
3. Position suitable cribbing (2) under track (4) so that suitable cribbing (2) is under the first track roller
on rear track roller frame (3). Install Tooling (A). Position Tooling (B) under the blade. Lower the
blade onto Tooling (B). Separate track (4) .
2/5D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
9. Illustration 3 g01412783
4. Remove plug (8) and drain the oil from rear track roller frame (3) into a suitable container for
storage or disposal. Remove bolts (5) and cover (6) from both sides of rear track roller frame (3).
Remove O-ring seal (7) that is located under cover (6) .
Illustration 4 g01412824
5. Use Tooling (C) in order to remove guide assembly (9) from both sides of rear track roller frame
(3) .
3/5D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
10. Illustration 5 g01412834
6. Attach a suitable lifting device onto front track roller frame (10). Position a suitable chain around
front track roller frame (10). Attach Tooling (D) onto the chain. Carefully move front track roller
frame (10) approximately 51 mm (2.0 inch) away from rear track roller frame (2). Use Tooling (E) in
order to protect the seals in rear track roller frame (3). You will need to cut Tooling (E) to length.
Illustration 6 g01412851
4/5D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
11. 7. Attach a suitable lifting device and Tooling (D) in order to support the rear of front track roller frame
(10). The weight of front track roller frame (10) is approximately 3810 kg (8400 lb). Remove front
track roller frame (10) from rear track roller frame (3) .
Illustration 7 g01412887
8. If necessary, remove retaining ring (14), seal (13), retaining ring (12), and bearing (11) .
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sun Feb 9 17:49:17 UTC+0800 2020
5/5D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
12. Shutdown SIS
Previous Screen
Product: TRACK-TYPE TRACTOR
Model: D11T TRACK-TYPE TRACTOR GEB
Configuration: D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 Engine
Disassembly and Assembly
D11T Track-Type Tractor Power Train
Media Number -RENR8226-03 Publication Date -01/06/2011 Date Updated -24/06/2011
i06668665
Track Roller Frame (Front) - Install
SMCS - 4151-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 105-3349 Strap 1
B
4C-6486 Stand 2
8S-7621 Tube 2
8S-8048 Saddle 2
8S-7615 Pin 2
D 1U-9200 Lever Puller Hoist 1
E 8T-5071 Seal Guard 1
1/5D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
13. Illustration 1 g01412887
1. Install bearing (11) and retaining ring (12). Install seal (13) and lightly lubricate the sealing lip with
the lubricant being sealed. Install retaining ring (14).
Illustration 2 g01108012
2. Use Tooling (E) to protect the seal.
2/5D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
14. Illustration 3 g01412851
3. Use a suitable lifting device and Tooling (D) to support the rear of front track roller frame (10). The
weight of front track roller frame (10) is approximately 3810 kg (8400 lb). Install front track roller
frame (10) until the suitable lifting device contacts rear track roller frame (3). Remove the suitable
lifting device.
Illustration 4 g01412938
4. Position a chain around the idler. Attach the chain to the rear track roller frame and to Tooling (D).
Remove Tooling (E). Use Tooling (D) and install front track roller frame (10) into rear track roller
frame (3).
3/5D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
15. Illustration 5 g01412958
5. Install guide assembly (9) on the outside of rear track roller frame (3).
Illustration 6 g01412968
Note: Check the O-ring seal for wear or for damage. If necessary, replace the O-ring seal.
6. Install O-ring seal (7) on cover (6). Install cover (6). Install bolts (5). Tighten bolts (5) to a torque of
215 ± 40 N·m (159 ± 30 lb ft).
7. Repeat Steps 5 and 6 for the inside of rear track roller frame (3).
4/5D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
16. Illustration 7 g01412775
8. Connect track (4). Raise the blade and remove Tooling (B). Remove Tooling (A). Remove suitable
cribbing (2) from track roller frame (3).
Illustration 8 g01425301
9. Install step assembly (1).
10. Fill the recoil spring compartment with oil. Refer to Operation and Maintenance Manual, "Recoil
Spring Compartment Oil Level - Check" and Operation and Maintenance Manual, "Capacities
(Refill)".
11. Tighten the track. Refer to Operation and Maintenance Manual, "Track - Check/Adjust".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sun Feb 9 17:50:06 UTC+0800 2020
5/5D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
17. Shutdown SIS
Previous Screen
Product: TRACK-TYPE TRACTOR
Model: D11T TRACK-TYPE TRACTOR GEB
Configuration: D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 Engine
Disassembly and Assembly
D11T Track-Type Tractor Power Train
Media Number -RENR8226-03 Publication Date -01/06/2011 Date Updated -24/06/2011
i02833674
Chrome Bearing - Remove and Install
SMCS - 4158-010
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 180-3033 Repair Stand Set 1
Start By:
A. Remove the front track roller frame. Refer to Disassembly and Assembly, "Track Roller
Frame (Front) - Remove".
Note: The front track roller frame does not need to be completely removed from the machine in
order to replace the chrome bearing.
1/4D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
18. Illustration 1 g00829677
Illustration 2 g01413080
1. Attach a suitable lifting device onto front track roller frame (3). The weight of front track
roller frame (3) is approximately 3810 kg (8400 lb). Move chrome bearing (2) to the
location of the suitable lifting device. Place Tooling (A) under recoil spring housing (1).
Remove the suitable lifting device.
2. Remove chrome bearing (2) from front track roller frame (3) and recoil spring housing (1).
Attach the suitable lifting device and remove Tooling (A) .
Installation Procedure
Table 2
Required Tools
Tool Part Number Part Description Qty
A 180-3033 Repair Stand Set 1
2/4D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
19. Illustration 3 g01413080
Illustration 4 g00829677
1. Attach a suitable lifting device to front track roller frame (3). The weight of front track
roller frame (3) is approximately 3810 kg (8400 lb). Use the suitable lifting device to raise
the rear of front track roller frame (3) to 15 degrees or more. Place Tooling (A) under recoil
spring housing (1) in order to hold front track roller frame (3) in position. Remove the
suitable lifting device.
2. Raise the temperature of chrome bearing (2). Slide chrome bearing (2) onto recoil spring
housing (1) to Tooling (A). Attach the suitable lifting device and remove Tooling (A). Slide
chrome bearing (2) to the larger diameter of recoil spring housing (2) .
3. Carefully slide chrome bearing (2) onto recoil spring housing (1). Use a suitable block to
apply constant pressure on chrome bearing (2). The suitable block will help prevent chrome
bearing (2) from bouncing away from the proper area of installation.
Note: Do not allow the temperature of chrome bearing (2) to cool during the installation
procedure. If chrome bearing (2) is installed in an incorrect position, chrome bearing (2)
must be removed and a new chrome bearing must be installed.
3/4D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
20. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
21. End By: Install the front track roller frame. Refer to Disassembly and Assembly, "Track Roller
Frame (Front) - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sun Feb 9 17:50:55 UTC+0800 2020
4/4D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
22. Shutdown SIS
Previous Screen
Product: TRACK-TYPE TRACTOR
Model: D11T TRACK-TYPE TRACTOR GEB
Configuration: D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 Engine
Disassembly and Assembly
D11T Track-Type Tractor Power Train
Media Number -RENR8226-03 Publication Date -01/06/2011 Date Updated -24/06/2011
i02837144
Track Adjuster - Remove
SMCS - 4157-011
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
8S-7640 Stand 1
8S-7611 Tube 1
8S-7615 Pin 1
8S-8048 Saddle 1
B 8S-9906 Ratchet Puller Gp 1
Start By:
A. Remove the front track roller frame. Refer to Disassembly and Assembly, "Track Roller
Frame (Front) - Remove".
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
1/5D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
23. Refer to Special Publication, NENG2500, "Caterpillar Dealer Service
Tool Catalog" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
Illustration 1 g00525270
1. Put Tooling (A) in position under the front track roller frame.
Illustration 2 g00525272
2. Remove the bolt, washer (5), and the spacer. Disconnect cable assembly (4) from cylinder
assembly (1) .
3. Loosen relief valve (2) and fill valve (3) .
2/5D11T TRACK-TYPE TRACTOR GEB00001-UP (MACHINE) POWERED BY C32 ...
2020/2/9https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...