Madison Square Garden Transformation
The transformation of Madison Square Garden’s (MSG) 985,000 s.f. footprint features an
expanded 7th Avenue entrance, new arena seating, luxury suites, dressing rooms and numerous
retail and dining concessions. Designed by BBB Architects, project highlights include the two
striking Chase Sky Bridges. High above the arena, each suspension bridge spans 233 feet long
and 22 feet wide, providing event-goers with a bird’s eye view of the action.
An inherent challenge to the rehabilitation of an iconic venue such as MSG is the full schedule of
sporting and entertainment events. Turner developed a multi-year construction plan that allowed
for major installations to occur during three “dark summers,” and enabled the team to work
continuously through the active periods. In addition, Turner worked with numerous city agencies
to develop a comprehensive site safety plan in order to mitigate the logistical challenges of MSG
sitting atop Penn Station, one of the world’s busiest transit hubs. To ensure the seamless progress
of the project, Turner’s team created e-manager, a cloud-based construction software, that allows
for efficient tracking of the change order process, and monitoring of subcontractor work flow.
The project, which broke ground on June 1st, 2010, was completed on schedule in October, 2014
without a single hitch in the Garden’s roster of events.

More Related Content

Similar to MadisonSquareGarden-edit-3

1 hudson yards project (peter wertheim)
1   hudson yards project (peter wertheim)1   hudson yards project (peter wertheim)
1 hudson yards project (peter wertheim)www.theurbanvision.com
 
2017 AEC Excellence Awards Showcase Book
2017 AEC Excellence Awards Showcase Book2017 AEC Excellence Awards Showcase Book
2017 AEC Excellence Awards Showcase BookAutodesk AEC
 
eBook-MicroStation-Civil-Engineering.pdf
eBook-MicroStation-Civil-Engineering.pdfeBook-MicroStation-Civil-Engineering.pdf
eBook-MicroStation-Civil-Engineering.pdfBunty899425
 
Timely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems InstallationTimely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems InstallationMcKenney's Inc
 
DD News Slide Show
DD News Slide ShowDD News Slide Show
DD News Slide Showtdonnelly1
 
David W. Jackson - Background
David W. Jackson - BackgroundDavid W. Jackson - Background
David W. Jackson - Backgrounddwj279
 
C Arias EA Current_WEM3 2015 Ouse Washes
C Arias EA Current_WEM3 2015 Ouse WashesC Arias EA Current_WEM3 2015 Ouse Washes
C Arias EA Current_WEM3 2015 Ouse WashesArias Christian
 
SIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGSIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGWilliam Wieners
 
PACOTECH Parks SOQ
PACOTECH Parks SOQPACOTECH Parks SOQ
PACOTECH Parks SOQPhilip Mok
 

Similar to MadisonSquareGarden-edit-3 (11)

1 hudson yards project (peter wertheim)
1   hudson yards project (peter wertheim)1   hudson yards project (peter wertheim)
1 hudson yards project (peter wertheim)
 
2017 AEC Excellence Awards Showcase Book
2017 AEC Excellence Awards Showcase Book2017 AEC Excellence Awards Showcase Book
2017 AEC Excellence Awards Showcase Book
 
eBook-MicroStation-Civil-Engineering.pdf
eBook-MicroStation-Civil-Engineering.pdfeBook-MicroStation-Civil-Engineering.pdf
eBook-MicroStation-Civil-Engineering.pdf
 
AMI Deployment Reaches New Heights
AMI Deployment Reaches New HeightsAMI Deployment Reaches New Heights
AMI Deployment Reaches New Heights
 
Jamie Resume
Jamie ResumeJamie Resume
Jamie Resume
 
Timely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems InstallationTimely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems Installation
 
DD News Slide Show
DD News Slide ShowDD News Slide Show
DD News Slide Show
 
David W. Jackson - Background
David W. Jackson - BackgroundDavid W. Jackson - Background
David W. Jackson - Background
 
C Arias EA Current_WEM3 2015 Ouse Washes
C Arias EA Current_WEM3 2015 Ouse WashesC Arias EA Current_WEM3 2015 Ouse Washes
C Arias EA Current_WEM3 2015 Ouse Washes
 
SIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGSIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERING
 
PACOTECH Parks SOQ
PACOTECH Parks SOQPACOTECH Parks SOQ
PACOTECH Parks SOQ
 

MadisonSquareGarden-edit-3

  • 1. Madison Square Garden Transformation The transformation of Madison Square Garden’s (MSG) 985,000 s.f. footprint features an expanded 7th Avenue entrance, new arena seating, luxury suites, dressing rooms and numerous retail and dining concessions. Designed by BBB Architects, project highlights include the two striking Chase Sky Bridges. High above the arena, each suspension bridge spans 233 feet long and 22 feet wide, providing event-goers with a bird’s eye view of the action. An inherent challenge to the rehabilitation of an iconic venue such as MSG is the full schedule of sporting and entertainment events. Turner developed a multi-year construction plan that allowed for major installations to occur during three “dark summers,” and enabled the team to work continuously through the active periods. In addition, Turner worked with numerous city agencies to develop a comprehensive site safety plan in order to mitigate the logistical challenges of MSG sitting atop Penn Station, one of the world’s busiest transit hubs. To ensure the seamless progress of the project, Turner’s team created e-manager, a cloud-based construction software, that allows for efficient tracking of the change order process, and monitoring of subcontractor work flow. The project, which broke ground on June 1st, 2010, was completed on schedule in October, 2014 without a single hitch in the Garden’s roster of events.