2. Content
1. Introduction …………………………………………………………………………….. 3
2. Location of Site ………………………………………………………………………... 4
3. Site Plan ………………………………………………………………………………... 4
4. Site Analysis ………………………………………………………………………….... 5
4.1. Topography ……………………………………………………………………..
5
4.2. Traffic …………………………………………………………………………....
5
4.3. Views …………………………………………………………………………... 6
4.4. Disadvantage ………………………………………………………………….. 6
4.5. Avantage ……………………………………………………………………….. 6
4.6. Site Context ……………………………………………………………………. 7
5. Rationale ……………………………………………………………………………….. 8
5.1. Rationale of Our Concept ……………………………………………………. 8
5.2. Advantage of Our Concept …………………………………………………... 8
5.3. Impact to the Client & Surrounding Community ………………………….... 8
6. Task of Project Management Team ………………………………………………….
9
6.1. Architect ………………………………………………………………………... 9
6.2. Landscape Architect ………………………………………………………….. 9
6.3. Quantity Surveyor ……………………………………………………………. 10
6.4. Mechanical & Electrical Engineer ………………………………………….. 10
6.5. Contractor ……………………………………………………………………..
10=
7. Project Concept ……………………………………………………………………….
11
7.1. Bubble Diagram ……………………………………………………………… 11
7.2. Elevation …………………………………………………………………….... 12
7.3. Floor Plan …………………………………………………………………….. 13
7.3.1. Basement …………………………………………………………….. 13
2
3. 7.3.2. Ground Floor ……………………………………………………... 1415
7.3.3. 2nd Floor ………………………………………………………….. 1618
7.3.4. 3rd Floor …………………………………………………………... 2021
8. Conclusion ……………………………………………………………………….. 2223
1. Introduction
For this project, we are tasked to select a specific empty land of size (30m x 30 m) to
initiate a small construction project.The objection of this project is to enable students to
develop an understanding of the building team,its organisation,duties,interrelatives
within which they will seek employment,career progression or further study.The project
also serves to develop an awareness of their professional responsibilities and to
appreciate their profession in the construction industry.We need to document our
observations and understanding from research resources as well as to communicate
our findings in a systematic and convincing report.
3
6.
12pm4pm (Weekdays)
4.3 Views
Good Views
facing the golf field , Sunway Driving Range .
facing at the Sunway South Quay Lake .
Bad Views
View of the future construction site .
Blocked by some of the high rise building .
4.4 Disadvantage
The disadvantage of this site is the small area to build high rise building . Another
disadvantage will be fulled of residential area and lack of commercial lot makes
people go to city work , school , entertain and etc. Due to this reason , its make
6
24.
iv)Formal BP submission
After WP is obtained and clearances from technical departments are obtained or likely to be
obtained within the next 2 weeks, QP submits formal BP application to BCA. QP only needs to
attach the site plan approved by URA with his BP submission. The full set of Development
Control (DC) plans is NOT required. He has to declare that BP does not deviate from DC plan.
BCA registers the application. BCA checks whether QP has submitted all clearances.
If all clearances are submitted and BCA requirements are complied with, BCA approves the
application within one week from the date of submission.
If any clearance is still outstanding within the 2week time frame, but BCA requirements are complied
with, BCA may approve the application on condition that outstanding BP clearances have to be
obtained and submitted prior to or with TOP/CSC application.
24