2. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 938G II WHEEL LOADER PHN
Configuration: 938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine
Disassembly and Assembly
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power
Train
Media Number -RENR6068-03 Publication Date -01/12/2008 Date Updated -19/12/2008
i01380984
Transmission Oil Pump - Disassemble
SMCS - 3066-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7573 Link Bracket 2
Illustration 1 g00742335
1. Remove two bolts (1) and cover (2) .
1/6
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
3. Illustration 2 g00742337
2. Remove seven bolts (3). Remove O-ring seal (4) .
Illustration 3 g00742339
3. Install two forcing screws, as shown.
4. Install Tooling (A), a hoist, and a suitable lifting device. Use a hoist to remove gear pump
(5) .
2/6
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
5. Illustration 4 g00742341
5. Remove six bolts (6) .
Illustration 5 g00742342
6. Remove shaft (7) .
Illustration 6 g00742343
7. Remove retaining ring (8) .
3/6
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
6. Illustration 7 g00742345
8. Remove gear (9) and ball bearing (10) as a unit from the body assembly.
Illustration 8 g00742477
9. Use a suitable press to remove ball bearing (10) from gear (9) .
Illustration 9 g00742480
10. Remove five bolts (11) .
4/6
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
7. Note: Only the bolt which is marked with an X has a washer.
Illustration 10 g00742485
11. Turn over the gear pump (5) and remove one bolt (12) .
12. Separate pump cover assembly (13) from gear pump (5) .
Illustration 11 g00742489
13. Remove two bearings (14) .
14. Remove O-ring seal (15) .
5/6
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
8. Illustration 12 g00742491
Note: Identify two oil pump gears and mark the location of the gears for assembly purposes.
15. Remove two oil pump gears (16) .
16. Check the condition of two dowels (17) and replace the dowels, if necessary.
17. Check the condition of two dowels (18) and replace the dowels, if necessary.
Illustration 13 g00742505
18. Remove two bearings (19) .
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon May 4 10:39:21 UTC+0800 2020
6/6
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
9. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 938G II WHEEL LOADER PHN
Configuration: 938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine
Disassembly and Assembly
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power
Train
Media Number -RENR6068-03 Publication Date -01/12/2008 Date Updated -19/12/2008
i01381042
Transmission Oil Pump - Assemble
SMCS - 3066-016
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7573 Link Bracket 2
Illustration 1 g00742505
1. Install two bearings (19) to a depth of 1.5 ± .5 mm (0.059 ± 0.02 inch) below the machined
surface of the body assembly. The bearing joints should be 30 ± 15 degrees from the
centerline that runs through the bearing bores.
1/6
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
10. Illustration 2 g00742491
2. Install two oil pump gears (16) .
3. Install two dowels (17), if the dowels were removed in assembly.
4. Install two dowels (18), if the dowels were removed in assembly.
Illustration 3 g00742489
5. Install two bearings (14) to a depth of 1.5 ± .5 mm (0.059 ± 0.02 inch) below the machined
surface of the body assembly. The bearing joints should be 30 ± 15 degrees from the
centerline that runs through the bearing bores.
6. Install O-ring (15) .
2/6
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
11. Illustration 4 g00742485
7. Turn over gear pump (5) .
8. Connect pump cover assembly (13) to gear pump (5) and install one bolt (12) .
Illustration 5 g00742480
9. Install five bolts (11) .
Note: Only one bolt which is marked has a washer.
3/6
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
12. Illustration 6 g00742477
10. Heat up bearing (10) to 135 °C (275 °F). Install the bearing in gear (9) .
Illustration 7 g00742345
11. Install gear (9) and bearing (10) as a unit on the body assembly.
Illustration 8 g00742343
12. Install retaining ring (8) .
4/6
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
13. Illustration 9 g00742342
13. Install shaft (7) .
Illustration 10 g00742341
14. Install six bolts (6). The torque for bolts (6) is 55 ± 10 N·m (41 ± 7 lb ft).
Illustration 11 g00742339
5/6
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
14. 15. Install Tooling (A), a hoist, and a suitable lifting device. Use a hoist to install gear pump
(5) .
16. Remove two forcing screws that were used in the disassembly.
Illustration 12 g00742337
17. Install seven bolts (3). Install O-ring seal (4) .
Illustration 13 g00742335
18. Install two bolts (1) and cover (2) .
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon May 4 10:40:18 UTC+0800 2020
6/6
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
15. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 938G II WHEEL LOADER PHN
Configuration: 938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine
Disassembly and Assembly
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power
Train
Media Number -RENR6068-03 Publication Date -01/12/2008 Date Updated -19/12/2008
i01886316
Transmission Oil Pump - Install
SMCS - 3066-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
B 138-7575 Link Bracket 2
C 10 mm by 1.5 by 6 (Guide Bolt) 2
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement.
1/2
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
16. Illustration 1 g00978988
Illustration 2 g00978974
1. Install transmission oil pump (4) on Tooling (C). The weight of transmission oil pump (4) is
approximately 30 kg (65 lb).
2. Remove Tooling (B) and install bolts (3). Remove Tooling (C) .
Illustration 3 g00978971
3. Install tube assembly (2). Connect tube assembly (1) .
End By: Install the implement and the steering pumps. Refer to Disassembly and Assembly,
"Piston and Vane Pump (Steering and Inplement) - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon May 4 10:41:14 UTC+0800 2020
2/2
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
17. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 938G II WHEEL LOADER PHN
Configuration: 938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine
Disassembly and Assembly
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power
Train
Media Number -RENR6068-03 Publication Date -01/12/2008 Date Updated -19/12/2008
i01886348
Relief Valve (Transmission Hydraulic Control) - Remove
SMCS - 3210-011
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
ZZ
6V-9507 Face Seal Plug 1
6V-9508 Face Seal Plug 1
6V-9828 Cap As 1
6V-9829 Cap As 1
Start By:
A. Remove the cab. Refer to Disassembly and Assembly, "Cab - Remove".
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the
component should be thoroughly cleaned. This will help to prevent dirt from entering the internal
mechanism.
Note: SERVICE DATA: TOOLING (ZZ) WILL NOT BE IDENTIFIED IN
PHOTOGRAPHS IN THE REMOVAL OR THE INSTALLATION. THIS TOOLING IS
SHOWN IN ORDER TO ASSIST THE EXPERIENCED SERVICEMAN.
NOTICE
1/3
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
18. Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop
Products Guide" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
Personal injury can result from hydraulic oil pressure and hot oil.
Hydraulic oil pressure can remain in the hydraulic system after the
engine has been stopped. Serious injury can be caused if this pressure is
not released before any service is done on the hydraulic system.
Make sure all of the work tools have been lowered to the ground, and
the oil is cool before removing any components or lines. Remove the oil
filler cap only when the engine is stopped, and the filler cap is cool
enough to touch with your bare hand.
Note: Put identification marks on all lines, on all hoses, on all wires, and on all tubes for
installation purposes. Plug all lines, hoses, and tubes. This helps to prevent fluid loss and this
helps to keep contaminants from entering the system.
Illustration 1 g00979028
1. Disconnect hose assemblies (1) and (2) .
2/3
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
19. Illustration 2 g00979031
2. Remove bolts (3) and remove relief valve (4) .
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon May 4 10:42:11 UTC+0800 2020
3/3
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
20. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 938G II WHEEL LOADER PHN
Configuration: 938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine
Disassembly and Assembly
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power
Train
Media Number -RENR6068-03 Publication Date -01/12/2008 Date Updated -19/12/2008
i01886519
Relief Valve (Transmission Hydraulic Control) - Disassemble
SMCS - 3210-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-1853 Retaining Ring Pliers 1
Start By:
A. Remove the relief valve. Refer to Disassembly and Assembly, "Relief Valve (Transmission
Hydraulic Control) - Remove".
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the
component should be thoroughly cleaned. This will help to prevent dirt from entering the internal
mechanism.
1/3
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
21. Illustration 1 g00979403
1. Remove bolts (1) and remove cover (2) .
Illustration 2 g00979407
Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
2. Remove bolts (3) and remove cover (4) .
2/3
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
22. Illustration 3 g00979409
3. Remove load piston (10), spring (9), spool assembly (8), and slug (11) from body (12) .
4. Use Tooling (A) to remove retaining ring (13). Remove retainer (5), spring (6), and ball (7)
from spool (8) .
Illustration 4 g00979416
5. Remove fitting (14), fitting (15), and plug (16) from body (12) .
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon May 4 10:43:08 UTC+0800 2020
3/3
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
23. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 938G II WHEEL LOADER PHN
Configuration: 938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine
Disassembly and Assembly
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power
Train
Media Number -RENR6068-03 Publication Date -01/12/2008 Date Updated -19/12/2008
i06649649
Relief Valve (Transmission Hydraulic Control) - Assemble
SMCS - 3210-016
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-1853 Retaining Ring Pliers 1
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement.
Illustration 1 g00979416
1. Install plug (16), fitting (15), and fitting (14) in body (12).
1/3
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
24. Illustration 2 g00979409
2. Install ball (7), spring (6), and retainer (5) in spool (8). Use Tooling (A) to install retaining
ring (13).
3. Install slug (11), spool assembly (8), spring (9), and load piston (10) in body (12).
Illustration 3 g00979407
Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
4. Install cover (4) and install bolts (3). Tighten bolts (3) to a torque of 28 ± 7 N·m
(21 ± 5 lb ft).
2/3
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
25. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
26. Illustration 4 g00979403
5. Install cover (2) and install bolts (1). Tighten bolts (1) to a torque of 28 ± 7 N·m
(21 ± 5 lb ft).
End By:
a. Install the relief valve. Refer to Disassembly and Assembly, "Relief Valve (Transmission
Hydraulic Control) - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon May 4 10:44:05 UTC+0800 2020
3/3
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
27. Shutdown SIS
Previous Screen
Product: WHEEL LOADER
Model: 938G II WHEEL LOADER PHN
Configuration: 938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine
Disassembly and Assembly
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power
Train
Media Number -RENR6068-03 Publication Date -01/12/2008 Date Updated -19/12/2008
i02840644
Relief Valve (Transmission Hydraulic Control) - Install
SMCS - 3210-012
Installation Procedure
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement.
Illustration 1 g00979031
1. Install relief valve (4) . Install bolts (3) . Tighten bolts (3) to a torque of 30 ± 4 N·m (22 ± 3
lb ft).
1/2
938G II Wheel Loader PHN00001-UP (MACHINE) POWERED BY 3126B Engine(S...
2020/5/4
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...