THE GRADE
MAKING
Metro Toronto Convention Centre
March 6 – March 9, 2016
Toronto, Canada
Booth 2724
2
FORWARD-LOOKING STATEMENTS
This presentation contains forward-looking statements. Forward-looking statements involve known and unknown risks, uncertainties and
assumptions and accordingly, actual results and future events could differ materially from those expressed or implied in such statements. You
are hence cautioned not to place undue reliance on forward-looking statements. Forward-looking statements include words or expressions such
as “projected”, “initial”, “targeted”, “expected”, “anticipated”, “estimates”, “potential”, “priority”, “objective”, “aim”, “continuing”, “planned”,
“designed to”, “in order to”, “achieve”, “envisaged”, ‘will”, “committed”, “evolve”, “become”, “pursuing”, “growth”, “opportunities” and other
similar words or expressions. Factors that could cause future results or events to differ materially from current expectations expressed or
implied by the forward-looking statements include the ability to achieve our 2016 production guidance of between 225,000 and 245,000
ounces, the ability to achieve our 2016 total cash cost guidance of between $535 and $565 per ounce and our all-in sustaining cost guidance
of between $720 and $760 per ounce, the ability to meet the annual average production targets at Natougou within the anticipated total cash
costs and all-in sustaining costs, the ability to achieve the projected LOM, the ability to meet the targeted permitting process, initial capital
expenditures, construction start-up, expected first gold pour and full year of production, the ability to bring Natougou into production with the
combination of our current cash position as at December 31, 2015, anticipated cash flow from production and the amended Macquarie Facility,
the ability to close the Macquarie amended Facility and to meet the various conditions precedent to drawdown, the ability to expand Natougou
resources at depth within the footwall zone of the Boungou Shear Zone, the ability to carry out our 2016 exploration program at Natougou and
obtain results within anticipated schedules, the ability to execute an agreement relating to the mining of Natougou, the ability to meet the
various objectives in terms of tonnes of ore to the milling facility, head-grade and tonnes per day processed at the Natougou plant, LOM overall
strip ratio and operational strip ratio, the ability to operate a power plant facility with an installed capacity of 15.4 MW using HFO/LFO
generators, the ability to generate an after-tax internal rate of return (IRR) of 48% with a payback period of 1.5 years and to generate an after-
tax NPV of $262 million, the accuracy of our assumptions, the ability to execute on our strategic focus, fluctuation in the price of currencies,
gold or operating costs, mining industry risks, uncertainty as to calculation of mineral reserves and resources, delays, political and social
stability in Africa (including our ability to maintain or renew licenses and permits) and other risks described in SEMAFO’s documents filed with
Canadian securities regulatory authorities. You can find further information with respect to these and other risks in SEMAFO’s 2014 Annual
MD&A, as updated in SEMAFO’s 2015 First Quarter MD&A, Second Quarter MD&A, Third Quarter MD&A and other filings made with Canadian
securities regulatory authorities and available at www.sedar.com. These documents are also available on our website at www.semafo.com.
SEMAFO disclaims any obligation to update or revise these forward-looking statements, except as required by applicable law.
All mineral resources are exclusive of mineral reserves.
In this presentation, all amounts are in US dollars unless otherwise indicated.
3
SEMAFO HAS….
 STRONG IN-HOUSE
TECHNICAL TEAM
 TRACK RECORD OF
OPERATING SUCCESS
IN WEST AFRICA
 HIGH-GRADE OPEN-PIT
DEPOSITS
 FINANCIAL STRENGTH
 LARGE EXPLORATION
PACKAGE
 RESPECTED CSR
PROGRAMS
 DISCIPLINED GROWTH
STRATEGY
4
6,605km2
in Burkina Faso
over three prospective belts
MANAMine
in Burkina Faso
20years
Commissioned
3 mines in West Africa
over
LONG STANDING PRESENCE IN WEST AFRICA
NATOUGOUFeasibility Study Completed
Targeted Production H2 2018
BurkinaFaso
Mana
BANFORA GOLD BELT
PERMITS
Ouagadougou
(Capital)
Inata
Essakane
Bissa
Taparko
Youga
SEMAFO property
Other mines
Electric line
Korhogo
Natougou
Nabanga
Bantou
5
5
172,7
158,6
234,3
255,9
750
777
649
495
550
1 221 1 242
805
648
740
0
200
400
600
800
1000
1200
1400
0
50
100
150
200
250
300
2012 2013 2014 2015 Guidance 2016
Production '000 ounces Total Cash Cost ($/oz) All-in Sustaining Cost ($/oz)
OPERATING SUCCESS
Met its production guidance for
the eighth consecutive year
0
1
2
3
Dec. 31, 2007 Dec. 31, 2014
Mana reserves after
production of 1.4M oz
Reserves in Moz Au
245
225
‘000oz
 Built and expanded Mana on time
and on budget
 Reserves at Mana more than
doubled since inauguration of
the mine in 2008
 One of the lowest cost gold
producers
 Generates free cash flow
6
6
$0
$200
$400
$600
$800
$1 000
$1 200
$1 400
PRU GSC TMM TGZ ASR AR HL MND AUY ACA AGI NEM SSRI KGC OGC CG ELD ABX EDV CDE BTO DGC P AEM GG SMF
AISC TCC
LOW ALL-IN SUSTAINING COST RELATIVE TO INDUSTRY PEERS: 2016
Source: BMO Capital Markets as at February 8, 2016
$/oz
AISC - All-In-Sustaining-Cost: Cash costs plus corporate costs plus sustaining capital
Total Cash Costs (Co-Product): The Gold Institute definition of Total Cash Costs is cash operating costs plus royalties and production taxes.
For averages, total cash costs are weighted to the number of ounces produced in each respective year.
SMF
7
MANA’S RESERVES (AS AT DECEMBER 31, 2014)
Wona-Kona:
13,275,500 Mt @ 2.27 g/t
Au
970,100 oz
Fofina:
2,443,200 Mt @ 2.62 g/t
Au
205,700 oz
Siou:
6,972,200 Mt @ 4.37 g/t
Au
980,000 oz
Mana
Processing Plant
8
TARGETED EXPLORATION WITHIN TRUCKING DISTANCE OF MANA - 2016
25 km
from the mine
 $4.5 million exploration budget
established for Mana project in
2016
 Exploration will concentrate on
areas within trucking distance of
the mine
 ~27,000-meter RC drill program,
mainly on 3 sectors south of Mana
 27,000-meter auger drill program
Mana Mine
Wona
Siou
Fofina
FobiriYaho
YAMA
RC drilling
4,600 m
RC drilling
6,900 m
RC drilling
12,500 m
9
YAMA DRILLING INTERSECTION HIGHLIGHTS
NATOUGOU: OUR NEW QUALITY ASSET
11
POSITIVE FEASIBILITY STUDY HIGHLIGHTS
During the first three years,
• Average annual production of more than 226,000 ounces
• Average total cash cost of $283/oz and AISC of $374/oz
• Average head grade 5.72 g/t at a gold recovery rate of 93.8%
Projected LOM total cash cost of $408/oz and all-in sustaining
cost of $518/oz
Maiden open pit mineral reserves of 9.6 million tonnes at a
grade of 4.15 g/t Au for 1,276,000 ounces of gold
Initial CAPEX: $219 million
First gold pour
H2 2018
Project economics at $1,100/oz:
• After-tax NPV 5%: $262 million
• After-tax IRR: 48%
• Payback period: 1.5 years
Production of some 1.2 million ounces over a
projected LOM in excess of 7 years
1212
ROBUST PROJECT ECONOMICS
GOLD PRICE SENSITIVITY ANALYSIS
Base Case
Gold Price ($/oz) $1,000 $1,100 $1,200
After-tax NPV 5% ($M) $199 $262 $334
After-tax IRR (%) 38 48 58
Payback period (years) 1.7 1.5 1.3
13
NATOUGOU INITIAL CAPITAL EXPENDITURES
Initial Capital Expenditures In millions of $
Indirect construction 13.6
Processing plant 42.3
Reagents and plant services 13.7
Infrastructure 41.8
Owner costs 15.8
EPCM costs 15.9
Resettlement action plan 8.0
Initial supplies inventory 7.2
Plant & infrastructures subtotal 158.3
Pre-stripping 42.4
Contingency 18.7
Grand Total 219.4
2016 - $10.0M
2017 - $46.0M
2018 - $163.4M
14
2016
2017
2018
NATOUGOU TIMETABLE
Permitting process & Detailed engineering
2026
Construction & Pre-stripping
17
Commissioning, ramp-up,
first gold pour and production
14
15
NATOUGOU– INITIAL PRODUCTION
YEAR 1 YEAR 2 YEAR 3
Feed ore (t) 1,256,000 1,343,200 1,343,200
Grade (g/t) 5.93 5.59 5.65
Gold recovery (%) 93.9 93.7 93.7
Ounces (oz) 224,918 226,100 228,502
TCC ($/oz) 319 304 227
AISC ($/oz) 380 406 337
STRONG FREE CASH FLOW
16
PROJECT FUNDING
Facility increased from $90 to $120 million
- Incremental $60 million to be drawn down by
June 30, 2017 ($30 million repayment due March 3, 2016)
- LIBOR + 4.75% per annum
- Quarterly repayments of $15 million, from first quarter of 2019 to
fourth quarter of 2020
- Closing of the amended Facility is anticipated on or about
March 31, 2016
Anticipated Cash Flow
from Ongoing Operations
Credit Facility
Cash Position
Sufficient Financial
Resources to Bring
Natougou into
Production
Generating cash flow
$167M in cash as of December 31, 2015
17
NATOUGOU: AN UNDEREXPLORED PROPERTY
Prior to the acquisition, Natougou had seen little near-pit or
regional exploration
Focus on in-fill drilling for the feasibility study in 2015
Regional and proximal exploration only commenced a few
months ago
773 km2 of exploration ground
Objective is to expand
reserves and resources
to further improve economics
18
EXPLORATION POTENTIAL - OPEN IN ALL DIRECTIONS
Grade x thickness
plan view
19
EXPLORATION POTENTIAL- FOOTWALL ZONE
20
PROXIMAL AND REGIONAL EXPLORATION PROGRAM : $6M IN 2016
 Airborne geophysical surveying - 2015
 20,000 meters of RC drilling
 6,000 meters of core drilling –
continuity of footwall & sector west
 60,000 meters of auger drilling
2016
21
21
NABANGA: A THIRD HIGH-GRADE DEPOSIT
Nabanga –Inferred Mineral Resource
(1)
Cut-off Grade Tonnes Grade Ounces
5.0 g/t Au 1.84 Mt 10.0 g/t Au 590,000 oz
(1) Inferred Mineral Resource figures at a 5.0 g/t Au cut-off grade. NI 43-101 report, June 2015
.
22
PROSPECTIVE PROPERTIES ON THE SOUTH HOUNDÉ BELT
23
Côte d’Ivoire
Highly mineralised greenstone belts
Korhogo Project
Along strike from Tongon Mine - priority targets
EXPLORATION UPSIDE: ACQUIRED PERMITS IN CÔTE D’IVOIRE
Korhogo Permit /Application
Korhogo East Application
Korhogo West Permit
Target Corridor
Fapoha South (Randgold)
Fapoha North (Randgold)
Gold Mine
Gold Deposits
Target Corridor
THE GRADE
MAKING
24
2016 PRIORITIES
NATOUGOU
 Completing detailed engineering in Q4
 Completing the permitting process and
starting construction by year-end
 Exploration with the aim of increasing
reserves and resources to further
improve economics
MANA
 Delivering our production and cost
guidance for a ninth consecutive year
 Exploration within trucking distance of
the Mine
25
National Workforce Development Program -
Training of promising national employees for
management or trainer posts
SEMAFO Foundation -
Six years of activities bolster our ability to
establish strong relations with communities
Training – 10,000 hours of training
were dispensed in 2014, of which 75%
benefited our Burkinabe employees
Strong Safety Record -
Accident frequency rate of 1.88 per 200,000
hours worked as of December 31, 2015

More Related Content

What's hot

2016 june investor presentation - update at 19 jul16
2016 june investor presentation - update at 19 jul162016 june investor presentation - update at 19 jul16
2016 june investor presentation - update at 19 jul16GoldenStarResources
 
2018 aug-7-8 - teranga presentation - vancouver marketing
2018 aug-7-8 - teranga presentation - vancouver marketing2018 aug-7-8 - teranga presentation - vancouver marketing
2018 aug-7-8 - teranga presentation - vancouver marketingTeranga Gold
 
European Gold Forum
European Gold Forum European Gold Forum
European Gold Forum Teranga Gold
 
Presentation november - final
Presentation   november - finalPresentation   november - final
Presentation november - finalFirstQuantum
 
Teranga gold agm 2018
Teranga gold   agm 2018Teranga gold   agm 2018
Teranga gold agm 2018Teranga Gold
 
GFG Resources Inc. Investor Presentation - November 2019
GFG Resources Inc. Investor Presentation - November 2019GFG Resources Inc. Investor Presentation - November 2019
GFG Resources Inc. Investor Presentation - November 2019GFG Resources Inc.
 
Sprott Natural Resource Symposium
Sprott Natural Resource Symposium Sprott Natural Resource Symposium
Sprott Natural Resource Symposium Teranga Gold
 
GFG Resources Inc. Investor Presentation - January 2019
GFG Resources Inc. Investor Presentation - January 2019GFG Resources Inc. Investor Presentation - January 2019
GFG Resources Inc. Investor Presentation - January 2019GFG Resources Inc.
 
Producing & Exploring: Denver Gold Forum 2013
Producing & Exploring: Denver Gold Forum 2013Producing & Exploring: Denver Gold Forum 2013
Producing & Exploring: Denver Gold Forum 2013Teranga Gold
 
European Gold Forum Investor Presentation
European Gold Forum Investor PresentationEuropean Gold Forum Investor Presentation
European Gold Forum Investor PresentationTeranga Gold
 
Annual General & Special Meeting of Shareholders
Annual General  & Special Meeting of Shareholders Annual General  & Special Meeting of Shareholders
Annual General & Special Meeting of Shareholders Teranga Gold
 
2017 beaver creek final
2017 beaver creek final2017 beaver creek final
2017 beaver creek finalTeranga Gold
 
GFG Resources Inc. IR Presentation - May 2019
GFG Resources Inc. IR Presentation - May 2019GFG Resources Inc. IR Presentation - May 2019
GFG Resources Inc. IR Presentation - May 2019GFG Resources Inc.
 
Td securities-mining-conference-january-2016-final
Td securities-mining-conference-january-2016-finalTd securities-mining-conference-january-2016-final
Td securities-mining-conference-january-2016-finalSemafoCorporate
 
Skyharbour Resources Ltd. Presentation 2016
Skyharbour Resources Ltd. Presentation 2016Skyharbour Resources Ltd. Presentation 2016
Skyharbour Resources Ltd. Presentation 2016Company Spotlight
 
2018 pdac presentation
2018 pdac presentation2018 pdac presentation
2018 pdac presentationTeranga Gold
 

What's hot (20)

2016 june investor presentation
2016 june investor presentation2016 june investor presentation
2016 june investor presentation
 
2016 june investor presentation - update at 19 jul16
2016 june investor presentation - update at 19 jul162016 june investor presentation - update at 19 jul16
2016 june investor presentation - update at 19 jul16
 
2018 aug-7-8 - teranga presentation - vancouver marketing
2018 aug-7-8 - teranga presentation - vancouver marketing2018 aug-7-8 - teranga presentation - vancouver marketing
2018 aug-7-8 - teranga presentation - vancouver marketing
 
2017 dgf final2
2017 dgf final22017 dgf final2
2017 dgf final2
 
European Gold Forum
European Gold Forum European Gold Forum
European Gold Forum
 
Presentation november - final
Presentation   november - finalPresentation   november - final
Presentation november - final
 
Teranga gold agm 2018
Teranga gold   agm 2018Teranga gold   agm 2018
Teranga gold agm 2018
 
Investor presentation dec 2016
Investor presentation dec 2016Investor presentation dec 2016
Investor presentation dec 2016
 
GFG Resources Inc. Investor Presentation - November 2019
GFG Resources Inc. Investor Presentation - November 2019GFG Resources Inc. Investor Presentation - November 2019
GFG Resources Inc. Investor Presentation - November 2019
 
Sprott Natural Resource Symposium
Sprott Natural Resource Symposium Sprott Natural Resource Symposium
Sprott Natural Resource Symposium
 
GFG Resources Inc. Investor Presentation - January 2019
GFG Resources Inc. Investor Presentation - January 2019GFG Resources Inc. Investor Presentation - January 2019
GFG Resources Inc. Investor Presentation - January 2019
 
Producing & Exploring: Denver Gold Forum 2013
Producing & Exploring: Denver Gold Forum 2013Producing & Exploring: Denver Gold Forum 2013
Producing & Exploring: Denver Gold Forum 2013
 
European Gold Forum Investor Presentation
European Gold Forum Investor PresentationEuropean Gold Forum Investor Presentation
European Gold Forum Investor Presentation
 
Annual General & Special Meeting of Shareholders
Annual General  & Special Meeting of Shareholders Annual General  & Special Meeting of Shareholders
Annual General & Special Meeting of Shareholders
 
2017 beaver creek final
2017 beaver creek final2017 beaver creek final
2017 beaver creek final
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
GFG Resources Inc. IR Presentation - May 2019
GFG Resources Inc. IR Presentation - May 2019GFG Resources Inc. IR Presentation - May 2019
GFG Resources Inc. IR Presentation - May 2019
 
Td securities-mining-conference-january-2016-final
Td securities-mining-conference-january-2016-finalTd securities-mining-conference-january-2016-final
Td securities-mining-conference-january-2016-final
 
Skyharbour Resources Ltd. Presentation 2016
Skyharbour Resources Ltd. Presentation 2016Skyharbour Resources Ltd. Presentation 2016
Skyharbour Resources Ltd. Presentation 2016
 
2018 pdac presentation
2018 pdac presentation2018 pdac presentation
2018 pdac presentation
 

Viewers also liked

Viewers also liked (10)

Shubhangi
ShubhangiShubhangi
Shubhangi
 
FINAL CORRECT Report
FINAL CORRECT ReportFINAL CORRECT Report
FINAL CORRECT Report
 
BMO 24th Global Metals and Mining Conference - February 22-25
BMO 24th Global Metals and Mining Conference - February 22-25BMO 24th Global Metals and Mining Conference - February 22-25
BMO 24th Global Metals and Mining Conference - February 22-25
 
Estrategia lectora
Estrategia lectoraEstrategia lectora
Estrategia lectora
 
Denver Gold Forum 2015
Denver Gold Forum 2015Denver Gold Forum 2015
Denver Gold Forum 2015
 
Agm 2016 final lR
Agm 2016 final lRAgm 2016 final lR
Agm 2016 final lR
 
Shubhangi
ShubhangiShubhangi
Shubhangi
 
Career Summary (1)
Career Summary (1)Career Summary (1)
Career Summary (1)
 
Embedded and Robotics System
Embedded and Robotics SystemEmbedded and Robotics System
Embedded and Robotics System
 
Denver gold-2016-final
Denver gold-2016-finalDenver gold-2016-final
Denver gold-2016-final
 

Similar to Pdac final-low-res

Scotiabank conference dec 2016 lr final
Scotiabank conference dec 2016 lr finalScotiabank conference dec 2016 lr final
Scotiabank conference dec 2016 lr finalSemafoCorporate
 
Presentation PDAC March 6, 2017
Presentation PDAC March 6, 2017Presentation PDAC March 6, 2017
Presentation PDAC March 6, 2017SemafoCorporate
 
National bank qc june 2016 lr
National bank qc june 2016 lrNational bank qc june 2016 lr
National bank qc june 2016 lrSemafoCorporate
 
Bank of America Merrill Lynch Conference - May 18, 2017
Bank of America Merrill Lynch Conference - May 18, 2017Bank of America Merrill Lynch Conference - May 18, 2017
Bank of America Merrill Lynch Conference - May 18, 2017SemafoCorporate
 
07 28-16-teranga-gold-q2-2016-slides-final2
07 28-16-teranga-gold-q2-2016-slides-final207 28-16-teranga-gold-q2-2016-slides-final2
07 28-16-teranga-gold-q2-2016-slides-final2Teranga Gold
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014Teranga Gold
 
2018 march swiss mining lunch presentation-final
2018 march swiss mining lunch presentation-final2018 march swiss mining lunch presentation-final
2018 march swiss mining lunch presentation-finalTeranga Gold
 
12 01-14 december investor presentation
12 01-14 december investor presentation12 01-14 december investor presentation
12 01-14 december investor presentationTeranga Gold
 
Investor Presentation December 2014
Investor Presentation December 2014Investor Presentation December 2014
Investor Presentation December 2014Teranga Gold
 
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014Claude Resources Inc.
 
Website slides november 26, 2017 - final
Website slides   november 26, 2017 - finalWebsite slides   november 26, 2017 - final
Website slides november 26, 2017 - finalTeranga Gold
 
European Gold Forum 2014
European Gold Forum 2014European Gold Forum 2014
European Gold Forum 2014Teranga Gold
 
Pdac march-2018-final-print-lr
Pdac march-2018-final-print-lrPdac march-2018-final-print-lr
Pdac march-2018-final-print-lrSemafoCorporate
 
PDAC - Investor Presentation
PDAC - Investor PresentationPDAC - Investor Presentation
PDAC - Investor PresentationSemafoCorporate
 
Dgc 16 04_07 - laurentian 1x1 presentation
Dgc 16 04_07 - laurentian 1x1 presentationDgc 16 04_07 - laurentian 1x1 presentation
Dgc 16 04_07 - laurentian 1x1 presentationdetour-gold
 
teranga gold swiss mining presentation
teranga gold swiss mining presentationteranga gold swiss mining presentation
teranga gold swiss mining presentationTeranga Gold
 
Teranga Gold AGM Presentation
Teranga Gold AGM Presentation Teranga Gold AGM Presentation
Teranga Gold AGM Presentation Teranga Gold
 

Similar to Pdac final-low-res (20)

Scotiabank conference dec 2016 lr final
Scotiabank conference dec 2016 lr finalScotiabank conference dec 2016 lr final
Scotiabank conference dec 2016 lr final
 
Presentation PDAC March 6, 2017
Presentation PDAC March 6, 2017Presentation PDAC March 6, 2017
Presentation PDAC March 6, 2017
 
National bank qc june 2016 lr
National bank qc june 2016 lrNational bank qc june 2016 lr
National bank qc june 2016 lr
 
Bank of America Merrill Lynch Conference - May 18, 2017
Bank of America Merrill Lynch Conference - May 18, 2017Bank of America Merrill Lynch Conference - May 18, 2017
Bank of America Merrill Lynch Conference - May 18, 2017
 
07 28-16-teranga-gold-q2-2016-slides-final2
07 28-16-teranga-gold-q2-2016-slides-final207 28-16-teranga-gold-q2-2016-slides-final2
07 28-16-teranga-gold-q2-2016-slides-final2
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014
 
2018 march swiss mining lunch presentation-final
2018 march swiss mining lunch presentation-final2018 march swiss mining lunch presentation-final
2018 march swiss mining lunch presentation-final
 
12 01-14 december investor presentation
12 01-14 december investor presentation12 01-14 december investor presentation
12 01-14 december investor presentation
 
Investor Presentation December 2014
Investor Presentation December 2014Investor Presentation December 2014
Investor Presentation December 2014
 
1711-Tabakoto-Mine.pptx
1711-Tabakoto-Mine.pptx1711-Tabakoto-Mine.pptx
1711-Tabakoto-Mine.pptx
 
1711-Tabakoto-Mine.pptx
1711-Tabakoto-Mine.pptx1711-Tabakoto-Mine.pptx
1711-Tabakoto-Mine.pptx
 
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014
 
Website slides november 26, 2017 - final
Website slides   november 26, 2017 - finalWebsite slides   november 26, 2017 - final
Website slides november 26, 2017 - final
 
European Gold Forum 2014
European Gold Forum 2014European Gold Forum 2014
European Gold Forum 2014
 
Pdac march-2018-final-print-lr
Pdac march-2018-final-print-lrPdac march-2018-final-print-lr
Pdac march-2018-final-print-lr
 
PDAC - Investor Presentation
PDAC - Investor PresentationPDAC - Investor Presentation
PDAC - Investor Presentation
 
Dgc 16 04_07 - laurentian 1x1 presentation
Dgc 16 04_07 - laurentian 1x1 presentationDgc 16 04_07 - laurentian 1x1 presentation
Dgc 16 04_07 - laurentian 1x1 presentation
 
teranga gold swiss mining presentation
teranga gold swiss mining presentationteranga gold swiss mining presentation
teranga gold swiss mining presentation
 
Teranga Gold AGM Presentation
Teranga Gold AGM Presentation Teranga Gold AGM Presentation
Teranga Gold AGM Presentation
 

More from SemafoCorporate

Presentation - Investor Day June 2019
Presentation - Investor Day June 2019Presentation - Investor Day June 2019
Presentation - Investor Day June 2019SemafoCorporate
 
Presentation - Investor Day June 2019
Presentation - Investor Day June 2019Presentation - Investor Day June 2019
Presentation - Investor Day June 2019SemafoCorporate
 
Corporate Presentation August 2018
Corporate Presentation August 2018Corporate Presentation August 2018
Corporate Presentation August 2018SemafoCorporate
 
Corporate presentation-february-2018-final-web
Corporate presentation-february-2018-final-webCorporate presentation-february-2018-final-web
Corporate presentation-february-2018-final-webSemafoCorporate
 
November boungou-visit final-low
November boungou-visit final-lowNovember boungou-visit final-low
November boungou-visit final-lowSemafoCorporate
 
Présentation corporative – avril 2016
Présentation corporative – avril 2016Présentation corporative – avril 2016
Présentation corporative – avril 2016SemafoCorporate
 
Assemblee generale annuelle des actionnaires
Assemblee generale annuelle des actionnairesAssemblee generale annuelle des actionnaires
Assemblee generale annuelle des actionnairesSemafoCorporate
 
Annual General Meeting (in French) - May 14, 2015
Annual General Meeting (in French) - May 14, 2015Annual General Meeting (in French) - May 14, 2015
Annual General Meeting (in French) - May 14, 2015SemafoCorporate
 
BMO 24th Global Metals and Mining Conference - February 22-25
BMO 24th Global Metals and Mining Conference - February 22-25BMO 24th Global Metals and Mining Conference - February 22-25
BMO 24th Global Metals and Mining Conference - February 22-25SemafoCorporate
 

More from SemafoCorporate (9)

Presentation - Investor Day June 2019
Presentation - Investor Day June 2019Presentation - Investor Day June 2019
Presentation - Investor Day June 2019
 
Presentation - Investor Day June 2019
Presentation - Investor Day June 2019Presentation - Investor Day June 2019
Presentation - Investor Day June 2019
 
Corporate Presentation August 2018
Corporate Presentation August 2018Corporate Presentation August 2018
Corporate Presentation August 2018
 
Corporate presentation-february-2018-final-web
Corporate presentation-february-2018-final-webCorporate presentation-february-2018-final-web
Corporate presentation-february-2018-final-web
 
November boungou-visit final-low
November boungou-visit final-lowNovember boungou-visit final-low
November boungou-visit final-low
 
Présentation corporative – avril 2016
Présentation corporative – avril 2016Présentation corporative – avril 2016
Présentation corporative – avril 2016
 
Assemblee generale annuelle des actionnaires
Assemblee generale annuelle des actionnairesAssemblee generale annuelle des actionnaires
Assemblee generale annuelle des actionnaires
 
Annual General Meeting (in French) - May 14, 2015
Annual General Meeting (in French) - May 14, 2015Annual General Meeting (in French) - May 14, 2015
Annual General Meeting (in French) - May 14, 2015
 
BMO 24th Global Metals and Mining Conference - February 22-25
BMO 24th Global Metals and Mining Conference - February 22-25BMO 24th Global Metals and Mining Conference - February 22-25
BMO 24th Global Metals and Mining Conference - February 22-25
 

Recently uploaded

如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书Fir La
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Corporation
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书Fir La
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd
 
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls KolkataCall Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Roomdivyansh0kumar0
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityJohanAspro
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Roomdivyansh0kumar0
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一Fir La
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...wyqazy
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirtsrahman018755
 

Recently uploaded (20)

如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Serviceyoung  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)
 
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
 
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCREscort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
 
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
 
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
 
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls KolkataCall Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanity
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirts
 

Pdac final-low-res

  • 1. THE GRADE MAKING Metro Toronto Convention Centre March 6 – March 9, 2016 Toronto, Canada Booth 2724
  • 2. 2 FORWARD-LOOKING STATEMENTS This presentation contains forward-looking statements. Forward-looking statements involve known and unknown risks, uncertainties and assumptions and accordingly, actual results and future events could differ materially from those expressed or implied in such statements. You are hence cautioned not to place undue reliance on forward-looking statements. Forward-looking statements include words or expressions such as “projected”, “initial”, “targeted”, “expected”, “anticipated”, “estimates”, “potential”, “priority”, “objective”, “aim”, “continuing”, “planned”, “designed to”, “in order to”, “achieve”, “envisaged”, ‘will”, “committed”, “evolve”, “become”, “pursuing”, “growth”, “opportunities” and other similar words or expressions. Factors that could cause future results or events to differ materially from current expectations expressed or implied by the forward-looking statements include the ability to achieve our 2016 production guidance of between 225,000 and 245,000 ounces, the ability to achieve our 2016 total cash cost guidance of between $535 and $565 per ounce and our all-in sustaining cost guidance of between $720 and $760 per ounce, the ability to meet the annual average production targets at Natougou within the anticipated total cash costs and all-in sustaining costs, the ability to achieve the projected LOM, the ability to meet the targeted permitting process, initial capital expenditures, construction start-up, expected first gold pour and full year of production, the ability to bring Natougou into production with the combination of our current cash position as at December 31, 2015, anticipated cash flow from production and the amended Macquarie Facility, the ability to close the Macquarie amended Facility and to meet the various conditions precedent to drawdown, the ability to expand Natougou resources at depth within the footwall zone of the Boungou Shear Zone, the ability to carry out our 2016 exploration program at Natougou and obtain results within anticipated schedules, the ability to execute an agreement relating to the mining of Natougou, the ability to meet the various objectives in terms of tonnes of ore to the milling facility, head-grade and tonnes per day processed at the Natougou plant, LOM overall strip ratio and operational strip ratio, the ability to operate a power plant facility with an installed capacity of 15.4 MW using HFO/LFO generators, the ability to generate an after-tax internal rate of return (IRR) of 48% with a payback period of 1.5 years and to generate an after- tax NPV of $262 million, the accuracy of our assumptions, the ability to execute on our strategic focus, fluctuation in the price of currencies, gold or operating costs, mining industry risks, uncertainty as to calculation of mineral reserves and resources, delays, political and social stability in Africa (including our ability to maintain or renew licenses and permits) and other risks described in SEMAFO’s documents filed with Canadian securities regulatory authorities. You can find further information with respect to these and other risks in SEMAFO’s 2014 Annual MD&A, as updated in SEMAFO’s 2015 First Quarter MD&A, Second Quarter MD&A, Third Quarter MD&A and other filings made with Canadian securities regulatory authorities and available at www.sedar.com. These documents are also available on our website at www.semafo.com. SEMAFO disclaims any obligation to update or revise these forward-looking statements, except as required by applicable law. All mineral resources are exclusive of mineral reserves. In this presentation, all amounts are in US dollars unless otherwise indicated.
  • 3. 3 SEMAFO HAS….  STRONG IN-HOUSE TECHNICAL TEAM  TRACK RECORD OF OPERATING SUCCESS IN WEST AFRICA  HIGH-GRADE OPEN-PIT DEPOSITS  FINANCIAL STRENGTH  LARGE EXPLORATION PACKAGE  RESPECTED CSR PROGRAMS  DISCIPLINED GROWTH STRATEGY
  • 4. 4 6,605km2 in Burkina Faso over three prospective belts MANAMine in Burkina Faso 20years Commissioned 3 mines in West Africa over LONG STANDING PRESENCE IN WEST AFRICA NATOUGOUFeasibility Study Completed Targeted Production H2 2018 BurkinaFaso Mana BANFORA GOLD BELT PERMITS Ouagadougou (Capital) Inata Essakane Bissa Taparko Youga SEMAFO property Other mines Electric line Korhogo Natougou Nabanga Bantou
  • 5. 5 5 172,7 158,6 234,3 255,9 750 777 649 495 550 1 221 1 242 805 648 740 0 200 400 600 800 1000 1200 1400 0 50 100 150 200 250 300 2012 2013 2014 2015 Guidance 2016 Production '000 ounces Total Cash Cost ($/oz) All-in Sustaining Cost ($/oz) OPERATING SUCCESS Met its production guidance for the eighth consecutive year 0 1 2 3 Dec. 31, 2007 Dec. 31, 2014 Mana reserves after production of 1.4M oz Reserves in Moz Au 245 225 ‘000oz  Built and expanded Mana on time and on budget  Reserves at Mana more than doubled since inauguration of the mine in 2008  One of the lowest cost gold producers  Generates free cash flow
  • 6. 6 6 $0 $200 $400 $600 $800 $1 000 $1 200 $1 400 PRU GSC TMM TGZ ASR AR HL MND AUY ACA AGI NEM SSRI KGC OGC CG ELD ABX EDV CDE BTO DGC P AEM GG SMF AISC TCC LOW ALL-IN SUSTAINING COST RELATIVE TO INDUSTRY PEERS: 2016 Source: BMO Capital Markets as at February 8, 2016 $/oz AISC - All-In-Sustaining-Cost: Cash costs plus corporate costs plus sustaining capital Total Cash Costs (Co-Product): The Gold Institute definition of Total Cash Costs is cash operating costs plus royalties and production taxes. For averages, total cash costs are weighted to the number of ounces produced in each respective year. SMF
  • 7. 7 MANA’S RESERVES (AS AT DECEMBER 31, 2014) Wona-Kona: 13,275,500 Mt @ 2.27 g/t Au 970,100 oz Fofina: 2,443,200 Mt @ 2.62 g/t Au 205,700 oz Siou: 6,972,200 Mt @ 4.37 g/t Au 980,000 oz Mana Processing Plant
  • 8. 8 TARGETED EXPLORATION WITHIN TRUCKING DISTANCE OF MANA - 2016 25 km from the mine  $4.5 million exploration budget established for Mana project in 2016  Exploration will concentrate on areas within trucking distance of the mine  ~27,000-meter RC drill program, mainly on 3 sectors south of Mana  27,000-meter auger drill program Mana Mine Wona Siou Fofina FobiriYaho YAMA RC drilling 4,600 m RC drilling 6,900 m RC drilling 12,500 m
  • 10. NATOUGOU: OUR NEW QUALITY ASSET
  • 11. 11 POSITIVE FEASIBILITY STUDY HIGHLIGHTS During the first three years, • Average annual production of more than 226,000 ounces • Average total cash cost of $283/oz and AISC of $374/oz • Average head grade 5.72 g/t at a gold recovery rate of 93.8% Projected LOM total cash cost of $408/oz and all-in sustaining cost of $518/oz Maiden open pit mineral reserves of 9.6 million tonnes at a grade of 4.15 g/t Au for 1,276,000 ounces of gold Initial CAPEX: $219 million First gold pour H2 2018 Project economics at $1,100/oz: • After-tax NPV 5%: $262 million • After-tax IRR: 48% • Payback period: 1.5 years Production of some 1.2 million ounces over a projected LOM in excess of 7 years
  • 12. 1212 ROBUST PROJECT ECONOMICS GOLD PRICE SENSITIVITY ANALYSIS Base Case Gold Price ($/oz) $1,000 $1,100 $1,200 After-tax NPV 5% ($M) $199 $262 $334 After-tax IRR (%) 38 48 58 Payback period (years) 1.7 1.5 1.3
  • 13. 13 NATOUGOU INITIAL CAPITAL EXPENDITURES Initial Capital Expenditures In millions of $ Indirect construction 13.6 Processing plant 42.3 Reagents and plant services 13.7 Infrastructure 41.8 Owner costs 15.8 EPCM costs 15.9 Resettlement action plan 8.0 Initial supplies inventory 7.2 Plant & infrastructures subtotal 158.3 Pre-stripping 42.4 Contingency 18.7 Grand Total 219.4 2016 - $10.0M 2017 - $46.0M 2018 - $163.4M
  • 14. 14 2016 2017 2018 NATOUGOU TIMETABLE Permitting process & Detailed engineering 2026 Construction & Pre-stripping 17 Commissioning, ramp-up, first gold pour and production 14
  • 15. 15 NATOUGOU– INITIAL PRODUCTION YEAR 1 YEAR 2 YEAR 3 Feed ore (t) 1,256,000 1,343,200 1,343,200 Grade (g/t) 5.93 5.59 5.65 Gold recovery (%) 93.9 93.7 93.7 Ounces (oz) 224,918 226,100 228,502 TCC ($/oz) 319 304 227 AISC ($/oz) 380 406 337 STRONG FREE CASH FLOW
  • 16. 16 PROJECT FUNDING Facility increased from $90 to $120 million - Incremental $60 million to be drawn down by June 30, 2017 ($30 million repayment due March 3, 2016) - LIBOR + 4.75% per annum - Quarterly repayments of $15 million, from first quarter of 2019 to fourth quarter of 2020 - Closing of the amended Facility is anticipated on or about March 31, 2016 Anticipated Cash Flow from Ongoing Operations Credit Facility Cash Position Sufficient Financial Resources to Bring Natougou into Production Generating cash flow $167M in cash as of December 31, 2015
  • 17. 17 NATOUGOU: AN UNDEREXPLORED PROPERTY Prior to the acquisition, Natougou had seen little near-pit or regional exploration Focus on in-fill drilling for the feasibility study in 2015 Regional and proximal exploration only commenced a few months ago 773 km2 of exploration ground Objective is to expand reserves and resources to further improve economics
  • 18. 18 EXPLORATION POTENTIAL - OPEN IN ALL DIRECTIONS Grade x thickness plan view
  • 20. 20 PROXIMAL AND REGIONAL EXPLORATION PROGRAM : $6M IN 2016  Airborne geophysical surveying - 2015  20,000 meters of RC drilling  6,000 meters of core drilling – continuity of footwall & sector west  60,000 meters of auger drilling 2016
  • 21. 21 21 NABANGA: A THIRD HIGH-GRADE DEPOSIT Nabanga –Inferred Mineral Resource (1) Cut-off Grade Tonnes Grade Ounces 5.0 g/t Au 1.84 Mt 10.0 g/t Au 590,000 oz (1) Inferred Mineral Resource figures at a 5.0 g/t Au cut-off grade. NI 43-101 report, June 2015 .
  • 22. 22 PROSPECTIVE PROPERTIES ON THE SOUTH HOUNDÉ BELT
  • 23. 23 Côte d’Ivoire Highly mineralised greenstone belts Korhogo Project Along strike from Tongon Mine - priority targets EXPLORATION UPSIDE: ACQUIRED PERMITS IN CÔTE D’IVOIRE Korhogo Permit /Application Korhogo East Application Korhogo West Permit Target Corridor Fapoha South (Randgold) Fapoha North (Randgold) Gold Mine Gold Deposits Target Corridor
  • 24. THE GRADE MAKING 24 2016 PRIORITIES NATOUGOU  Completing detailed engineering in Q4  Completing the permitting process and starting construction by year-end  Exploration with the aim of increasing reserves and resources to further improve economics MANA  Delivering our production and cost guidance for a ninth consecutive year  Exploration within trucking distance of the Mine
  • 25. 25 National Workforce Development Program - Training of promising national employees for management or trainer posts SEMAFO Foundation - Six years of activities bolster our ability to establish strong relations with communities Training – 10,000 hours of training were dispensed in 2014, of which 75% benefited our Burkinabe employees Strong Safety Record - Accident frequency rate of 1.88 per 200,000 hours worked as of December 31, 2015