This document is a resume for Steven Willard that outlines his education, skills, and work experience. Steven graduated from ITT Technical Institute in 2015 with an Associate of Applied Science in Computer Drafting and Design. He has skills in AutoCAD, Revit, Inventor Pro, and 3ds Max software as well as experience with materials like plastics, wood, and metals. His work history includes jobs in construction, concrete finishing, and as an operator for a PVC pipe production line.
1. STEVEN WILLARD
4101 S. SHERIDAN RD. #484
LENNON, MI. 48449
TELEPHONE # (810) 908-7845
EMAIL: STEVEWILLARD30@YAHOO.COM
EDUCATION
ITT Technical Institute Swartz Creek, MI 2013-2015
Associate ofApplied Science
Computer Drafting and Design
Graduation Date: December/2015
GPA: 3.3
Honors Summer 2014
SKILLS
SOFTWARE:
AutoCAD 2012
AutoCAD Civil 3D 2012 Imperial
Revit 2012 Architecture
Inventor Pro 2012
3ds Max
Microsoft Word & PowerPoint
MATERIALS AND PROCESSES:
Work with multiple materials including plastics,
wood, metals, glass, cement, fiber, leather &
paper
Read/interpret blueprints & plans
Transfer technical information into
working drawings
DRAFTING/CAD METHODS:
Technical Drawings in 2D & 3D
Architectural, mechanical, civil and
manual drafting
Produce floor plans, roof plans, elevations,
wall sections and details, dimensioning,
schedules and space planning
Area calculations
RAPID VISUALIZATION:
Basic representation techniques
Basic forms
Structure of objects and space
EXPERIENCE
Csiki Builders Flint, MI 2006-Present
General Laborer
Install countertops, windows, doors
Tear off and replace shingle roofs (also rubber roofs)
Interior framing, hang gutters and siding
Cobra Construction Fort Pierce,FL 2005-2006
Concrete Finisher, Laborer
Form, pour and top concrete slabs
Flamingo Pools Port Saint Lucie, FL 2004-2005
Concrete Finisher, General Laborer
Form, pour and top concrete pools/pool decks
K L Durant Construction Port Saint Lucie, FL 2002-2005
Concrete Finisher, Laborer
Form, pour and top concrete slabs/patio`s
FreedomPlastics Fort Pierce,FL 2000-2002
PVC Pipe Line Operator, Assistant Supervisor Trainee
Complete hourly readings of extruder temperatures and speeds
Make sure two or more production lines run smoothly for 12hr. periods
Take measurements on pipe (length, outside diameter, thickness)
Maintain quality control
Count, stack, and bundle PVC pipe