SlideShare a Scribd company logo
1 of 17
Download to read offline
1
APPENDIX
2
PROJECTFINAL
PRESENTATION
08/21/13
MineTailingsMassFlowStudy
ACarlsonSoftwareApproach
PhotosbyA.Fournier
3
Introduction
•Name:AntoineFournier
•University:McGillUniversity
•Degree:MiningEngineeringCo-op
•Expectedgraduationdate:06/15
•PositionTitle:Assistantmineengineer
•Department:MiningEngineering
•Supervisor/ManagerName:RobertPride
•WorkLocation:MarbleFalls,Texas
•ProjectTitle:MineTailingsMassFlowStudy
4
Objectivesanddeliverables
•Allminesfaceaproblem:tailings
•Determinetailings;October2007thruJuly312013
•Wheretostore?
•Howlongisitgoingtolast?
•Atwhatrateisitpouring?
•Whataretheconsequenceforlifeofmineplanning?
5
ElementsofSolution
•Determineelevationsofsedimentacrossthepondforgrid
•CalculatevolumeusingCarlsonminingsoftware
•Determineproductionrate(tonscrushed/years)
•Calculateportionofproductioneffectingtailings
•Determinetailingdepositionrate
•DetermineMassDensityoftailings
6
Initialfinding2011
7
FINESSTORAGEWORKSHEET
InitialFindingsRobertPride2011
8
TailingsPoints
..
.
.
.
9
Challenges
•Aerialsurveysshowonlywaterlevel(notsedimentlevel)
•Findsubmergedsedimentlevel
•Notpossibletogetpointsinthemiddle(havetoapproximate)
•Createagridfor2007whenminingbegan
•Waterlevelisneverconstant,hardtodrawcontactline
10
Tailingpondgrid
Blue=Fill
Red=Cut
11
Mineproductionschedulesummary
EffectiveTons
EffectiveTons=onlytonseffectingtailings
12
13
Result/CalculationSummary
•23,923,718cubicfootofsediment(fromCarlson)
•23,980,781tonsofrockeffectingtailings(fromproductionschedule)
•1tonofrock1cubicfootofsediment1.0:1.0
•Densityforrockisapproximately165lb/cuft
•Densityofwetsedimentis88.8lb/cuft
BYVOLUME
•Fromdensityofrockwehave290,676,133cubicfootofrock
•FromCarlsonwehave23,923,718cubicfootofsediment
•Thuscuftofsediment=8.25%cufteff.crushedtons
BYWEIGHT
•Fromvolumereportthereis1,062,213.11tonsofsediment
•Fromproductionschedulethereis23,980,781eff.tonsofrock
•Tonsofsediment=4.4%eff.crushedtons
•Swellfactortailing’sfineswithwater=1.67
(additionalstudyforbenefits)
Initialtailingssamplingnearsurface
14
Opportunities
•Supplymineplanningwithdataforlifeofmine
•Provideassistancetominingcontractor
•Eliminateunknownsforreclamationplanning
•Identifyanynewareasforcostsavingsfromstudy
•Offerchemicalpropertiesforfutureopportunity(needsstudy)
15
VariousStoragePlaces
SumTotalThisConceptto2031
16
Additionaltaskscompleted
GPSminesurvey
Supplydrilloperatorswithdrilldepth
Carlsonminesoftware
Massdensitymeasurements
Qualitycontrol(QC)
Labassistance
17
QUESTIONS
?

More Related Content

Viewers also liked (13)

Social Recruiting (Beginner)
Social Recruiting (Beginner)Social Recruiting (Beginner)
Social Recruiting (Beginner)
 
test
testtest
test
 
Fluence
FluenceFluence
Fluence
 
Intro to ss9
Intro to ss9Intro to ss9
Intro to ss9
 
A dislexia no pré escolar prevenir-nos 1º e 2º ciclos-intervir_nos 3º ciclo e...
A dislexia no pré escolar prevenir-nos 1º e 2º ciclos-intervir_nos 3º ciclo e...A dislexia no pré escolar prevenir-nos 1º e 2º ciclos-intervir_nos 3º ciclo e...
A dislexia no pré escolar prevenir-nos 1º e 2º ciclos-intervir_nos 3º ciclo e...
 
Explorador de archivo presentación
Explorador de archivo presentaciónExplorador de archivo presentación
Explorador de archivo presentación
 
Travel with me - prezentare
Travel with me - prezentare Travel with me - prezentare
Travel with me - prezentare
 
Borrador calendario académico curso 2016 2017
Borrador calendario académico curso 2016 2017Borrador calendario académico curso 2016 2017
Borrador calendario académico curso 2016 2017
 
Agile and Scrum for Executives
Agile and Scrum for ExecutivesAgile and Scrum for Executives
Agile and Scrum for Executives
 
Test1
Test1Test1
Test1
 
Tabla de indice
Tabla de indiceTabla de indice
Tabla de indice
 
Album de viatges
Album de viatgesAlbum de viatges
Album de viatges
 
สอนแต่งภาพ
สอนแต่งภาพสอนแต่งภาพ
สอนแต่งภาพ
 

PROJECT FINAL PRESENTATION