SlideShare a Scribd company logo
1 of 2
Download to read offline
interCALM™ Case Study
THE CHALLENGE
Legacyisanintermediateupstreamoilandgascompanywithamanagement
team committed to aggressive, cost effective production growth. As their
business grew more complex, they began to experience a number of pains
in the management of capital budgets. Many of these pains centered on
the consistency and transparency of their planning data.
Their planners were increasingly dependent on multiple disparate sources
for their planning data. At one point, it seemed like every team member
had his or her own spreadsheet. These inconsistencies created difficulties
conducting important planning activities such as reconciling expenditures
with the budget, or understanding the sensitivities of changes to their drilling
schedule, and the impact of those changes on their capital exposure and
production profile.
Legacy had existing tools in place, but they were growing out of these old
systems, and were now attempting to use a single tool for more jobs than
it was capable of handling.
THE SOLUTION
Legacy conducted an extensive search for a new solution, which included
reaching out to their peers for word of mouth recommendations. They found
what they were looking for with interCALM - a capital planning solution that
could handle the complex budgeting, scheduling, forecasting, sensitivity
analysis, and tracking workflows they relied on. Moreover, it provided all of
these capabilities within a single solution.
Now, not only could they build their annual budgets within interCALM,
they could use it on a daily basis throughout the year to track actuals
and understand if they were on course to meet or exceed their budgets.
interCALM would allow Legacy to schedule rig contracts, and quickly
understand the implications of changing the timing of rigs, or the number of
rigs utilized. And with interCALM, they could perform monthly look backs,
resulting in a clearer understanding of what was causing capital creep and
how to prevent it from happening.
Another reason for choosing interCALM was the level of service and quality
of support they could provide. Rob Fiorentino, Manager of Exploitation
Engineering says,
“ The implementation service and support was
outstanding and a big reason why the product has
blossomed in our company. I can’t understate the fact
that it was truly outstanding. I have no regrets about
switching to interCALM and would recommend it to any
producer in the industry. It is an excellent tool that is
constantly improving to provide a niche solution for the
oil and gas industry.”
INTEGRATED CAPITAL MANAGEMENT AT LEGACY OIL & GAS
“ I have no regrets
about switching
to interCALM and
would recommend
it to any producer
in the industry. It
is an excellent tool
that is constantly
improving to
provide a niche
solution for the oil
and gas industry.”
Rob Fiorentino,
Exploitation
Engineering Manager
Legacy Oil and Gas
www.3esi.comwww.3esi.com
THE RESULT
Today, Legacy imports their capital and production volumes into interCALM
on a monthly basis. From there they are able to tweak the schedule and
forecast, to ensure they deliver on their numbers. As Rob states, “If you
can measure it, you can manage it”.
The results are regularly presented to the executive team, providing
leadership with awareness of Legacy’s capabilities, commitments, and
pending hurdles, in order to set realistic performance expectations. This
extremely beneficial process gets all stakeholders onto the same page,
increasing confidence in their decisions.
When it becomes necessary to delay a rig, or add another, Legacy uses
interCALM’s built in scheduler to show everyone in the boardroom how
these changes will affect the numbers for the year. This visibility is provided
on the fly, allowing decisions to be explored in detail, and executed quickly.
Adds Fiorentino,
“ It is a niche solution unlike anything I’ve ever seen
before, and I have been looking for years. The software
brings the company together “singing from the same
song sheet”. Once established and set up it literally “runs
itself” and requires minimal maintenance throughout the
year...similar to an underground sprinkler system. And
similar to underground sprinkler systems, once you’ve
used one you can’t imagine returning to the old way of
doing things.”
Legacy has enjoyed a number of benefits, and savings, since deploying
interCALM. However, the greatest benefit of all has been the time saved
for their technical staff. In the words of the client,
“ We have paid for the software numerous times over
within the first year because of its ability to highlight
awareness to over expenditures and the tremendous
amount of time that is saved by key staff members, who
are able to redeploy that time to value added exercises.”
CHOOSE interCALM
About interCALM
Budgeting, Forecasting,
AFE, RTD, and Resource
Scheduling. interCALM
brings together all of these
business processes into a
single application.
interCALM is critical to
tracking exactly how much
projects will cost and how
long they will take. With
interCALM, 3esi offers a
complete capital and upside
production management
solution that allows you to
gauge the health of your
organization today, and
prepare your business for
growth tomorrow.
BUDGET
FORECAST
SCHEDULE
www.3esi.com
Experience the benefits of interCALM for yourself with a
customized demonstration
www.cogss.com/interCALM
3esi
+1.403.270.3270
info@3esi.com

More Related Content

Similar to 3esi Case Study - Legacy Oil and Gas

Platforms and Microservices - Is There a Middle Ground for Engineers and Tech...
Platforms and Microservices - Is There a Middle Ground for Engineers and Tech...Platforms and Microservices - Is There a Middle Ground for Engineers and Tech...
Platforms and Microservices - Is There a Middle Ground for Engineers and Tech...Dialexa
 
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...David J Rosenthal
 
HOW TO SCALE AGILE IN OFFSHORE SOFTWARE DEVELOPMENT.pdf
HOW TO SCALE AGILE IN OFFSHORE SOFTWARE DEVELOPMENT.pdfHOW TO SCALE AGILE IN OFFSHORE SOFTWARE DEVELOPMENT.pdf
HOW TO SCALE AGILE IN OFFSHORE SOFTWARE DEVELOPMENT.pdfLaura Miller
 
Benchmarking for facility professionals - Ifma foundation whitepaper
Benchmarking for facility professionals - Ifma foundation whitepaperBenchmarking for facility professionals - Ifma foundation whitepaper
Benchmarking for facility professionals - Ifma foundation whitepaperMuriel Walter
 
Mongo db better_faster_leaner
Mongo db better_faster_leanerMongo db better_faster_leaner
Mongo db better_faster_leanerDrew LaMonte
 
TCM infosys featured in The Telegraph
TCM infosys featured in The TelegraphTCM infosys featured in The Telegraph
TCM infosys featured in The TelegraphTCM infosys
 
TorosAgriCaseStudyFromIBMandPlanist.PDF
TorosAgriCaseStudyFromIBMandPlanist.PDFTorosAgriCaseStudyFromIBMandPlanist.PDF
TorosAgriCaseStudyFromIBMandPlanist.PDFMucahit Erdal
 
FinOps Chronicles: Everything You Wanted to Know
FinOps Chronicles: Everything You Wanted to Know FinOps Chronicles: Everything You Wanted to Know
FinOps Chronicles: Everything You Wanted to Know Adex International
 
Managing Organization And Leading People Essay
Managing Organization And Leading People EssayManaging Organization And Leading People Essay
Managing Organization And Leading People EssayLorie Harris
 
guide-finance-transformation-in-the-digital-age
guide-finance-transformation-in-the-digital-ageguide-finance-transformation-in-the-digital-age
guide-finance-transformation-in-the-digital-ageMagdalena Matell
 
Michael hammer and james champy on Business process re-engineering video anal...
Michael hammer and james champy on Business process re-engineering video anal...Michael hammer and james champy on Business process re-engineering video anal...
Michael hammer and james champy on Business process re-engineering video anal...Surbhi Jindal
 
Adaptive Insights: Konica Minolta - A Customer Success Story
Adaptive Insights: Konica Minolta - A Customer Success StoryAdaptive Insights: Konica Minolta - A Customer Success Story
Adaptive Insights: Konica Minolta - A Customer Success StoryAdaptive Insights
 
IBM Oil | Integrated Framework Makes Intelligent Oil Field a Reality
IBM Oil | Integrated Framework Makes Intelligent Oil Field a RealityIBM Oil | Integrated Framework Makes Intelligent Oil Field a Reality
IBM Oil | Integrated Framework Makes Intelligent Oil Field a RealityIBM Chemical Petroleum
 
IBM GBS Making the intelligent oil field a reality
IBM GBS Making the intelligent oil field a realityIBM GBS Making the intelligent oil field a reality
IBM GBS Making the intelligent oil field a realityGuy Blissett
 
DEC-16-UNLEASH THE POWER OF HUMAN COLLABORATION
DEC-16-UNLEASH THE POWER OF HUMAN COLLABORATIONDEC-16-UNLEASH THE POWER OF HUMAN COLLABORATION
DEC-16-UNLEASH THE POWER OF HUMAN COLLABORATIONMichael G. Schwarzwalder
 
Garwood - Techonology Roundtable
Garwood - Techonology RoundtableGarwood - Techonology Roundtable
Garwood - Techonology RoundtableRita Garwood
 
CIO Bulletin-10 Best ERP Solution Providers 2018
CIO Bulletin-10 Best ERP Solution Providers 2018CIO Bulletin-10 Best ERP Solution Providers 2018
CIO Bulletin-10 Best ERP Solution Providers 2018CIOBulletin1
 
Four Steps Toward a Digital Oilfield Future
Four Steps Toward a Digital Oilfield FutureFour Steps Toward a Digital Oilfield Future
Four Steps Toward a Digital Oilfield FutureGE Canada
 

Similar to 3esi Case Study - Legacy Oil and Gas (20)

Platforms and Microservices - Is There a Middle Ground for Engineers and Tech...
Platforms and Microservices - Is There a Middle Ground for Engineers and Tech...Platforms and Microservices - Is There a Middle Ground for Engineers and Tech...
Platforms and Microservices - Is There a Middle Ground for Engineers and Tech...
 
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...
Nintex Workflow for Sharepoint - Return on Investment Whitepaper by Forrester...
 
HOW TO SCALE AGILE IN OFFSHORE SOFTWARE DEVELOPMENT.pdf
HOW TO SCALE AGILE IN OFFSHORE SOFTWARE DEVELOPMENT.pdfHOW TO SCALE AGILE IN OFFSHORE SOFTWARE DEVELOPMENT.pdf
HOW TO SCALE AGILE IN OFFSHORE SOFTWARE DEVELOPMENT.pdf
 
Benchmarking for facility professionals - Ifma foundation whitepaper
Benchmarking for facility professionals - Ifma foundation whitepaperBenchmarking for facility professionals - Ifma foundation whitepaper
Benchmarking for facility professionals - Ifma foundation whitepaper
 
Mongo db better_faster_leaner
Mongo db better_faster_leanerMongo db better_faster_leaner
Mongo db better_faster_leaner
 
TCM infosys featured in The Telegraph
TCM infosys featured in The TelegraphTCM infosys featured in The Telegraph
TCM infosys featured in The Telegraph
 
TorosAgriCaseStudyFromIBMandPlanist.PDF
TorosAgriCaseStudyFromIBMandPlanist.PDFTorosAgriCaseStudyFromIBMandPlanist.PDF
TorosAgriCaseStudyFromIBMandPlanist.PDF
 
FinOps Chronicles: Everything You Wanted to Know
FinOps Chronicles: Everything You Wanted to Know FinOps Chronicles: Everything You Wanted to Know
FinOps Chronicles: Everything You Wanted to Know
 
Managing Organization And Leading People Essay
Managing Organization And Leading People EssayManaging Organization And Leading People Essay
Managing Organization And Leading People Essay
 
guide-finance-transformation-in-the-digital-age
guide-finance-transformation-in-the-digital-ageguide-finance-transformation-in-the-digital-age
guide-finance-transformation-in-the-digital-age
 
Michael hammer and james champy on Business process re-engineering video anal...
Michael hammer and james champy on Business process re-engineering video anal...Michael hammer and james champy on Business process re-engineering video anal...
Michael hammer and james champy on Business process re-engineering video anal...
 
Adaptive Insights: Konica Minolta - A Customer Success Story
Adaptive Insights: Konica Minolta - A Customer Success StoryAdaptive Insights: Konica Minolta - A Customer Success Story
Adaptive Insights: Konica Minolta - A Customer Success Story
 
Zoom for enterprise
Zoom for enterpriseZoom for enterprise
Zoom for enterprise
 
IBM Oil | Integrated Framework Makes Intelligent Oil Field a Reality
IBM Oil | Integrated Framework Makes Intelligent Oil Field a RealityIBM Oil | Integrated Framework Makes Intelligent Oil Field a Reality
IBM Oil | Integrated Framework Makes Intelligent Oil Field a Reality
 
IBM GBS Making the intelligent oil field a reality
IBM GBS Making the intelligent oil field a realityIBM GBS Making the intelligent oil field a reality
IBM GBS Making the intelligent oil field a reality
 
DEC-16-UNLEASH THE POWER OF HUMAN COLLABORATION
DEC-16-UNLEASH THE POWER OF HUMAN COLLABORATIONDEC-16-UNLEASH THE POWER OF HUMAN COLLABORATION
DEC-16-UNLEASH THE POWER OF HUMAN COLLABORATION
 
Software Management
Software ManagementSoftware Management
Software Management
 
Garwood - Techonology Roundtable
Garwood - Techonology RoundtableGarwood - Techonology Roundtable
Garwood - Techonology Roundtable
 
CIO Bulletin-10 Best ERP Solution Providers 2018
CIO Bulletin-10 Best ERP Solution Providers 2018CIO Bulletin-10 Best ERP Solution Providers 2018
CIO Bulletin-10 Best ERP Solution Providers 2018
 
Four Steps Toward a Digital Oilfield Future
Four Steps Toward a Digital Oilfield FutureFour Steps Toward a Digital Oilfield Future
Four Steps Toward a Digital Oilfield Future
 

3esi Case Study - Legacy Oil and Gas

  • 1. interCALM™ Case Study THE CHALLENGE Legacyisanintermediateupstreamoilandgascompanywithamanagement team committed to aggressive, cost effective production growth. As their business grew more complex, they began to experience a number of pains in the management of capital budgets. Many of these pains centered on the consistency and transparency of their planning data. Their planners were increasingly dependent on multiple disparate sources for their planning data. At one point, it seemed like every team member had his or her own spreadsheet. These inconsistencies created difficulties conducting important planning activities such as reconciling expenditures with the budget, or understanding the sensitivities of changes to their drilling schedule, and the impact of those changes on their capital exposure and production profile. Legacy had existing tools in place, but they were growing out of these old systems, and were now attempting to use a single tool for more jobs than it was capable of handling. THE SOLUTION Legacy conducted an extensive search for a new solution, which included reaching out to their peers for word of mouth recommendations. They found what they were looking for with interCALM - a capital planning solution that could handle the complex budgeting, scheduling, forecasting, sensitivity analysis, and tracking workflows they relied on. Moreover, it provided all of these capabilities within a single solution. Now, not only could they build their annual budgets within interCALM, they could use it on a daily basis throughout the year to track actuals and understand if they were on course to meet or exceed their budgets. interCALM would allow Legacy to schedule rig contracts, and quickly understand the implications of changing the timing of rigs, or the number of rigs utilized. And with interCALM, they could perform monthly look backs, resulting in a clearer understanding of what was causing capital creep and how to prevent it from happening. Another reason for choosing interCALM was the level of service and quality of support they could provide. Rob Fiorentino, Manager of Exploitation Engineering says, “ The implementation service and support was outstanding and a big reason why the product has blossomed in our company. I can’t understate the fact that it was truly outstanding. I have no regrets about switching to interCALM and would recommend it to any producer in the industry. It is an excellent tool that is constantly improving to provide a niche solution for the oil and gas industry.” INTEGRATED CAPITAL MANAGEMENT AT LEGACY OIL & GAS “ I have no regrets about switching to interCALM and would recommend it to any producer in the industry. It is an excellent tool that is constantly improving to provide a niche solution for the oil and gas industry.” Rob Fiorentino, Exploitation Engineering Manager Legacy Oil and Gas www.3esi.comwww.3esi.com
  • 2. THE RESULT Today, Legacy imports their capital and production volumes into interCALM on a monthly basis. From there they are able to tweak the schedule and forecast, to ensure they deliver on their numbers. As Rob states, “If you can measure it, you can manage it”. The results are regularly presented to the executive team, providing leadership with awareness of Legacy’s capabilities, commitments, and pending hurdles, in order to set realistic performance expectations. This extremely beneficial process gets all stakeholders onto the same page, increasing confidence in their decisions. When it becomes necessary to delay a rig, or add another, Legacy uses interCALM’s built in scheduler to show everyone in the boardroom how these changes will affect the numbers for the year. This visibility is provided on the fly, allowing decisions to be explored in detail, and executed quickly. Adds Fiorentino, “ It is a niche solution unlike anything I’ve ever seen before, and I have been looking for years. The software brings the company together “singing from the same song sheet”. Once established and set up it literally “runs itself” and requires minimal maintenance throughout the year...similar to an underground sprinkler system. And similar to underground sprinkler systems, once you’ve used one you can’t imagine returning to the old way of doing things.” Legacy has enjoyed a number of benefits, and savings, since deploying interCALM. However, the greatest benefit of all has been the time saved for their technical staff. In the words of the client, “ We have paid for the software numerous times over within the first year because of its ability to highlight awareness to over expenditures and the tremendous amount of time that is saved by key staff members, who are able to redeploy that time to value added exercises.” CHOOSE interCALM About interCALM Budgeting, Forecasting, AFE, RTD, and Resource Scheduling. interCALM brings together all of these business processes into a single application. interCALM is critical to tracking exactly how much projects will cost and how long they will take. With interCALM, 3esi offers a complete capital and upside production management solution that allows you to gauge the health of your organization today, and prepare your business for growth tomorrow. BUDGET FORECAST SCHEDULE www.3esi.com Experience the benefits of interCALM for yourself with a customized demonstration www.cogss.com/interCALM 3esi +1.403.270.3270 info@3esi.com