Report on
Business Analysis of Social Service Organization
Arience Strategies,
Bangalore.
Prepared By:
C M SHAMEER
Registration No:
14010121101
Under the Guidance of
Dr Dolphy M Abraham
Program Director – Doctoral Program,
Alliance University
In partial fulfilment of the Course-Industry Internship Programme (IIP) in the
Semester II of the
Master of Business Administration (Batch of 2014)
Bangalore
Master of Business Administration
Industry Internship Programme (IIP)
Declaration
This is to declare that the report entitled “Business Analysis of Social Service
Organization” has been made for the partial fulfilment of the Course: Industry Internship
Programme (IIP) in Semester II (Batch: July 2014-2016) by me at Arience Strategies,
Bangalore under the guidance of Dr Dolphy M. Abraham, Program Director – Doctoral
Program.
I confirm that this report truly represents my work undertaken as a part of my Industry
Internship Programme (IIP). This work is not a replication of work done previously by any
other person. I also confirm that the content of the report and the views contained therein have
been discussed and deliberated with the Faculty Guide.
Signature of the Student :
Name of the Student (In Capital Letters) : SHAMEER C M
Registration No : 14010121101
Master of Business Administration
Certificate
This is to certify that Mr C M SHAMEER Registration no: 14010121101 has completed the
Report entitled “Business Analysis of Social Service Organization” in “Arience Strategies,”
Bangalore under my guidance for the partial fulfilment of the Course: Industry Internship
programme (IIP) in Semester II of the Master of Business Administration.
Signature of Faculty Guide:
Name of the Faculty Guide: Dr Dolphy M. Abraham,
Program Director – Doctoral Program,
Alliance University,
Bangalore.
ACKNOWLEDGEMENT
First and foremost I would like to thank the Almighty God, my family members and
my friends for encouraging me to do this project work.
I express my sincere thanks and heartfelt gratitude to Mr Pramod Kumar, Managing
Director of Arience Strategies for allowing me to do my internship in Arience Strategies,
Bangalore. Mr Pramod Kumar made my internship very interesting with inspiration,
enthusiasm and his great efforts to explain things clear and simple. Throughout the intern
period, he provided me encouragement, sound advice, good teaching, company and lot of good
ideas. It was a great learning experience and he had helped me a lot in enhancing my
knowledge about the Project Management-Business Analysis. I find no words to express my
deep rooted thanks for his valuable guidance.
I express my profound gratitude to Dr Dolphy M. Abraham, Program Director –
Doctoral Program, Alliance University, for allowing me to work under his guidance. He has
provided valuable inputs to build my internship and has also been a constant support.
I thank Arience Strategies, Bangalore for granting me permission to do my project
work in its premises. I would also like to convey my sincere gratitude to all the staff, friends
and well-wishers who extended their fullest co-operation with regard to my project.
Finally, I thank Alliance School of Business for providing me an opportunity to face
the reality in the corporate world and I would like to thank all the ones that helped to bring out
this project work a great success.
C M SHAMEER
LIST OF CONTENTS
S.NO CHAPTER PAGE
No.
1 Executive Summary 1
2 Introduction 3
2.1 Introduction to Management Consultancy
Industry
4
2.1.1 Global scenario of Management Consultancy 7
2.1.2 Indian Scenario of Management Consultancy 8
2.1.3 Industry structure of Management
Consultancy in India
11
2.1.4 Porter’s Five Force Model 12
2.2 Company Overview 15
2.2.1 Philosophy and Vision 15
2.2.2 Organisation Structure of the Company 16
2.2.3 Operations of the Company 16
2.2.4 SWOT Analysis 17
3 Project Profile 19
3.1 Objectives 20
3.2 Methodology 20
3.3 Introduction to Project Management 21
3.4 Project Charter 24
3.4.1 Background / Justification 25
3.4.2 Goals 25
3.4.3 Objective 25
3.4.4 Scope 25
3.4.5 Major Deliverables 25
3.4.6 Stakeholders 25
3.4.7 Project Constraints 25
3.4.8 Project Milestones 26
4 Observations and Analysis 27
5 Findings 32
5.1 Organization Structure 33
5.2 Cost Structure 34
6 Recommendations 36
7 Conclusion 40
7.1 Learning Outcome 41
8 References 42
LIST OF FIGURES
Figure
No
Description Page No.
2.1 Organization Structure of Arience 16
3.1 Project Management Process 22
5.1 Organization Structure of Social Service
Organization
33
5.2 Cause and Effect Analysis 34
LIST OF TABLES
Table
No.
Description Page
No.
4.1 Expenses of the Social Service Organisation 28
4.2 Income details of the Social Service Organisation 29
4.3 Deficit of the Organisation per year 29
4.4 Breakup of ₹ 42,00,000 for different programs 30
5.1 Cost structure of the social service organisation 34
LIST OF GRAPHS
Graph No Description Page
4.1 Expenses of the social service organization 16
4.2 Deficit of the organization per year 22
4.3 Breakup of ₹ 42, 00,000 for different programs 34
5.2 Cause and Effect analysis 34
1
CHAPTER 1
EXECUTIVE SUMMARY
2
EXECUTIVE SUMMARY
Arience Strategies is a management consulting company which aims at achieving
excellence with convergence of different global standards and methodologies. Arience has
a team of highly experienced professionals which helps in providing consulting services,
project management support services, education and training services to diverse industry
sectors. Arience Strategies is a commercial consulting company which provides expertise,
support and project teams to the Arience Foundation in carrying out various social projects.
Arience Foundation undertakes various non- profit projects which are sponsored by
Arience Strategies. These projects help the MSME enterprises, rural cooperatives and
various social sectors in carrying out their businesses and solving their business problems.
It involves rigorous study of these social projects and deployment of global operating
standards in the fields of application.
Current scenario shows how such organizations are unable to perform to maximum
capability due to lack of cost planning, or lack of well-defined organization structure etc.
This report shows how the Project Management and business analysis was done for
respective Social Service Organization by providing them Organization Structure and Cost
Structure.
3
CHAPTER 2
INTRODUCTION
4
2.1 Introduction to Management Consultancy Industry
Management consultancy is the practice of helping organization to improve their
performance operating primarily through the analysis of existing organizational problems
and the development of plans for improvement.
Management consultancy often brings their own proprietary knowledge /
methodologies / framework to guide the identification of problems and to serve as the basis
for recommendation for more effective and efficient ways of performing work task. As a
result of their exposure to and relationships with numerous organizations, consulting firms
are also said to be aware of industry "best practices", although the specific nature of
situations under consideration may limit the transferability of such practices from one
organization to another.
Management Consultancy firm helps a company to identify future goals, current
skills and fault lines by using their best practices, branding and strategies, marketing
decisions, motivation and incentives , as well as technology adaptation, production line
efficiency and profitable accounting.
Assignments for management consultant:
1. Review an organisation's corporate objectives and strategy
2. Review an organisation's structure and staffing
3. Apprising, selecting, and determining the remuneration structure for executives
4. Preparing and implementing development programme
5. Improving revenue and profitability
6. Increase cost effectiveness
7. Introduce new or better management techniques such as information technology,
personnel incentives, asset management, and re-engineering.
8. Planning and controlling the execution of projects which are outside the normal
experience of the organisation's staff
5
Management consultant firm must have below characteristics:
1. Passion for acquiring knowledge and technical competence
2. Willingness to change and adapt new ideas
3. Recognize present paradigm and shift to new paradigm
4. Passion for give more than 100% all the time
5. High developed, motivated and intellect
6. Genuine concern and compassion for others
7. Vision
8. Courage
9. Sincerity
10. Ethics
Industry Trends:
1. Consulting Firms Accept Assignments with Contingency Fees
2. Accounting Firms Taking Large Market Share of Consulting Contracts
3. Many Industry Sectors Seek Consulting and Outsourcing Income, Competing with
Pure Consultancies
4. Major Corporations and Organizations Develop Internal Consultants and Seek
Outside Clients
5. Corporate Clients Want Solid Returns on IT Investments
6. Federal Government Consulting Is Curtailed in Some Agencies as Part of Budget
Austerity and Defence Cutbacks
7. Consultancies Position Themselves to Serve Global Markets and Multinational
Corporations
8. Off shoring to India Drives Changes in Global Consulting
9. BPO and KPO: White-Collar and Professional Tasks are off shored to a Growing
Extent.
10. New MBA’S desire consulting and accounting jobs.
6
Major Roles and responsibilities in Management consultant firm:
1. Analyst:
1.1 Collect data for company overview- interviews , surveys, market reports
1.2 Analytical Modelling- analysts do most of excel heavy lifting, models vary
from market segmentation to cost reduction.
2. Senior Analyst:
2.1 Client interaction
2.2 Develop complex models
3. Consultant:
3.1 Consultants own a work stream (work module) in the project
3.2 Analysis structure
3.3 Creating the sections client presentation documents
3.4 Interacting with the client on a day to day basis on their level
3.5 Managing upwards to engagement managers and the senior team members in
the firm
4. Engagement firms:
4.1 Client Work: Engagement managers own the overall responsibility of the
project management, management of junior team, analysts and consultants.
The senior team depends on them to get the work done according to quality
the standards of the firm and in a timely fashion. They interact heavily with
the client as the project leads
4.2 Marketing: Engagement managers market firm’s services to new/existing
clients, develop white papers about industries.
4.3 People Development: They participate in recruiting, screening candidates and
campus presentations, informal meeting with candidates, interviewing.
5. Principal:
5.1 Client work: Principals oversee client assignments part time or full time on
larger projects. They deal with senior executives with clients, usually at Vice
president or C-level.
5.2 Marketing: Principal usually are aligned to several key clients and develop a
market position. They forge a niche and want to be known in the firm and in
7
the marketplace with that niche. They demonstrate thought leadership to build
firm’s offerings
5.3 Sales: Principal is often leads to write and coordinate proposals and participate
in sell meetings. They are in active contact with their set of key clients to
generate new leads. In some firms, they have sales targets
5.4 People Development: They are active in all aspects of recruiting and may lead
overall recruiting efforts.
2.1.1 Global scenario of Management Consultancy:
Global consulting industry revenue is about $449 billion in 2015 according to
Plunkett research estimates. This represents reasonable growth from $415 billion in 2014.
Growth in global trade has rebounded from the very low level of the recession. This fuelled
demand for consulting of all kinds including management, human resource and technology.
The growing globalization of business and industry in general led inevitably to the
globalization of the leading consulting companies. Major consultancies operate offices in
the most important business centres in Europe and Asia-Pacific as well as in North and
South America. Africa is the next consulting frontier, as rapid economic growth has been
enjoyed by a handful of African nations in spite of problems ranging from lack of
infrastructure to social turmoil and terrorism. Many consultancies operate worldwide and
have multi-ethnic, multilingual employee bases. In particular, major consulting firms have
opened large numbers of offices in Brazil, India and China in recent years.
India’s largest outsourced business and technology consulting firms were
complaining that clients were delaying or cancelling projects as 2009 began. However, in
recent years, corporate profits in general grew dramatically, meaning that executives are
now more willing to authorize new consulting projects as long as they see the potential for
a good return on the cost.
Firms with multi-cultural staffing capability and offers in strategic cities worldwide
will benefit in particular. Recent growth of developing nation economy gave huge
opportunities to the consulting firm’s special in the countries South Korea, china, Indonesia
8
and India both in government and private sectors contracts in industries range from
transport to health care.
Top 10 Consultancy Companies are:
1. Bain & Company
2. McKinsey & Company
3. The Boston Consulting Group
4. PWC Network (Formerly Booz & Company)
5. Deloitte Consulting LLP
6. PwC (Price Water House Cooper) LLP (Consulting Practise)
7. The Brattle Group
8. Oliver Wyman
9. The Cambridge Group
10. Accenture.
2.1.2 Indian Scenario of Management Consultancy:
India has been globally recognized for its fast paced development. The service
sector has been growing at a fast pace with a compound annual growth rate (CAGR) at 8.5
per cent for period 2000-01 to 2013-14 and it contribute around 57 per cent to the gross
domestic product.
In parallel, it leads to increasing demand for consultancy services, both for domestic
and foreign firms, a study by ASSCOHAM the consulting sector in India to grow at an
Compound Annual Growth Rate (CAGR) of 30 per cent.
The Indian consultancy industry reportedly stands at Rs. 13,000 Cr for the year
2008, by the year 2010 it was Rs. 17,000 cr. In the year 2013, the Management consultancy
industry crossed Rs. 22,000 cr. Indian consultancy industry has largest concentration in
Delhi and Mumbai followed by Kolkata and Chennai. As per ASSCHOM former president
Venugopal Dhoot, the US, UK, Japan, China, Saudi Arabia are competence with the India
Consultancy Firms.
9
Indian Consultancy Companies have strong capabilities of strong knowledge
human resource and strong economy such as India economy shown growth in areas of
automobile, power, aviation, infrastructure, service in every sector very Management
consultancy can grow, due to strong presence of IT sector make India consultancy services
as keep favourite place for consultancy service for Multi nation companies.
Latest Trends in Consultancy Industry in INDIA:
1. Fast Growth
The consulting industry is trying its best to accommodate the demand and big
consulting companies are merging the small consultancy companies.
2. One Stop for all solution:
Like any other industry, the consultancy industry made one stop for all solutions.
Knowledge management tools, practises, databases and internet make it possible
for consultancy to draw up knowledge of every type of solution to every problem.
3. Shortage of people:
Shortage of human resource became the greatest threat to the consultancy firms as
small consultancy firm’s unable to get well qualified people for their offers and for
big consultancy company’s attrition, high salary became problem. Some of
companies made an integrated MBA with colleges towards specific need of
consultants.
4. Nature of projects: Moving towards high end strategy consulting
Management consulting in India has traditionally about capital funding and market
size. Due to increase in competition due to globalization, many Indian companies
are using management consulting are using in their high end strategies which
includes reduce cost; implement new market strategies, relationship with
customers.
5. Public Sector:
Management consulting has entered into public sector as central and state
governments have identified the importance of management consulting. The
governments has realized the importance of data and analytical driven approach to
solve complex problems and farming policies at the macroeconomic level. For
10
example Gujarat government gave work of market assessment of the Rs. 78,000
crore Gujarat International Finance Tec-City (GIFT) to a top tier management
consulting.
Major challenges faced by Management consultancy firms in India:
1. Data:
Getting accurate and adequate data is a major issue in India. If we go by the inputs,
market assessment, feasibility or sizing assignments are very few and far between in
developed economies whereas India is replete with such projects. One should not be
surprise by the fact that Indian-based KPOs and analytics firms do an excellent job
crunching numbers for their foreign clients but struggle while coming up with such
insights for Indian clients and most of the blame lies with quality of data. The need for
3-4 types of ID proofs in India is another proof that data is not “proven” yet. So you
may have a hard time drawing meaningful insights out of them.
2. Experience:
With major consulting firms having less than two decades of presence in India and the
country witnessing major changes in the intervening period, one may still be some
distance away from being “too-old” to “know it all” as far as Indian landscape is
concerned. Similarly for the clients, one of the major reasons for their apprehensions
or expectations is their limited experience of engaging with the consultants.
3. Relation between firm and customer:
One of the major roadblocks is the inability of the prospective interviewees to
differentiate industry standards or information from strategic and confidential
information. But things may change if you have close contact that connects you with
the right person. It could also boil down to consultant’s capability.
4. Clients Requirements:
Indian clients are excepting far from what they want and what they offer, this leads to
major problem to the firms. Multi-tasking expertise are not available right now.
11
5. Competition:
In India, health competition is not healthy among small players they competition with
each other in terms of price wars not in terms of quality of service.
Other challenges:
1. Lack of proper management.
2. Inability to get new clients
3. Over promising results.
4. Lack of communication skills
5. Diversity
6. Different priority from place to place.
2.1.3 Industry structure of Management Consultancy in India:
The management consulting services across all industries and sectors, this leads to
create the industry into segmentation wise with each layer catering to a distinct set of needs
1. Global management consulting firms:
They have an edge over low –cost domestic players due to their experience and
knowledge investments. Their experience talent and deep relationship with clients
make them ideal for high-level strategy projects that require macroeconomic or global
perspectives. Majority of domestic businesses (especially SMEs) cannot afford their
services, leaving ample room for domestic players to bridge the supply gap, with a
much more viable value proposition in terms of service and fees. With near saturation
and declining profit margins at the bottom of the management consulting pyramid,
Indian consulting firms are moving up the value chain towards high-end technology
consulting. However, winning credibility as a management consulting firm is a huge
challenge. Indian IT firms realize these limitations and as a result, are now spending
increasingly on innovation and R&D.
2. Niche Management Consulting Firms:
They focus on particular Functions or set of industries. At smaller management
consulting firms, clients get a senior professional for the full duration of the project,
12
while a big-brand global firm typically offers blended packages with senior consultants
working part-time on strategy and junior associates overseeing execution. Rising talent
levels, flexible business models and competitive billing rates have helped these firms
to pit themselves against established players. With their hands-on experience with the
smaller domestic clients, they can spot emerging trends faster – making them best
positioned for projects that involve both strategizing and long-term execution.
3. Operational Consulting Firms:
These firms are both divisions of global firms or individual firms tackling operational
problems. These firms deal with projects that are more inward-looking for the clients
and include cost structuring, organizational change, supply-chain innovation.
2.1.4 Porter’s five force model:
Bargaining power of suppliers:
 This is one of the major parts of the management consulting industry. These
consultancies are built upon the competence of their consultants.
 It is important to have the knowledge of the company and the way they work as well
as the local knowledge and competence required at the subsidiary level.
 However, it is not always available and the firm needs to find ways to recruit the top
talents and make themselves into an attractive employer.
 It is crucial for a new company that enters the market to build its image not just for the
potential clients but also for potential employees. Being at job fairs, announcing
positions and marketing themselves in different ways will help them be more visible
and hopefully build an image that will attract competent people to their business.
 This can also entail higher start-up costs since marketing can cost a lot and since there
is a lack of consultants their bargaining power for salary will be higher and probably
cost more for the company to hire people.
 Another point to that is worth considering when entering a new market is if the country
or area can supply such competence. Some areas of the world do not have the literacy
rate or higher education that is required in order to bring people to the competence level
13
that management consultancies demand. This would be one of the crucial areas to focus
on since this is what builds the company.
Threat of new entrants:
 The importance is to make sure that your company has an existing client relationship
and image within that market.
 As one barrier, it might create greater cost to enter the market.
 As a management consultancy, it is important to keep up with the trends and desires
from companies. Seeing where the problems seem to lie and where companies are
willing to spend their money.
 Keeping to the same tactic might cause difficulties for the company in the future if
others come with better services and solutions.
Bargaining power of buyers:
 Consultancies build their customer base upon relationships and referrals from satisfied
clients. It is important to foster a good image so that the clients feel confident in that
they know what they get. There should be substance behind the image.
 However, since services are consumed at the same time as you pay for it, it is not easy
to examine the quality before the buy. That is why referrals and satisfied customers,
who can spread the word about the company, are essential and lead to ways of gaining
more business, either from existing clients or through new clients.
 One big difference that exists between some manufacturing firms and consultancies is
the quantity of customers available.
 If it is a new company, it is crucial to have some ties to the market from existing clients
who are able to improve the company’s image on that market. Therefore, it is important
to analyse the potential clients in the market.
 There will always be different trends showing what area will be slightly more
prosperous to look into. For example, Corporate Social Responsibility has been a hot
topic and area to work in, however, as all companies see it as a basic part to have in
their business, it has become institutionalized and companies know how to deal with
this area.
14
 Fostering and caring for the clients relationship makes sure that the company will have
a stable growth. Never be satisfied with the clients you have, always see potential for
more.
 Consultancies are much affected by the economic development in the country or area.
If the companies do not have money to pay for their services, they won’t hire the
consultancies and therefore there will be less business for them. In bad times, it is good
to have stable and long term relationships with certain clients to ensure perseverance.
This leads us into ensuring perseverance in the face of substitutes.
Threat of substitutes:
 It is important to be more specialized focused, but broad enough to cover areas that can
potentially foster business for the consultancy.
 Having the right competence and knowledge to enable the consultancy to be a little
broader but at the same time very specific can give it room to move out of their usual
business when there are recessions.
 Consultancies need to be up to date and always be a step ahead of companies so that
they do not lose their purpose for these companies.
Rivalry among existing players:
 The consultancies fringe in on each other’s areas of expertise but not enough to seem
like a serious threat to their specific area.
 If the economic development is slow, then there might be some tension between the
different consultancies. The different consultancies have to fight to recruit the right
talent to their business
15
2.2 Company Overview
Arience Strategies is a management company with a vision of achieving excellence
with convergence of various global standards and methodologies. With a team of highly
experienced professionals, Arience is providing consulting service, education & training
services, project management support services to diverse industry sectors.
Arience helps organizations to align their day to day operations with strategic
objective by streamlining management process, optimize team productivity and by
effectively applications of tools &techniques.
Arience Strategies started their operations from 01 September, 2009.
Arience Strategies has Arience Foundation which takes two programs.
1. Arience Research
It is management maturity enhancement program for non-profit organization to:
 Lead Change and Inspire innovation
 Manage complex, Multi-cultural global projects
 Building an integrated management approach
 Achieving excellence in project delivery
 Enhancing productivity and Profitability
2. Arience Mentor
It is an initiative for individuals who are affected by economic situations
 Personal counselling and guidance
 Professionals mentoring and coaching
 Continuous improvement and growth
2.2.1 Philosophy and Vision
Vision: Achieving excellence with convergence of various global standards and
methodologies.
16
Philosophy: Utilize globally accepted methodologies, tools & techniques for providing
value to our stakeholders.
2.2.2 Organization Structure of the Company
Fig 2.1: Organization Structure of Arience
2.2.3 Operations of the Company
Project Management Services
 Build an integrated project and program management methodology
 Setting up PMO (PM Office) / PMCoE (PM Centre of Excellence)
 PM Process Maturity Assessment & Improvement
 Enhance PM productivity and profitability
 Business Analysis and Requirement Engineering process implementation
 Agile and Scrum adoption in projects
17
Project Management Technology Consulting
 Project Management software deployment
 PM process implementation on software tool
 Requirement Management tools implementation
Competency Enhancement Services
Specialized training includes:
 Project Management/Program Management
 Risk Management
 Business Analysis
 Project planning & Monitoring with Microsoft Project
 Professionals mentoring, counselling and coaching
 Agile and Scrum methodology
Certifications Programs:
 PMI-PMP/CAPM Certification
 IREB-CPRE Certification Workshop
 SCRUM Master Certification Workshop
2.2.4. SWOT Analysis:
Strengths:
1. Strong Management
2. Size Advantage
3. Economics of Scale
4. Unique Products
5. Brand Name
6. Quick Response
7. Quality process
Weakness:
1. Out-dated Technology
2. High Staff Turnover
3. No market presence
4. Less Cash Flow
5. Lack of marketing expertise
18
Opportunities:
1. Emerging Markets
2. Innovation
3. New services
4. New Products
5. New Markets
Threats:
1. Volatile Currencies
2. Bad Economy
3. Government Regulations
4. Political Risk
5. Technology change
6. Price wars
19
CHAPTER 3
PROJECT PROFILE
20
PROJECT PROFILE
3.1 Objectives
 To understand the roles and responsibilities of the personnel in the Social Service
Organization for providing them with the suitable Organization Structure.
 To understand all the cost related activities of Social Service Organization for
providing them with the Cost Structure.
3.2 Methodology
The objectives of this project are to provide the Organization Structure and Cost Structure
to the Social Service Organization.
Primary Sources of the data are
 The primary data was collected with direct interactions with the various personals
of the organization.
1. Employees of the Social Service Organization.
2. Parents of the children with special needs.
3. Employees of Arience Strategies.
4. Top Management of Arience Strategies.
5. Top Management of Social Service Organization.
6. Website of Arience Research Foundation
7. Partners of the Social Service Organization.
8. Donors of the Social Service Organization.
 Secondary Sources of the data are
1. Website of Social Service organization
2. Website of Arience Strategies
21
3.3 Introduction to Project Management
Project Management is the application of knowledge, skills, tools, and techniques to
project activities to meet the project requirements. Project Management is accomplished
through the appropriate application and integration of the 47 logically grouped project
management processes, which are categorised into five process groups.
The five process groups are:
 Initiating,
 Planning,
 Executing,
 Monitoring and Controlling, and
 Closing
Managing a project typically includes, but not limited to
 Identifying requirements;
 Addressing the various needs, concerns and expectations of the stakeholders in
planning and executing the project;
 Setting up, maintaining, and carrying out communications among stakeholders
that are active, effective, and collaborative in nature;
 Managing Stakeholders towards meeting project requirements and creating
Project deliverables;
 Balancing the competing project constraints, which include:
Scope,
Quality,
Schedule,
Budget,
Resources, and
Risks
 The specific project characteristics and circumstances can influence the
constraints on which the project management team needs to focus. The Project
team needs to be able to assess the situation, balance the demands, and maintain
22
proactive communication with stakeholders in order to deliver a successful
project.
 Due to the potential for change, the development of the project management plan
is an iterative activity and is progressively elaborated throughout the project’s
life cycle. Progressive elaboration involves continuously improving and detailing
a plan as more detailed and specific information and more accurate estimates
become available. Progressive elaboration allows a project management team to
define work and manage it to a greater level of detail as the project evolves.
A guide to the Project Management Body of Knowledge (PMBOK Guide) was first
published by the Project Management Institute (PMI) as a white paper in 1987 in an attempt
to provide a standardized project management practices as a document. The PMBOK guide
organizes its contents by processes as it views work as series of overlapping processes
For any process, three parts are necessary-
 Input
 Tools and Technique
 Output
There are altogether 47 processes in the PMBOK guide, categorized in five groups.
Figure 3.1 – Project Management Processes
23
3.3.1 Initiating Process
 Defines the nature and scope of the project
 Understanding the Business environment
 Analysing various needs in terms of measurable goals
 Reviewing of current operations
 Financial Analysis and
 Stakeholder Analysis
 Developing the Project Charter
3.3.2 Planning
 Describing the process like flow chart
 To plan time, cost and resources, to estimate the work needed, and to effectively
manage risk
 In NPD, conceptual design is also involved
 Work Breakdown Structure
 Deliverable oriented decomposition of project into smaller components
 Organize plans, workloads and management of teams
3.3.3 Execution
 Project Plan Execution – implementing the course of action
 Quality Assurance – regular checks to verify that the project is aligned with the
quality standards
 Team Development – developing an efficient team with necessary skills
 Information distribution(in timely manner)
 Solicitation - Choosing the potential sellers and maintaining relationships with
them.
3.3.4 Controlling
 To identify variances from the project plan
 Scope
 Scope Verification
 Scope change control
 Time (Schedule control)
 Cost
 Quality
 Performance Reporting
 Risk Monitoring and Control
24
3.3.5 Closing
Contract closeout
 Completion and settlement of the contracts
Administrative closeout
 Formalizing the project completion
 Project evaluation
 Documenting lessons learnt for future use
3.4 Project Charter
As the main outcome of the Initiation phase of the project, developing the project
charter becomes the immediate document which supports that a project exists and gives
the authority to the project manager in guiding the project in right directions.
The Project Charter outlines the purpose, objectives, and scope of the project with the
focus on requirements of Stakeholders with relevance to project management global
standards.
The purpose of a Project Charter is:
To provide an understanding of the project and connecting the processes with the Project
Management Institute (PMI) standards
To establish early on in the project the general scope
The elements included in the project charter are as follows:
Project goals and objectives
Project Deliverables
Project constraints
Project Assumptions
Project Milestones
Project References
25
3.4.1 Background / Justification
As an intern in Arience Strategies, based on the client requirement - Cost
Structure and Organization Structure are to be provided.
3.4.2 Goals
To understand the roles and responsibilities of the personnel in the Social Service
Organization for providing them with the suitable Organization Structure.
To understand all the cost related activities of Social Service Organization for
providing them with the Cost Structure.
3.4.3 Objective
To provide Organization Structure and Cost Structure to the Social Service
Organization within two and half months with two interns.
3.4.4 Scope
To provide Organization Structure and Cost Structure with necessary
recommendations and their impact on the respective Organization
3.4.5 Major Deliverables
1. Project Charter
2. Organization Structure
3. Cost Structure
3.4.6 Stakeholders
1. Employees of the Social Service Organization.
2. Parents of the children with special needs.
3. Employees of Arience Strategies.
4. Top Management of Arience Strategies.
5. Top Management of Social Service Organization.
6. Partners of the Social Service Organization.
7. Donors of the Social Service Organization.
3.4.7 Project Constraints
The constraints of the Project are
1. Limited Time
2. Limited Budget
3. Two Interns
26
3.4.8 Project Milestones
1. Meeting Clients – D + 1 week
2. Conducting interviews with the parents of the children with special needs – D + 2
weeks
3. Providing daily reports- from April 26th
2015 to July 11th
2015
4. Organization Structure – D + 6 weeks
5. Cost Structure – D + 7 weeks
Note: D refers to Today’s Date i.e. May 10th 2015
27
CHAPTER – 4
OBSERVATION AND ANALYSIS
28
4.1Observations & Analysis
TABLE 4.1: EXPENSES OF THE SOCIAL SERVICE ORGANIZATION
GRAPH 4.1: EXPENSES OF THE SOCIAL SERVICE ORGANIZATION
4,80,000
19,20,000
10,80,000
22,80,000
1,50,000 1,50,000
3,00,000
1,44,000
-
5,00,000
10,00,000
15,00,000
20,00,000
25,00,000
COSTINCURREDPERYEAR
PARAMETERS
Expenses of the Organization
29
TABLE 4.2: INCOME DETAILS OF THE SOCIAL SERVICE ORGANIZATION
Table 4.3: DEFICIT OF THE ORGANIZATION PER YEAR
30
GRAPH 4.2: DEFICIT OF THE ORGANIZATION PER YEAR
TABLE 4.4: BREAKUP OF ₹ 42, 00,000 FOR DIFFERENT PROGRAMS
65,04,000
25,65,000
39,39,000
-
10,00,000
20,00,000
30,00,000
40,00,000
50,00,000
60,00,000
70,00,000
Total Expense Total Income DEFICIT
Amount
Parameter
DEFICIT OF THE ORGANIZATION PER YEAR
31
GRAPH 4.3: BREAKUP OF ₹ 42, 00,000 FOR DIFFERENT PROGRAMS
8,64,000 8,64,000
11,04,000
3,12,000 3,12,000
7,44,000
-
2,00,000
4,00,000
6,00,000
8,00,000
10,00,000
12,00,000
0
10
20
30
40
50
60
70
80
School setup
academy
Extra curricular
programs
Early
intervention
program
Special young
children
program 1
Special young
children
program -2
One on One
Program
Break up of ₹ 4200000 for different programs
No. of Children Expenses incurred per year
32
CHAPTER 5
FINDINGS
33
5.1 Organization Structure
Fig 5.1: ORGANIZATION STRUCTURE OF SOCIAL SERVICE ORGANIZATION
34
The social service organization currently is working in an unstructured manner. As
per the discussions held with the organization’s members, it has been found that the various
roles and responsibilities are not clearly defined; also the business functions are practiced
in an informal manner. Various personnel’s have common functions to perform that lead
to confusion on who has to perform what functions.
FIG 5.2: CAUSE AND EFFECT ANALYSIS
5.2 Cost Structure
Table 5.1: Cost Structure of the Social Service Organization
35
The Total Expenditure of the respective Social Service Organization is
₹ 65, 04,000.
The Total Income of the respective Social Service Organization is ₹ 25, 65,000.
Therefore, the difference between the total income and total expenditure is ₹ 39, 39,000 in
negative which is very clear that the respective Social Service Organization is in DEFICIT of
₹ 39, 39,000.
36
CHAPTER 6
RECOMMENDATIONS
37
6.1 RECOMMENDATIONS
1. Recruit people who are loyal and have zest to work for the cause are to be recruited.
2. Properly define the organization structure and distribute the roles and
responsibilities across various levels so that there is no confusion by adding new
posts.
3. Properly define the Cost Structure and try to decrease the costs to maximum extent
in various levels of the activities or programs.
4. As there is a fixed location for different programs at Malleshwaram, it can be used
for organizing workshops, trainings, etc.
5. So that additional costs incurred for organizing workshops, trainings, etc. at
different locations can be reduced.
6. A sum of ₹ 5, 42,000/- is required to meet the ongoing activities every month.
7. So, fundraising activity must be effectively implemented to meet the ongoing
activities.
8. Conduct Fundraising campaigns.
9. Tie up with Corporates – which is beneficiary not only to the Social Service
Organizations but also to the Corporates. i.e., NGO – Corporate Partnerships.
10. It is often thought that NGOs would benefit more from such partnerships, but there
are positive incentives that could or should concern the private sector as well,
especially when focusing on the long-term benefits partnerships may afford.
11. “The world has spent many years debating what business can offer the NGOs, but
what NGOs can offer the corporate world is a recent trend.”
12. Because, Company reputation is becoming more and more important to both
investors and consumers. “A company’s impact on its stakeholders is an emerging
benchmark of corporate performance since stakeholders are beginning to ask what
companies can do for society, not what society can do for companies.” – Image
and Credibility.
13. In the public eye, NGOs are more trustworthy than corporations in terms of
benefiting society. So, a company that partners with an NGO can hope to be seen
as trustworthy and be more credible in its attempts at CSR through this association.
38
14. All these clearly mention that Corporates may strive for partnership with NGOs.
15. So, an effective Fund raising campaign definitely helps Social Service Organization
by which if any corporate agrees to tie up and donate funds from the salaries of
their employees every month, then the cost of fund raising mechanism and the
cost of deducting amount from accounts of the employees is zero at any point
of time.
16. As this respective organization is a certified trust which provides 80G certification
that helps in tax exemption, employees might feel free to donate.
17. A diversified fund-raising programme can be implemented. An interesting
thumb-rule - closer the donor, smaller the amount. A person walking on the street
in your town may provide only small change that he currently has in his pocket.
But a more 'distant' person or organization may provide more funding.
18. Step out of the 'charity' angle. Develop clear professionalism among the staff
members. Always be willing to provide info on the NGO's goals and objectives, as
well as programmes. Get third party organizations to write about the programme
and projects. Keep good relations with the media, and cultivate spokespersons
among the staff members.
19. All staff members of an NGO should spend part of their time in fund raising - each
catering to different aspects of the process - writing proposals, finding and
networking with donors, negotiating, writing reports etc.
20. Creating NGO Networks, NGO service centres, information kiosks etc. help in
pooling and developing the knowledge and skills needed for this purpose.
39
CHAPTER 7
CONCLUSION
40
CONCLUSION
The entire report summarizes on how the Organization Structure and Cost Structure
was done for a social service organization. It explains how various information was
gathered to understand the organization structure and the business processes undertaken by
the social service organization. Through interviews conducted, an understanding of the
project requirements obtained to create a project charter wherein the project scope,
objectives, deliverables were clearly defined. An understanding of the PMI standards for
project management was obtained and implemented. The recommendations were listed for
the respective Social Service Organization to overcome its BUDGET DEFICIT. The
impact / benefits of those recommendations on the organization are as follows:
 Achieve sustainability
 Overcome deficits
 Increase effectiveness of the service offered
 Never run out of money to meet ongoing activities
41
7.1 LEARNING OUTCOME
The following are the different learnings that has happened to me during my internship.
They are
1. Handling clients - a challenging task which was done successfully
2. Collecting requirements for the project
3. Matching the collected requirements with the core objectives of the project
4. Satisfying Stakeholders
5. Identifying Stakeholders based on the Project
6. Preparation of Organization Structure
7. Preparation of Cost Structure
8. Project Management Concepts
9. Clear understanding capability of the objectives of the project
10. Developing Project Charter
42
REFERENCES
1. Project Management Institute, Project Management Body of Knowledge, Fifth
Edition.
2. http://ariencestrategies.net/
3. www.arience.com
4. http://repository.upenn.edu/cgi/viewcontent.cgi?article=1022&context=curej

More Related Content

What's hot

Nikita rai mba 3rd sem summer training project
Nikita rai mba 3rd sem summer training projectNikita rai mba 3rd sem summer training project
Nikita rai mba 3rd sem summer training projectDeepVyas25
 
Organisational climate and employee job
Organisational climate and employee jobOrganisational climate and employee job
Organisational climate and employee jobPolly Kee
 
Inernship report fizz final
Inernship report fizz finalInernship report fizz final
Inernship report fizz finalPravesh Shah
 
Graduation marketing summer internship project
Graduation marketing summer internship projectGraduation marketing summer internship project
Graduation marketing summer internship projectSARTHAK GUPTA
 
wheels india company final year project training and development
wheels india company final year project training and development wheels india company final year project training and development
wheels india company final year project training and development Ravi balan
 
Mba hr project report in india
Mba hr project report in indiaMba hr project report in india
Mba hr project report in indiaPrakashB09
 
General Accounting & Financial system
General Accounting & Financial systemGeneral Accounting & Financial system
General Accounting & Financial systemMd. Shumon Iftikher
 
FYP 1 Slide - Bridal Packages and Planner System (BPPS)
FYP 1 Slide - Bridal Packages and Planner System (BPPS)FYP 1 Slide - Bridal Packages and Planner System (BPPS)
FYP 1 Slide - Bridal Packages and Planner System (BPPS)Nang Hafizza Long Hassan
 
Performance appraisal (MBA summer training project) (Report File)
Performance appraisal (MBA summer training project) (Report File)Performance appraisal (MBA summer training project) (Report File)
Performance appraisal (MBA summer training project) (Report File)JASTINDER PAL SINGH
 
Talent mnagement- MBA(HR) project
Talent mnagement- MBA(HR) projectTalent mnagement- MBA(HR) project
Talent mnagement- MBA(HR) projectAmol30586
 
1. Tittle acc main project Shivam chauhan
1. Tittle acc main project  Shivam chauhan1. Tittle acc main project  Shivam chauhan
1. Tittle acc main project Shivam chauhanShivam Chauhan
 
project report on hr operations and talent management
project report on hr operations and talent managementproject report on hr operations and talent management
project report on hr operations and talent managementpriyamvada14
 
Project Report-Final
Project Report-FinalProject Report-Final
Project Report-FinalVinita Singh
 
trainning and development sip report of ism patna
trainning and development sip report of ism patnatrainning and development sip report of ism patna
trainning and development sip report of ism patnaANIKET SINHA
 
Impact of Training on Employee Performance (Banking Sector Karachi)
Impact of Training on Employee Performance (Banking Sector Karachi)Impact of Training on Employee Performance (Banking Sector Karachi)
Impact of Training on Employee Performance (Banking Sector Karachi)iosrjce
 
Hr training & development
Hr   training & developmentHr   training & development
Hr training & developmentRaveena Udasi
 
A STUDY ON RECRUITMENT AND SELECTION AT VIDYA GLOBAL ACADEMY
A STUDY ON RECRUITMENT AND SELECTION AT VIDYA GLOBAL ACADEMYA STUDY ON RECRUITMENT AND SELECTION AT VIDYA GLOBAL ACADEMY
A STUDY ON RECRUITMENT AND SELECTION AT VIDYA GLOBAL ACADEMYVijayKumar6072
 

What's hot (20)

Nikita rai mba 3rd sem summer training project
Nikita rai mba 3rd sem summer training projectNikita rai mba 3rd sem summer training project
Nikita rai mba 3rd sem summer training project
 
Organisational climate and employee job
Organisational climate and employee jobOrganisational climate and employee job
Organisational climate and employee job
 
Inernship report fizz final
Inernship report fizz finalInernship report fizz final
Inernship report fizz final
 
Project 2015
Project 2015Project 2015
Project 2015
 
Graduation marketing summer internship project
Graduation marketing summer internship projectGraduation marketing summer internship project
Graduation marketing summer internship project
 
wheels india company final year project training and development
wheels india company final year project training and development wheels india company final year project training and development
wheels india company final year project training and development
 
Mba hr project report in india
Mba hr project report in indiaMba hr project report in india
Mba hr project report in india
 
General Accounting & Financial system
General Accounting & Financial systemGeneral Accounting & Financial system
General Accounting & Financial system
 
‘Human resources recuritment’ project report
‘Human resources recuritment’ project report‘Human resources recuritment’ project report
‘Human resources recuritment’ project report
 
FYP 1 Slide - Bridal Packages and Planner System (BPPS)
FYP 1 Slide - Bridal Packages and Planner System (BPPS)FYP 1 Slide - Bridal Packages and Planner System (BPPS)
FYP 1 Slide - Bridal Packages and Planner System (BPPS)
 
Performance appraisal (MBA summer training project) (Report File)
Performance appraisal (MBA summer training project) (Report File)Performance appraisal (MBA summer training project) (Report File)
Performance appraisal (MBA summer training project) (Report File)
 
Talent mnagement- MBA(HR) project
Talent mnagement- MBA(HR) projectTalent mnagement- MBA(HR) project
Talent mnagement- MBA(HR) project
 
1. Tittle acc main project Shivam chauhan
1. Tittle acc main project  Shivam chauhan1. Tittle acc main project  Shivam chauhan
1. Tittle acc main project Shivam chauhan
 
Bba project
Bba projectBba project
Bba project
 
project report on hr operations and talent management
project report on hr operations and talent managementproject report on hr operations and talent management
project report on hr operations and talent management
 
Project Report-Final
Project Report-FinalProject Report-Final
Project Report-Final
 
trainning and development sip report of ism patna
trainning and development sip report of ism patnatrainning and development sip report of ism patna
trainning and development sip report of ism patna
 
Impact of Training on Employee Performance (Banking Sector Karachi)
Impact of Training on Employee Performance (Banking Sector Karachi)Impact of Training on Employee Performance (Banking Sector Karachi)
Impact of Training on Employee Performance (Banking Sector Karachi)
 
Hr training & development
Hr   training & developmentHr   training & development
Hr training & development
 
A STUDY ON RECRUITMENT AND SELECTION AT VIDYA GLOBAL ACADEMY
A STUDY ON RECRUITMENT AND SELECTION AT VIDYA GLOBAL ACADEMYA STUDY ON RECRUITMENT AND SELECTION AT VIDYA GLOBAL ACADEMY
A STUDY ON RECRUITMENT AND SELECTION AT VIDYA GLOBAL ACADEMY
 

Viewers also liked

High Performance Power Electronics Systems for PV Solar Applications
High Performance Power Electronics Systems for PV Solar ApplicationsHigh Performance Power Electronics Systems for PV Solar Applications
High Performance Power Electronics Systems for PV Solar ApplicationsRick Borry
 
Real Time Atomization of agriculture system for the modernization of indian a...
Real Time Atomization of agriculture system for the modernization of indian a...Real Time Atomization of agriculture system for the modernization of indian a...
Real Time Atomization of agriculture system for the modernization of indian a...SHAMEER C M
 
IEEE PROJECTS ABSTRACT-A zigbee based wireless sensor network for monitoring ...
IEEE PROJECTS ABSTRACT-A zigbee based wireless sensor network for monitoring ...IEEE PROJECTS ABSTRACT-A zigbee based wireless sensor network for monitoring ...
IEEE PROJECTS ABSTRACT-A zigbee based wireless sensor network for monitoring ...ASHOKKUMAR RAMAR
 
2013 IEEE eee hard ware projects
2013 IEEE eee hard ware projects2013 IEEE eee hard ware projects
2013 IEEE eee hard ware projectsVision Solutions
 
Analysis of Dairy Cooperatives to hasten their transition into Successful Bus...
Analysis of Dairy Cooperatives to hasten their transition into Successful Bus...Analysis of Dairy Cooperatives to hasten their transition into Successful Bus...
Analysis of Dairy Cooperatives to hasten their transition into Successful Bus...SHAMEER C M
 

Viewers also liked (6)

High Performance Power Electronics Systems for PV Solar Applications
High Performance Power Electronics Systems for PV Solar ApplicationsHigh Performance Power Electronics Systems for PV Solar Applications
High Performance Power Electronics Systems for PV Solar Applications
 
Real Time Atomization of agriculture system for the modernization of indian a...
Real Time Atomization of agriculture system for the modernization of indian a...Real Time Atomization of agriculture system for the modernization of indian a...
Real Time Atomization of agriculture system for the modernization of indian a...
 
IEEE PROJECTS ABSTRACT-A zigbee based wireless sensor network for monitoring ...
IEEE PROJECTS ABSTRACT-A zigbee based wireless sensor network for monitoring ...IEEE PROJECTS ABSTRACT-A zigbee based wireless sensor network for monitoring ...
IEEE PROJECTS ABSTRACT-A zigbee based wireless sensor network for monitoring ...
 
2013 IEEE eee hard ware projects
2013 IEEE eee hard ware projects2013 IEEE eee hard ware projects
2013 IEEE eee hard ware projects
 
Sllideshare
SllideshareSllideshare
Sllideshare
 
Analysis of Dairy Cooperatives to hasten their transition into Successful Bus...
Analysis of Dairy Cooperatives to hasten their transition into Successful Bus...Analysis of Dairy Cooperatives to hasten their transition into Successful Bus...
Analysis of Dairy Cooperatives to hasten their transition into Successful Bus...
 

Similar to Final Report - Shameer - July 20

Corporate level Stratergies
Corporate level StratergiesCorporate level Stratergies
Corporate level StratergiesSandeep K Bohra
 
Tintoria strategic plan 2 2019-2024
Tintoria strategic plan 2 2019-2024Tintoria strategic plan 2 2019-2024
Tintoria strategic plan 2 2019-2024Fred Mmbololo
 
Human Resource Practices in Software Company
Human Resource Practices in Software CompanyHuman Resource Practices in Software Company
Human Resource Practices in Software CompanyFakrul Hassan
 
0601013 study stress at managerial level
0601013 study stress at managerial level0601013 study stress at managerial level
0601013 study stress at managerial levelSupa Buoy
 
jeyaram1.final report projectdocx
jeyaram1.final report projectdocxjeyaram1.final report projectdocx
jeyaram1.final report projectdocxjeyaram Rajendran
 
jeyaram1.final report projectdocx
jeyaram1.final report projectdocxjeyaram1.final report projectdocx
jeyaram1.final report projectdocxjeyaram Rajendran
 
Bba marketing internship project
Bba marketing internship projectBba marketing internship project
Bba marketing internship projectPranaySharma66
 
0601013 study stress at managerial level
0601013 study stress at managerial level0601013 study stress at managerial level
0601013 study stress at managerial levelSupa Buoy
 
BUSINESS EXPANSION STRATEGY
BUSINESS EXPANSION STRATEGYBUSINESS EXPANSION STRATEGY
BUSINESS EXPANSION STRATEGYBISWADEEPROY1991
 
SIGNIFICANCE OF EXTENDED 3 P’S WITH REFERENCE TO SHREEKIPA AUTOMOBILES PVT. L...
SIGNIFICANCE OF EXTENDED 3 P’S WITH REFERENCE TO SHREEKIPA AUTOMOBILES PVT. L...SIGNIFICANCE OF EXTENDED 3 P’S WITH REFERENCE TO SHREEKIPA AUTOMOBILES PVT. L...
SIGNIFICANCE OF EXTENDED 3 P’S WITH REFERENCE TO SHREEKIPA AUTOMOBILES PVT. L...Siddanna Balapgol
 
Fm assignment final report
Fm assignment final reportFm assignment final report
Fm assignment final reportlohwenjun
 
Establishing a business analysis practice in the he web version
Establishing a business analysis practice in the he web versionEstablishing a business analysis practice in the he web version
Establishing a business analysis practice in the he web versionucisa
 
Recruitment & selection (1)
  Recruitment & selection (1)  Recruitment & selection (1)
Recruitment & selection (1)ANIKET SINHA
 
Training Program & its Effectiveness in Customer Service of Grameenphone
Training Program & its Effectiveness in Customer Service of GrameenphoneTraining Program & its Effectiveness in Customer Service of Grameenphone
Training Program & its Effectiveness in Customer Service of GrameenphoneShaiful Islam (Shawn)
 
Tintoria strategic plan 2015-2019 1
Tintoria strategic plan 2015-2019 1Tintoria strategic plan 2015-2019 1
Tintoria strategic plan 2015-2019 1Fred Mmbololo
 
The Challenge Facing By The Consultant
The Challenge Facing By The ConsultantThe Challenge Facing By The Consultant
The Challenge Facing By The ConsultantChristina Valadez
 
ANALYSIS OF FINANCIAL STATEMENT using technique of Ratio Analysis By Furkan K...
ANALYSIS OF FINANCIAL STATEMENT using technique of Ratio Analysis By Furkan K...ANALYSIS OF FINANCIAL STATEMENT using technique of Ratio Analysis By Furkan K...
ANALYSIS OF FINANCIAL STATEMENT using technique of Ratio Analysis By Furkan K...Lisa Graves
 
Summer corporate relation program
Summer corporate relation program  Summer corporate relation program
Summer corporate relation program ApoorvGupta825588
 

Similar to Final Report - Shameer - July 20 (20)

157340592132
157340592132157340592132
157340592132
 
Corporate level Stratergies
Corporate level StratergiesCorporate level Stratergies
Corporate level Stratergies
 
Tintoria strategic plan 2 2019-2024
Tintoria strategic plan 2 2019-2024Tintoria strategic plan 2 2019-2024
Tintoria strategic plan 2 2019-2024
 
Human Resource Practices in Software Company
Human Resource Practices in Software CompanyHuman Resource Practices in Software Company
Human Resource Practices in Software Company
 
0601013 study stress at managerial level
0601013 study stress at managerial level0601013 study stress at managerial level
0601013 study stress at managerial level
 
jeyaram1.final report projectdocx
jeyaram1.final report projectdocxjeyaram1.final report projectdocx
jeyaram1.final report projectdocx
 
jeyaram1.final report projectdocx
jeyaram1.final report projectdocxjeyaram1.final report projectdocx
jeyaram1.final report projectdocx
 
Bba marketing internship project
Bba marketing internship projectBba marketing internship project
Bba marketing internship project
 
0601013 study stress at managerial level
0601013 study stress at managerial level0601013 study stress at managerial level
0601013 study stress at managerial level
 
BUSINESS EXPANSION STRATEGY
BUSINESS EXPANSION STRATEGYBUSINESS EXPANSION STRATEGY
BUSINESS EXPANSION STRATEGY
 
ARJUN
ARJUNARJUN
ARJUN
 
SIGNIFICANCE OF EXTENDED 3 P’S WITH REFERENCE TO SHREEKIPA AUTOMOBILES PVT. L...
SIGNIFICANCE OF EXTENDED 3 P’S WITH REFERENCE TO SHREEKIPA AUTOMOBILES PVT. L...SIGNIFICANCE OF EXTENDED 3 P’S WITH REFERENCE TO SHREEKIPA AUTOMOBILES PVT. L...
SIGNIFICANCE OF EXTENDED 3 P’S WITH REFERENCE TO SHREEKIPA AUTOMOBILES PVT. L...
 
Fm assignment final report
Fm assignment final reportFm assignment final report
Fm assignment final report
 
Establishing a business analysis practice in the he web version
Establishing a business analysis practice in the he web versionEstablishing a business analysis practice in the he web version
Establishing a business analysis practice in the he web version
 
Recruitment & selection (1)
  Recruitment & selection (1)  Recruitment & selection (1)
Recruitment & selection (1)
 
Training Program & its Effectiveness in Customer Service of Grameenphone
Training Program & its Effectiveness in Customer Service of GrameenphoneTraining Program & its Effectiveness in Customer Service of Grameenphone
Training Program & its Effectiveness in Customer Service of Grameenphone
 
Tintoria strategic plan 2015-2019 1
Tintoria strategic plan 2015-2019 1Tintoria strategic plan 2015-2019 1
Tintoria strategic plan 2015-2019 1
 
The Challenge Facing By The Consultant
The Challenge Facing By The ConsultantThe Challenge Facing By The Consultant
The Challenge Facing By The Consultant
 
ANALYSIS OF FINANCIAL STATEMENT using technique of Ratio Analysis By Furkan K...
ANALYSIS OF FINANCIAL STATEMENT using technique of Ratio Analysis By Furkan K...ANALYSIS OF FINANCIAL STATEMENT using technique of Ratio Analysis By Furkan K...
ANALYSIS OF FINANCIAL STATEMENT using technique of Ratio Analysis By Furkan K...
 
Summer corporate relation program
Summer corporate relation program  Summer corporate relation program
Summer corporate relation program
 

Final Report - Shameer - July 20

  • 1. Report on Business Analysis of Social Service Organization Arience Strategies, Bangalore. Prepared By: C M SHAMEER Registration No: 14010121101 Under the Guidance of Dr Dolphy M Abraham Program Director – Doctoral Program, Alliance University In partial fulfilment of the Course-Industry Internship Programme (IIP) in the Semester II of the Master of Business Administration (Batch of 2014) Bangalore
  • 2. Master of Business Administration Industry Internship Programme (IIP) Declaration This is to declare that the report entitled “Business Analysis of Social Service Organization” has been made for the partial fulfilment of the Course: Industry Internship Programme (IIP) in Semester II (Batch: July 2014-2016) by me at Arience Strategies, Bangalore under the guidance of Dr Dolphy M. Abraham, Program Director – Doctoral Program. I confirm that this report truly represents my work undertaken as a part of my Industry Internship Programme (IIP). This work is not a replication of work done previously by any other person. I also confirm that the content of the report and the views contained therein have been discussed and deliberated with the Faculty Guide. Signature of the Student : Name of the Student (In Capital Letters) : SHAMEER C M Registration No : 14010121101
  • 3. Master of Business Administration Certificate This is to certify that Mr C M SHAMEER Registration no: 14010121101 has completed the Report entitled “Business Analysis of Social Service Organization” in “Arience Strategies,” Bangalore under my guidance for the partial fulfilment of the Course: Industry Internship programme (IIP) in Semester II of the Master of Business Administration. Signature of Faculty Guide: Name of the Faculty Guide: Dr Dolphy M. Abraham, Program Director – Doctoral Program, Alliance University, Bangalore.
  • 4.
  • 5. ACKNOWLEDGEMENT First and foremost I would like to thank the Almighty God, my family members and my friends for encouraging me to do this project work. I express my sincere thanks and heartfelt gratitude to Mr Pramod Kumar, Managing Director of Arience Strategies for allowing me to do my internship in Arience Strategies, Bangalore. Mr Pramod Kumar made my internship very interesting with inspiration, enthusiasm and his great efforts to explain things clear and simple. Throughout the intern period, he provided me encouragement, sound advice, good teaching, company and lot of good ideas. It was a great learning experience and he had helped me a lot in enhancing my knowledge about the Project Management-Business Analysis. I find no words to express my deep rooted thanks for his valuable guidance. I express my profound gratitude to Dr Dolphy M. Abraham, Program Director – Doctoral Program, Alliance University, for allowing me to work under his guidance. He has provided valuable inputs to build my internship and has also been a constant support. I thank Arience Strategies, Bangalore for granting me permission to do my project work in its premises. I would also like to convey my sincere gratitude to all the staff, friends and well-wishers who extended their fullest co-operation with regard to my project. Finally, I thank Alliance School of Business for providing me an opportunity to face the reality in the corporate world and I would like to thank all the ones that helped to bring out this project work a great success. C M SHAMEER
  • 6. LIST OF CONTENTS S.NO CHAPTER PAGE No. 1 Executive Summary 1 2 Introduction 3 2.1 Introduction to Management Consultancy Industry 4 2.1.1 Global scenario of Management Consultancy 7 2.1.2 Indian Scenario of Management Consultancy 8 2.1.3 Industry structure of Management Consultancy in India 11 2.1.4 Porter’s Five Force Model 12 2.2 Company Overview 15 2.2.1 Philosophy and Vision 15 2.2.2 Organisation Structure of the Company 16 2.2.3 Operations of the Company 16 2.2.4 SWOT Analysis 17 3 Project Profile 19 3.1 Objectives 20 3.2 Methodology 20 3.3 Introduction to Project Management 21 3.4 Project Charter 24 3.4.1 Background / Justification 25 3.4.2 Goals 25 3.4.3 Objective 25
  • 7. 3.4.4 Scope 25 3.4.5 Major Deliverables 25 3.4.6 Stakeholders 25 3.4.7 Project Constraints 25 3.4.8 Project Milestones 26 4 Observations and Analysis 27 5 Findings 32 5.1 Organization Structure 33 5.2 Cost Structure 34 6 Recommendations 36 7 Conclusion 40 7.1 Learning Outcome 41 8 References 42
  • 8. LIST OF FIGURES Figure No Description Page No. 2.1 Organization Structure of Arience 16 3.1 Project Management Process 22 5.1 Organization Structure of Social Service Organization 33 5.2 Cause and Effect Analysis 34
  • 9. LIST OF TABLES Table No. Description Page No. 4.1 Expenses of the Social Service Organisation 28 4.2 Income details of the Social Service Organisation 29 4.3 Deficit of the Organisation per year 29 4.4 Breakup of ₹ 42,00,000 for different programs 30 5.1 Cost structure of the social service organisation 34
  • 10. LIST OF GRAPHS Graph No Description Page 4.1 Expenses of the social service organization 16 4.2 Deficit of the organization per year 22 4.3 Breakup of ₹ 42, 00,000 for different programs 34 5.2 Cause and Effect analysis 34
  • 12. 2 EXECUTIVE SUMMARY Arience Strategies is a management consulting company which aims at achieving excellence with convergence of different global standards and methodologies. Arience has a team of highly experienced professionals which helps in providing consulting services, project management support services, education and training services to diverse industry sectors. Arience Strategies is a commercial consulting company which provides expertise, support and project teams to the Arience Foundation in carrying out various social projects. Arience Foundation undertakes various non- profit projects which are sponsored by Arience Strategies. These projects help the MSME enterprises, rural cooperatives and various social sectors in carrying out their businesses and solving their business problems. It involves rigorous study of these social projects and deployment of global operating standards in the fields of application. Current scenario shows how such organizations are unable to perform to maximum capability due to lack of cost planning, or lack of well-defined organization structure etc. This report shows how the Project Management and business analysis was done for respective Social Service Organization by providing them Organization Structure and Cost Structure.
  • 14. 4 2.1 Introduction to Management Consultancy Industry Management consultancy is the practice of helping organization to improve their performance operating primarily through the analysis of existing organizational problems and the development of plans for improvement. Management consultancy often brings their own proprietary knowledge / methodologies / framework to guide the identification of problems and to serve as the basis for recommendation for more effective and efficient ways of performing work task. As a result of their exposure to and relationships with numerous organizations, consulting firms are also said to be aware of industry "best practices", although the specific nature of situations under consideration may limit the transferability of such practices from one organization to another. Management Consultancy firm helps a company to identify future goals, current skills and fault lines by using their best practices, branding and strategies, marketing decisions, motivation and incentives , as well as technology adaptation, production line efficiency and profitable accounting. Assignments for management consultant: 1. Review an organisation's corporate objectives and strategy 2. Review an organisation's structure and staffing 3. Apprising, selecting, and determining the remuneration structure for executives 4. Preparing and implementing development programme 5. Improving revenue and profitability 6. Increase cost effectiveness 7. Introduce new or better management techniques such as information technology, personnel incentives, asset management, and re-engineering. 8. Planning and controlling the execution of projects which are outside the normal experience of the organisation's staff
  • 15. 5 Management consultant firm must have below characteristics: 1. Passion for acquiring knowledge and technical competence 2. Willingness to change and adapt new ideas 3. Recognize present paradigm and shift to new paradigm 4. Passion for give more than 100% all the time 5. High developed, motivated and intellect 6. Genuine concern and compassion for others 7. Vision 8. Courage 9. Sincerity 10. Ethics Industry Trends: 1. Consulting Firms Accept Assignments with Contingency Fees 2. Accounting Firms Taking Large Market Share of Consulting Contracts 3. Many Industry Sectors Seek Consulting and Outsourcing Income, Competing with Pure Consultancies 4. Major Corporations and Organizations Develop Internal Consultants and Seek Outside Clients 5. Corporate Clients Want Solid Returns on IT Investments 6. Federal Government Consulting Is Curtailed in Some Agencies as Part of Budget Austerity and Defence Cutbacks 7. Consultancies Position Themselves to Serve Global Markets and Multinational Corporations 8. Off shoring to India Drives Changes in Global Consulting 9. BPO and KPO: White-Collar and Professional Tasks are off shored to a Growing Extent. 10. New MBA’S desire consulting and accounting jobs.
  • 16. 6 Major Roles and responsibilities in Management consultant firm: 1. Analyst: 1.1 Collect data for company overview- interviews , surveys, market reports 1.2 Analytical Modelling- analysts do most of excel heavy lifting, models vary from market segmentation to cost reduction. 2. Senior Analyst: 2.1 Client interaction 2.2 Develop complex models 3. Consultant: 3.1 Consultants own a work stream (work module) in the project 3.2 Analysis structure 3.3 Creating the sections client presentation documents 3.4 Interacting with the client on a day to day basis on their level 3.5 Managing upwards to engagement managers and the senior team members in the firm 4. Engagement firms: 4.1 Client Work: Engagement managers own the overall responsibility of the project management, management of junior team, analysts and consultants. The senior team depends on them to get the work done according to quality the standards of the firm and in a timely fashion. They interact heavily with the client as the project leads 4.2 Marketing: Engagement managers market firm’s services to new/existing clients, develop white papers about industries. 4.3 People Development: They participate in recruiting, screening candidates and campus presentations, informal meeting with candidates, interviewing. 5. Principal: 5.1 Client work: Principals oversee client assignments part time or full time on larger projects. They deal with senior executives with clients, usually at Vice president or C-level. 5.2 Marketing: Principal usually are aligned to several key clients and develop a market position. They forge a niche and want to be known in the firm and in
  • 17. 7 the marketplace with that niche. They demonstrate thought leadership to build firm’s offerings 5.3 Sales: Principal is often leads to write and coordinate proposals and participate in sell meetings. They are in active contact with their set of key clients to generate new leads. In some firms, they have sales targets 5.4 People Development: They are active in all aspects of recruiting and may lead overall recruiting efforts. 2.1.1 Global scenario of Management Consultancy: Global consulting industry revenue is about $449 billion in 2015 according to Plunkett research estimates. This represents reasonable growth from $415 billion in 2014. Growth in global trade has rebounded from the very low level of the recession. This fuelled demand for consulting of all kinds including management, human resource and technology. The growing globalization of business and industry in general led inevitably to the globalization of the leading consulting companies. Major consultancies operate offices in the most important business centres in Europe and Asia-Pacific as well as in North and South America. Africa is the next consulting frontier, as rapid economic growth has been enjoyed by a handful of African nations in spite of problems ranging from lack of infrastructure to social turmoil and terrorism. Many consultancies operate worldwide and have multi-ethnic, multilingual employee bases. In particular, major consulting firms have opened large numbers of offices in Brazil, India and China in recent years. India’s largest outsourced business and technology consulting firms were complaining that clients were delaying or cancelling projects as 2009 began. However, in recent years, corporate profits in general grew dramatically, meaning that executives are now more willing to authorize new consulting projects as long as they see the potential for a good return on the cost. Firms with multi-cultural staffing capability and offers in strategic cities worldwide will benefit in particular. Recent growth of developing nation economy gave huge opportunities to the consulting firm’s special in the countries South Korea, china, Indonesia
  • 18. 8 and India both in government and private sectors contracts in industries range from transport to health care. Top 10 Consultancy Companies are: 1. Bain & Company 2. McKinsey & Company 3. The Boston Consulting Group 4. PWC Network (Formerly Booz & Company) 5. Deloitte Consulting LLP 6. PwC (Price Water House Cooper) LLP (Consulting Practise) 7. The Brattle Group 8. Oliver Wyman 9. The Cambridge Group 10. Accenture. 2.1.2 Indian Scenario of Management Consultancy: India has been globally recognized for its fast paced development. The service sector has been growing at a fast pace with a compound annual growth rate (CAGR) at 8.5 per cent for period 2000-01 to 2013-14 and it contribute around 57 per cent to the gross domestic product. In parallel, it leads to increasing demand for consultancy services, both for domestic and foreign firms, a study by ASSCOHAM the consulting sector in India to grow at an Compound Annual Growth Rate (CAGR) of 30 per cent. The Indian consultancy industry reportedly stands at Rs. 13,000 Cr for the year 2008, by the year 2010 it was Rs. 17,000 cr. In the year 2013, the Management consultancy industry crossed Rs. 22,000 cr. Indian consultancy industry has largest concentration in Delhi and Mumbai followed by Kolkata and Chennai. As per ASSCHOM former president Venugopal Dhoot, the US, UK, Japan, China, Saudi Arabia are competence with the India Consultancy Firms.
  • 19. 9 Indian Consultancy Companies have strong capabilities of strong knowledge human resource and strong economy such as India economy shown growth in areas of automobile, power, aviation, infrastructure, service in every sector very Management consultancy can grow, due to strong presence of IT sector make India consultancy services as keep favourite place for consultancy service for Multi nation companies. Latest Trends in Consultancy Industry in INDIA: 1. Fast Growth The consulting industry is trying its best to accommodate the demand and big consulting companies are merging the small consultancy companies. 2. One Stop for all solution: Like any other industry, the consultancy industry made one stop for all solutions. Knowledge management tools, practises, databases and internet make it possible for consultancy to draw up knowledge of every type of solution to every problem. 3. Shortage of people: Shortage of human resource became the greatest threat to the consultancy firms as small consultancy firm’s unable to get well qualified people for their offers and for big consultancy company’s attrition, high salary became problem. Some of companies made an integrated MBA with colleges towards specific need of consultants. 4. Nature of projects: Moving towards high end strategy consulting Management consulting in India has traditionally about capital funding and market size. Due to increase in competition due to globalization, many Indian companies are using management consulting are using in their high end strategies which includes reduce cost; implement new market strategies, relationship with customers. 5. Public Sector: Management consulting has entered into public sector as central and state governments have identified the importance of management consulting. The governments has realized the importance of data and analytical driven approach to solve complex problems and farming policies at the macroeconomic level. For
  • 20. 10 example Gujarat government gave work of market assessment of the Rs. 78,000 crore Gujarat International Finance Tec-City (GIFT) to a top tier management consulting. Major challenges faced by Management consultancy firms in India: 1. Data: Getting accurate and adequate data is a major issue in India. If we go by the inputs, market assessment, feasibility or sizing assignments are very few and far between in developed economies whereas India is replete with such projects. One should not be surprise by the fact that Indian-based KPOs and analytics firms do an excellent job crunching numbers for their foreign clients but struggle while coming up with such insights for Indian clients and most of the blame lies with quality of data. The need for 3-4 types of ID proofs in India is another proof that data is not “proven” yet. So you may have a hard time drawing meaningful insights out of them. 2. Experience: With major consulting firms having less than two decades of presence in India and the country witnessing major changes in the intervening period, one may still be some distance away from being “too-old” to “know it all” as far as Indian landscape is concerned. Similarly for the clients, one of the major reasons for their apprehensions or expectations is their limited experience of engaging with the consultants. 3. Relation between firm and customer: One of the major roadblocks is the inability of the prospective interviewees to differentiate industry standards or information from strategic and confidential information. But things may change if you have close contact that connects you with the right person. It could also boil down to consultant’s capability. 4. Clients Requirements: Indian clients are excepting far from what they want and what they offer, this leads to major problem to the firms. Multi-tasking expertise are not available right now.
  • 21. 11 5. Competition: In India, health competition is not healthy among small players they competition with each other in terms of price wars not in terms of quality of service. Other challenges: 1. Lack of proper management. 2. Inability to get new clients 3. Over promising results. 4. Lack of communication skills 5. Diversity 6. Different priority from place to place. 2.1.3 Industry structure of Management Consultancy in India: The management consulting services across all industries and sectors, this leads to create the industry into segmentation wise with each layer catering to a distinct set of needs 1. Global management consulting firms: They have an edge over low –cost domestic players due to their experience and knowledge investments. Their experience talent and deep relationship with clients make them ideal for high-level strategy projects that require macroeconomic or global perspectives. Majority of domestic businesses (especially SMEs) cannot afford their services, leaving ample room for domestic players to bridge the supply gap, with a much more viable value proposition in terms of service and fees. With near saturation and declining profit margins at the bottom of the management consulting pyramid, Indian consulting firms are moving up the value chain towards high-end technology consulting. However, winning credibility as a management consulting firm is a huge challenge. Indian IT firms realize these limitations and as a result, are now spending increasingly on innovation and R&D. 2. Niche Management Consulting Firms: They focus on particular Functions or set of industries. At smaller management consulting firms, clients get a senior professional for the full duration of the project,
  • 22. 12 while a big-brand global firm typically offers blended packages with senior consultants working part-time on strategy and junior associates overseeing execution. Rising talent levels, flexible business models and competitive billing rates have helped these firms to pit themselves against established players. With their hands-on experience with the smaller domestic clients, they can spot emerging trends faster – making them best positioned for projects that involve both strategizing and long-term execution. 3. Operational Consulting Firms: These firms are both divisions of global firms or individual firms tackling operational problems. These firms deal with projects that are more inward-looking for the clients and include cost structuring, organizational change, supply-chain innovation. 2.1.4 Porter’s five force model: Bargaining power of suppliers:  This is one of the major parts of the management consulting industry. These consultancies are built upon the competence of their consultants.  It is important to have the knowledge of the company and the way they work as well as the local knowledge and competence required at the subsidiary level.  However, it is not always available and the firm needs to find ways to recruit the top talents and make themselves into an attractive employer.  It is crucial for a new company that enters the market to build its image not just for the potential clients but also for potential employees. Being at job fairs, announcing positions and marketing themselves in different ways will help them be more visible and hopefully build an image that will attract competent people to their business.  This can also entail higher start-up costs since marketing can cost a lot and since there is a lack of consultants their bargaining power for salary will be higher and probably cost more for the company to hire people.  Another point to that is worth considering when entering a new market is if the country or area can supply such competence. Some areas of the world do not have the literacy rate or higher education that is required in order to bring people to the competence level
  • 23. 13 that management consultancies demand. This would be one of the crucial areas to focus on since this is what builds the company. Threat of new entrants:  The importance is to make sure that your company has an existing client relationship and image within that market.  As one barrier, it might create greater cost to enter the market.  As a management consultancy, it is important to keep up with the trends and desires from companies. Seeing where the problems seem to lie and where companies are willing to spend their money.  Keeping to the same tactic might cause difficulties for the company in the future if others come with better services and solutions. Bargaining power of buyers:  Consultancies build their customer base upon relationships and referrals from satisfied clients. It is important to foster a good image so that the clients feel confident in that they know what they get. There should be substance behind the image.  However, since services are consumed at the same time as you pay for it, it is not easy to examine the quality before the buy. That is why referrals and satisfied customers, who can spread the word about the company, are essential and lead to ways of gaining more business, either from existing clients or through new clients.  One big difference that exists between some manufacturing firms and consultancies is the quantity of customers available.  If it is a new company, it is crucial to have some ties to the market from existing clients who are able to improve the company’s image on that market. Therefore, it is important to analyse the potential clients in the market.  There will always be different trends showing what area will be slightly more prosperous to look into. For example, Corporate Social Responsibility has been a hot topic and area to work in, however, as all companies see it as a basic part to have in their business, it has become institutionalized and companies know how to deal with this area.
  • 24. 14  Fostering and caring for the clients relationship makes sure that the company will have a stable growth. Never be satisfied with the clients you have, always see potential for more.  Consultancies are much affected by the economic development in the country or area. If the companies do not have money to pay for their services, they won’t hire the consultancies and therefore there will be less business for them. In bad times, it is good to have stable and long term relationships with certain clients to ensure perseverance. This leads us into ensuring perseverance in the face of substitutes. Threat of substitutes:  It is important to be more specialized focused, but broad enough to cover areas that can potentially foster business for the consultancy.  Having the right competence and knowledge to enable the consultancy to be a little broader but at the same time very specific can give it room to move out of their usual business when there are recessions.  Consultancies need to be up to date and always be a step ahead of companies so that they do not lose their purpose for these companies. Rivalry among existing players:  The consultancies fringe in on each other’s areas of expertise but not enough to seem like a serious threat to their specific area.  If the economic development is slow, then there might be some tension between the different consultancies. The different consultancies have to fight to recruit the right talent to their business
  • 25. 15 2.2 Company Overview Arience Strategies is a management company with a vision of achieving excellence with convergence of various global standards and methodologies. With a team of highly experienced professionals, Arience is providing consulting service, education & training services, project management support services to diverse industry sectors. Arience helps organizations to align their day to day operations with strategic objective by streamlining management process, optimize team productivity and by effectively applications of tools &techniques. Arience Strategies started their operations from 01 September, 2009. Arience Strategies has Arience Foundation which takes two programs. 1. Arience Research It is management maturity enhancement program for non-profit organization to:  Lead Change and Inspire innovation  Manage complex, Multi-cultural global projects  Building an integrated management approach  Achieving excellence in project delivery  Enhancing productivity and Profitability 2. Arience Mentor It is an initiative for individuals who are affected by economic situations  Personal counselling and guidance  Professionals mentoring and coaching  Continuous improvement and growth 2.2.1 Philosophy and Vision Vision: Achieving excellence with convergence of various global standards and methodologies.
  • 26. 16 Philosophy: Utilize globally accepted methodologies, tools & techniques for providing value to our stakeholders. 2.2.2 Organization Structure of the Company Fig 2.1: Organization Structure of Arience 2.2.3 Operations of the Company Project Management Services  Build an integrated project and program management methodology  Setting up PMO (PM Office) / PMCoE (PM Centre of Excellence)  PM Process Maturity Assessment & Improvement  Enhance PM productivity and profitability  Business Analysis and Requirement Engineering process implementation  Agile and Scrum adoption in projects
  • 27. 17 Project Management Technology Consulting  Project Management software deployment  PM process implementation on software tool  Requirement Management tools implementation Competency Enhancement Services Specialized training includes:  Project Management/Program Management  Risk Management  Business Analysis  Project planning & Monitoring with Microsoft Project  Professionals mentoring, counselling and coaching  Agile and Scrum methodology Certifications Programs:  PMI-PMP/CAPM Certification  IREB-CPRE Certification Workshop  SCRUM Master Certification Workshop 2.2.4. SWOT Analysis: Strengths: 1. Strong Management 2. Size Advantage 3. Economics of Scale 4. Unique Products 5. Brand Name 6. Quick Response 7. Quality process Weakness: 1. Out-dated Technology 2. High Staff Turnover 3. No market presence 4. Less Cash Flow 5. Lack of marketing expertise
  • 28. 18 Opportunities: 1. Emerging Markets 2. Innovation 3. New services 4. New Products 5. New Markets Threats: 1. Volatile Currencies 2. Bad Economy 3. Government Regulations 4. Political Risk 5. Technology change 6. Price wars
  • 30. 20 PROJECT PROFILE 3.1 Objectives  To understand the roles and responsibilities of the personnel in the Social Service Organization for providing them with the suitable Organization Structure.  To understand all the cost related activities of Social Service Organization for providing them with the Cost Structure. 3.2 Methodology The objectives of this project are to provide the Organization Structure and Cost Structure to the Social Service Organization. Primary Sources of the data are  The primary data was collected with direct interactions with the various personals of the organization. 1. Employees of the Social Service Organization. 2. Parents of the children with special needs. 3. Employees of Arience Strategies. 4. Top Management of Arience Strategies. 5. Top Management of Social Service Organization. 6. Website of Arience Research Foundation 7. Partners of the Social Service Organization. 8. Donors of the Social Service Organization.  Secondary Sources of the data are 1. Website of Social Service organization 2. Website of Arience Strategies
  • 31. 21 3.3 Introduction to Project Management Project Management is the application of knowledge, skills, tools, and techniques to project activities to meet the project requirements. Project Management is accomplished through the appropriate application and integration of the 47 logically grouped project management processes, which are categorised into five process groups. The five process groups are:  Initiating,  Planning,  Executing,  Monitoring and Controlling, and  Closing Managing a project typically includes, but not limited to  Identifying requirements;  Addressing the various needs, concerns and expectations of the stakeholders in planning and executing the project;  Setting up, maintaining, and carrying out communications among stakeholders that are active, effective, and collaborative in nature;  Managing Stakeholders towards meeting project requirements and creating Project deliverables;  Balancing the competing project constraints, which include: Scope, Quality, Schedule, Budget, Resources, and Risks  The specific project characteristics and circumstances can influence the constraints on which the project management team needs to focus. The Project team needs to be able to assess the situation, balance the demands, and maintain
  • 32. 22 proactive communication with stakeholders in order to deliver a successful project.  Due to the potential for change, the development of the project management plan is an iterative activity and is progressively elaborated throughout the project’s life cycle. Progressive elaboration involves continuously improving and detailing a plan as more detailed and specific information and more accurate estimates become available. Progressive elaboration allows a project management team to define work and manage it to a greater level of detail as the project evolves. A guide to the Project Management Body of Knowledge (PMBOK Guide) was first published by the Project Management Institute (PMI) as a white paper in 1987 in an attempt to provide a standardized project management practices as a document. The PMBOK guide organizes its contents by processes as it views work as series of overlapping processes For any process, three parts are necessary-  Input  Tools and Technique  Output There are altogether 47 processes in the PMBOK guide, categorized in five groups. Figure 3.1 – Project Management Processes
  • 33. 23 3.3.1 Initiating Process  Defines the nature and scope of the project  Understanding the Business environment  Analysing various needs in terms of measurable goals  Reviewing of current operations  Financial Analysis and  Stakeholder Analysis  Developing the Project Charter 3.3.2 Planning  Describing the process like flow chart  To plan time, cost and resources, to estimate the work needed, and to effectively manage risk  In NPD, conceptual design is also involved  Work Breakdown Structure  Deliverable oriented decomposition of project into smaller components  Organize plans, workloads and management of teams 3.3.3 Execution  Project Plan Execution – implementing the course of action  Quality Assurance – regular checks to verify that the project is aligned with the quality standards  Team Development – developing an efficient team with necessary skills  Information distribution(in timely manner)  Solicitation - Choosing the potential sellers and maintaining relationships with them. 3.3.4 Controlling  To identify variances from the project plan  Scope  Scope Verification  Scope change control  Time (Schedule control)  Cost  Quality  Performance Reporting  Risk Monitoring and Control
  • 34. 24 3.3.5 Closing Contract closeout  Completion and settlement of the contracts Administrative closeout  Formalizing the project completion  Project evaluation  Documenting lessons learnt for future use 3.4 Project Charter As the main outcome of the Initiation phase of the project, developing the project charter becomes the immediate document which supports that a project exists and gives the authority to the project manager in guiding the project in right directions. The Project Charter outlines the purpose, objectives, and scope of the project with the focus on requirements of Stakeholders with relevance to project management global standards. The purpose of a Project Charter is: To provide an understanding of the project and connecting the processes with the Project Management Institute (PMI) standards To establish early on in the project the general scope The elements included in the project charter are as follows: Project goals and objectives Project Deliverables Project constraints Project Assumptions Project Milestones Project References
  • 35. 25 3.4.1 Background / Justification As an intern in Arience Strategies, based on the client requirement - Cost Structure and Organization Structure are to be provided. 3.4.2 Goals To understand the roles and responsibilities of the personnel in the Social Service Organization for providing them with the suitable Organization Structure. To understand all the cost related activities of Social Service Organization for providing them with the Cost Structure. 3.4.3 Objective To provide Organization Structure and Cost Structure to the Social Service Organization within two and half months with two interns. 3.4.4 Scope To provide Organization Structure and Cost Structure with necessary recommendations and their impact on the respective Organization 3.4.5 Major Deliverables 1. Project Charter 2. Organization Structure 3. Cost Structure 3.4.6 Stakeholders 1. Employees of the Social Service Organization. 2. Parents of the children with special needs. 3. Employees of Arience Strategies. 4. Top Management of Arience Strategies. 5. Top Management of Social Service Organization. 6. Partners of the Social Service Organization. 7. Donors of the Social Service Organization. 3.4.7 Project Constraints The constraints of the Project are 1. Limited Time 2. Limited Budget 3. Two Interns
  • 36. 26 3.4.8 Project Milestones 1. Meeting Clients – D + 1 week 2. Conducting interviews with the parents of the children with special needs – D + 2 weeks 3. Providing daily reports- from April 26th 2015 to July 11th 2015 4. Organization Structure – D + 6 weeks 5. Cost Structure – D + 7 weeks Note: D refers to Today’s Date i.e. May 10th 2015
  • 38. 28 4.1Observations & Analysis TABLE 4.1: EXPENSES OF THE SOCIAL SERVICE ORGANIZATION GRAPH 4.1: EXPENSES OF THE SOCIAL SERVICE ORGANIZATION 4,80,000 19,20,000 10,80,000 22,80,000 1,50,000 1,50,000 3,00,000 1,44,000 - 5,00,000 10,00,000 15,00,000 20,00,000 25,00,000 COSTINCURREDPERYEAR PARAMETERS Expenses of the Organization
  • 39. 29 TABLE 4.2: INCOME DETAILS OF THE SOCIAL SERVICE ORGANIZATION Table 4.3: DEFICIT OF THE ORGANIZATION PER YEAR
  • 40. 30 GRAPH 4.2: DEFICIT OF THE ORGANIZATION PER YEAR TABLE 4.4: BREAKUP OF ₹ 42, 00,000 FOR DIFFERENT PROGRAMS 65,04,000 25,65,000 39,39,000 - 10,00,000 20,00,000 30,00,000 40,00,000 50,00,000 60,00,000 70,00,000 Total Expense Total Income DEFICIT Amount Parameter DEFICIT OF THE ORGANIZATION PER YEAR
  • 41. 31 GRAPH 4.3: BREAKUP OF ₹ 42, 00,000 FOR DIFFERENT PROGRAMS 8,64,000 8,64,000 11,04,000 3,12,000 3,12,000 7,44,000 - 2,00,000 4,00,000 6,00,000 8,00,000 10,00,000 12,00,000 0 10 20 30 40 50 60 70 80 School setup academy Extra curricular programs Early intervention program Special young children program 1 Special young children program -2 One on One Program Break up of ₹ 4200000 for different programs No. of Children Expenses incurred per year
  • 43. 33 5.1 Organization Structure Fig 5.1: ORGANIZATION STRUCTURE OF SOCIAL SERVICE ORGANIZATION
  • 44. 34 The social service organization currently is working in an unstructured manner. As per the discussions held with the organization’s members, it has been found that the various roles and responsibilities are not clearly defined; also the business functions are practiced in an informal manner. Various personnel’s have common functions to perform that lead to confusion on who has to perform what functions. FIG 5.2: CAUSE AND EFFECT ANALYSIS 5.2 Cost Structure Table 5.1: Cost Structure of the Social Service Organization
  • 45. 35 The Total Expenditure of the respective Social Service Organization is ₹ 65, 04,000. The Total Income of the respective Social Service Organization is ₹ 25, 65,000. Therefore, the difference between the total income and total expenditure is ₹ 39, 39,000 in negative which is very clear that the respective Social Service Organization is in DEFICIT of ₹ 39, 39,000.
  • 47. 37 6.1 RECOMMENDATIONS 1. Recruit people who are loyal and have zest to work for the cause are to be recruited. 2. Properly define the organization structure and distribute the roles and responsibilities across various levels so that there is no confusion by adding new posts. 3. Properly define the Cost Structure and try to decrease the costs to maximum extent in various levels of the activities or programs. 4. As there is a fixed location for different programs at Malleshwaram, it can be used for organizing workshops, trainings, etc. 5. So that additional costs incurred for organizing workshops, trainings, etc. at different locations can be reduced. 6. A sum of ₹ 5, 42,000/- is required to meet the ongoing activities every month. 7. So, fundraising activity must be effectively implemented to meet the ongoing activities. 8. Conduct Fundraising campaigns. 9. Tie up with Corporates – which is beneficiary not only to the Social Service Organizations but also to the Corporates. i.e., NGO – Corporate Partnerships. 10. It is often thought that NGOs would benefit more from such partnerships, but there are positive incentives that could or should concern the private sector as well, especially when focusing on the long-term benefits partnerships may afford. 11. “The world has spent many years debating what business can offer the NGOs, but what NGOs can offer the corporate world is a recent trend.” 12. Because, Company reputation is becoming more and more important to both investors and consumers. “A company’s impact on its stakeholders is an emerging benchmark of corporate performance since stakeholders are beginning to ask what companies can do for society, not what society can do for companies.” – Image and Credibility. 13. In the public eye, NGOs are more trustworthy than corporations in terms of benefiting society. So, a company that partners with an NGO can hope to be seen as trustworthy and be more credible in its attempts at CSR through this association.
  • 48. 38 14. All these clearly mention that Corporates may strive for partnership with NGOs. 15. So, an effective Fund raising campaign definitely helps Social Service Organization by which if any corporate agrees to tie up and donate funds from the salaries of their employees every month, then the cost of fund raising mechanism and the cost of deducting amount from accounts of the employees is zero at any point of time. 16. As this respective organization is a certified trust which provides 80G certification that helps in tax exemption, employees might feel free to donate. 17. A diversified fund-raising programme can be implemented. An interesting thumb-rule - closer the donor, smaller the amount. A person walking on the street in your town may provide only small change that he currently has in his pocket. But a more 'distant' person or organization may provide more funding. 18. Step out of the 'charity' angle. Develop clear professionalism among the staff members. Always be willing to provide info on the NGO's goals and objectives, as well as programmes. Get third party organizations to write about the programme and projects. Keep good relations with the media, and cultivate spokespersons among the staff members. 19. All staff members of an NGO should spend part of their time in fund raising - each catering to different aspects of the process - writing proposals, finding and networking with donors, negotiating, writing reports etc. 20. Creating NGO Networks, NGO service centres, information kiosks etc. help in pooling and developing the knowledge and skills needed for this purpose.
  • 50. 40 CONCLUSION The entire report summarizes on how the Organization Structure and Cost Structure was done for a social service organization. It explains how various information was gathered to understand the organization structure and the business processes undertaken by the social service organization. Through interviews conducted, an understanding of the project requirements obtained to create a project charter wherein the project scope, objectives, deliverables were clearly defined. An understanding of the PMI standards for project management was obtained and implemented. The recommendations were listed for the respective Social Service Organization to overcome its BUDGET DEFICIT. The impact / benefits of those recommendations on the organization are as follows:  Achieve sustainability  Overcome deficits  Increase effectiveness of the service offered  Never run out of money to meet ongoing activities
  • 51. 41 7.1 LEARNING OUTCOME The following are the different learnings that has happened to me during my internship. They are 1. Handling clients - a challenging task which was done successfully 2. Collecting requirements for the project 3. Matching the collected requirements with the core objectives of the project 4. Satisfying Stakeholders 5. Identifying Stakeholders based on the Project 6. Preparation of Organization Structure 7. Preparation of Cost Structure 8. Project Management Concepts 9. Clear understanding capability of the objectives of the project 10. Developing Project Charter
  • 52. 42 REFERENCES 1. Project Management Institute, Project Management Body of Knowledge, Fifth Edition. 2. http://ariencestrategies.net/ 3. www.arience.com 4. http://repository.upenn.edu/cgi/viewcontent.cgi?article=1022&context=curej