12. Turning Side frame Cargo Basket
container
Crane Time
Man/Hour
Waiting Time
10 Min 10 Min 10 Min
30 Min 30 Min 30 Min
Man/Hour 2 Welder 1 Fitter
Welding position
13. Turning Side frame Cargo Basket
container
Reduce Waiting Time 60%
Crane Time
Waiting Time
20 Min
60 Min
Reduce
Turning
Man/Hour
Man/Hour 2 Welder 1 Fitter
15. Lifting & Turning Side frame Dry Goods
container
Crane Time
Waiting Time
10 Min 10 Min 10 Min
40 Min 40 Min 40 MinMan/Hour
Man/Hour 3 Welder 1 Fitter
Welding position
16. Lifting & Turning Side frame Dry Goods
container
Reduce Waiting Time 60%
Crane Time
Waiting Time
20 Min
80 Min
Reduce
Turning
Man/Hour
Man/Hour 3 Welder 1 Fitter
17. Rotator Cargo Basket Container
Cargo Basket Container Welding sequence
Welding position
1 2 3 4 5
Crane Time 15 Min 15 Min
60 Min 60 MinMan/Hour
Man/Hour 3 Welder 1 Fitter
15 Min
60 Min
15 Min
60 Min
15 Min
60 Min
Waiting Time
18. Rotator Cargo Basket
Container
• Reduce Waiting Time 60%
Crane Time
Waiting Time
60 Min
240 Min
Rotate
Man/Hour
Reduce
Man/Hour 4 Welder 1 Fitter
19. Rotator Dry Good Container
Dry Good Container Welding sequence
Welding position
1 2 3 4 5
Crane Time 15 Min 15 Min
105 Min 105 MinMan/Hour
Man/Hour 5 Welder 2 Fitter
15 Min
105 Min
15 Min
105 Min
15 Min
105 Min
Waiting Time
20. Rotator Dry Good Container
• Reduce Waiting Time 60%
Crane Time
Waiting Time
60 Min
420 Min
Rotate
Man/Hour
Reduce
Man/Hour 5 Welder 2 Fitter