Abstract
Infrastructure has been worldwide perceived as key of development; such concept is
not an exception for ASEAN member states. While infrastructure typically falls into
non-commercially viable project, thus requires sovereign financing- the governments
usually face lacking fiscal capacity to finance the demand for infrastructure. In
recent years, Public-Private Partnership (PPP) has been increasingly gained
popularity as alternative to financing modality in infrastructure development. In fact,
there is overwhelming expectation on PPP to solve infrastructure problems.
Misperception of PPP often becomes backlash to the utilization of PPP; its
overestimated expectation brings unexpected responses that potentially ruin the
project. Apart from that, differences in economic stage across ASEAN member states
should not be ignored, and consequently should be reflected in pertinent advices and
actions on handling PPP. The paper reviewed the current situation of PPP in broad
terms, or more precisely is “Private Sector Participation” (PSP) in ASEAN
countries and provided the economies’ key characteristics. It also discussed the
challenges to use the scheme to develop infrastructure especially in the least
developed countries. Finally the paper suggested how ASEAN leaders should
perceive PPP as one of financing modalities and what the way forward and direction
in ASEAN development.
Keywords: PPP, financing infrastructure, ASEAN Connectivity
1. Introduction
ASEAN Member States (AMS) have been agreeing to achieve ASEAN Community
by 2015 which can be structured into ASEAN Political-Security Community,
ASEAN Economic Community, and ASEAN Socio-Cultural Community. The
ASEAN has developed a Master Plan on ASEAN Connectivity (MPAC) “as a key
step towards realising the ASEAN Community of continued economic growth,
reduced development gap and improved connectivity among Member States and
between Member States and the rest of the world by enhancing regional and national
physical, institutional and people-to-people linkages”. 1
The MPAC consists of three
pillars of connectivity: institutional, physical, and people-to-people and interact one
another as we can see in Figure 1.
1 Master Plan on ASEAN Connectivity, 2011, ASEAN Secretariat, Jakarta.
2
Figure 1. ASEAN Community Building
To support a well-connected ASEAN, physical connectivity requires sufficient
domestic infrastructure within member states that is interconnected across the region.
Thus having sufficient infrastructure is vital. Infrastructure serves at least three
functions, namely: (i) to provide basic human needs, (ii) to support people and goods
mobility, and (iii) to support productivity.
Unfortunately, the quantity and quality of infrastructure in AMS in general is far
below that in advanced economies. The most lacking ones are transportation,
electrification, and access to clean water. World Economic Forum in its Global
Competitiveness Report 2012-2013 indicated that in average, the quality of ASEAN
infrastructure is only half of that in Japan and US.
Table 1 Global Comparison in Infrastructure Coverage (2008)
Region
Roads
(km) Rail (km)
Phones
(number) Electrification
Clean
Water
per 1,000 people Percentage
ASEAN 10.51 0.27 3.53 71.69 86.39
Asia 12.83 0.53 3.47 77.72 87.72
OECD 211.68 5.21 13.87 99.80 99.63
Latin
America 14.32 2.48 6.11 92.70 91.37
Africa n.a. 0.95 1.42 28.50 58.36
3
Note: km=kilometer, OECD = Organization for Economic Co-operation and
Development.
Source: ADB, UNDP and UNESCAP, 2010
On the estimation of infrastructure demand, some assessments come up within the
range of $6 to $8 trillion for a decade. Asian Development Bank (ADB) projected
that ASEAN economies need to invest over $ 60 billion a year in infrastructure until
2020 to support and maintain the region’s high economic growth. It requires about 7
to 8 percent of GDP while current spending level is at 3 to 4 percent of GDP. The
shortage funds call for bigger role of private sector, hence PPP has becoming hot
issue recently.
4.1
2.5
1.1
0.4 8.1
Energy Transport Telecom Water and Sanita on Total
Figure 2 Investment needs for Asia's identified and pipeline infrastructure
projects, 2010-2020, $ trillion
Source: ADB, Clean Edge, WB PFI Database (McKinsey Analysis)
2. Private sector participation in ASEAN Member States
ASEAN member states have different stages of infrastructure policy, financing
method, and financial capacity. Singapore and Brunei have abundant domestic
financial resources to build their infrastructure. PPP has been adopted in these
countries mainly for the reason of improving public sector efficiency (in Singapore)
and utilizing private sector competence (in Brunei). Malaysia, Indonesia, Thailand,
and Philippines have been adopting PPP quite progressively to fill financing gap and
tap private sector’s competence.
In Cambodia and Vietnam, private sector participation becomes increasingly
important in infrastructure development. However, there are limited numbers of PPP
4
projects in these countries, mainly supported by international organizations such as
ADB and the World Bank.
Meanwhile, Laos and Myanmar are still facing multiple challenges, especially:
lacking fiscal resources, low capacity, lacking regulatory framework, and
challenging fiscal sustainability. PPP requires mature private sector and sufficient
access to capital market; the condition that is unfortunately uncommon in half of
AMS as shown in Table 2.
Table 2 Factors affected financing modalities
Notes:
 = in good state
 = in good direction
 = need more attention/stagnant
*Fiscal situation: use S&P, Moody’s and Fitch credit ratings as proxy
Source: Zen and Regan (ERIA, 2013)
3. PPP as financing modality
Apart from its advantages to bring private sector’s competence into a better public
service delivery, PPP can be viewed –and this is the most popular view- as one of
purchasing methods in delivery public services. An international standard PPP
requires a complex system to ensure the objectives of PPP can be achieved. PPP is
not a method suitable for all types of infrastructures.
Recalling the various ways to finance infrastructure, as shown in figure 3, PPP is a
procurement method to expand private sector’s involvement into developing non-
commercially viable projects. The most possible ones are the projects that fall into
economically viable category. As for nonviable projects, when they are schemed into
PPP, public sources have to finance most of the costs, or the government should
5
increase the creditworthiness of the projects to transform the projects to financially
viable ones.
Even though financing infrastructure can be done through various methods, PPP
should not be viewed as additional money to build infrastructure. It actually
restructures the financing through contract arrangement between public and private
entities. Private entities finance some of (or full) total costs of construction but
expect profits in return. Thus someone has to pay, either through tax and subsidy or
through user charges. This nature unfortunately has not been well understood by
some governments, leading to the attempt to shift all risks and most financial burden
to private entities. The “different languages” spoken by government versus private
entities made prolonged or even failed project negotiation.
Financing Infrastructure
Commercially
Viable Project
Economically Viable
Project
Nonviable Project
Private Sector
Government ODA/OOF
PPP
Contract
SPV
Contractors
Lenders/Sponsors
Gov Contrac ng
Agency
Private Sector
Public Sector
Construction-Operation
Financing
Guarantee
O aker or User
Loan/TA
Awarded
Form
Form
Pay Pay
Fiscal Support
Traditional Procurement PPP Scheme
Figure 3 Financing Infrastructure
Source: ERIA (2012)
The problem is rooted in lacking understanding of how financing and funding should
work in PPP. Many decision makers are confused with these two terms, leading to
the unsustainable project. Financing refers to the construction or initial project costs.
That can be come from public sector directly (all from government budget) or
indirectly (usually combination of budget and private sector debt and equity). The
later financing means require that repayment should be performed. Meanwhile,
funding is the main source of payment to sustain the project. The sources usually
come either from government, means taxpayers’ money, or user charges.
In the situation where both public and private sectors have sufficient capabilities to
run a PPP project, the number of procurements made through traditional way is
outnumbered PPP projects. Typical PPP project requires higher efforts – budget-wise
6
and time-wise, hence a small size project usually is not recommended for PPP2
.
Another reason is the flexibility to structure the funds through syndicated debt over a
number of financial institutions and structured in several tranches denominated in
different currencies, interest rates, maturities and security ranking (Zen and Regan,
2013).
The case for medium size projects, say minimum at USD25 million, implemented in
PPP scheme has evidence as well. Philippines PPP Centre runs some small size
projects especially in social infrastructure including schools and hospitals, some of
them are brownfield projects. Small size projects can still get benefits from PPP
especially in securing deliverables, standardized and stable output, as well as
efficient management. What we need to consider is the trade-off between costly
process and desirable outputs. This calls for a simpler PPP or “lite PPP”. Since lite
PPP does not consist of complex financing or management structures, or complex
design and construction, it is suitable for the projects with state availability payment
and do not involve currency mismatch risk (Zen and Regan, 2013).
Despite its costly and longer process, PPP has several advantages compared to
traditional procurement. Australian experience showed that in total PPP projects have
lower cost overruns than traditional projects. Further, albeit initial cost estimated for
PPPs is far higher than that of traditional procurements, its final actual cost turned
out to be lower (see table 3).
Table 3: Cost Comparisons of PPP and Traditional Projects (in AUD million)
Initial Cost
Estimates
Contractual
Commitments
Cost
Overruns
Final Actual
Cost
Traditional
Projects
3082.0 4532.6 672.5 5205.1
PPPs 4484.4 4946.1 57.6 5003.7
Source: Infrastructure Partnership Australia, 2007.
The projects that free from difficult risks (e.g. currency mismatch, demand risks)
have a big chance to be successfully offered as PPP. Independent Power Producer
(IPP) is typical easy PPP project, because the off taker is well defined thus no
demand risk. Negotiation on water projects is often more complicated since they
usually belong to subnational governments and can involve more than one
jurisdiction. Difficulties are higher for the nonviable projects such as non-toll roads.
When no fee can be charged, the government should find a way to make the project
feasible for PPP.
There are some ways to increase the creditworthiness of the projects. One way is
government acts as the off-taker. In case of non-toll road, government can set in the
2
Some institutions suggest that only projects with size at least USD100 million will
be efficient for PPP.
7
contract that it will pay a certain fee for every vehicle passing the road. When it is
possible to impose a user charge, this is considered better than full subsidy.
However, some rural roads may not be feasible to become toll road, but they are
important to support economic growth. This is similar with the case of PPP in social
infrastructure such as schools.
Another way to make the project attractive is to enlarge the scope of initial project. A
non-toll road –or road with under cost revenue, can be wrapped with commercial
license in some parts of it, for example commercial properties (resort, hotel,
amusement park, tourism complex, etc.). The package will improve financial cash
flows of the project and allow cross-subsidy from one business unit to another one
within this project. Huge project can also be unbundled to provide some flexibilities
and modifications in certain blocks of the project.
In the above cases, the benefits from adopting PPP scheme instead of traditional
procurement are: i) securing reliable public services, ii) reducing overall cost because
of using life-cycle horizon rather than short term period, iii) shifting fiscal burden
from upfront large funds to periodically disbursement, and iv) improve public sector
efficiency by deterring from non-core public sector’s tasks.
4. Challenges
Despite good practices and lessons from PPP project failures are abundant for public
access, misperception of PPP is still common. Many people think PPP as panacea for
infrastructure problems. Many also think that PPP will lift the government burden in
infrastructure provision. In parallel, many still confuse between PPP and traditional
procurements. However, increasing interests on adopting PPP should be viewed
positively and used as means to bring PPP into good practices.
The basic problems for most developing economies to adopt PPP are (i) insufficient
regulatory framework, (ii) lacking capacity, and (iii) lacking fiscal resources.
Regulatory framework can be approached differently from country to country, but
the ultimate goal is similar: to provide private sector confidence to involve in PPP
projects. Some countries may need specific PPP regulation while some others may
not need it. The capacity problems are not monopolized by public sector; in new
emerging countries such as Cambodia, Lao PDR, Myanmar and Vietnam, (and
Brunei) private sector development is still at early stage and need to be nurtured
properly. The situation is usually coupled with the issues of lacking access to capital
market and limited fiscal space in government budget. PPP still requires fiscal
contribution from government budget, directly or indirectly, current or later. Lao
PDR, Myanmar and Vietnam are facing the problems of macroeconomic instability
as well as limited fiscal space, induce to decreasing options of loans from
international institutions or bilateral resources.
Meanwhile, lacking funds to finance infrastructure is not the main problem per se. In
fact there are massive supplies of surplus capital –global savings currently amount to
8
US $17 trillion– with investors looking for long-term stable returns: this is the
'infrastructure paradox'. A similar paradox exists in ASEAN countries, too, where
both savings rates and foreign reserves are high (Shishido, Sugiyama, and Zen,
2013). Interviews with long-term funds management have confirmed that supply
does exist but it cannot be fully utilized because of lacking appropriate channels3
.
Additionally, the supply can grow more than existing amount if the options for
investing in long-term portfolios are expanding as well.
The problems of only fewer numbers of PPP are mainly caused by two conditions,
namely: lacking investor friendly environment and lacking properly prepared
projects. Many countries cannot provide supportive business environment granting
sufficient regulatory framework, legal certainty, and appropriate incentives.
Meanwhile, to be able to offer attractive projects, government should make efforts to
prepare the projects, meaning it has to have competent human resources, sufficient
allocated fund for Project Development Facility (PDF), and proper communication
with international community.
At regional level, there are a number of efforts provided by international
organizations to support PPP implementation. The supports come in various ways:
capacity building, technical assistance, co-financing, etc. however, within ASEAN
scope, there is no centralized and integrated coordination for PPP support.
Again, all benefits from PPP can only be obtained if the project is well structured and
well planned. The government’s credibility is vital; private sector holds that the
business certainty is key to determine its involvement.
5. Way forward
Current situation of implementing PPP has provided us with several challenges to be
addressed. The solution definitely is not a one-time action but continuous and
systemized efforts. Capacity building is a long-term process and potentially could
fall into inefficient work.
Building a solid regulatory framework requires many years and high commitment
from many stakeholders, thus it is a long-term solution. While the reform should be
done when needed, the ad hoc approach may be used as pragmatic and short-term
solution. The approach of “sterilized regulation” to secure the contract can be used as
long as it complies with standardized legal framework.
Regional cooperation should be enhanced to transform existing efforts into synergy
and to realize ASEAN Connectivity. Some actions include providing suitable PPP
Guidelines for ASEAN Member States, establishing PPP Forum, and continuing
systemized capacity building program as well as offering technical assistance.
3 Sources: Mr. Donald Kanak (Prudential Asia Corp.): Sep 20th, 2013 and Dr.
Leonnie Lethbridge (ANZ Indonesia): July 24th, 2013. pers. comm.
9
Reference:
Asian Development Bank. 2009. Infrastructure for Seamless Asia. Manila: ADB.
Economic Research Institute for ASEAN and East Asia (ERIA). 2012. Phnom Penh
Initiatives for Narrowing Development Gaps, Jakarta: ERIA.
Infrastructure Partnership Australia. 2007. Performance of PPPs and Traditional
Procurement in Australia. Sydney: Infrastructure Partnership Australia.
Schwab, Klaus (ed.). 2012. The Global Competitiveness Report 2012-2013. Geneva:
World Economic Forum.
Shishido, Hisanobu, Shintaro Sugiyama, and Fauziah Zen. 2013. Moving MPAC
Forward: Strengthening Public-Private Partnership, Improving Project
Portfolio and in Search of Practical Financing Schemes. Jakarta: ERIA.
Zen, Fauziah and Michael Regan (eds.). 2013. Financing ASEAN Infrastructure,
Economic Research Institute for ASEAN and East Asia (ERIA). Jakarta: ERIA.
10
Annex
Summary of PPP Implementation in ASEAN Member States
Country Public Body
Responsible for
Implementation
Type of
Private
Sector
Participation
Projects/Sector Background/
Progress
Brunei Department of
Economic
Planning and
Development
Not yet
determined
Housing Just started in
2010. No specific
regulation for PPP.
Cambodia Not determined Concessions,
BOT
(although
there are no
regulations)
Power, and
limited projects in
water and
transport
Concessions Law
issued in 2007.
Still no
implementing
regulations
Indonesia Line Ministries,
Planning
Development
Agency, MOF
All types of
PPP schemes
Transportation,
roads, irrigation,
drinking water,
wastewater, ICT,
power, oil and
gas.
Under the new
regulation
(President
Regulation 2011):
One IPP project
waiting for
financial closing, 9
other projects in
the pipeline.
Lao PDR Line ministries,
subnational
government
Concessions Targets: energy,
air transport,
telecom, roads,
railways, other
designated
activities (water,
waste
management,
insurance,
banking)
No specific law.
Limited, projects
include energy,
transportation, and
community
market.
Malaysia UKAS (PPP
Unit)
All types of
PPP schemes
Any sector
fulfilling the
criteria
Privatisation
Masterplan and
PPP Guidelines
513 projects
during 1983-2010
period
Myanmar Line Ministries
with approval
from Parliament
Traditional
Procurement,
concession
Transportation,
energy, water,
seaport services
No specific law.
11
(port
handling)
Philippines PPP Center.
Approving
bodies depend on
size of projects
and authority
level (national or
subnational)
Various BOT
and contracts,
joint venture,
concession,
lease.
All types
including social
sectors
BOT Law
Many projects.
Singapore Ministry of
Finance
Variations of
DBFO and
DBO
Various, including
social
infrastructure
Introduced since
2004 under Best
Sourcing
Framework, 8
projects awarded
Thailand Line ministries
submit
application to
NESDB and
MOF then to
Council of
Ministers  will
be centralized
through SEPO
Concessions,
service and
lease contracts
Various
infrastructure
types
(New) Act on PPP
(BE 2556) private
sector participation
shall be centralized
in State Enterprise
Policy Office
(SEPO) since
October 2013.
BTS, Motorway,
Tollway
Vietnam The Ministry of
Planning and
Investment
(MPI) establishes
interdepartmental
working group
PPP as special
case of BOT
and BTO
Roads, railway,
urban transport,
ports, water
supply, hospitals,
waste treatment,
power, and others
decided by the
Prime Minister
Regulation on PPP
has been issued in
2011.
Source: Shishido, Sugiyama, and Zen (2013) updated

More Related Content

What's hot

Public and Private Partnership in Infrastructure Development in India
Public and Private Partnership in Infrastructure Development in IndiaPublic and Private Partnership in Infrastructure Development in India
Public and Private Partnership in Infrastructure Development in Indiainventionjournals
 
Public private partnerships-nepal and bangladesh perspective
Public private partnerships-nepal and bangladesh perspectivePublic private partnerships-nepal and bangladesh perspective
Public private partnerships-nepal and bangladesh perspectivePrazwal Pradhan
 
Identify Current Deficiencies in Public Private Partnership Practices and Are...
Identify Current Deficiencies in Public Private Partnership Practices and Are...Identify Current Deficiencies in Public Private Partnership Practices and Are...
Identify Current Deficiencies in Public Private Partnership Practices and Are...IJERA Editor
 
Public private partnership in agriculture in india
Public private partnership in agriculture in indiaPublic private partnership in agriculture in india
Public private partnership in agriculture in indiaDr. Shalini Pandey
 
Public Private Partnership (PPP)
Public Private Partnership (PPP)Public Private Partnership (PPP)
Public Private Partnership (PPP)Zaid Khan
 
Public infra financing in india
Public infra financing in indiaPublic infra financing in india
Public infra financing in indiaSumeet Sharma PMP
 
Public private patnerships
Public private patnershipsPublic private patnerships
Public private patnershipsYakshika Vats
 
Presentation Public Private Partnership (PPP)
Presentation Public Private Partnership (PPP) Presentation Public Private Partnership (PPP)
Presentation Public Private Partnership (PPP) Khalid Rasulli
 
New Public Management through Public Private Partnership - Case Study of Emer...
New Public Management through Public Private Partnership - Case Study of Emer...New Public Management through Public Private Partnership - Case Study of Emer...
New Public Management through Public Private Partnership - Case Study of Emer...Dr. Kalpeshkumar L Gupta
 
Financial inclusions a pavement towards the future growth
Financial inclusions a pavement towards the future growthFinancial inclusions a pavement towards the future growth
Financial inclusions a pavement towards the future growthTapasya123
 
Financial Inclusions: A Pavement towards the Future Growth
Financial Inclusions: A Pavement towards the Future GrowthFinancial Inclusions: A Pavement towards the Future Growth
Financial Inclusions: A Pavement towards the Future Growthprofessionalpanorama
 
Public-Private Partnerships
Public-Private PartnershipsPublic-Private Partnerships
Public-Private PartnershipsCultural Vistas
 
PUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTOR
PUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTORPUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTOR
PUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTORfarhad240669
 
Public Private Partnership
Public Private PartnershipPublic Private Partnership
Public Private PartnershipDeepti Mahajan
 
PPP Bangladesh
PPP BangladeshPPP Bangladesh
PPP BangladeshBPSA
 
Public Private partnership
Public Private partnershipPublic Private partnership
Public Private partnershipRayhan Mia
 
Debt restructuring options_adani
Debt restructuring options_adaniDebt restructuring options_adani
Debt restructuring options_adanikalpesh7777
 
Private public partnership in agriculture
Private public partnership in agriculturePrivate public partnership in agriculture
Private public partnership in agriculturezulqiyarshaikh
 
Financiang Infrastructural Development in Zimbabwe
Financiang Infrastructural Development in ZimbabweFinanciang Infrastructural Development in Zimbabwe
Financiang Infrastructural Development in ZimbabweVincent Mutsvene
 

What's hot (20)

Public and Private Partnership in Infrastructure Development in India
Public and Private Partnership in Infrastructure Development in IndiaPublic and Private Partnership in Infrastructure Development in India
Public and Private Partnership in Infrastructure Development in India
 
Public private partnerships-nepal and bangladesh perspective
Public private partnerships-nepal and bangladesh perspectivePublic private partnerships-nepal and bangladesh perspective
Public private partnerships-nepal and bangladesh perspective
 
Identify Current Deficiencies in Public Private Partnership Practices and Are...
Identify Current Deficiencies in Public Private Partnership Practices and Are...Identify Current Deficiencies in Public Private Partnership Practices and Are...
Identify Current Deficiencies in Public Private Partnership Practices and Are...
 
Public private partnership in agriculture in india
Public private partnership in agriculture in indiaPublic private partnership in agriculture in india
Public private partnership in agriculture in india
 
Public Private Partnership (PPP)
Public Private Partnership (PPP)Public Private Partnership (PPP)
Public Private Partnership (PPP)
 
Public infra financing in india
Public infra financing in indiaPublic infra financing in india
Public infra financing in india
 
Public private patnerships
Public private patnershipsPublic private patnerships
Public private patnerships
 
Presentation Public Private Partnership (PPP)
Presentation Public Private Partnership (PPP) Presentation Public Private Partnership (PPP)
Presentation Public Private Partnership (PPP)
 
Chapter+7 capital+markets
Chapter+7 capital+marketsChapter+7 capital+markets
Chapter+7 capital+markets
 
New Public Management through Public Private Partnership - Case Study of Emer...
New Public Management through Public Private Partnership - Case Study of Emer...New Public Management through Public Private Partnership - Case Study of Emer...
New Public Management through Public Private Partnership - Case Study of Emer...
 
Financial inclusions a pavement towards the future growth
Financial inclusions a pavement towards the future growthFinancial inclusions a pavement towards the future growth
Financial inclusions a pavement towards the future growth
 
Financial Inclusions: A Pavement towards the Future Growth
Financial Inclusions: A Pavement towards the Future GrowthFinancial Inclusions: A Pavement towards the Future Growth
Financial Inclusions: A Pavement towards the Future Growth
 
Public-Private Partnerships
Public-Private PartnershipsPublic-Private Partnerships
Public-Private Partnerships
 
PUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTOR
PUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTORPUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTOR
PUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTOR
 
Public Private Partnership
Public Private PartnershipPublic Private Partnership
Public Private Partnership
 
PPP Bangladesh
PPP BangladeshPPP Bangladesh
PPP Bangladesh
 
Public Private partnership
Public Private partnershipPublic Private partnership
Public Private partnership
 
Debt restructuring options_adani
Debt restructuring options_adaniDebt restructuring options_adani
Debt restructuring options_adani
 
Private public partnership in agriculture
Private public partnership in agriculturePrivate public partnership in agriculture
Private public partnership in agriculture
 
Financiang Infrastructural Development in Zimbabwe
Financiang Infrastructural Development in ZimbabweFinanciang Infrastructural Development in Zimbabwe
Financiang Infrastructural Development in Zimbabwe
 

Viewers also liked

Public private partnerships in infrastructure projects
Public private partnerships in infrastructure projectsPublic private partnerships in infrastructure projects
Public private partnerships in infrastructure projectsHillary Fernando
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluationrexcris
 
International business: THEORIES OF INTERNATIONAL TRADE
International business: THEORIES OF INTERNATIONAL TRADEInternational business: THEORIES OF INTERNATIONAL TRADE
International business: THEORIES OF INTERNATIONAL TRADERoni Kumar
 
Types of economic systems
Types of economic systemsTypes of economic systems
Types of economic systemsyacub13
 
Economy type and characteristics
Economy type and characteristicsEconomy type and characteristics
Economy type and characteristicsNamita Sharma
 
Theories of international trade
Theories of international tradeTheories of international trade
Theories of international tradenisaa89
 
International Trade Theories
International Trade TheoriesInternational Trade Theories
International Trade Theoriesshanmugapriya
 

Viewers also liked (8)

Features Of Ie
Features Of IeFeatures Of Ie
Features Of Ie
 
Public private partnerships in infrastructure projects
Public private partnerships in infrastructure projectsPublic private partnerships in infrastructure projects
Public private partnerships in infrastructure projects
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
 
International business: THEORIES OF INTERNATIONAL TRADE
International business: THEORIES OF INTERNATIONAL TRADEInternational business: THEORIES OF INTERNATIONAL TRADE
International business: THEORIES OF INTERNATIONAL TRADE
 
Types of economic systems
Types of economic systemsTypes of economic systems
Types of economic systems
 
Economy type and characteristics
Economy type and characteristicsEconomy type and characteristics
Economy type and characteristics
 
Theories of international trade
Theories of international tradeTheories of international trade
Theories of international trade
 
International Trade Theories
International Trade TheoriesInternational Trade Theories
International Trade Theories
 

Similar to Ppp in asean

Urban infrastructure financing in nepal
Urban infrastructure financing in nepalUrban infrastructure financing in nepal
Urban infrastructure financing in nepalAmit Pokharel
 
Urban infrastructure financing in nepal
Urban infrastructure financing in nepalUrban infrastructure financing in nepal
Urban infrastructure financing in nepalAmit Pokharel
 
PUBLIC PRIVATE PARTNERSHIP AND ECONOMIC GROWTH WITH SPECIAL REFERENCE TO INDI...
PUBLIC PRIVATE PARTNERSHIP AND ECONOMIC GROWTH WITH SPECIAL REFERENCE TO INDI...PUBLIC PRIVATE PARTNERSHIP AND ECONOMIC GROWTH WITH SPECIAL REFERENCE TO INDI...
PUBLIC PRIVATE PARTNERSHIP AND ECONOMIC GROWTH WITH SPECIAL REFERENCE TO INDI...IAEME Publication
 
808960BRI0Winn00Box379814B00PUBLIC0
808960BRI0Winn00Box379814B00PUBLIC0808960BRI0Winn00Box379814B00PUBLIC0
808960BRI0Winn00Box379814B00PUBLIC0Richard Florizone
 
ACCELERATING FINANCIAL INCLUSION IN SOUTH-EAST ASIA WITH DIGITAL FINANCE by ADB
ACCELERATING FINANCIAL INCLUSION IN SOUTH-EAST ASIA WITH DIGITAL FINANCE by ADBACCELERATING FINANCIAL INCLUSION IN SOUTH-EAST ASIA WITH DIGITAL FINANCE by ADB
ACCELERATING FINANCIAL INCLUSION IN SOUTH-EAST ASIA WITH DIGITAL FINANCE by ADBHiếu T. D. Võ
 
ACCELERATING FINANCIAL INCLUSION IN SOUTH-EAST ASIA WITH DIGITAL FINANCE by ADB
ACCELERATING FINANCIAL INCLUSION IN SOUTH-EAST ASIA WITH DIGITAL FINANCE by ADBACCELERATING FINANCIAL INCLUSION IN SOUTH-EAST ASIA WITH DIGITAL FINANCE by ADB
ACCELERATING FINANCIAL INCLUSION IN SOUTH-EAST ASIA WITH DIGITAL FINANCE by ADBHiếu T. D. Võ
 
The infrastructure sector contribution to sustainable development - MOOC FFD ...
The infrastructure sector contribution to sustainable development - MOOC FFD ...The infrastructure sector contribution to sustainable development - MOOC FFD ...
The infrastructure sector contribution to sustainable development - MOOC FFD ...Marco Pittalis
 
Current oda allocation across sectors in bangladesh and effective financing f...
Current oda allocation across sectors in bangladesh and effective financing f...Current oda allocation across sectors in bangladesh and effective financing f...
Current oda allocation across sectors in bangladesh and effective financing f...Abdullah Al Mamun
 
Current ODA Allocation Across Sectors in Bangladesh and Effective Financing f...
Current ODA Allocation Across Sectors in Bangladesh and Effective Financing f...Current ODA Allocation Across Sectors in Bangladesh and Effective Financing f...
Current ODA Allocation Across Sectors in Bangladesh and Effective Financing f...Abdullah Al Mamun
 
understand challenges for infrastructure
understand challenges for infrastructureunderstand challenges for infrastructure
understand challenges for infrastructurechristopher nyabulegesi
 
FINANCIAL INCLUSION A RETROSPECTIVE APPRAISAL
 FINANCIAL INCLUSION A RETROSPECTIVE APPRAISAL FINANCIAL INCLUSION A RETROSPECTIVE APPRAISAL
FINANCIAL INCLUSION A RETROSPECTIVE APPRAISALDr Lendy Spires
 
1_PPP paper_FINAL 05 17 16
1_PPP paper_FINAL 05 17 161_PPP paper_FINAL 05 17 16
1_PPP paper_FINAL 05 17 16stolleman
 
PPP collaborative models to stimulate economic growth
PPP collaborative models to stimulate economic growthPPP collaborative models to stimulate economic growth
PPP collaborative models to stimulate economic growthKannan Rajarathnam
 
PPP collaborative models to stimulate economic growth
PPP collaborative models to stimulate economic growthPPP collaborative models to stimulate economic growth
PPP collaborative models to stimulate economic growthKannan R
 

Similar to Ppp in asean (20)

Urban infrastructure financing in nepal
Urban infrastructure financing in nepalUrban infrastructure financing in nepal
Urban infrastructure financing in nepal
 
Urban infrastructure financing in nepal
Urban infrastructure financing in nepalUrban infrastructure financing in nepal
Urban infrastructure financing in nepal
 
PUBLIC PRIVATE PARTNERSHIP AND ECONOMIC GROWTH WITH SPECIAL REFERENCE TO INDI...
PUBLIC PRIVATE PARTNERSHIP AND ECONOMIC GROWTH WITH SPECIAL REFERENCE TO INDI...PUBLIC PRIVATE PARTNERSHIP AND ECONOMIC GROWTH WITH SPECIAL REFERENCE TO INDI...
PUBLIC PRIVATE PARTNERSHIP AND ECONOMIC GROWTH WITH SPECIAL REFERENCE TO INDI...
 
808960BRI0Winn00Box379814B00PUBLIC0
808960BRI0Winn00Box379814B00PUBLIC0808960BRI0Winn00Box379814B00PUBLIC0
808960BRI0Winn00Box379814B00PUBLIC0
 
Development finance impact digital artifact
Development finance impact   digital artifactDevelopment finance impact   digital artifact
Development finance impact digital artifact
 
ACCELERATING FINANCIAL INCLUSION IN SOUTH-EAST ASIA WITH DIGITAL FINANCE by ADB
ACCELERATING FINANCIAL INCLUSION IN SOUTH-EAST ASIA WITH DIGITAL FINANCE by ADBACCELERATING FINANCIAL INCLUSION IN SOUTH-EAST ASIA WITH DIGITAL FINANCE by ADB
ACCELERATING FINANCIAL INCLUSION IN SOUTH-EAST ASIA WITH DIGITAL FINANCE by ADB
 
ACCELERATING FINANCIAL INCLUSION IN SOUTH-EAST ASIA WITH DIGITAL FINANCE by ADB
ACCELERATING FINANCIAL INCLUSION IN SOUTH-EAST ASIA WITH DIGITAL FINANCE by ADBACCELERATING FINANCIAL INCLUSION IN SOUTH-EAST ASIA WITH DIGITAL FINANCE by ADB
ACCELERATING FINANCIAL INCLUSION IN SOUTH-EAST ASIA WITH DIGITAL FINANCE by ADB
 
The infrastructure sector contribution to sustainable development - MOOC FFD ...
The infrastructure sector contribution to sustainable development - MOOC FFD ...The infrastructure sector contribution to sustainable development - MOOC FFD ...
The infrastructure sector contribution to sustainable development - MOOC FFD ...
 
Gvt 01
Gvt 01Gvt 01
Gvt 01
 
Policy Watch, September 2017
Policy Watch, September 2017Policy Watch, September 2017
Policy Watch, September 2017
 
Current oda allocation across sectors in bangladesh and effective financing f...
Current oda allocation across sectors in bangladesh and effective financing f...Current oda allocation across sectors in bangladesh and effective financing f...
Current oda allocation across sectors in bangladesh and effective financing f...
 
Current ODA Allocation Across Sectors in Bangladesh and Effective Financing f...
Current ODA Allocation Across Sectors in Bangladesh and Effective Financing f...Current ODA Allocation Across Sectors in Bangladesh and Effective Financing f...
Current ODA Allocation Across Sectors in Bangladesh and Effective Financing f...
 
understand challenges for infrastructure
understand challenges for infrastructureunderstand challenges for infrastructure
understand challenges for infrastructure
 
Financial for development final project
Financial for development final projectFinancial for development final project
Financial for development final project
 
Mis
MisMis
Mis
 
12 chapter 3
12 chapter 312 chapter 3
12 chapter 3
 
FINANCIAL INCLUSION A RETROSPECTIVE APPRAISAL
 FINANCIAL INCLUSION A RETROSPECTIVE APPRAISAL FINANCIAL INCLUSION A RETROSPECTIVE APPRAISAL
FINANCIAL INCLUSION A RETROSPECTIVE APPRAISAL
 
1_PPP paper_FINAL 05 17 16
1_PPP paper_FINAL 05 17 161_PPP paper_FINAL 05 17 16
1_PPP paper_FINAL 05 17 16
 
PPP collaborative models to stimulate economic growth
PPP collaborative models to stimulate economic growthPPP collaborative models to stimulate economic growth
PPP collaborative models to stimulate economic growth
 
PPP collaborative models to stimulate economic growth
PPP collaborative models to stimulate economic growthPPP collaborative models to stimulate economic growth
PPP collaborative models to stimulate economic growth
 

More from Fauziah Zen

Age Related Pension Expenditure and Fiscal Space: Book Launch Event
Age Related Pension Expenditure and Fiscal Space: Book Launch EventAge Related Pension Expenditure and Fiscal Space: Book Launch Event
Age Related Pension Expenditure and Fiscal Space: Book Launch EventFauziah Zen
 
Trans-boundary haze
Trans-boundary hazeTrans-boundary haze
Trans-boundary hazeFauziah Zen
 
China daily asean edition 22 may 2015
China daily asean edition 22 may 2015China daily asean edition 22 may 2015
China daily asean edition 22 may 2015Fauziah Zen
 
Social insurance and social protection in ASEAN: status, challenges and ways...
Social insurance and social protection in ASEAN:  status, challenges and ways...Social insurance and social protection in ASEAN:  status, challenges and ways...
Social insurance and social protection in ASEAN: status, challenges and ways...Fauziah Zen
 
Ie singapore lunch talk
Ie singapore lunch talkIe singapore lunch talk
Ie singapore lunch talkFauziah Zen
 
Disaster Management in ASEAN
Disaster Management in ASEANDisaster Management in ASEAN
Disaster Management in ASEANFauziah Zen
 

More from Fauziah Zen (6)

Age Related Pension Expenditure and Fiscal Space: Book Launch Event
Age Related Pension Expenditure and Fiscal Space: Book Launch EventAge Related Pension Expenditure and Fiscal Space: Book Launch Event
Age Related Pension Expenditure and Fiscal Space: Book Launch Event
 
Trans-boundary haze
Trans-boundary hazeTrans-boundary haze
Trans-boundary haze
 
China daily asean edition 22 may 2015
China daily asean edition 22 may 2015China daily asean edition 22 may 2015
China daily asean edition 22 may 2015
 
Social insurance and social protection in ASEAN: status, challenges and ways...
Social insurance and social protection in ASEAN:  status, challenges and ways...Social insurance and social protection in ASEAN:  status, challenges and ways...
Social insurance and social protection in ASEAN: status, challenges and ways...
 
Ie singapore lunch talk
Ie singapore lunch talkIe singapore lunch talk
Ie singapore lunch talk
 
Disaster Management in ASEAN
Disaster Management in ASEANDisaster Management in ASEAN
Disaster Management in ASEAN
 

Recently uploaded

The Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarThe Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarHarsh Kumar
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证rjrjkk
 
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...Suhani Kapoor
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdfHenry Tapper
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdfAdnet Communications
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Modelshematsharma006
 
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdfBPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdfHenry Tapper
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Stock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfStock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfMichael Silva
 
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一S SDS
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfMichael Silva
 
Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Commonwealth
 
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...makika9823
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfAdnet Communications
 
Unveiling the Top Chartered Accountants in India and Their Staggering Net Worth
Unveiling the Top Chartered Accountants in India and Their Staggering Net WorthUnveiling the Top Chartered Accountants in India and Their Staggering Net Worth
Unveiling the Top Chartered Accountants in India and Their Staggering Net WorthShaheen Kumar
 
Bladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex
 
Vp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppVp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppmiss dipika
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...Henry Tapper
 
Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024Bladex
 
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130  Available With RoomVIP Kolkata Call Girl Serampore 👉 8250192130  Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Roomdivyansh0kumar0
 

Recently uploaded (20)

The Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarThe Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh Kumar
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
 
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdf
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Models
 
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdfBPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Stock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfStock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdf
 
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdf
 
Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]
 
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdf
 
Unveiling the Top Chartered Accountants in India and Their Staggering Net Worth
Unveiling the Top Chartered Accountants in India and Their Staggering Net WorthUnveiling the Top Chartered Accountants in India and Their Staggering Net Worth
Unveiling the Top Chartered Accountants in India and Their Staggering Net Worth
 
Bladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results Presentation
 
Vp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppVp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsApp
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
 
Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024
 
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130  Available With RoomVIP Kolkata Call Girl Serampore 👉 8250192130  Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
 

Ppp in asean

  • 1. 1 PPP for infrastructure in ASEAN member states: How do developing countries utilize and get benefit from the scheme? Fauziah Zen, Economic Research Institute for ASEAN and East Asia (ERIA), fauziah.zen@eria.org Abstract Infrastructure has been worldwide perceived as key of development; such concept is not an exception for ASEAN member states. While infrastructure typically falls into non-commercially viable project, thus requires sovereign financing- the governments usually face lacking fiscal capacity to finance the demand for infrastructure. In recent years, Public-Private Partnership (PPP) has been increasingly gained popularity as alternative to financing modality in infrastructure development. In fact, there is overwhelming expectation on PPP to solve infrastructure problems. Misperception of PPP often becomes backlash to the utilization of PPP; its overestimated expectation brings unexpected responses that potentially ruin the project. Apart from that, differences in economic stage across ASEAN member states should not be ignored, and consequently should be reflected in pertinent advices and actions on handling PPP. The paper reviewed the current situation of PPP in broad terms, or more precisely is “Private Sector Participation” (PSP) in ASEAN countries and provided the economies’ key characteristics. It also discussed the challenges to use the scheme to develop infrastructure especially in the least developed countries. Finally the paper suggested how ASEAN leaders should perceive PPP as one of financing modalities and what the way forward and direction in ASEAN development. Keywords: PPP, financing infrastructure, ASEAN Connectivity 1. Introduction ASEAN Member States (AMS) have been agreeing to achieve ASEAN Community by 2015 which can be structured into ASEAN Political-Security Community, ASEAN Economic Community, and ASEAN Socio-Cultural Community. The ASEAN has developed a Master Plan on ASEAN Connectivity (MPAC) “as a key step towards realising the ASEAN Community of continued economic growth, reduced development gap and improved connectivity among Member States and between Member States and the rest of the world by enhancing regional and national physical, institutional and people-to-people linkages”. 1 The MPAC consists of three pillars of connectivity: institutional, physical, and people-to-people and interact one another as we can see in Figure 1. 1 Master Plan on ASEAN Connectivity, 2011, ASEAN Secretariat, Jakarta.
  • 2. 2 Figure 1. ASEAN Community Building To support a well-connected ASEAN, physical connectivity requires sufficient domestic infrastructure within member states that is interconnected across the region. Thus having sufficient infrastructure is vital. Infrastructure serves at least three functions, namely: (i) to provide basic human needs, (ii) to support people and goods mobility, and (iii) to support productivity. Unfortunately, the quantity and quality of infrastructure in AMS in general is far below that in advanced economies. The most lacking ones are transportation, electrification, and access to clean water. World Economic Forum in its Global Competitiveness Report 2012-2013 indicated that in average, the quality of ASEAN infrastructure is only half of that in Japan and US. Table 1 Global Comparison in Infrastructure Coverage (2008) Region Roads (km) Rail (km) Phones (number) Electrification Clean Water per 1,000 people Percentage ASEAN 10.51 0.27 3.53 71.69 86.39 Asia 12.83 0.53 3.47 77.72 87.72 OECD 211.68 5.21 13.87 99.80 99.63 Latin America 14.32 2.48 6.11 92.70 91.37 Africa n.a. 0.95 1.42 28.50 58.36
  • 3. 3 Note: km=kilometer, OECD = Organization for Economic Co-operation and Development. Source: ADB, UNDP and UNESCAP, 2010 On the estimation of infrastructure demand, some assessments come up within the range of $6 to $8 trillion for a decade. Asian Development Bank (ADB) projected that ASEAN economies need to invest over $ 60 billion a year in infrastructure until 2020 to support and maintain the region’s high economic growth. It requires about 7 to 8 percent of GDP while current spending level is at 3 to 4 percent of GDP. The shortage funds call for bigger role of private sector, hence PPP has becoming hot issue recently. 4.1 2.5 1.1 0.4 8.1 Energy Transport Telecom Water and Sanita on Total Figure 2 Investment needs for Asia's identified and pipeline infrastructure projects, 2010-2020, $ trillion Source: ADB, Clean Edge, WB PFI Database (McKinsey Analysis) 2. Private sector participation in ASEAN Member States ASEAN member states have different stages of infrastructure policy, financing method, and financial capacity. Singapore and Brunei have abundant domestic financial resources to build their infrastructure. PPP has been adopted in these countries mainly for the reason of improving public sector efficiency (in Singapore) and utilizing private sector competence (in Brunei). Malaysia, Indonesia, Thailand, and Philippines have been adopting PPP quite progressively to fill financing gap and tap private sector’s competence. In Cambodia and Vietnam, private sector participation becomes increasingly important in infrastructure development. However, there are limited numbers of PPP
  • 4. 4 projects in these countries, mainly supported by international organizations such as ADB and the World Bank. Meanwhile, Laos and Myanmar are still facing multiple challenges, especially: lacking fiscal resources, low capacity, lacking regulatory framework, and challenging fiscal sustainability. PPP requires mature private sector and sufficient access to capital market; the condition that is unfortunately uncommon in half of AMS as shown in Table 2. Table 2 Factors affected financing modalities Notes:  = in good state  = in good direction  = need more attention/stagnant *Fiscal situation: use S&P, Moody’s and Fitch credit ratings as proxy Source: Zen and Regan (ERIA, 2013) 3. PPP as financing modality Apart from its advantages to bring private sector’s competence into a better public service delivery, PPP can be viewed –and this is the most popular view- as one of purchasing methods in delivery public services. An international standard PPP requires a complex system to ensure the objectives of PPP can be achieved. PPP is not a method suitable for all types of infrastructures. Recalling the various ways to finance infrastructure, as shown in figure 3, PPP is a procurement method to expand private sector’s involvement into developing non- commercially viable projects. The most possible ones are the projects that fall into economically viable category. As for nonviable projects, when they are schemed into PPP, public sources have to finance most of the costs, or the government should
  • 5. 5 increase the creditworthiness of the projects to transform the projects to financially viable ones. Even though financing infrastructure can be done through various methods, PPP should not be viewed as additional money to build infrastructure. It actually restructures the financing through contract arrangement between public and private entities. Private entities finance some of (or full) total costs of construction but expect profits in return. Thus someone has to pay, either through tax and subsidy or through user charges. This nature unfortunately has not been well understood by some governments, leading to the attempt to shift all risks and most financial burden to private entities. The “different languages” spoken by government versus private entities made prolonged or even failed project negotiation. Financing Infrastructure Commercially Viable Project Economically Viable Project Nonviable Project Private Sector Government ODA/OOF PPP Contract SPV Contractors Lenders/Sponsors Gov Contrac ng Agency Private Sector Public Sector Construction-Operation Financing Guarantee O aker or User Loan/TA Awarded Form Form Pay Pay Fiscal Support Traditional Procurement PPP Scheme Figure 3 Financing Infrastructure Source: ERIA (2012) The problem is rooted in lacking understanding of how financing and funding should work in PPP. Many decision makers are confused with these two terms, leading to the unsustainable project. Financing refers to the construction or initial project costs. That can be come from public sector directly (all from government budget) or indirectly (usually combination of budget and private sector debt and equity). The later financing means require that repayment should be performed. Meanwhile, funding is the main source of payment to sustain the project. The sources usually come either from government, means taxpayers’ money, or user charges. In the situation where both public and private sectors have sufficient capabilities to run a PPP project, the number of procurements made through traditional way is outnumbered PPP projects. Typical PPP project requires higher efforts – budget-wise
  • 6. 6 and time-wise, hence a small size project usually is not recommended for PPP2 . Another reason is the flexibility to structure the funds through syndicated debt over a number of financial institutions and structured in several tranches denominated in different currencies, interest rates, maturities and security ranking (Zen and Regan, 2013). The case for medium size projects, say minimum at USD25 million, implemented in PPP scheme has evidence as well. Philippines PPP Centre runs some small size projects especially in social infrastructure including schools and hospitals, some of them are brownfield projects. Small size projects can still get benefits from PPP especially in securing deliverables, standardized and stable output, as well as efficient management. What we need to consider is the trade-off between costly process and desirable outputs. This calls for a simpler PPP or “lite PPP”. Since lite PPP does not consist of complex financing or management structures, or complex design and construction, it is suitable for the projects with state availability payment and do not involve currency mismatch risk (Zen and Regan, 2013). Despite its costly and longer process, PPP has several advantages compared to traditional procurement. Australian experience showed that in total PPP projects have lower cost overruns than traditional projects. Further, albeit initial cost estimated for PPPs is far higher than that of traditional procurements, its final actual cost turned out to be lower (see table 3). Table 3: Cost Comparisons of PPP and Traditional Projects (in AUD million) Initial Cost Estimates Contractual Commitments Cost Overruns Final Actual Cost Traditional Projects 3082.0 4532.6 672.5 5205.1 PPPs 4484.4 4946.1 57.6 5003.7 Source: Infrastructure Partnership Australia, 2007. The projects that free from difficult risks (e.g. currency mismatch, demand risks) have a big chance to be successfully offered as PPP. Independent Power Producer (IPP) is typical easy PPP project, because the off taker is well defined thus no demand risk. Negotiation on water projects is often more complicated since they usually belong to subnational governments and can involve more than one jurisdiction. Difficulties are higher for the nonviable projects such as non-toll roads. When no fee can be charged, the government should find a way to make the project feasible for PPP. There are some ways to increase the creditworthiness of the projects. One way is government acts as the off-taker. In case of non-toll road, government can set in the 2 Some institutions suggest that only projects with size at least USD100 million will be efficient for PPP.
  • 7. 7 contract that it will pay a certain fee for every vehicle passing the road. When it is possible to impose a user charge, this is considered better than full subsidy. However, some rural roads may not be feasible to become toll road, but they are important to support economic growth. This is similar with the case of PPP in social infrastructure such as schools. Another way to make the project attractive is to enlarge the scope of initial project. A non-toll road –or road with under cost revenue, can be wrapped with commercial license in some parts of it, for example commercial properties (resort, hotel, amusement park, tourism complex, etc.). The package will improve financial cash flows of the project and allow cross-subsidy from one business unit to another one within this project. Huge project can also be unbundled to provide some flexibilities and modifications in certain blocks of the project. In the above cases, the benefits from adopting PPP scheme instead of traditional procurement are: i) securing reliable public services, ii) reducing overall cost because of using life-cycle horizon rather than short term period, iii) shifting fiscal burden from upfront large funds to periodically disbursement, and iv) improve public sector efficiency by deterring from non-core public sector’s tasks. 4. Challenges Despite good practices and lessons from PPP project failures are abundant for public access, misperception of PPP is still common. Many people think PPP as panacea for infrastructure problems. Many also think that PPP will lift the government burden in infrastructure provision. In parallel, many still confuse between PPP and traditional procurements. However, increasing interests on adopting PPP should be viewed positively and used as means to bring PPP into good practices. The basic problems for most developing economies to adopt PPP are (i) insufficient regulatory framework, (ii) lacking capacity, and (iii) lacking fiscal resources. Regulatory framework can be approached differently from country to country, but the ultimate goal is similar: to provide private sector confidence to involve in PPP projects. Some countries may need specific PPP regulation while some others may not need it. The capacity problems are not monopolized by public sector; in new emerging countries such as Cambodia, Lao PDR, Myanmar and Vietnam, (and Brunei) private sector development is still at early stage and need to be nurtured properly. The situation is usually coupled with the issues of lacking access to capital market and limited fiscal space in government budget. PPP still requires fiscal contribution from government budget, directly or indirectly, current or later. Lao PDR, Myanmar and Vietnam are facing the problems of macroeconomic instability as well as limited fiscal space, induce to decreasing options of loans from international institutions or bilateral resources. Meanwhile, lacking funds to finance infrastructure is not the main problem per se. In fact there are massive supplies of surplus capital –global savings currently amount to
  • 8. 8 US $17 trillion– with investors looking for long-term stable returns: this is the 'infrastructure paradox'. A similar paradox exists in ASEAN countries, too, where both savings rates and foreign reserves are high (Shishido, Sugiyama, and Zen, 2013). Interviews with long-term funds management have confirmed that supply does exist but it cannot be fully utilized because of lacking appropriate channels3 . Additionally, the supply can grow more than existing amount if the options for investing in long-term portfolios are expanding as well. The problems of only fewer numbers of PPP are mainly caused by two conditions, namely: lacking investor friendly environment and lacking properly prepared projects. Many countries cannot provide supportive business environment granting sufficient regulatory framework, legal certainty, and appropriate incentives. Meanwhile, to be able to offer attractive projects, government should make efforts to prepare the projects, meaning it has to have competent human resources, sufficient allocated fund for Project Development Facility (PDF), and proper communication with international community. At regional level, there are a number of efforts provided by international organizations to support PPP implementation. The supports come in various ways: capacity building, technical assistance, co-financing, etc. however, within ASEAN scope, there is no centralized and integrated coordination for PPP support. Again, all benefits from PPP can only be obtained if the project is well structured and well planned. The government’s credibility is vital; private sector holds that the business certainty is key to determine its involvement. 5. Way forward Current situation of implementing PPP has provided us with several challenges to be addressed. The solution definitely is not a one-time action but continuous and systemized efforts. Capacity building is a long-term process and potentially could fall into inefficient work. Building a solid regulatory framework requires many years and high commitment from many stakeholders, thus it is a long-term solution. While the reform should be done when needed, the ad hoc approach may be used as pragmatic and short-term solution. The approach of “sterilized regulation” to secure the contract can be used as long as it complies with standardized legal framework. Regional cooperation should be enhanced to transform existing efforts into synergy and to realize ASEAN Connectivity. Some actions include providing suitable PPP Guidelines for ASEAN Member States, establishing PPP Forum, and continuing systemized capacity building program as well as offering technical assistance. 3 Sources: Mr. Donald Kanak (Prudential Asia Corp.): Sep 20th, 2013 and Dr. Leonnie Lethbridge (ANZ Indonesia): July 24th, 2013. pers. comm.
  • 9. 9 Reference: Asian Development Bank. 2009. Infrastructure for Seamless Asia. Manila: ADB. Economic Research Institute for ASEAN and East Asia (ERIA). 2012. Phnom Penh Initiatives for Narrowing Development Gaps, Jakarta: ERIA. Infrastructure Partnership Australia. 2007. Performance of PPPs and Traditional Procurement in Australia. Sydney: Infrastructure Partnership Australia. Schwab, Klaus (ed.). 2012. The Global Competitiveness Report 2012-2013. Geneva: World Economic Forum. Shishido, Hisanobu, Shintaro Sugiyama, and Fauziah Zen. 2013. Moving MPAC Forward: Strengthening Public-Private Partnership, Improving Project Portfolio and in Search of Practical Financing Schemes. Jakarta: ERIA. Zen, Fauziah and Michael Regan (eds.). 2013. Financing ASEAN Infrastructure, Economic Research Institute for ASEAN and East Asia (ERIA). Jakarta: ERIA.
  • 10. 10 Annex Summary of PPP Implementation in ASEAN Member States Country Public Body Responsible for Implementation Type of Private Sector Participation Projects/Sector Background/ Progress Brunei Department of Economic Planning and Development Not yet determined Housing Just started in 2010. No specific regulation for PPP. Cambodia Not determined Concessions, BOT (although there are no regulations) Power, and limited projects in water and transport Concessions Law issued in 2007. Still no implementing regulations Indonesia Line Ministries, Planning Development Agency, MOF All types of PPP schemes Transportation, roads, irrigation, drinking water, wastewater, ICT, power, oil and gas. Under the new regulation (President Regulation 2011): One IPP project waiting for financial closing, 9 other projects in the pipeline. Lao PDR Line ministries, subnational government Concessions Targets: energy, air transport, telecom, roads, railways, other designated activities (water, waste management, insurance, banking) No specific law. Limited, projects include energy, transportation, and community market. Malaysia UKAS (PPP Unit) All types of PPP schemes Any sector fulfilling the criteria Privatisation Masterplan and PPP Guidelines 513 projects during 1983-2010 period Myanmar Line Ministries with approval from Parliament Traditional Procurement, concession Transportation, energy, water, seaport services No specific law.
  • 11. 11 (port handling) Philippines PPP Center. Approving bodies depend on size of projects and authority level (national or subnational) Various BOT and contracts, joint venture, concession, lease. All types including social sectors BOT Law Many projects. Singapore Ministry of Finance Variations of DBFO and DBO Various, including social infrastructure Introduced since 2004 under Best Sourcing Framework, 8 projects awarded Thailand Line ministries submit application to NESDB and MOF then to Council of Ministers  will be centralized through SEPO Concessions, service and lease contracts Various infrastructure types (New) Act on PPP (BE 2556) private sector participation shall be centralized in State Enterprise Policy Office (SEPO) since October 2013. BTS, Motorway, Tollway Vietnam The Ministry of Planning and Investment (MPI) establishes interdepartmental working group PPP as special case of BOT and BTO Roads, railway, urban transport, ports, water supply, hospitals, waste treatment, power, and others decided by the Prime Minister Regulation on PPP has been issued in 2011. Source: Shishido, Sugiyama, and Zen (2013) updated