Pre-monsoon works identified as follows:- 
1. De-silting and removal of debris and mud slush out of drainage devices. 
2. Renewal of mud capping and resetting of loose bricks. 
3. Re-pointing with mud mortar for consolidation of wall cores i.e. grouting of cracks, filling voids 
in walls, etc. complete. 
4. Erection of dry burnt brick masonry buttressing to the leaning walls in order to avoid from 
collapsing as a temporary measures. 
5. Erection of steel shoring (properly designed) to the extremely tilted or out of plane walls in 
order to stop them from further collapsing. 
6. Construction of shallow drains lined with pacca brick masonry. 
7. Repair and construction of barriers/mud pushtas in mud brick masonry in order to slow down 
the speed of rain run off and to divert the flow of rain water towards less sensitive areas. 
8. Filling up of cavities and holes of the mud capping of the walls with salt free pure clay obtained 
from the river Indus, to prevent the rainwater entering into the core of the walls. 
9. Recording of gullies with the help of maps and the reinforcement of the same with sundried 
brick masonry. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Conventions adopted for 
site works on maps. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Conventions 
adopted for site 
works on maps in 
SD-Area. 
Prepared by: Ali Hyder, A. Conservator, Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Conventions 
adopted for site 
works on maps in 
DKG- South Area. 
Prepared by: Ali Hyder, A. Conservator, Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Conventions 
adopted for site 
works on maps in 
DKG- North Area. 
Prepared by: Ali Hyder, A. Conservator, Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Conventions 
adopted for site 
works on maps in 
VS-Area. 
Prepared by: Ali Hyder, A. Conservator, Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Conventions 
adopted for site 
works on maps in 
HR-Area. 
Prepared by: Ali Hyder, A. Conservator, Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
RAIN WATER IS THE MAIN CONTRIBUTOR TO THE WEAR AND DAMAGE OF 
RUINS AND IT CAN DAMAGE THE STRUCTURES IN SEVERAL WAY; BY 
WASHING AWAY THE SOIL (EROSION AND SCOURING), • BY MAKING THE SOIL 
LOOSE, (I.E. WEAKENING THE LOAD BEARING CAPACITY) RESULTING IN 
TILTING OF WALLS. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
BY DEPOSITING SOILS (SILTING) WHICH MAY OBSTRUCT THE PASSAGE 
OF WATER 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
BY WASHING AWAY ENTIRE SECTIONS OF THE WALLS OR PART OF 
STRUCTURES 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
RAIN WATER CAUSES TUNNELING, GULLIES, FURROWS 
AND CREVICES 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
OBVIOUSLY, THE DESIGN OF PROPER DRAINAGE RELIES ON CAREFUL STUDIES AT SITE. 
EQUALLY IMPORTANT, THE DRAINAGE PATTERNS AND REQUIREMENTS SHOULD BE OBSERVED 
DURING RAINY PERIODS, IN ORDER TO OBTAIN A REALISTIC IMPRESSION OF THE HOW, AND 
HOW MUCH, WATER IS MOVING IN THE VICINITY OF THE STRUCTURES. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
SIDE DRAINS AND SHALLOW DRAINS WHICH COLLECT 
AND LEAD THE WATER AWAY FROM WALLS. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
How to over come afore mentioned damages of rains:- 
Measures adopted during this ensuing monsoon season, 
2013, according to plan, by constructing barriers, filling 
voids in capping and to maintain catch-water drains which 
catch surface water before it reaches the walls, building 
scour checks, preventing erosion and barriers by slowing 
down the flow of the water. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
BARRIERS 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
BARRIERS 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Designing surface drainage which enables 
the water to flow off out of remains 
smoothly. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Drainage work in progress (Shallow drain 
and building scour check) 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Constructing scouring checks. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Constructing scouring checks. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Damage and wear to the structures can be reduced if 
the flow of water is controlled. Minor damages can 
easily be repaired as part of the regular maintenance 
provided to the remains and its structures. If the flow of 
water is not properly managed, the deterioration of the 
structures will be more serious and occur more rapidly. 
This will lead to higher maintenance demands. An 
efficient drainage system is therefore essential to allow 
water to flow off and away from the walls as quickly as 
possible. This is achieved by a system consisting of the 
following components: 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Maintenance of drainage devices i.e 
cleaning, removing mud slush, dust 
dirt, debris and all kinds of rubbish. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Maintenance of drainage devices i.e 
cleaning, removing mud slush, dust 
dirt, debris and all kinds of rubbish. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Maintenance of drainage devices i.e 
cleaning, removing mud slush, dust 
dirt, debris and all kinds of rubbish. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Maintenance of drainage devices i.e 
cleaning, removing mud slush, dust 
dirt, debris and all kinds of rubbish. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Maintenance of drainage devices i.e 
cleaning, removing mud slush, dust 
dirt, debris and all kinds of rubbish. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Resetting work in SD Area 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Resetting work in SD Area 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Maintenance of drainage devices i.e 
cleaning, removing mud slush, dust 
dirt, debris and all kinds of rubbish. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Maintenance of drainage devices i.e 
cleaning, removing mud slush, dust 
dirt, debris and all kinds of rubbish. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Maintenance of drainage devices i.e 
cleaning, removing mud slush, dust 
dirt, debris and all kinds of rubbish. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Maintenance of drainage devices i.e 
cleaning, removing mud slush, dust 
dirt, debris and all kinds of rubbish. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Maintenance of drainage devices i.e 
cleaning, removing mud slush, dust 
dirt, debris and all kinds of rubbish. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Stabilization of endangered part of 
structures by building dry brunt brick 
buttressing or steel shoring. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Stabilization of endangered part of 
structures by building dry brunt brick 
buttressing. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Stabilization of endangered part of 
structures by building dry brunt brick 
buttressing. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Stabilization of endangered part of 
structures by building dry brunt brick 
buttressing. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Brushing before application of mud 
slurry. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Mud slurry work 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Mud slurry work 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Mud pushta in DKG Area 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Resetting work in DKG Area 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Resetting work in DKG Area 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Resetting work in DKG Area 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Resetting work in SD Area 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Wall base protection either with mud 
filling or by sundried bricks 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Wall base protection either with mud 
filling or by sundried bricks 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Mud brick flooring DKG-South 
Area 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Mud brick flooring DKG-South 
Area 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Mud capping and slurry in 
Block-29, DKG-North 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Mud capping and slurry in 
Block-29, DKG-North 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Mud capping in Block-29, 
DKG-North 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Mud capping and slurry in 
DKG-North 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Mud capping and slurry in 
DKG-North 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Mud capping and slurry in 
DKG-North 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Brushing before application of re-pointing 
in SD Area. 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Re-Pointing work at Stupa 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Re-Pointing work at Stupa 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Re-Pointing work at Stupa 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Mud pushta work at Stupa 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Resetting work at SD -Area 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Filling of gaps, voids in mud 
capping with pure clay in DK area 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Filling of gaps, voids in mud 
capping with pure clay in DK area 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Filling of gaps, voids in mud 
capping with pure clay in HR area 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Filling of gullies with mud 
bricks after rain at DKG- South - 
Area 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Filling of gullies after rain at SD-Area 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Filling of gullies after rain at SD-Area 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
Filling of gullies after rain at SD-Area 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
NATIONAL FUND FOR MOHENJODARO 
THANKS 
Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput

More Related Content

More from ALI HYDER GADHI

National Fund for Mohenjodaro , its status, functions and detail of deposits
National Fund for Mohenjodaro , its status,    functions and detail of deposits National Fund for Mohenjodaro , its status,    functions and detail of deposits
National Fund for Mohenjodaro , its status, functions and detail of deposits ALI HYDER GADHI
 
Conservation methods 13 2-2013
Conservation methods 13 2-2013Conservation methods 13 2-2013
Conservation methods 13 2-2013ALI HYDER GADHI
 
General Contract Conditions as incorporated by SPPRA /PPPRA
General Contract Conditions as incorporated by SPPRA /PPPRA General Contract Conditions as incorporated by SPPRA /PPPRA
General Contract Conditions as incorporated by SPPRA /PPPRA ALI HYDER GADHI
 
Monsoon Preparations Survey for Archaeological Ruins Mohenjodaro
 Monsoon Preparations Survey for  Archaeological Ruins Mohenjodaro  Monsoon Preparations Survey for  Archaeological Ruins Mohenjodaro
Monsoon Preparations Survey for Archaeological Ruins Mohenjodaro ALI HYDER GADHI
 
Urban renewal, conservation & regeneration of arabic cities
Urban renewal, conservation & regeneration of arabic citiesUrban renewal, conservation & regeneration of arabic cities
Urban renewal, conservation & regeneration of arabic citiesALI HYDER GADHI
 
Conservation and revitalization of historic buildings
Conservation and revitalization of historic buildingsConservation and revitalization of historic buildings
Conservation and revitalization of historic buildingsALI HYDER GADHI
 
Mohen jo Daro Indus valley by ALI HYDER GADHI BALOCH
Mohen jo Daro  Indus valley by ALI HYDER GADHI BALOCH Mohen jo Daro  Indus valley by ALI HYDER GADHI BALOCH
Mohen jo Daro Indus valley by ALI HYDER GADHI BALOCH ALI HYDER GADHI
 
History of Conservation and Preservation of Cultural Property
 History of Conservation and Preservation of Cultural Property  History of Conservation and Preservation of Cultural Property
History of Conservation and Preservation of Cultural Property ALI HYDER GADHI
 
2nd day presentation mohanlal
2nd day presentation   mohanlal2nd day presentation   mohanlal
2nd day presentation mohanlalALI HYDER GADHI
 
Conservation terminologies for site and monuments
Conservation terminologies for site and monumentsConservation terminologies for site and monuments
Conservation terminologies for site and monumentsALI HYDER GADHI
 

More from ALI HYDER GADHI (12)

National Fund for Mohenjodaro , its status, functions and detail of deposits
National Fund for Mohenjodaro , its status,    functions and detail of deposits National Fund for Mohenjodaro , its status,    functions and detail of deposits
National Fund for Mohenjodaro , its status, functions and detail of deposits
 
Conservation methods 13 2-2013
Conservation methods 13 2-2013Conservation methods 13 2-2013
Conservation methods 13 2-2013
 
General Contract Conditions as incorporated by SPPRA /PPPRA
General Contract Conditions as incorporated by SPPRA /PPPRA General Contract Conditions as incorporated by SPPRA /PPPRA
General Contract Conditions as incorporated by SPPRA /PPPRA
 
Monsoon Preparations Survey for Archaeological Ruins Mohenjodaro
 Monsoon Preparations Survey for  Archaeological Ruins Mohenjodaro  Monsoon Preparations Survey for  Archaeological Ruins Mohenjodaro
Monsoon Preparations Survey for Archaeological Ruins Mohenjodaro
 
Urban renewal, conservation & regeneration of arabic cities
Urban renewal, conservation & regeneration of arabic citiesUrban renewal, conservation & regeneration of arabic cities
Urban renewal, conservation & regeneration of arabic cities
 
Conservation and revitalization of historic buildings
Conservation and revitalization of historic buildingsConservation and revitalization of historic buildings
Conservation and revitalization of historic buildings
 
Mohen jo Daro Indus valley by ALI HYDER GADHI BALOCH
Mohen jo Daro  Indus valley by ALI HYDER GADHI BALOCH Mohen jo Daro  Indus valley by ALI HYDER GADHI BALOCH
Mohen jo Daro Indus valley by ALI HYDER GADHI BALOCH
 
History of Conservation and Preservation of Cultural Property
 History of Conservation and Preservation of Cultural Property  History of Conservation and Preservation of Cultural Property
History of Conservation and Preservation of Cultural Property
 
Estimation
Estimation    Estimation
Estimation
 
2nd day presentation mohanlal
2nd day presentation   mohanlal2nd day presentation   mohanlal
2nd day presentation mohanlal
 
Group a workshop on c h
Group a workshop on c hGroup a workshop on c h
Group a workshop on c h
 
Conservation terminologies for site and monuments
Conservation terminologies for site and monumentsConservation terminologies for site and monuments
Conservation terminologies for site and monuments
 

Emergency Measures adopted before monsoon, during and after rainfall at World Heritage Site of Mohenjodaro during 2013 under National Fund for Mohenjodaro

  • 1. G O V E R N M E N T O F S I N D H C U L T U R E D E P A R T M E N T NATIONAL FUND FOR MOHENJODARO Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 2. NATIONAL FUND FOR MOHENJODARO Pre-monsoon works identified as follows:- 1. De-silting and removal of debris and mud slush out of drainage devices. 2. Renewal of mud capping and resetting of loose bricks. 3. Re-pointing with mud mortar for consolidation of wall cores i.e. grouting of cracks, filling voids in walls, etc. complete. 4. Erection of dry burnt brick masonry buttressing to the leaning walls in order to avoid from collapsing as a temporary measures. 5. Erection of steel shoring (properly designed) to the extremely tilted or out of plane walls in order to stop them from further collapsing. 6. Construction of shallow drains lined with pacca brick masonry. 7. Repair and construction of barriers/mud pushtas in mud brick masonry in order to slow down the speed of rain run off and to divert the flow of rain water towards less sensitive areas. 8. Filling up of cavities and holes of the mud capping of the walls with salt free pure clay obtained from the river Indus, to prevent the rainwater entering into the core of the walls. 9. Recording of gullies with the help of maps and the reinforcement of the same with sundried brick masonry. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 3. NATIONAL FUND FOR MOHENJODARO Conventions adopted for site works on maps. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 4. NATIONAL FUND FOR MOHENJODARO Conventions adopted for site works on maps in SD-Area. Prepared by: Ali Hyder, A. Conservator, Designed by: Shankar Oad Rajput
  • 5. NATIONAL FUND FOR MOHENJODARO Conventions adopted for site works on maps in DKG- South Area. Prepared by: Ali Hyder, A. Conservator, Designed by: Shankar Oad Rajput
  • 6. NATIONAL FUND FOR MOHENJODARO Conventions adopted for site works on maps in DKG- North Area. Prepared by: Ali Hyder, A. Conservator, Designed by: Shankar Oad Rajput
  • 7. NATIONAL FUND FOR MOHENJODARO Conventions adopted for site works on maps in VS-Area. Prepared by: Ali Hyder, A. Conservator, Designed by: Shankar Oad Rajput
  • 8. NATIONAL FUND FOR MOHENJODARO Conventions adopted for site works on maps in HR-Area. Prepared by: Ali Hyder, A. Conservator, Designed by: Shankar Oad Rajput
  • 9. NATIONAL FUND FOR MOHENJODARO RAIN WATER IS THE MAIN CONTRIBUTOR TO THE WEAR AND DAMAGE OF RUINS AND IT CAN DAMAGE THE STRUCTURES IN SEVERAL WAY; BY WASHING AWAY THE SOIL (EROSION AND SCOURING), • BY MAKING THE SOIL LOOSE, (I.E. WEAKENING THE LOAD BEARING CAPACITY) RESULTING IN TILTING OF WALLS. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 10. NATIONAL FUND FOR MOHENJODARO BY DEPOSITING SOILS (SILTING) WHICH MAY OBSTRUCT THE PASSAGE OF WATER Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 11. NATIONAL FUND FOR MOHENJODARO BY WASHING AWAY ENTIRE SECTIONS OF THE WALLS OR PART OF STRUCTURES Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 12. NATIONAL FUND FOR MOHENJODARO RAIN WATER CAUSES TUNNELING, GULLIES, FURROWS AND CREVICES Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 13. NATIONAL FUND FOR MOHENJODARO OBVIOUSLY, THE DESIGN OF PROPER DRAINAGE RELIES ON CAREFUL STUDIES AT SITE. EQUALLY IMPORTANT, THE DRAINAGE PATTERNS AND REQUIREMENTS SHOULD BE OBSERVED DURING RAINY PERIODS, IN ORDER TO OBTAIN A REALISTIC IMPRESSION OF THE HOW, AND HOW MUCH, WATER IS MOVING IN THE VICINITY OF THE STRUCTURES. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 14. NATIONAL FUND FOR MOHENJODARO SIDE DRAINS AND SHALLOW DRAINS WHICH COLLECT AND LEAD THE WATER AWAY FROM WALLS. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 15. NATIONAL FUND FOR MOHENJODARO How to over come afore mentioned damages of rains:- Measures adopted during this ensuing monsoon season, 2013, according to plan, by constructing barriers, filling voids in capping and to maintain catch-water drains which catch surface water before it reaches the walls, building scour checks, preventing erosion and barriers by slowing down the flow of the water. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 16. NATIONAL FUND FOR MOHENJODARO BARRIERS Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 17. NATIONAL FUND FOR MOHENJODARO BARRIERS Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 18. NATIONAL FUND FOR MOHENJODARO Designing surface drainage which enables the water to flow off out of remains smoothly. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 19. NATIONAL FUND FOR MOHENJODARO Drainage work in progress (Shallow drain and building scour check) Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 20. NATIONAL FUND FOR MOHENJODARO Constructing scouring checks. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 21. NATIONAL FUND FOR MOHENJODARO Constructing scouring checks. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 22. NATIONAL FUND FOR MOHENJODARO Damage and wear to the structures can be reduced if the flow of water is controlled. Minor damages can easily be repaired as part of the regular maintenance provided to the remains and its structures. If the flow of water is not properly managed, the deterioration of the structures will be more serious and occur more rapidly. This will lead to higher maintenance demands. An efficient drainage system is therefore essential to allow water to flow off and away from the walls as quickly as possible. This is achieved by a system consisting of the following components: Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 23. NATIONAL FUND FOR MOHENJODARO Maintenance of drainage devices i.e cleaning, removing mud slush, dust dirt, debris and all kinds of rubbish. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 24. NATIONAL FUND FOR MOHENJODARO Maintenance of drainage devices i.e cleaning, removing mud slush, dust dirt, debris and all kinds of rubbish. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 25. NATIONAL FUND FOR MOHENJODARO Maintenance of drainage devices i.e cleaning, removing mud slush, dust dirt, debris and all kinds of rubbish. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 26. NATIONAL FUND FOR MOHENJODARO Maintenance of drainage devices i.e cleaning, removing mud slush, dust dirt, debris and all kinds of rubbish. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 27. NATIONAL FUND FOR MOHENJODARO Maintenance of drainage devices i.e cleaning, removing mud slush, dust dirt, debris and all kinds of rubbish. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 28. NATIONAL FUND FOR MOHENJODARO Resetting work in SD Area Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 29. NATIONAL FUND FOR MOHENJODARO Resetting work in SD Area Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 30. NATIONAL FUND FOR MOHENJODARO Maintenance of drainage devices i.e cleaning, removing mud slush, dust dirt, debris and all kinds of rubbish. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 31. NATIONAL FUND FOR MOHENJODARO Maintenance of drainage devices i.e cleaning, removing mud slush, dust dirt, debris and all kinds of rubbish. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 32. NATIONAL FUND FOR MOHENJODARO Maintenance of drainage devices i.e cleaning, removing mud slush, dust dirt, debris and all kinds of rubbish. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 33. NATIONAL FUND FOR MOHENJODARO Maintenance of drainage devices i.e cleaning, removing mud slush, dust dirt, debris and all kinds of rubbish. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 34. NATIONAL FUND FOR MOHENJODARO Maintenance of drainage devices i.e cleaning, removing mud slush, dust dirt, debris and all kinds of rubbish. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 35. NATIONAL FUND FOR MOHENJODARO Stabilization of endangered part of structures by building dry brunt brick buttressing or steel shoring. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 36. NATIONAL FUND FOR MOHENJODARO Stabilization of endangered part of structures by building dry brunt brick buttressing. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 37. NATIONAL FUND FOR MOHENJODARO Stabilization of endangered part of structures by building dry brunt brick buttressing. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 38. NATIONAL FUND FOR MOHENJODARO Stabilization of endangered part of structures by building dry brunt brick buttressing. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 39. NATIONAL FUND FOR MOHENJODARO Brushing before application of mud slurry. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 40. NATIONAL FUND FOR MOHENJODARO Mud slurry work Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 41. NATIONAL FUND FOR MOHENJODARO Mud slurry work Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 42. NATIONAL FUND FOR MOHENJODARO Mud pushta in DKG Area Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 43. NATIONAL FUND FOR MOHENJODARO Resetting work in DKG Area Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 44. NATIONAL FUND FOR MOHENJODARO Resetting work in DKG Area Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 45. NATIONAL FUND FOR MOHENJODARO Resetting work in DKG Area Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 46. NATIONAL FUND FOR MOHENJODARO Resetting work in SD Area Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 47. NATIONAL FUND FOR MOHENJODARO Wall base protection either with mud filling or by sundried bricks Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 48. NATIONAL FUND FOR MOHENJODARO Wall base protection either with mud filling or by sundried bricks Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 49. NATIONAL FUND FOR MOHENJODARO Mud brick flooring DKG-South Area Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 50. NATIONAL FUND FOR MOHENJODARO Mud brick flooring DKG-South Area Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 51. NATIONAL FUND FOR MOHENJODARO Mud capping and slurry in Block-29, DKG-North Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 52. NATIONAL FUND FOR MOHENJODARO Mud capping and slurry in Block-29, DKG-North Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 53. NATIONAL FUND FOR MOHENJODARO Mud capping in Block-29, DKG-North Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 54. NATIONAL FUND FOR MOHENJODARO Mud capping and slurry in DKG-North Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 55. NATIONAL FUND FOR MOHENJODARO Mud capping and slurry in DKG-North Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 56. NATIONAL FUND FOR MOHENJODARO Mud capping and slurry in DKG-North Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 57. NATIONAL FUND FOR MOHENJODARO Brushing before application of re-pointing in SD Area. Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 58. NATIONAL FUND FOR MOHENJODARO Re-Pointing work at Stupa Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 59. NATIONAL FUND FOR MOHENJODARO Re-Pointing work at Stupa Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 60. NATIONAL FUND FOR MOHENJODARO Re-Pointing work at Stupa Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 61. NATIONAL FUND FOR MOHENJODARO Mud pushta work at Stupa Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 62. NATIONAL FUND FOR MOHENJODARO Resetting work at SD -Area Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 63. NATIONAL FUND FOR MOHENJODARO Filling of gaps, voids in mud capping with pure clay in DK area Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 64. NATIONAL FUND FOR MOHENJODARO Filling of gaps, voids in mud capping with pure clay in DK area Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 65. NATIONAL FUND FOR MOHENJODARO Filling of gaps, voids in mud capping with pure clay in HR area Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 66. NATIONAL FUND FOR MOHENJODARO Filling of gullies with mud bricks after rain at DKG- South - Area Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 67. NATIONAL FUND FOR MOHENJODARO Filling of gullies after rain at SD-Area Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 68. NATIONAL FUND FOR MOHENJODARO Filling of gullies after rain at SD-Area Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 69. NATIONAL FUND FOR MOHENJODARO Filling of gullies after rain at SD-Area Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput
  • 70. NATIONAL FUND FOR MOHENJODARO THANKS Prepared by: Ali Hyder, A. Conservator Designed by: Shankar Oad Rajput