2. 1: PERSONALINFORMATION
NAME: COENRAADWESSEL
SURNAME: SCHALKWYK
BORN: 6 SEPTEMBER 1963
ID NUMBER: 630906 5094 087
MATRICULATED: SENTRAALHIGH SCHOOL,BLOEMFONTEIN
MILITARY SERVICE: 1982 – 1983
MARRIED: PHYLLISITY LUCINDA ARPIN IN 1986
DEPENDANTS: DAUGHTER: BORN 1-12-1989
SON: BORN 8-2-1993
POSTALADDRESS: P.O.BOX 865
HARTENBOS
6511
RESIDENTIALADDRESS: WALDECKSTR. 5
DUYNEFONTEIN
MELKBOSSTRANDCAPETOWN
2: BACKGROUND
2.1 Wessel wasbornon 6 September1963 inBloemfonteinandmatriculatedfromSentraal HighSchool
in1981
2.2 He joinedthe SADFin1982 andcompletedmilitaryservice atendof 1983
2.3 In January1984 he joinedBloemfonteinbasedconsultantsStrydom,NewmarkanAnthonyand
workedasa learnerdraughtsmanuntil July1984.
2.4 He resignedfromSNA tojoin Mossel BaybasedconsultantsKurzke,SalmonBraamvanderWalt in
August1984. Forthe next10 yearshe gainedexperience indesignandconstructionundersupervision
of Braam vander Walt (PrEng) inmostfieldsof civil andstructural engineeringsuchasRoads &
Stormwater,SewerReticulation,WaterReticulationandthe designanddrawingof structural steel and
reinforcedconcrete structures. He wasextensivelyinvolvedinthe designandconstructionof internal
roads of Mossgas from1988-1993 (NowcalledPetroSA).
2.5 He joinedmothercompanyof Kurzke,SalmonBraamvanderWalt, VanHeerden,CalitzandHayesin
1994 and movedtoLichtenburginthe North-Westprovince.He workedastownengineerinthe former
Bophuthatswanatownsof ItsosengandAtamalangforthe next5 yearsup to November1998. He was
3. responsible forthe preparationof budgets,maintenance andupgradingof these townstobudget
restraints.Inthistime he managed3 foremenand30 workers.
2.6 He resignedfromVHCHinNovember1998 to joinMVD Consultantsinhishome townMossel Bay.In
the following15 yearshe receivedformal traininginthe electronicfieldwithdraughtingprograms
Autocadand ModelmakeranddesignprogramsModelmakerandRoadmaker. He alsounderwentsurvey
trainingwithTotal stationandGPS equipment.
In thisperiodof hiscareeras a seniortechnicianwiththe companyhe is extensively involvedinthe
design,supervision andsurveyingof mostlycivil projectsincludingRoadsandStormwater,Sewer
ReticulationandWaterReticulation.
He alsopreparednumerousdetaileddrawingsandthe reinforcingschedulingof concrete structures
such as sewerpumpstations, stormwaterinletstructuresandreinforcedconcrete slabsfornew
dwellings.
He was also involvedinthe preparationandshopdetailingof structural steel drawings toalesser
degree.
In thisperiodof hiscareerhe gainedlotsof experienceinprojectmanagement,programmingof work,
holdingsite meetingsandthe minutesthereofaswell asmeasuringandprocessingprogressandfinal
certificatesforpaymentbythe client.
2.7 He resignedfromMVDinMarch 2014 to move to Cape Town andstart his owncompanycalledWe
Do DesignsinApril 2014. Inthe followingyearhe wasinvolvedinthe design,supervisionandphysical
constructionof the newlybuiltGRIWindsteelfactoryinAtlantisCape Town.
He alsodidthe design,supervisionandphysical constructionof earthworksandlayerworksforanewly
builtfactoryforFabricatedSteel ManufacturersinAtlantis
3: PROJECTSSUCCESSFULLY COMPLETED
Legend: D-Design S-Supervision C-Construction
3.1 ROADSAND STORMWATER
Internal RoadsforMossgas (1987-1993) - D&S – R10 Million
TownshiproadsforMossgas (1987-1993) - D&S – R8 Million
Industrial RoadsMossel Bay(1987-1993) - D&S – R3 Million
Nestle Site DevelopmentMossel Bay (1987-1993) - D&S – R4 Million
ParkingAreasforMossgas (1987-1993) - D&S – R5 Million
New Tar Roads forItsosengtownship(1994-1998) - D&S – R5.2 Million
Safarituine Ext8 Rustenburg(1994-1999) - D&S – R2.4 Million
Scot TanneryMossel Bay (1999-2000) - D&S – R0.5 Million
Gravel Roads forKwanonquabaMossel Bay(1999-2014) – D&S –
4. R2 Million
Upgradingfrom gravel totar forKwanonquabaMossel Bay(1999-2014) – D&S – R2 Million
New Roadsfor Le Grand Estate George (2008-2010) – D&S –R12 Million
Newpaved RoadsforMonte ChristoMossel Bay(2008) – D&S –R13 Million
New Roadsfor IslandViewMossel Bay(2007) – D&S –R3 Million
New RoadsKarmosynVleesbaai (2006) – D&S –R2 Million
New RoadsGansfonteinGouritsmond(2005) – D&S –R2 Million
Newgravel RoadsforPanorama townshipRiversdal (2007-2013) – D&S –R3 Million
Newgravel RoadsforMurraysburg township(2007-2013) – D&S –
R1 Million
Newpaved RoadsforHartenbosLandgoedMossel Bay(2007-2008) – D&S –R1.5 Million
New PavedRoads forGRI WindsteelAtlantis(2014)-(D,S&C)-R60Million
3.2 SEWER RETICULATION
CollectorSewerforMossgas-(1988-1990)- (D&S)-R1.0Million
ReticulationWOBIndustrial Development-(1990)-(D&S)-R1.5Million
ReticulationMossgasTemporaryhousing-(1990-1993)-(D&S)-
R4 Million
Reticulationand PumpstationsLe GrandGolf Estate-(2008-2010)-(D&S)-R4Million
ReticulationandpumpstationsMonte ChristoMossel Bay-(2008)-(D&S)-R3Million
NewFactoryfor GRI Windsteel Atlantis(2014)-(D,S&C)-R1Million
3.3 WATER RETICULATION
BulkSupplyforMossgas-(D&S)-(1989)-R3.0Million
ReservoirsforMossgas-(D&S)-(1989)-R2.0Million
ReticulationMossgasTemporaryhousing-(1990-1993)-(D&S)-R5.0Million
ReticulationWOBIndustrial Development-(1990)-(D&S)-R3Million
ReticulationLe GrandGolf Estate-(2008-2010)-(D&S)-R3Million
ReticulationMonte ChristoMossel Bay-(2008)-(D&S)-R3Million
NewFactoryfor GRI Windsteel Atlantis(2014)-(D,S&C)-R1Million
3.4 STORMWATER
5. Qualitycontrol andremedial workMossgas-(D&S)-1990-R8Million
ReticulationWOBIndustrial Development-(1990)-(D&S)-R1Million
NewFactoryfor GRI Windsteel Atlantis(2014)-(D,S&C)-R1Million
ReticulationMossgasTemporaryhousing-(1990-1993)-(D&S)-R5.0Million
3.5 CONSTRUCTION ANDPROJECTMANAGEMENT
ResidentEngineeronthe followingprojects:
GypseyParkMossel Bay-(1986-1990)-R10.0 Million
LouisHarris Industrial Development-(1991)-R1.5Million
Mossgas StormwaterQualityControl-(1988)-R8.0Million
Grootbrak School Mass Earthwork-(1989)-R1.0Million
Le Grand Golf Estate-(2008-2010)-R15.7 Million
Monte ChristoDevelopment-(2008)-R27Million
Scot Tannery Mossel Bay-(1999-2002)-R5 Million
NautilusDevelopmentMossel Bay-(2002)-R8.0Million
Springerbaai EcoDevelopmentMossel Bay-(2001-2008)-R5 Million
Mossel Bay Mall-(2002-2014)-R5.0 Million
NewFactoryfor GRI Windsteel Atlantis(2014)-(D,S&C)-R65Million
3.6 CAPIBILITIES
He iscapable of carrying outthe following activities:
3.6.1 CIVIL
Assesingsite situations accordingtogeotechnical reports
Surveyingof site andexistingservices forthe purpose of design
Designingof completeRoadandStormwatersystems,SewerandWaterReticulationsandpreparing
final detaileddrawingthereof forapproval byauthorities.
Site supervisionof the above activities.
Calculatingmassearthworksvolumesforanytype of design.
Managing projectsintermsof regularsite meetingsandthe minutesthereof,programmingand
certificationof progresspayments,close-outreportsetc.
Preparationof final asbuiltdrawings.