This document provides instructions for removing and installing the fuel manifold (rail) on a C9.3 engine. The removal procedure involves disconnecting harness assemblies, tube assemblies, and removing bolts to access the fuel manifold. Sensors, solenoid valves, and other components are then removed from the manifold. Installation is the reverse of removal, with all components torqued to the specified values. Safety notices warn of hazards from high pressure fuel and ensure cleanliness to prevent contamination of fuel system components.
Caterpillar cat 323 d l excavator (prefix lfl) service repair manual (lfl0000...fjjsekmsmmes
1) The document provides instructions for removing and installing the fuel injection pump and gear on a Caterpillar C6.4 engine.
2) To remove the pump, over a dozen hoses, tubes, brackets and bolts must be disconnected and removed, with identification marks made for installation.
3) Installation requires connecting all removed components in reverse order, replacing washers, and ensuring timing marks are aligned between the pump gear and idler gear. Cleanliness is important during removal and installation.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual Instant D...fijsekkdmdm2w
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and properly tightening all connections with the specified torques.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual Instant D...zan2736ban
This document provides instructions for removing and installing the fuel injection pump and gear on a Caterpillar C6.4 engine. It describes using identification marks to align the pump drive gear and idler gear during removal and installation. Removal involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking off the pump. Installation is the reverse, including installing new washers and O-rings, and tightening all connections to the specified torques. Special cleaning procedures and tools are required to work on the high-pressure fuel system safely.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual (LFL00001...fusjekkdmdmd2w
This document provides instructions for removing and installing the fuel injection pump and gear on a Caterpillar C6.4 engine. It describes using identification marks to align the pump drive gear and idler gear during removal and installation. Removal involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking off the pump. Installation is the reverse, including installing new washers and O-rings, and tightening all connections to the specified torques. Special cleaning procedures and tools are required to work on the high-pressure fuel system safely.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual (LFL00001...f8uesjdkdmdm
This document provides instructions for removing and installing the fuel injection pump and gear on a Caterpillar C6.4 engine. It describes using identification marks to align the pump drive gear and idler gear. Removal requires disconnecting fuel lines and electrical connections, removing mounting bolts, and using a puller tool. Installation specifies cleaning parts, installing new washers, reconnecting lines and bolts, and checking fuel injection timing. Proper alignment of gears and cleanliness during installation are emphasized.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual (LFL00001...jdkskmdmdm
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and properly tightening all connections with the specified torques.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual Instant D...fskekkdmdmdm3e
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and torquing all connections to the specified values.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual (LFL00001...prmy389342
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and torquing all connections to the specified values.
Caterpillar cat 323 d l excavator (prefix lfl) service repair manual (lfl0000...fjjsekmsmmes
1) The document provides instructions for removing and installing the fuel injection pump and gear on a Caterpillar C6.4 engine.
2) To remove the pump, over a dozen hoses, tubes, brackets and bolts must be disconnected and removed, with identification marks made for installation.
3) Installation requires connecting all removed components in reverse order, replacing washers, and ensuring timing marks are aligned between the pump gear and idler gear. Cleanliness is important during removal and installation.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual Instant D...fijsekkdmdm2w
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and properly tightening all connections with the specified torques.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual Instant D...zan2736ban
This document provides instructions for removing and installing the fuel injection pump and gear on a Caterpillar C6.4 engine. It describes using identification marks to align the pump drive gear and idler gear during removal and installation. Removal involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking off the pump. Installation is the reverse, including installing new washers and O-rings, and tightening all connections to the specified torques. Special cleaning procedures and tools are required to work on the high-pressure fuel system safely.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual (LFL00001...fusjekkdmdmd2w
This document provides instructions for removing and installing the fuel injection pump and gear on a Caterpillar C6.4 engine. It describes using identification marks to align the pump drive gear and idler gear during removal and installation. Removal involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking off the pump. Installation is the reverse, including installing new washers and O-rings, and tightening all connections to the specified torques. Special cleaning procedures and tools are required to work on the high-pressure fuel system safely.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual (LFL00001...f8uesjdkdmdm
This document provides instructions for removing and installing the fuel injection pump and gear on a Caterpillar C6.4 engine. It describes using identification marks to align the pump drive gear and idler gear. Removal requires disconnecting fuel lines and electrical connections, removing mounting bolts, and using a puller tool. Installation specifies cleaning parts, installing new washers, reconnecting lines and bolts, and checking fuel injection timing. Proper alignment of gears and cleanliness during installation are emphasized.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual (LFL00001...jdkskmdmdm
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and properly tightening all connections with the specified torques.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual Instant D...fskekkdmdmdm3e
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and torquing all connections to the specified values.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual (LFL00001...prmy389342
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and torquing all connections to the specified values.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual (LFL00001...8ufjsekddm8u
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and torquing all connections to the specified values.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual Instant D...fujkskemdmdm4r
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and properly tightening all connections with the specified torques.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual (LFL00001...ufjksemd8ujd
This document provides instructions for removing and installing the fuel injection pump and gear on a Caterpillar C6.4 engine. It describes using identification marks to align the pump drive gear and idler gear during removal and installation. Removal involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking off the pump. Installation is the reverse process of installing the pump with new washers and O-rings, and aligning the gears using the identification marks. Special cleaning and safety precautions are noted to prevent contamination of precise components and injuries from high pressure fuel.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual (LFL00001...km7seydwuhdw
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and torquing all connections to the specified values.
Caterpillar cat 323 d l excavator (prefix lfl) service repair manual (lfl0000...fjjskekdmmme
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and torquing all connections to the specified values.
Caterpillar Cat 336D L Excavator (Prefix M4T) Service Repair Manual (M4T00001...zatao0179249295
The document provides instructions for removing and installing the final drive and travel motor, and removing the swivel, on a 336D L excavator. Key steps include using vacuum tools to remove hydraulic pressure, disconnecting hoses and fittings, and removing bolts to separate components like the final drive, travel motor, and swivel. Proper cleaning, containment of fluids, and use of lifting devices are emphasized due to the heavy weight of parts.
Caterpillar Cat 336D L Excavator (Prefix M4T) Service Repair Manual (M4T00001...kesi7153062
The document provides instructions for removing and installing the final drive and travel motor assembly on a 336D L excavator. Key steps include:
1. Removing hoses, fittings, bolts and covers to access the assembly.
2. Attaching lifting tools and carefully removing the heavy final drive and travel motor unit.
3. Inspecting and replacing seals if needed before reinstalling the component and reconnecting all hoses and fittings. Proper torque is applied to bolts during reinstallation.
Caterpillar Cat 336D L Excavator (Prefix M4T) Service Repair Manual (M4T00001...cnp692569
The document provides instructions for removing and installing the final drive and travel motor assembly on a 336D L excavator. Key steps include:
1. Removing hoses, fittings, bolts and covers to access the assembly.
2. Attaching lifting tools and carefully removing the heavy final drive and travel motor unit.
3. Inspecting and replacing seals if needed before reinstalling the component and reconnecting all hoses and fittings. Proper torque is applied to bolts during reinstallation.
The document provides instructions for removing and installing the fuel injection pump on a 320DL excavator with a C6.4 engine. It describes:
1) Required tools including a fuel system protection group and puller group.
2) Removal steps such as disconnecting hoses and tubes, removing brackets and gears, and removing bolts to detach the pump.
3) Installation steps including cleaning parts, installing new seals and washers, aligning gears using identification marks, and torquing bolts.
The document provides instructions for removing the fuel injection pump from a Caterpillar 320D L excavator with a C6.4 engine. It lists the required tools and safety notices, then describes a 20-step procedure involving disconnecting fuel lines and harness assemblies, removing mounting bolts and brackets, and taking off the pump while retaining identification marks for installation.
The document provides instructions for removing the fuel injection pump from a Caterpillar 320D L excavator with a C6.4 engine. It lists the required tools and safety notices, then describes a 20-step procedure involving disconnecting fuel lines and harness assemblies, removing mounting bolts and brackets, and taking off the pump while retaining identification marks for installation.
The document provides instructions for removing and installing the fuel injection pump on a 320DL excavator with a C6.4 engine. It describes:
1) Required tools including a fuel system protection group and puller group.
2) Removal steps such as disconnecting hoses and tubes, removing brackets and gears, and removing the fuel injection pump.
3) Installation steps including cleaning parts, installing new seals and washers, positioning the pump and gears using alignment marks, and reconnecting all hoses and tubes.
The document provides instructions for removing the fuel injection pump from a Caterpillar 320D L excavator with a C6.4 engine. It lists the required tools and safety notices, then gives a step-by-step procedure involving disconnecting fuel lines and harness assemblies, removing mounting hardware, and taking off the pump while keeping identification marks aligned for installation. Cleanliness is emphasized throughout to prevent contaminants from entering the system.
The document provides instructions for removing and installing the fuel injection pump on a 320DL excavator with a C6.4 engine. It describes:
1) Required tools including a fuel system protection group and puller group.
2) Removal steps such as disconnecting hoses and tubes, removing brackets and gears, and removing the fuel injection pump.
3) Installation steps including cleaning parts, installing new seals and washers, aligning gears, and reconnecting all hoses and tubes.
The document provides instructions for removing the fuel injection pump from a Caterpillar 320D L excavator equipped with a C6.4 engine. It outlines 20 steps to disconnect fuel lines and electrical connections, remove mounting hardware, and take out the pump. Proper cleaning and installation of identification marks is emphasized to prevent contamination of fuel system components.
The document provides instructions for removing and installing a fuel injection pump on a 320DL excavator with a C6.4 engine. It describes:
1) Required tools including a fuel system protection group and puller group.
2) Removal steps such as disconnecting hoses and tubes, removing brackets and gears, and removing bolts to detach the pump.
3) Installation steps including cleaning parts, installing new seals and washers, aligning gears using identification marks, and torquing bolts.
The document provides instructions for removing and installing a fuel injection pump on a 320DL excavator with a C6.4 engine. It describes:
1) Removing components like hoses, tubes, brackets and gears to access the fuel injection pump.
2) Using identification marks and tooling to properly align gears during removal and installation.
3) Cleaning components thoroughly before installation to prevent contamination.
4) Installing the fuel injection pump by reversing the removal steps and ensuring proper torque of fasteners.
This document provides instructions for removing and installing a fuel injection pump on a Caterpillar 320D L excavator with a C6.4 engine. The removal procedure involves disconnecting fuel lines and harness assemblies, removing mounting bolts and nuts, and removing identification marks. The installation procedure specifies cleaning parts and installing new seals and washers before reconnecting lines and tightening fasteners to the specified torques while aligning identification marks. Special tools and safety precautions are also noted.
1. The document provides removal and installation instructions for a fuel injection pump on a 320DL excavator with a C6.4 engine.
2. The procedure describes disconnecting fuel lines and harness assemblies, removing mounting hardware, and using identification marks to ensure proper installation orientation.
3. Cleanliness is emphasized and special tools are required to disconnect the high pressure fuel lines before the pump can be removed from the engine.
This document provides instructions for removing and installing a fuel injection pump on a Caterpillar 320D L excavator with a C6.4 engine. The removal procedure involves disconnecting fuel lines and harness assemblies, removing mounting bolts and nuts, and removing identification marks. The installation procedure specifies cleaning parts and installing new seals and washers before reconnecting lines and tightening fasteners to the specified torques while aligning identification marks. Special tools and safety precautions are also noted.
Este documento contiene instrucciones para operar y mantener una máquina. Explica los números de identificación de la máquina, las señales de seguridad, los componentes principales, cómo subirse y bajarse de la máquina, la estación del operador, cómo poner en marcha la máquina, cómo conducirla y operarla, cómo transportarla, el mantenimiento requerido y las especificaciones técnicas.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual (LFL00001...8ufjsekddm8u
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and torquing all connections to the specified values.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual Instant D...fujkskemdmdm4r
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and properly tightening all connections with the specified torques.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual (LFL00001...ufjksemd8ujd
This document provides instructions for removing and installing the fuel injection pump and gear on a Caterpillar C6.4 engine. It describes using identification marks to align the pump drive gear and idler gear during removal and installation. Removal involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking off the pump. Installation is the reverse process of installing the pump with new washers and O-rings, and aligning the gears using the identification marks. Special cleaning and safety precautions are noted to prevent contamination of precise components and injuries from high pressure fuel.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual (LFL00001...km7seydwuhdw
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and torquing all connections to the specified values.
Caterpillar cat 323 d l excavator (prefix lfl) service repair manual (lfl0000...fjjskekdmmme
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and torquing all connections to the specified values.
Caterpillar Cat 336D L Excavator (Prefix M4T) Service Repair Manual (M4T00001...zatao0179249295
The document provides instructions for removing and installing the final drive and travel motor, and removing the swivel, on a 336D L excavator. Key steps include using vacuum tools to remove hydraulic pressure, disconnecting hoses and fittings, and removing bolts to separate components like the final drive, travel motor, and swivel. Proper cleaning, containment of fluids, and use of lifting devices are emphasized due to the heavy weight of parts.
Caterpillar Cat 336D L Excavator (Prefix M4T) Service Repair Manual (M4T00001...kesi7153062
The document provides instructions for removing and installing the final drive and travel motor assembly on a 336D L excavator. Key steps include:
1. Removing hoses, fittings, bolts and covers to access the assembly.
2. Attaching lifting tools and carefully removing the heavy final drive and travel motor unit.
3. Inspecting and replacing seals if needed before reinstalling the component and reconnecting all hoses and fittings. Proper torque is applied to bolts during reinstallation.
Caterpillar Cat 336D L Excavator (Prefix M4T) Service Repair Manual (M4T00001...cnp692569
The document provides instructions for removing and installing the final drive and travel motor assembly on a 336D L excavator. Key steps include:
1. Removing hoses, fittings, bolts and covers to access the assembly.
2. Attaching lifting tools and carefully removing the heavy final drive and travel motor unit.
3. Inspecting and replacing seals if needed before reinstalling the component and reconnecting all hoses and fittings. Proper torque is applied to bolts during reinstallation.
The document provides instructions for removing and installing the fuel injection pump on a 320DL excavator with a C6.4 engine. It describes:
1) Required tools including a fuel system protection group and puller group.
2) Removal steps such as disconnecting hoses and tubes, removing brackets and gears, and removing bolts to detach the pump.
3) Installation steps including cleaning parts, installing new seals and washers, aligning gears using identification marks, and torquing bolts.
The document provides instructions for removing the fuel injection pump from a Caterpillar 320D L excavator with a C6.4 engine. It lists the required tools and safety notices, then describes a 20-step procedure involving disconnecting fuel lines and harness assemblies, removing mounting bolts and brackets, and taking off the pump while retaining identification marks for installation.
The document provides instructions for removing the fuel injection pump from a Caterpillar 320D L excavator with a C6.4 engine. It lists the required tools and safety notices, then describes a 20-step procedure involving disconnecting fuel lines and harness assemblies, removing mounting bolts and brackets, and taking off the pump while retaining identification marks for installation.
The document provides instructions for removing and installing the fuel injection pump on a 320DL excavator with a C6.4 engine. It describes:
1) Required tools including a fuel system protection group and puller group.
2) Removal steps such as disconnecting hoses and tubes, removing brackets and gears, and removing the fuel injection pump.
3) Installation steps including cleaning parts, installing new seals and washers, positioning the pump and gears using alignment marks, and reconnecting all hoses and tubes.
The document provides instructions for removing the fuel injection pump from a Caterpillar 320D L excavator with a C6.4 engine. It lists the required tools and safety notices, then gives a step-by-step procedure involving disconnecting fuel lines and harness assemblies, removing mounting hardware, and taking off the pump while keeping identification marks aligned for installation. Cleanliness is emphasized throughout to prevent contaminants from entering the system.
The document provides instructions for removing and installing the fuel injection pump on a 320DL excavator with a C6.4 engine. It describes:
1) Required tools including a fuel system protection group and puller group.
2) Removal steps such as disconnecting hoses and tubes, removing brackets and gears, and removing the fuel injection pump.
3) Installation steps including cleaning parts, installing new seals and washers, aligning gears, and reconnecting all hoses and tubes.
The document provides instructions for removing the fuel injection pump from a Caterpillar 320D L excavator equipped with a C6.4 engine. It outlines 20 steps to disconnect fuel lines and electrical connections, remove mounting hardware, and take out the pump. Proper cleaning and installation of identification marks is emphasized to prevent contamination of fuel system components.
The document provides instructions for removing and installing a fuel injection pump on a 320DL excavator with a C6.4 engine. It describes:
1) Required tools including a fuel system protection group and puller group.
2) Removal steps such as disconnecting hoses and tubes, removing brackets and gears, and removing bolts to detach the pump.
3) Installation steps including cleaning parts, installing new seals and washers, aligning gears using identification marks, and torquing bolts.
The document provides instructions for removing and installing a fuel injection pump on a 320DL excavator with a C6.4 engine. It describes:
1) Removing components like hoses, tubes, brackets and gears to access the fuel injection pump.
2) Using identification marks and tooling to properly align gears during removal and installation.
3) Cleaning components thoroughly before installation to prevent contamination.
4) Installing the fuel injection pump by reversing the removal steps and ensuring proper torque of fasteners.
This document provides instructions for removing and installing a fuel injection pump on a Caterpillar 320D L excavator with a C6.4 engine. The removal procedure involves disconnecting fuel lines and harness assemblies, removing mounting bolts and nuts, and removing identification marks. The installation procedure specifies cleaning parts and installing new seals and washers before reconnecting lines and tightening fasteners to the specified torques while aligning identification marks. Special tools and safety precautions are also noted.
1. The document provides removal and installation instructions for a fuel injection pump on a 320DL excavator with a C6.4 engine.
2. The procedure describes disconnecting fuel lines and harness assemblies, removing mounting hardware, and using identification marks to ensure proper installation orientation.
3. Cleanliness is emphasized and special tools are required to disconnect the high pressure fuel lines before the pump can be removed from the engine.
This document provides instructions for removing and installing a fuel injection pump on a Caterpillar 320D L excavator with a C6.4 engine. The removal procedure involves disconnecting fuel lines and harness assemblies, removing mounting bolts and nuts, and removing identification marks. The installation procedure specifies cleaning parts and installing new seals and washers before reconnecting lines and tightening fasteners to the specified torques while aligning identification marks. Special tools and safety precautions are also noted.
Similar to Caterpillar Cat 340F Excavator (Prefix RBD) Service Repair Manual (RBD00001 and up).pdf (20)
Este documento contiene instrucciones para operar y mantener una máquina. Explica los números de identificación de la máquina, las señales de seguridad, los componentes principales, cómo subirse y bajarse de la máquina, la estación del operador, cómo poner en marcha la máquina, cómo conducirla y operarla, cómo transportarla, el mantenimiento requerido y las especificaciones técnicas.
Este documento contiene instrucciones para operar y mantener una máquina. Incluye secciones sobre números de máquina y seguridad, identificación de componentes, subirse y bajarse de la máquina, estación del operador, puesta en marcha, operación del motor y la máquina, transporte, mantenimiento, especificaciones y un índice.
Este documento contiene instrucciones para operar y mantener una máquina. Explica los números de la máquina, las señales de seguridad, cómo subirse y bajarse, cómo operar la estación del operador, cómo conducir y operar la máquina, cómo transportarla, el mantenimiento requerido y las especificaciones técnicas.
Caterpillar Cat 390F L Excavator (Prefix FEH) Service Repair Manual (FEH00001...dujdkksdmm
This document provides instructions for disassembling and assembling the travel motor on a 390F excavator model. It involves over 40 steps to fully disassemble the travel motor by removing components like the head, relief valves, pistons, plates, seals, bearings, and housing. Special tools are required and safety precautions must be followed when removing spring-loaded or heavy parts. The assembly process reverses the disassembly steps and requires cleaning and lubricating parts before reinstallation.
The document provides instructions for disassembling and assembling the travel motor of a 390F excavator. It involves 40 steps to disassemble the various components of the travel motor including removing the head, relief valves, spools, pistons, plates, seals and other parts. The 39 steps for assembly involve cleaning and lubricating parts before carefully reinstalling them in the reverse order of disassembly while ensuring proper alignment and installation of springs, seals, and other components. Precision, cleanliness and following the correct procedure are important for successful reassembly.
The semiochemicals market size has grown rapidly in
recent years. It will grow from $4.56 billion in 2023
to $5.37 billion in 2024 at a compound annual
growth rate (CAGR) of 17.6%. The growth in the
historic period can be attributed to market
acceptance and education, pest resistance concerns,
increased agricultural productivity demands,
chemical ecology research, growing advancements in
formulations. The semiochemicals market size is
expected to see rapid growth in the next few years. It
will grow to $9.67 billion in 2028 at a compound
annual growth rate (CAGR) of 15.9%.
Kalyan chart DP boss guessing matka results➑➌➋➑➒➎➑➑➊➍
8328958814Satta Matka is a number-based game. There are several markets, each with its owner responsible for releasing the lottery satta Matka market results on time. Kalyan market, Worli market, main Mumbai market, Rajdhani market, and Milan market are some of the main markets or bazaars involved in the satta Matka game. The oldest and most legitimate markets are in Kalyan and Main Mumbai. Every Satta Market has an open and close time. The satta results for these markets are published on or shortly after the open and close times. During the open result, two numbers are decoded, one of which is a three-digit number and the other a single-digit number. Similarly, three-digit and single-digit numbers are declared during the satta market's close. The last digit after adding the three digits of the open or close result is usually the single digit declared during the open and close results.KALYAN MATKA | MATKA RESULT | KALYAN MATKA TIPS | SATTA MATKA | MATKA.COM | MATKA PANA JODI TODAY | BATTA SATKA | MATKA PATTI JODI NUMBER | MATKA RESULTS | MATKA CHART | MATKA JODI | SATTA COM | FULL RATE GAME | MATKA GAME | MATKA WAPKA | ALL MATKA RESULT LIVE ONLINE | MATKA RESULT | KALYAN MATKA RESULT | DPBOSS MATKA 143 | MAINSATTA MATKA SATTA FAST RESULT KALYAN TOP MATKA RESULT KALYAN SATTA MATKA FAST RESULT MILAN RATAN RAJDHANI MAIN BAZAR MATKA FAST TIPS RESULT MATKA CHART JODI CHART PANEL CHART FREE FIX GAME SATTAMATKA ! MATKA MOBI SATTA 143 spboss.in TOP NO1 RESULT FULL RATE MATKA ONLINE GAME PLAY BY APP SPBOSSdp boss net, dp satta, dpboss dpboss, indian satta matka, kalyan matkà result today , matka boss, matka result live, matka satta result today, satamatka com, satta boss, satta matka king, sattamatkà, sattamatkà result, sattamatta com, sattmatka sattmatka, star matka, tara matka, tara satta matka, worli matka, indian matka, matka live, kalyan guessing, satta fix, kalyan final ank, dp matka, dpboss net, sata mata com, सट्टा मटका, sattamatkà 143, golden matka, satta matta matka 143, satta fast, kalyan open, satta 143, dpboss 143 guessing, dpboss satta, golden satta matka, satta bajar
Satta Matka Market is India's leading website providing the quickest sattamatka outcome, experienced in Satta Matka game. Our services include free Satta Matka Trick and Tips for Kalyan Matka and Disawar Satta King, as well as satta matka graphs, online play, tips and more. Our team of experts strive to help you recoup your losses quickly through our proposals such as Free Satta Matka Tips and Kalyan Bazar Tips. We are known as India's best Matka DpBoss portal site, here to deliver updates on all sorts of Satta Market like Kalyan Bazar, Milan, Rajdhani, Time Bazaar, Main and the most current charts. Stay tuned with us for more live updates on the Satta market
Khushmeet Khushi Resume of manufacturing industry Khushmeet Khushi
A result oriented professional working for Process and New Technology of Manufacturing industry presently associated with Manufacturing Industry as
Asst. Manager in Research & Development. Skilled in manufacturing Process of various type of cords, cables, connector, wire Harness, Remote Control devices, Switches including backward integration thereof. Acquired knowledge of New product and process development, QMS, Compliance and product certification, IPQC, Product & process Stranded, Lean Manufacturing Methodology, and problem solving methodology, VAVE, Etc.
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 340F EXCAVATOR RBD
Configuration: 340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine
Disassembly and Assembly
C9.3 Engines for Caterpillar Built Machines
Media Number -UENR0130-06 Publication Date -01/08/2015 Date Updated -22/05/2017
i03897450
Fuel Lines - Remove and Install
SMCS - 1274-010
Removal Procedure
Contact with high pressure fuel may cause fluid penetration and burn
hazards. High pressure fuel spray may cause a fire hazard. Failure to
follow these inspection, maintenance and service instructions may cause
personal injury or death.
NOTICE
Contact with high pressure fuel may cause personal injury or death.
Wait 60 seconds after the engine has stopped to allow fuel pressure to
purge before any service or repair is performed on the engine fuel
lines.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
1/7
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. before opening any compartment or disassembling any component
containing fluids.
Dispose of all fluids according to local regulations and mandates.
NOTICE
Cleanliness is an important factor. Clean the exterior of the engine
before the removal procedure. Ensure the area around the Fuel
Manifold and the Fuel Lines are thoroughly cleaned. This action will
prevent contaminants from entering the internal mechanism. Before
replacing any Fuel Lines, follow the instructions that are listed below.
Replace the Fuel Lines with the correct Fuel Lines Group.
Note: The following procedures were written for the complete removal of all of the fuel lines and
clamps. If only specific fuel lines need to be replaced then only remove the fuel lines and clamps
that need replacement.
1. Turn the fuel supply to the OFF position.
2. Disconnect the battery. Refer to Operation and Maintenance Manual, "Battery or Battery
Cable - Disconnect".
3. Remove all components in order to access to the wiring harness.
Illustration 1 g02140798
4. Loosen clamp assemblies (1) and remove hose (2).
2/7
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. 10. Position harness assembly (13) out of the way. Remove the spacers (not shown) from studs
(14).
Illustration 5 g02141131
11. Remove the bolt (15) and remove the clamp assembly. Discard the clamp assembly.
12. Remove nuts (23), (19), and (20). Remove the corresponding clamp assemblies and discard
the clamp assemblies.
13. Loosen nuts (16) and (18). Remove fuel line (17) and discard the fuel line. Repeat for the
remaining fuel lines.
14. Loosen nuts (21) and (24). Remove fuel line (22) and discard the fuel line.
Installation Procedure
NOTICE
Fuel injection lines MUST only be used once. Discard all fuel injection
lines after use.
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
Note: Make sure that the fuel line caps remain in position until the fuel line is positioned near the
corresponding ports in order to prevent contamination. Ensure that the areas around the rail and
fuel lines are thoroughly clean before continuing this procedure. If any parts are worn or damaged,
use new parts for replacement. Cleanliness is an important factor. Ensure that no debris gets
4/7
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. introduced into the fuel system during the installation procedure. If any parts are worn or
damaged, use new parts for replacement.
Illustration 6 g02141131
Illustration 7 g02141119
Note: Make sure that the fuel line caps remain in position until the fuel line is positioned
near the corresponding ports in order to prevent contamination.
1. Install a new fuel line (17). Hand tighten nuts (16) and (18) on each end of the fuel line.
Repeat for the remaining fuel lines.
2. Install a new fuel line (22). Hand tighten nuts (21) and (24).
3. Position the clamp assembly and install bolt (15). Hand tighten the bolt.Failure to place the
grommet correctly on the fuel line could result in a failed fuel line..
4. Position the clamp assembly and install nuts (23), (19), and (20). Hand tighten the nuts.
Failure to place the grommet correctly on the fuel line could result in a failed fuel line.
Note: Ensure that the fuel lines are centered in the nuts prior to tightening. Do not use
excessive force or bending in order to assemble the fuel lines.
5. Tighten nuts (24) and (18) at the fuel rail to a torque of 27 ± 3 N·m (239 ± 27 lb in).
6. Tighten nuts (21) and (16) to a torque of 27 ± 3 N·m (239 ± 27 lb in).
5/7
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. 7. Tighten bolt (15) and nuts (23), (19), and (20) to a torque of 12 ± 3 N·m (105 ± 27 lb in).
8. Position the spacers (not shown) and harness (13) onto studs (14).
Illustration 8 g02140971
9. Install bracket (11) and install nuts (10).
10. Connect harness assemblies (12).
Illustration 9 g02140852
11. Position tube assembly (4). Connect fittings (3) and (7). Install bolts (5), (6), and (8).
12. Install bolt (9).
6/7
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 10 g02140798
13. Position hose (2) and install clamp assemblies (1).
14. Connect the battery. Refer to Operation and Maintenance Manual, "Battery or Battery Cable
- Connect".
15. Turn the fuel supply to the ON position.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Dec 9 14:14:30 UTC+0800 2020
7/7
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 340F EXCAVATOR RBD
Configuration: 340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine
Disassembly and Assembly
C9.3 Engines for Caterpillar Built Machines
Media Number -UENR0130-06 Publication Date -01/08/2015 Date Updated -22/05/2017
i04679349
Fuel Transfer Pump - Remove and Install
SMCS - 1256-010
Removal Procedure
Start By:
a. Remove the fuel injection pump.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat®
products.
Dispose of all fluids according to local regulations and mandates.
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1/2
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 1 g03348107
1. Remove nuts (1) and nut (3). Remove plate (4) and bracket assembly (2).
Illustration 2 g03348110
2. Remove bolts (5) and studs (6).
3. Remove connectors (7) and the O-ring seals.
Installation Procedure
Note: Check the O-ring seals, the gaskets, and the seals for wear or for damage. Replace the
components, if necessary.
1. Install the fuel transfer pump in the reverse order of removal.
a. Torque bolts (5) and studs (6) to a torque of 30 ± 4 N·m (22 ± 3 lb ft).
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Dec 9 14:15:26 UTC+0800 2020
2/2
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 340F EXCAVATOR RBD
Configuration: 340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine
Disassembly and Assembly
C9.3 Engines for Caterpillar Built Machines
Media Number -UENR0130-06 Publication Date -01/08/2015 Date Updated -22/05/2017
i04679613
Fuel Manifold - Remove and Install - Return
SMCS - 1702-010
Removal Procedure
Illustration 1 g02796484
1. Remove tube assemblies (3) and remove clip (1).
2. Remove fuel manifold (2).
1/2
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Illustration 2 g02796498
3. Remove connector (4) and the O-ring seal. Remove plug (6).
4. Remove check valve (5).
Illustration 3 g02796509
5. Remove check valve (7) and the O-ring seal. Remove O-ring seal (9) and backup ring (8).
Installation Procedure
1. Install fuel manifold (2) in the reverse order of removal.
a. Tighten check valve (7) to a torque of 28 ± 3 N·m (21 ± 2 lb ft).
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Dec 9 14:16:23 UTC+0800 2020
2/2
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 340F EXCAVATOR RBD
Configuration: 340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine
Disassembly and Assembly
C9.3 Engines for Caterpillar Built Machines
Media Number -UENR0130-06 Publication Date -01/08/2015 Date Updated -22/05/2017
i04687849
Fuel Manifold - Remove and Install
SMCS - 1702-010
Removal Procedure
Illustration 1 g02798190
1. Disconnect harness assemblies (1) and (2).
1/3
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Illustration 2 g02798192
2. Disconnect tube assemblies (3).
3. Remove bolts (5) and remove fuel manifold (4).
Illustration 3 g03356369
4. Remove adapter assemblies (6). Remove sensors (7) and the O-ring seals.
5. Remove solenoid valves (8).
6. Remove cap (10) and remove connector assembly (9).
Illustration 4 g02798209
7. Remove nut (15 ), washer (14), and solenoid (13).
8. Remove cartridge assembly (12) and remove O-ring seals (11).
Installation Procedure
1. Install fuel manifold (4) in the reverse order of removal.
a. Tighten nut (15) to a torque of 20 ± 2.5 N·m (177 ± 22 lb in).
b. Tighten solenoid valve (8) to a torque of 50 ± 5 N·m (37 ± 4 lb ft).
2/3
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. c. Tighten connector assembly (9) to a torque of 30 ± 3 N·m (22 ± 2 lb ft).
d. Tighten cap (10) to a torque of 7.0 ± 2.5 N·m (62 ± 22 lb in).
e. Tighten sensors (7) to a torque of 30 ± 3 N·m (22 ± 2 lb ft).
f. Tighten adapter assemblies (6) to a torque of 17 ± 1.5 N·m (150 ± 13 lb in).
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Dec 9 14:17:20 UTC+0800 2020
3/3
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 340F EXCAVATOR RBD
Configuration: 340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine
Disassembly and Assembly
C9.3 Engines for Caterpillar Built Machines
Media Number -UENR0130-06 Publication Date -01/08/2015 Date Updated -22/05/2017
i05678358
Fuel Manifold (Rail) - Remove and Install
SMCS - 1702-010
Removal Procedure
Contact with high pressure fuel may cause fluid penetration and burn
hazards. High pressure fuel spray may cause a fire hazard. Failure to
follow these inspection, maintenance and service instructions may cause
personal injury or death.
NOTICE
Contact with high pressure fuel may cause personal injury or death.
Wait 60 seconds after the engine has stopped to allow fuel pressure to
purge before any service or repair is performed on the engine fuel
lines.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
1/8
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. before opening any compartment or disassembling any component
containing fluids.
Dispose of all fluids according to local regulations and mandates.
NOTICE
Cleanliness is an important factor. Clean the exterior of the engine
thoroughly before the removal procedure. Ensure the area around the
Fuel Manifold and the Fuel Lines are thoroughly cleaned. This action
will prevent contaminants from entering the internal mechanism.
Before replacing any Fuel Lines, follow the instructions that are listed
below. Replace the Fuel Lines with the correct Fuel Lines Group.
1. Turn the fuel supply to the OFF position.
2. Disconnect the battery. Refer to Operation and Maintenance Manual, "Battery or Battery
Cable - Disconnect".
3. Remove all components in order to access to the wiring harness.
Illustration 1 g02140798
4. Loosen clamp assemblies (1) and remove hose (2) .
2/8
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Illustration 4 g02141119
10. Position harness assembly (13) out of the way. Remove the spacers (not shown) from studs
(14) .
Illustration 5 g02141131
11. Remove the bolt (15) and remove the clamp assembly. Discard the clamp assembly.
12. Remove nuts (23) , (19) , and (20) . Remove the corresponding clamp assemblies and
discard the clamp assemblies.
13. Loosen nuts (16) and (18) . Remove fuel line (17) and discard the fuel line. Repeat for the
remaining fuel lines.
14. Loosen nuts (21) and (24) . Remove fuel line (22) and discard the fuel line.
4/8
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 6 g02147909
15. Disconnect tube assembly (26) .
16. Remove studs (14) and remove fuel manifold (25) .
Installation Procedure
NOTICE
Fuel injection lines MUST only be used once. Discard all fuel injection
lines after use.
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
Note: Make sure that the caps for the fuel lines remain in position until the fuel line is positioned
near the corresponding ports to prevent contamination. Ensure that the areas around the rail and
fuel lines are thoroughly clean before continuing this procedure. If any parts are worn or damaged,
use new parts for replacement. Cleanliness is an important factor. Ensure that no debris gets
introduced into the fuel system during the installation procedure. If any parts are worn or
damaged, use new parts for replacement.
5/8
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 7 g02147909
1. Position fuel manifold (25) and install studs (14) hand tight. Connect tube assembly (26) .
Illustration 8 g02141131
Illustration 9 g02141119
Note: During installation, make sure that the fuel line caps remain in position until the fuel
line is positioned near the corresponding ports. This action will prevent contamination.
6/8
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. 2. Install a new fuel line (17) . Hand tighten nuts (16) and (18) on each end of the fuel line.
Repeat for the remaining fuel lines.
3. Install a new fuel line (22) . Hand tighten nuts (21) and (24) .
4. Position the clamp assembly and install bolt (15) . Hand tighten the bolt.The fuel line could
fail if the grommet is not correctly placed on the fuel line.
5. Position the clamp assembly and install nuts (23) , (19) , and (20) . Hand tighten the nuts.
The fuel line could fail if the grommet is not correctly placed on the fuel line.
Note: Ensure that the fuel lines are centered in the nuts prior to tightening. Do not use
excessive force or bending in order to assemble the fuel lines.
6. Tighten nuts (24) and (18) at the fuel rail to a torque of 27 ± 3 N·m (239 ± 27 lb in).
7. Tighten studs (14) to a torque of 28 ± 7 N·m (21 ± 5 lb ft).
8. Tighten nuts (21) and (16) to a torque of 15 ± 3 N·m (135 ± 27 lb in). Turn nuts (10) and (5)
for an additional 60 ± 5 degrees.
9. Tighten bolt (15) and nuts (23) , (19) , and (20) to a torque of 12 ± 3 N·m (105 ± 27 lb in).
10. Position the spacers (not shown) and harness (13) onto studs (14) .
Illustration 10 g02140971
11. Install bracket (11) and install nuts (10) .
12. Connect harness assemblies (12) .
7/8
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
24. Illustration 11 g02140852
13. Position tube assembly (4) . Connect fittings (3) and (7) . Install bolts (5) , (6) , and (8) .
14. Install bolt (9) .
Illustration 12 g02140798
15. Position hose (2) and install clamp assemblies (1) .
16. Connect the battery. Refer to Operation and Maintenance Manual, "Battery or Battery Cable
- Connect".
17. Turn the fuel supply to the ON position.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Dec 9 14:18:17 UTC+0800 2020
8/8
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 340F EXCAVATOR RBD
Configuration: 340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine
Disassembly and Assembly
C9.3 Engines for Caterpillar Built Machines
Media Number -UENR0130-06 Publication Date -01/08/2015 Date Updated -22/05/2017
i04679931
Relief Valve (Fuel) - Remove and Install
SMCS - 1702-010-PV
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description QTY
A 5P-0332 Crowfoot Wrench 1
B 129-1966 Multipurpose Grease 1
Start By:
a. Remove the exhaust sensor lines.
NOTICE
Contact with high pressure fuel may cause personal injury or death.
Wait 60 seconds after the engine has stopped to allow fuel pressure to
purge before any service or repair is performed on the engine fuel
lines.
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1/5
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
26. NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Dispose of all fluids according to local regulations and mandates.
Contact with high pressure fuel may cause fluid penetration and burn
hazards. High pressure fuel spray may cause a fire hazard. Failure to
follow these inspection, maintenance and service instructions may cause
personal injury or death.
1. Turn the fuel supply to the OFF position.
2. Disconnect the battery. Refer to Operation and Maintenance Manual, "Battery or Battery
Cable - Disconnect".
3. Remove all components in order to access to the harness assembly.
Illustration 1 g02796524
4. Loosen clamp assemblies (1) and remove hose (2).
2/5
340F Excavator RBD00001-UP (MACHINE) POWERED BY C9.3 Engine(M007667...
2020/12/9
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...