SlideShare a Scribd company logo
1 of 1
Risk assessment
There will be many risks in the making of my movie and certain things will need
to be changed to make things safe for my actors
We will film on a sunny and dry day to reduce the risk of slipping and falling so
my actors don’t get injured
One of my actors will be walking down the side of a small/muddy hill with rocks
and it will vital that this is a dry place so he does not slip and he will take it
slowly while being filmed
There is a part in my movie where one of the actors are strangled
To reduce risk in this situation a very soft material has been picked so it would
rip if too much pressure was put on it and also that the other actor will be gentle
when doing this
Another risk will be when one of my actors get taken to the ground after being
strangled
This issue will be solved by filming on a dry day so the actor does not slip and fall
unexpectedly and will be caught by the other actor
A final scene where a person carrying another actor will put them onto the
ground
For this shot a dry and soft ground will be made with no sharp objects and the
actor will be put onto the ground slowly and carefully so no harm comes to the
actor.

More Related Content

More from Andrew Tierney (17)

Magazine adverts
Magazine advertsMagazine adverts
Magazine adverts
 
Call sheet
Call sheetCall sheet
Call sheet
 
Call sheet outside
Call sheet outsideCall sheet outside
Call sheet outside
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Script
ScriptScript
Script
 
4
44
4
 
Question 6 media
Question 6 mediaQuestion 6 media
Question 6 media
 
Question 7
Question 7Question 7
Question 7
 
Question1
Question1Question1
Question1
 
Call sheet
Call sheetCall sheet
Call sheet
 
Written analysis of opening sequence
Written analysis of opening sequenceWritten analysis of opening sequence
Written analysis of opening sequence
 
Institutional research
Institutional researchInstitutional research
Institutional research
 
Initial ideas for thriller movie
Initial ideas for thriller movieInitial ideas for thriller movie
Initial ideas for thriller movie
 
History of the genre
History of the genreHistory of the genre
History of the genre
 
Conventions of the genre
Conventions of the genreConventions of the genre
Conventions of the genre
 
9frame
9frame9frame
9frame
 
Initial ideas for thriller movie
Initial ideas for thriller movieInitial ideas for thriller movie
Initial ideas for thriller movie
 

Risk assessment

  • 1. Risk assessment There will be many risks in the making of my movie and certain things will need to be changed to make things safe for my actors We will film on a sunny and dry day to reduce the risk of slipping and falling so my actors don’t get injured One of my actors will be walking down the side of a small/muddy hill with rocks and it will vital that this is a dry place so he does not slip and he will take it slowly while being filmed There is a part in my movie where one of the actors are strangled To reduce risk in this situation a very soft material has been picked so it would rip if too much pressure was put on it and also that the other actor will be gentle when doing this Another risk will be when one of my actors get taken to the ground after being strangled This issue will be solved by filming on a dry day so the actor does not slip and fall unexpectedly and will be caught by the other actor A final scene where a person carrying another actor will put them onto the ground For this shot a dry and soft ground will be made with no sharp objects and the actor will be put onto the ground slowly and carefully so no harm comes to the actor.