Status Report5

294 views

Published on

Status Report 5

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
294
On SlideShare
0
From Embeds
0
Number of Embeds
22
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Status Report5

  1. 1. Drinks Unlimited<br />AVD&FDS<br />Automated Volume Detection<br />& FluidDispensing System.<br />Status Report #5<br />Design Team #2<br />Frederick Weissbach<br />Brendan Baker<br />Sean Tovar<br />EE 4813 – Electrical Engineering Design II<br />03 March, 2010<br />
  2. 2. OverallNeed& Milestones<br />Our product will help disperse lines and increase productivity while also helping with sanitation at public beverage dispensing locations.<br />Milestones – <br /><ul><li> Finalized Design - 03 February, 2010
  3. 3. Receive Ordered Parts – 21 February, 2010
  4. 4. Working Code – 22 March, 2010
  5. 5. Completed Report - 3 April, 2010
  6. 6. Functional Prototype – 13 April, 2010</li></li></ul><li>RecentTasks<br /><ul><li>CompletedTasks -
  7. 7. Image Acquisition
  8. 8. Hardware/Software Collaboration
  9. 9. Working Code
  10. 10. Tentative GUI
  11. 11. Spec’d Cameras</li></li></ul><li>Ongoing/PendingTasks<br /><ul><li>100k Competition
  12. 12. Changes in product equipment
  13. 13. Including needed software on different PC</li></ul>Pending Tasks -<br />
  14. 14. UpcomingTasks<br />Approaching Tasks -<br />Valve integration<br />Order Webcams<br />GUI additions<br />Trim down code<br />New Hardware Integration with new cameras<br />
  15. 15. Block DiagramPercentages<br />
  16. 16. Schedule Percentages<br />

×