HEAVY ENGINEERING
CORPORATION
PROJECT REPORT ON
CASTING, FORGING, HEAT TREATMENT & MACHINING
Name- Ashish Ranjan
Admn No - 2012JE1013
6th Semester
Heavy Engineering Corporation
Foundry Forge Plant
(FFP)
Heavy Machine Building Plant
(HMBP)
Heavy Machine Tool Plant
(HMTP)
Pattern
Shop
Grey Iron
Foundry
Steel
Foundry
Fettling Shop
Forge Shop
Machine
Shop
Turning, Boring, Facing,
Grinding, Threading etc.
Milling, Grinding,
Gear Hobbing, Heat
Treatment
CNC gas cutting,
Sheet metal work,
Welding
Fabrication & Assembly
Machining
Operations
Assembly of
Machine Tools like
CNC machine
Product
Requirement
Flow Chart of Casting
Method
Pattern Allowance,
Gating System,
Machining Allowance etc.
Moulding &
Core Making
Pattern Making
Mould & Core
Painting
Mould & core
assembly and
Closing of
Mould
Drying in oven
Clamping &
Loading
Pouring of
Liquid Metal
Cooling & Shake
out
Cleaning &
Fettling
Stress RelievingMachining ShopFinal Product
Melting Section
Charging Unit Melting Unit Die and pit Unit
• Preparation of metal
scraps mainly for
Plane carbon steel,
Alloy Steel and Cast
Iron Materials.
• Basic components of
melt contains C, Si,
Mn, P etc.
• Metal is alloyed with
different alloying
elements Cr, Ni,Mo,V
etc.
• Electric Arc Furnace,
Induction Furnace and
Vacuum Arc Degassing
Furnace.
• Molten metal
is poured into
mold cavity for
casting using
ladle furnace
with the help
of E.O.T.
crane.
Furnaces
Induction Furnace
Electric Arc Furnace
Vacuum Arc Degasing Furnace (VAD)
Vacuum Degasing Furnace (VD)
ELECTRIC ARC FURNACE
• It is powered by a 3 phase electrical system and has three electrodes.
• Arc is formed between the charged metal and the electrode.
• The charge is heated both by current passing through the charge and by the
radiant energy evolved by the arc.
• Electrodes can move up and down automatically for regulation of the arc.
• To protect the transformer from heat, it is installed in a vault.
• It is cooled via pumped oil exchanging heat with the plants water cooling
systems.
• It is built on a tilting platform to pour molten metal into another vessel for
transport.
Ladle
• It is not used for metal melting, metal addition & degassing purpose.
• This Furnace is used to reserve molten metal for pouring and degasing
process.
• It is of three type.
a) Casting Ladle: For pouring of molten metal into mold.
b) Transfer Ladle: Transfer of molten metal from one process to other.
c) Treatment Ladle: Process to take place within the ladle to change some
aspect of molten metal
VACUUM ARC DEGASING FURNACE
• The VAD is used for
purification of molten
metal.
• It is equipped with
bottom plugs for argon
bubbling.
• To achieve a
homogeneous bath
temperature and
composition, the steel in
the ladle is often stirred
by means of argon gas
bubbling.
• Hydrogen and oxygen
gas is removed.
Fettling Shop
• Process of cleaning of casting object from sand & gating
elements i.e. Runner, riser, Sprue basin & gates.
• Maximum sand is removed by pneumatic chipping hammer
(operating press. 4 to 7 kg/cm2 ).
• Runner, Riser, Sprue basin and other extra metal is removed by
gas cutting (Lancing).
• Some extra metal is removed by Fettle Torch.( Graphite
electrode for steel & general purpose electrode is used for cast
iron).
Heat Treatment Process
• Annealing
• Normalising
• Quenching
• Induction
Hardening
Controlled heating &
cooling of materials
for the purpose of
altering their
structures and
properties
Annealing
• In this process, hypoeutectoid steels (less than 0.77 % C) are heated to 30o
to 60oC above the upper recrystallization temperature held for sufficient
time to convert the structure to homogeneous single phase austonite of
uniform composition and slowly cooled at a controlled rate through the
lower crystallization tem.
• Cooling is done in the furnace by decreasing the tem by 10oC to 30oC per
hour to at least 30oc below 727oC.
• After that metal can be cooled at room tem.
• Annealing produce softer material.
Normalizing
• The steel is heated to 60°C (100°F) above the upper recrystallization
Temp (hypoeutectoid) or lower recrystallization Temp
(hypereutectoid) , held at this temperature to produce uniform
austenite.
• It is removed from the furnace and allowed to cool in still air.
• The resultant structures and properties will depend on the subsequent
cooling rate.
HMBP
Machining Processes
• Turning
• Boring
• Facing
• Grinding
• Vertical & Horizontal
Milling
• Planning
• Grooving
• Threading
• Parting
• Slotting
• Trepanning
• Gear Hobbing,
• Heat Treatment
Thank
You

More Related Content

What's hot

VOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORTVOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORT
Gunjesh Jha
 
BSP Project (Based on Continuous Casting) [Final]
BSP Project (Based on Continuous Casting) [Final]BSP Project (Based on Continuous Casting) [Final]
BSP Project (Based on Continuous Casting) [Final]
Subham Shit
 

What's hot (20)

Project report on Automated Strapping Machine (BRM)_Bhilai Steel Plant.pdf
Project report on Automated Strapping Machine (BRM)_Bhilai Steel Plant.pdfProject report on Automated Strapping Machine (BRM)_Bhilai Steel Plant.pdf
Project report on Automated Strapping Machine (BRM)_Bhilai Steel Plant.pdf
 
Training report on bokaro steel plant
Training report on bokaro steel plantTraining report on bokaro steel plant
Training report on bokaro steel plant
 
VOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORTVOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORT
 
Visakhapatnam steel plant
Visakhapatnam steel plantVisakhapatnam steel plant
Visakhapatnam steel plant
 
Training at sail bokaro
Training at sail bokaroTraining at sail bokaro
Training at sail bokaro
 
Front report on bokaro steel plant
Front report on bokaro steel plantFront report on bokaro steel plant
Front report on bokaro steel plant
 
Alloy Steels Plant, Durgapur, WB, India
Alloy Steels Plant, Durgapur, WB, IndiaAlloy Steels Plant, Durgapur, WB, India
Alloy Steels Plant, Durgapur, WB, India
 
SMS PROJECT
SMS PROJECTSMS PROJECT
SMS PROJECT
 
Industrial Training Report on Steel Melting Shop(SMS)
Industrial Training Report on Steel Melting Shop(SMS)Industrial Training Report on Steel Melting Shop(SMS)
Industrial Training Report on Steel Melting Shop(SMS)
 
Steel melting shop (sms) - 2
Steel melting shop (sms) - 2Steel melting shop (sms) - 2
Steel melting shop (sms) - 2
 
Durgapur Steel Plant - Summer Training
Durgapur Steel Plant - Summer TrainingDurgapur Steel Plant - Summer Training
Durgapur Steel Plant - Summer Training
 
Bsp ppt
Bsp pptBsp ppt
Bsp ppt
 
Bhilai Steel Plant Training Presentation
Bhilai Steel Plant Training PresentationBhilai Steel Plant Training Presentation
Bhilai Steel Plant Training Presentation
 
Vacational Trainning at SAIL (DSP)
Vacational Trainning at SAIL (DSP)Vacational Trainning at SAIL (DSP)
Vacational Trainning at SAIL (DSP)
 
Bsp 2011
Bsp 2011Bsp 2011
Bsp 2011
 
DSP VT REPORT.pdf
DSP VT REPORT.pdfDSP VT REPORT.pdf
DSP VT REPORT.pdf
 
Heavy engineering corporation summer traing project
Heavy engineering corporation summer traing projectHeavy engineering corporation summer traing project
Heavy engineering corporation summer traing project
 
Industrial training at durgapur steel plant (instrumentation)
Industrial training at durgapur steel plant (instrumentation)Industrial training at durgapur steel plant (instrumentation)
Industrial training at durgapur steel plant (instrumentation)
 
Jindal Steel
Jindal SteelJindal Steel
Jindal Steel
 
BSP Project (Based on Continuous Casting) [Final]
BSP Project (Based on Continuous Casting) [Final]BSP Project (Based on Continuous Casting) [Final]
BSP Project (Based on Continuous Casting) [Final]
 

Viewers also liked

NFC_TRAINING_REPORT-1
NFC_TRAINING_REPORT-1NFC_TRAINING_REPORT-1
NFC_TRAINING_REPORT-1
Ratan Kumar
 
Nuclear Power India Sample
Nuclear Power   India   SampleNuclear Power   India   Sample
Nuclear Power India Sample
vandalmax
 
Mukesh kumar training report
Mukesh kumar training reportMukesh kumar training report
Mukesh kumar training report
Mukesh Kumar
 
central coalfeild limited
central coalfeild limitedcentral coalfeild limited
central coalfeild limited
samohi
 

Viewers also liked (20)

Hec me 2015
Hec me 2015Hec me 2015
Hec me 2015
 
HEC (w_o exp)
HEC (w_o exp)HEC (w_o exp)
HEC (w_o exp)
 
PPT ON LATHE MACHINE BY MD G.QUADIR
PPT ON LATHE MACHINE BY MD G.QUADIRPPT ON LATHE MACHINE BY MD G.QUADIR
PPT ON LATHE MACHINE BY MD G.QUADIR
 
Ccl ppt (2)
Ccl ppt (2)Ccl ppt (2)
Ccl ppt (2)
 
HEC quality and quality assurance by khalida
HEC quality and quality assurance by khalidaHEC quality and quality assurance by khalida
HEC quality and quality assurance by khalida
 
A project report on financial statement analysis
A project report on financial statement analysisA project report on financial statement analysis
A project report on financial statement analysis
 
Summer training report
Summer training reportSummer training report
Summer training report
 
NFC_TRAINING_REPORT-1
NFC_TRAINING_REPORT-1NFC_TRAINING_REPORT-1
NFC_TRAINING_REPORT-1
 
Nuclear Power India Sample
Nuclear Power   India   SampleNuclear Power   India   Sample
Nuclear Power India Sample
 
TAPS Industrial Visit Report 2015 BCOE by Raviraj Ahire
TAPS Industrial Visit Report 2015 BCOE by Raviraj AhireTAPS Industrial Visit Report 2015 BCOE by Raviraj Ahire
TAPS Industrial Visit Report 2015 BCOE by Raviraj Ahire
 
Bhabha atomic research centre
Bhabha atomic research centreBhabha atomic research centre
Bhabha atomic research centre
 
Mukesh kumar training report
Mukesh kumar training reportMukesh kumar training report
Mukesh kumar training report
 
[Rural marketing]
[Rural marketing][Rural marketing]
[Rural marketing]
 
indian railway real report
indian railway real reportindian railway real report
indian railway real report
 
integral coach factory report
integral coach factory report integral coach factory report
integral coach factory report
 
Maintenace manual for wagons
Maintenace manual for wagonsMaintenace manual for wagons
Maintenace manual for wagons
 
Carriage and wagon
Carriage and wagonCarriage and wagon
Carriage and wagon
 
central coalfeild limited
central coalfeild limitedcentral coalfeild limited
central coalfeild limited
 
Gorakhpur mechanical workshop summer training report
Gorakhpur mechanical workshop summer training reportGorakhpur mechanical workshop summer training report
Gorakhpur mechanical workshop summer training report
 
Indian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~iIndian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~i
 

Similar to Heavy engineering corporation project report

Similar to Heavy engineering corporation project report (20)

Foundry Lectures
Foundry LecturesFoundry Lectures
Foundry Lectures
 
1 heat treatment
1 heat treatment1 heat treatment
1 heat treatment
 
heat treatment
heat treatmentheat treatment
heat treatment
 
EM-Unit-IV- heat treatment
EM-Unit-IV- heat treatmentEM-Unit-IV- heat treatment
EM-Unit-IV- heat treatment
 
1 heat treatment
1 heat treatment1 heat treatment
1 heat treatment
 
Heat treatment
Heat treatmentHeat treatment
Heat treatment
 
heat treatment
 heat treatment heat treatment
heat treatment
 
Heat Treatment
Heat TreatmentHeat Treatment
Heat Treatment
 
heat treatment
heat treatmentheat treatment
heat treatment
 
Heat treatment processes
Heat treatment processesHeat treatment processes
Heat treatment processes
 
Steel Melting Shop (SMS)
Steel Melting Shop (SMS)Steel Melting Shop (SMS)
Steel Melting Shop (SMS)
 
Module 3.ppt
Module 3.pptModule 3.ppt
Module 3.ppt
 
Heat treatment process for steel
Heat treatment process for steelHeat treatment process for steel
Heat treatment process for steel
 
HEAT TREATMENT
HEAT TREATMENTHEAT TREATMENT
HEAT TREATMENT
 
UNIT- IV.pptx
UNIT- IV.pptxUNIT- IV.pptx
UNIT- IV.pptx
 
TTT diagram and Heat treatment processes
TTT diagram and Heat treatment processesTTT diagram and Heat treatment processes
TTT diagram and Heat treatment processes
 
UNIT- IV --HEAT TREATMENT.pptx
UNIT- IV --HEAT TREATMENT.pptxUNIT- IV --HEAT TREATMENT.pptx
UNIT- IV --HEAT TREATMENT.pptx
 
Heat Treatments Material Technology.pptx
Heat Treatments Material Technology.pptxHeat Treatments Material Technology.pptx
Heat Treatments Material Technology.pptx
 
17767705 heat-treatment-oct08
17767705 heat-treatment-oct0817767705 heat-treatment-oct08
17767705 heat-treatment-oct08
 
Heat Treatment Of Steel
Heat Treatment Of SteelHeat Treatment Of Steel
Heat Treatment Of Steel
 

Recently uploaded

Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 

Recently uploaded (20)

Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 

Heavy engineering corporation project report

  • 1. HEAVY ENGINEERING CORPORATION PROJECT REPORT ON CASTING, FORGING, HEAT TREATMENT & MACHINING Name- Ashish Ranjan Admn No - 2012JE1013 6th Semester
  • 2. Heavy Engineering Corporation Foundry Forge Plant (FFP) Heavy Machine Building Plant (HMBP) Heavy Machine Tool Plant (HMTP) Pattern Shop Grey Iron Foundry Steel Foundry Fettling Shop Forge Shop Machine Shop Turning, Boring, Facing, Grinding, Threading etc. Milling, Grinding, Gear Hobbing, Heat Treatment CNC gas cutting, Sheet metal work, Welding Fabrication & Assembly Machining Operations Assembly of Machine Tools like CNC machine
  • 3. Product Requirement Flow Chart of Casting Method Pattern Allowance, Gating System, Machining Allowance etc. Moulding & Core Making Pattern Making Mould & Core Painting Mould & core assembly and Closing of Mould Drying in oven Clamping & Loading Pouring of Liquid Metal Cooling & Shake out Cleaning & Fettling Stress RelievingMachining ShopFinal Product
  • 4. Melting Section Charging Unit Melting Unit Die and pit Unit • Preparation of metal scraps mainly for Plane carbon steel, Alloy Steel and Cast Iron Materials. • Basic components of melt contains C, Si, Mn, P etc. • Metal is alloyed with different alloying elements Cr, Ni,Mo,V etc. • Electric Arc Furnace, Induction Furnace and Vacuum Arc Degassing Furnace. • Molten metal is poured into mold cavity for casting using ladle furnace with the help of E.O.T. crane.
  • 5. Furnaces Induction Furnace Electric Arc Furnace Vacuum Arc Degasing Furnace (VAD) Vacuum Degasing Furnace (VD)
  • 6. ELECTRIC ARC FURNACE • It is powered by a 3 phase electrical system and has three electrodes. • Arc is formed between the charged metal and the electrode. • The charge is heated both by current passing through the charge and by the radiant energy evolved by the arc. • Electrodes can move up and down automatically for regulation of the arc. • To protect the transformer from heat, it is installed in a vault. • It is cooled via pumped oil exchanging heat with the plants water cooling systems. • It is built on a tilting platform to pour molten metal into another vessel for transport.
  • 7. Ladle • It is not used for metal melting, metal addition & degassing purpose. • This Furnace is used to reserve molten metal for pouring and degasing process. • It is of three type. a) Casting Ladle: For pouring of molten metal into mold. b) Transfer Ladle: Transfer of molten metal from one process to other. c) Treatment Ladle: Process to take place within the ladle to change some aspect of molten metal
  • 8. VACUUM ARC DEGASING FURNACE • The VAD is used for purification of molten metal. • It is equipped with bottom plugs for argon bubbling. • To achieve a homogeneous bath temperature and composition, the steel in the ladle is often stirred by means of argon gas bubbling. • Hydrogen and oxygen gas is removed.
  • 9. Fettling Shop • Process of cleaning of casting object from sand & gating elements i.e. Runner, riser, Sprue basin & gates. • Maximum sand is removed by pneumatic chipping hammer (operating press. 4 to 7 kg/cm2 ). • Runner, Riser, Sprue basin and other extra metal is removed by gas cutting (Lancing). • Some extra metal is removed by Fettle Torch.( Graphite electrode for steel & general purpose electrode is used for cast iron).
  • 10. Heat Treatment Process • Annealing • Normalising • Quenching • Induction Hardening Controlled heating & cooling of materials for the purpose of altering their structures and properties
  • 11.
  • 12. Annealing • In this process, hypoeutectoid steels (less than 0.77 % C) are heated to 30o to 60oC above the upper recrystallization temperature held for sufficient time to convert the structure to homogeneous single phase austonite of uniform composition and slowly cooled at a controlled rate through the lower crystallization tem. • Cooling is done in the furnace by decreasing the tem by 10oC to 30oC per hour to at least 30oc below 727oC. • After that metal can be cooled at room tem. • Annealing produce softer material.
  • 13. Normalizing • The steel is heated to 60°C (100°F) above the upper recrystallization Temp (hypoeutectoid) or lower recrystallization Temp (hypereutectoid) , held at this temperature to produce uniform austenite. • It is removed from the furnace and allowed to cool in still air. • The resultant structures and properties will depend on the subsequent cooling rate.
  • 14. HMBP Machining Processes • Turning • Boring • Facing • Grinding • Vertical & Horizontal Milling • Planning • Grooving • Threading • Parting • Slotting • Trepanning • Gear Hobbing, • Heat Treatment