SlideShare a Scribd company logo
1 of 1
Download to read offline
ROUNDABOUT REPORT
General Information Site Information
Analyst CARLOS FIGUEROA
Agency or Co. UPTC
Date Performed 13/05/2014
Time Period HORA PICO-SABADO
Intersection CASA DEL GOBERNADOR
E/W Street Name AVENIDA OLIMPICA
N/S Street Name
Analysis Year 2014
Project ID TALLER 4
Project Description:
Volume Adjustment and Site Characteristics
EB WB NB SB
L T R U L T R U L T R U L T R U
Number of Lanes(N) 0 2 0 0 2 0 0 2 0 0 2 0
Volume (V), veh/h 0 77 0 0 0 73 0 0 0 437 0 0 0 285 0 0
Heavy Veh. Adj. (fHV), % 6 5 17 3 5 15 11 3 0 2 0 3 2 2 4 3
Peak Hour Factor (PHF) 0.86 0.83 0.78 1.00 0.81 0.78 0.80 1.00 0.77 0.89 0.50 1.00 0.97 0.90 0.87 1.00
No. of Pedestrians
Crossing Entry
77 52 3 65
Critical and Follow-Up Headway Adjustment
EB WB NB SB
Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass
Critical Headway (sec) 4.2929 4.1129 5.1929 4.2929 4.1129 5.1929 4.2929 4.1129 5.1929 4.2929 4.1129 5.1929
Follow-Up Headway (sec) 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858
Flow Computations
EB WB NB SB
Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass
Circulating Flow (Vc), pc/h 320 501 97 108
Exiting Flow (Vex), pc/h 97 108 501 320
Entry Flow (Ve), pc/h 46 51 51 57 235 266 150 170
Entry Volume veh/h 44 49 44 50 230 261 149 168
Capacity and v/c Ratios
EB WB NB SB
Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass
Capacity (cPCE), pc/h 889 903 776 796 1051 1056 1042 1048
Capacity (c), veh/h 792 804 652 669 1027 1032 961 967
v/c Ratio (X) 0.06 0.06 0.07 0.07 0.22 0.25 0.15 0.17
Delay and Level of Service
EB WB NB SB
Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass
Lane Control Delay (d), s/veh 5.1 5.1 6.3 6.2 5.6 5.9 5.2 5.4
Lane LOS A A A A A A A A
Lane 95% Queue 0.2 0.2 0.2 0.2 0.9 1.0 0.5 0.6
Approach Delay, s/veh 5.08 6.22 5.79 5.29
Approach LOS, s/veh A A A A
Intersection Delay, s/veh 5.61
Intersection LOS A
Copyright © 2010 University of Florida, All Rights Reserved HCS 2010TM 6.2 Roundabouts Generated:  13/05/2014    10:31 p.m.
Página 1 de 1Formatted Report
13/05/2014file://C:UsersCARLOSAppDataLocalTempu2kE7F5.tmpYou created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

More Related Content

What's hot (12)

Saudi Aramco Material System Specifications (SAMSS) 10
Saudi Aramco Material System Specifications (SAMSS) 10Saudi Aramco Material System Specifications (SAMSS) 10
Saudi Aramco Material System Specifications (SAMSS) 10
 
Multidestinos tap setembro 2014
Multidestinos tap setembro 2014Multidestinos tap setembro 2014
Multidestinos tap setembro 2014
 
Gtp usb[plus]
Gtp usb[plus]Gtp usb[plus]
Gtp usb[plus]
 
Sara Maatje VI
Sara Maatje VISara Maatje VI
Sara Maatje VI
 
TGS GPS- Portugal well data
TGS GPS- Portugal well data TGS GPS- Portugal well data
TGS GPS- Portugal well data
 
Notam 28 set
Notam 28 setNotam 28 set
Notam 28 set
 
Afra Marine Technologies Pte Ltd Brochure
Afra Marine Technologies Pte Ltd BrochureAfra Marine Technologies Pte Ltd Brochure
Afra Marine Technologies Pte Ltd Brochure
 
Hard wares
Hard waresHard wares
Hard wares
 
Nasa HDS
Nasa HDSNasa HDS
Nasa HDS
 
Shear capacity asd lrfd friedberg high sterngth bolts 031213
Shear capacity asd lrfd friedberg high sterngth bolts 031213Shear capacity asd lrfd friedberg high sterngth bolts 031213
Shear capacity asd lrfd friedberg high sterngth bolts 031213
 
RYC offers this Valk flushdeck motoryacht FOR SALE
RYC offers this Valk flushdeck motoryacht FOR SALERYC offers this Valk flushdeck motoryacht FOR SALE
RYC offers this Valk flushdeck motoryacht FOR SALE
 
Saudi Aramco Engineering Procedures (SAEP)1
Saudi Aramco Engineering Procedures (SAEP)1Saudi Aramco Engineering Procedures (SAEP)1
Saudi Aramco Engineering Procedures (SAEP)1
 

Similar to Glorieta avenida universitaria con avenida olimpica

PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffgh
PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffghPFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffgh
PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffgh
JhomelEbero
 

Similar to Glorieta avenida universitaria con avenida olimpica (15)

Study project - Traffic engineering 2019
Study project - Traffic engineering 2019Study project - Traffic engineering 2019
Study project - Traffic engineering 2019
 
Quishpe mireya practica6
Quishpe mireya practica6Quishpe mireya practica6
Quishpe mireya practica6
 
Reporte diseño multicarril
Reporte diseño multicarrilReporte diseño multicarril
Reporte diseño multicarril
 
Motor speeed Erdi Karaçal Mechanical Engineer
Motor speeed  Erdi Karaçal Mechanical EngineerMotor speeed  Erdi Karaçal Mechanical Engineer
Motor speeed Erdi Karaçal Mechanical Engineer
 
10 DTL flow rate and tank volume calculation.pptx
10 DTL flow rate and tank volume calculation.pptx10 DTL flow rate and tank volume calculation.pptx
10 DTL flow rate and tank volume calculation.pptx
 
USM-Bonifacio Four-Leg Intersection
USM-Bonifacio Four-Leg IntersectionUSM-Bonifacio Four-Leg Intersection
USM-Bonifacio Four-Leg Intersection
 
129589738 preliminariesprre
129589738 preliminariesprre129589738 preliminariesprre
129589738 preliminariesprre
 
DUG 2010 Technical Workshop Presentation
DUG 2010 Technical Workshop PresentationDUG 2010 Technical Workshop Presentation
DUG 2010 Technical Workshop Presentation
 
PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffgh
PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffghPFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffgh
PFD-PIDs.pdfmuiijgfh jjgdgjjddryujhgffgh
 
12 h7 sist-electrico-serie-4er (1)
12 h7 sist-electrico-serie-4er (1)12 h7 sist-electrico-serie-4er (1)
12 h7 sist-electrico-serie-4er (1)
 
Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah)
Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah) Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah)
Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah)
 
SI47XX_Tuner (1).pdf
SI47XX_Tuner (1).pdfSI47XX_Tuner (1).pdf
SI47XX_Tuner (1).pdf
 
TC74VHCT04AFN PSpice Model (Free SPICE Model)
TC74VHCT04AFN PSpice Model  (Free SPICE Model)TC74VHCT04AFN PSpice Model  (Free SPICE Model)
TC74VHCT04AFN PSpice Model (Free SPICE Model)
 
D1401 e 3.2
D1401 e 3.2D1401 e 3.2
D1401 e 3.2
 
Practica 5 irc
Practica 5 ircPractica 5 irc
Practica 5 irc
 

Glorieta avenida universitaria con avenida olimpica

  • 1. ROUNDABOUT REPORT General Information Site Information Analyst CARLOS FIGUEROA Agency or Co. UPTC Date Performed 13/05/2014 Time Period HORA PICO-SABADO Intersection CASA DEL GOBERNADOR E/W Street Name AVENIDA OLIMPICA N/S Street Name Analysis Year 2014 Project ID TALLER 4 Project Description: Volume Adjustment and Site Characteristics EB WB NB SB L T R U L T R U L T R U L T R U Number of Lanes(N) 0 2 0 0 2 0 0 2 0 0 2 0 Volume (V), veh/h 0 77 0 0 0 73 0 0 0 437 0 0 0 285 0 0 Heavy Veh. Adj. (fHV), % 6 5 17 3 5 15 11 3 0 2 0 3 2 2 4 3 Peak Hour Factor (PHF) 0.86 0.83 0.78 1.00 0.81 0.78 0.80 1.00 0.77 0.89 0.50 1.00 0.97 0.90 0.87 1.00 No. of Pedestrians Crossing Entry 77 52 3 65 Critical and Follow-Up Headway Adjustment EB WB NB SB Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway (sec) 4.2929 4.1129 5.1929 4.2929 4.1129 5.1929 4.2929 4.1129 5.1929 4.2929 4.1129 5.1929 Follow-Up Headway (sec) 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858 Flow Computations EB WB NB SB Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Circulating Flow (Vc), pc/h 320 501 97 108 Exiting Flow (Vex), pc/h 97 108 501 320 Entry Flow (Ve), pc/h 46 51 51 57 235 266 150 170 Entry Volume veh/h 44 49 44 50 230 261 149 168 Capacity and v/c Ratios EB WB NB SB Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Capacity (cPCE), pc/h 889 903 776 796 1051 1056 1042 1048 Capacity (c), veh/h 792 804 652 669 1027 1032 961 967 v/c Ratio (X) 0.06 0.06 0.07 0.07 0.22 0.25 0.15 0.17 Delay and Level of Service EB WB NB SB Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 5.1 5.1 6.3 6.2 5.6 5.9 5.2 5.4 Lane LOS A A A A A A A A Lane 95% Queue 0.2 0.2 0.2 0.2 0.9 1.0 0.5 0.6 Approach Delay, s/veh 5.08 6.22 5.79 5.29 Approach LOS, s/veh A A A A Intersection Delay, s/veh 5.61 Intersection LOS A Copyright © 2010 University of Florida, All Rights Reserved HCS 2010TM 6.2 Roundabouts Generated:  13/05/2014    10:31 p.m. Página 1 de 1Formatted Report 13/05/2014file://C:UsersCARLOSAppDataLocalTempu2kE7F5.tmpYou created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)