All information included in this presentation, including any information as to Terangaâs future financial or operating performance and other statements that express managementâs
expectations or estimates of future performance, other than statements of historical fact, constitute forward-looking information or forward-looking statements within the meaning of
applicable securities laws and are based on expectations, estimates and projections as of the date hereof. Forward-looking statements are included for the purpose of providing
information about managementâs current expectations and plans relating to the future. Wherever possible, words such as âplansâ, âexpectsâ, âscheduledâ, âtrendsâ, âindicationsâ,
âpotentialâ, âestimatesâ, âpredictsâ, âanticipateâ, âto establishâ, âbelieveâ, âintendâ, âability toâ, or statements that certain actions, events or results âmayâ, âcouldâ, âwouldâ, âmightâ,
âwillâ, or are "likely" to be taken, occur or be achieved, or the negative of these words or other variations thereof, have been used to identify such forward-looking information.
Specific forward-looking statements include, without limitation, all disclosure regarding future results of operations, economic conditions and anticipated courses of action.
Although the forward-looking statements contained herein reflect management's current beliefs and reasonable assumptions based upon information available to management as
of the date hereof, Teranga cannot be certain that actual results will be consistent with such forward-looking information. Such assumptions include, among others, the ability to
obtain any requisite governmental approvals, the accuracy of mineral reserve and mineral resource estimates, gold price, exchange rates, fuel and energy costs, future economic
conditions, anticipated future estimates of free cash flow, and courses of action. Teranga cautions you not to place undue reliance upon any such forward-looking statements.
The risks and uncertainties that may affect forward-looking statements include, among others, the inherent risks involved in exploration and development of mineral properties,
including government approvals and permitting, changes in economic conditions, changes in the worldwide price of gold and other key inputs, changes in mine plans and other
factors, such as project execution delays, many of which are beyond the control of Teranga. For a more comprehensive discussion of the risks faced by Teranga, and which may
cause the actual financial results, performance or achievements of Teranga to be materially different from estimated future results, performance or achievements expressed or
implied by forward-looking information or forward-looking statements, please refer to Terangaâs latest Annual Information Form filed with Canadian securities regulatory authorities
at www.sedar.com or on Terangaâs website at www.terangagold.com. The risks described in the Annual Information Form (filed and viewable on www.sedar.com and on
Terangaâs website at www.terangagold.com) are hereby incorporated by reference herein. Teranga disclaims any intention or obligation to update or revise any forward-looking
statements whether as a result of new information, future events or otherwise, except as required by applicable law. Nothing herein should be construed as either an offer to sell
or a solicitation to buy or sell Teranga securities.
All references to Teranga include its subsidiaries unless the context requires otherwise. This presentation contains references to Teranga using the words âweâ, âusâ, âourâ and
similar words and the reader is referred to using the words âyouâ, âyourâ and similar words. All dollar amounts stated are denominated in U.S. dollars unless specified otherwise.
4. 4
Deep Value Based on Cash and 2P Reserves
(C$)
Gold Price per Ounce Assumption
Cash balance as at March 31, 2018
Wahgnion Project NPV5% based on 2P(1)
Sabodala NPV5% based on 2P(2)
$5.25
$1.45
$0.72
$1,300
$5.37
TGZ Current
Share Price
(closing price
May 10, 2018)
$7.42
NPV* Per Share
based on cash &
2P reserves(1)(2)
Excludes potential value from:
⢠Wahgnion infill drill program
⢠Golden Hill
⢠Afema and CĂ´te dâIvoire assets
*Refer to Appendix â Non-IFRS Performance Measures
Refer to Appendix â Endnotes (1) and (2)
USD/CAD FX rate 0.79
5. Senegal
CĂ´te dâIvoire
Burkina Faso
Mali
Guinea
Guinea-
Bisseau
The Gambia
Ghana
Benin
Niger
Sierra
Leone
Liberia
Togo
Sabodala Gold Mine
⢠Long-life mine
⢠More than 1.4Moz production
since late 2010
5
Wahgnion Development Project
⢠Expect to close financing and
commence construction in Q2 2018
⢠Reserve update expected by mid-year
Golden Hill Exploration JV
⢠Initial resource expected in 2018
⢠Fully funded to feasibility
Gourma
Exploration
JV
Guitry
Dianra
Mahepleu
Tiassale
Sangaredougou
Building a Multi-Asset Mid-Tier Gold Producer in Mining-Friendly West Africa
Teranga has nearly
4.0 million ounces of
gold reserves from
its Sabodala Gold Mine
and its Wahgnion
Development Project(1)(2)
Afema
Refer to Appendix â Endnotes (1) and (2)
6. Achieved record
production of
233,267 oz
of gold
Announced positive
feasibility for
Wahgnion Project
including reserves
of 1.2Moz(1)
Positive drill results
from Golden Hill
Entered into joint
venture on Afema
land package in
CĂ´te dâlvoire
FY2017 Highlights
6
ď ď ďď
Refer to Appendix â Endnote (1)
7. 7
ď
Prospectors & Developers Association of Canada
2017 Environmental & Social Responsibility Award
United Nations Global Compact
Network Canada Sustainability Award
3X Winner of Corporate Knights Future 40
Responsible Corporate Leaders in Canada
Capital Finance International: Best ESG
Responsible Mining Management West Africa
Leading With Our Social License
ď
ď
ď
11. 11
Solid Start to Terangaâs Second Mine â Wahgnion
Nogbele
Stinger
15km from plant
Samavogo
25km from plant
Fourkoura
6km from plant
Life of Mine Summary
Initial
5.5 years
LOM
(9 years)
Annual production(4)(5) 131koz 119koz
All-in Sustaining Costs* $807/oz $843/oz
Total free cash flow* $302M $409M
Pre-production capital** ($232M)
Net cash flow $176M
*Refer to Appendix â Non-IFRS Performance Measures
**Pre-production capital costs of $232 million excludes $12 million in construction readiness activities
spent prior to major construction
Refer to Appendix â Endnotes (1), (4), (5) and (10)
1.2Moz
2P
Reserves(1)
1.8Moz
M&I
Resources(10)
0.7Moz
Inferred
Resources(10)
Wahgnion Development Project
Permitted mining license: 89 km2
Exploration licenses:+1,000 km2
Four initial deposits at Wahgnion
(Nogbele, Samavogo, Fourkoura
& Stinger) located in close proximity
to proposed plant site
Proposed
Processing Plant
12. Kafina West
Raul
Hillside
12
Significant Upside Potential at Wahgnion
Samavogo
Nogbele
Fourkoura
Stinger
Bagu Sud
Korindougou
Ouahiri
Sud
Near-Term Upside: Mid-2018 Reserve Update
⢠73,000-metre infill drill program targeted inferred
resources located near to the current reserve pits
⢠Objective is to increase drill hole density within the
existing inferred resources
⢠Targeting to convert 25%-50% of inferred resources
Mid to Long-Term Upside: ~12 Drill-Ready Targets
⢠Targets have potential to become resources and are
within trucking distance of proposed plant site
⢠Konatvogo: 2,000-metre NW-trending anomaly
between Fourkoura and Nogbele deposits. Up to
21.6 g/t Au from altered shear-hosted quartz vein
outcrops
⢠Bassongoro: 1,500-metre NNE-trending soil and
auger anomaly (up to 15g/t Au). Intersection of
regional Nianka and Fourkoura structures undrilled
Raul
Proposed Plant Site
Kondandougoug
Konatvogo
Bazogo
Bassongoro
Samavogo North
MuddhiPetit Colline
Reserve Deposits
Exploration Targets
14. 14
Sources
š Semafo Corporate Presentation (Mar 2017)
² Roxgold Corporate Presentation (Feb 2017)
Âł Endeavour Corporate Presentation (Feb 2017)
â´ Acacia Preliminary Results (Feb 2017)
âľ Savary Corporate Presentation (Mar 2017)
M&I Resources are inclusive of P&P Reserves
Uniquely Positioned: High-Grade, Big Potential Siou Pit
M&I: 0.89 Moz š
Mana
M&I: 3.63 Moz š
HoundĂŠ
M&I: 2.55 Moz Âł
Yaramoko
M&I: 0.81 Moz ²
Acacia JVs â´
Karankasso JV
Inf: 0.67 Moz âľ
South HoundĂŠ JV
Inf: 2.10 Moz â´
Sarama Permits
Terangaâs
Golden Hill
JV
Situated in the Heart of the HoundĂŠ Belt (Burkina Faso)
⢠468 km2 situated ~250 km NE of Wahgnion
⢠One of the most prospective gold belts in the world
⢠In close proximity and along strike to other deposits
One of the Best High-Grade Projects in West Africa
⢠Plan to release an initial resource for Golden Hillâs
most advanced prospects by end of 2018
⢠$25 million financing secured for the future
advancement of Golden Hill feasibility study
Joint Venture with Boss Resources (51%, earning 80%)
⢠Teranga, as the operator, can earn an 80% interest
in the JV upon delivery of a feasibility study and
the payment of AUD2.5 million
15. 15
Five Prospects Within ~6-Kilometre Radius of Central Point
⢠In just one year, there have been three discoveries at
Golden Hill
⢠To date Golden Hill has produced a series of high-grade,
near-surface drill results at the first five prospects:
â Ma
â Jackhammer Hill
â Peksou
â C-Zone
â Nahiri
⢠The close proximity of these targets
and prospects lends itself to a central
mill/multi-deposit operation similar to
Sabodala and Wahgnion
For full details on Golden Hill, please visit www.terangagold.com
Rapidly Progressing Towards an Initial Resource
GEOLOGY
Tarkwaian Type Sediments
Volcano Sediments
Mixed Volcano Sediments & Volcanics
Basalt
Grantoid
Batholith
Ma North
Ma Main
Ma East
Jackhammer Hill
PeksouC-Zone
B-Zone
A-Zone
Nahiri
17. Guitry
⢠Completed the first-ever drilling program on the
property
â 68 shallow air-core sectional profile holes
â comprising 3,300 metres over the central
1 km extent of our current 7 km strike
length gold-in-soil geochem anomaly
⢠Results from this first pass, near-surface drilling
program, will help us determine where to focus
subsequent exploration within this large target
Endeavour
Endeavour
Perseus
Randgold
CĂ´te dâIvoire
Guitry
Tiassale
Mahepleu
Sangaredougou
Operating Gold Mine/ Development Project
Newcrest
Dianra
17
Afema
Exciting Opportunities in CĂ´te dâIvoire
18. Ahafo
17 Moz
Newmont
3 Afema
Exploration
Permits
Afema
Mining Permit
Bibiani
7 Moz
Resolute
Chirano
5 Moz
Kinross
Edikan
6.6 Moz
Perseus
Bogoso/Prestea18
Moz Gold Star
Konogo
1.4 Moz
Signature Metals
Akyem
Newmont
Essase
5.19 Moz
Obotan
5.5 Moz
Asanko
Obuasi 41 Moz
Anglo Gold Ashanti
Kubi 0.9 Moz
Asaute Gold Corporation
Damang 7.1 Moz
Goldfields
Tarkwa 24 Moz
Iduapriem
8.2 Moz
AngloGold Ashanti
Kumasi
Cape Coast
Sefwi-Bibiani
Gold Belt
Asankrangwa
Gold Belt
Ashanti
Gold Belt
Winneba-Kibi
Gold Belt
18
Afema: Historical Resource* of 2Moz of Gold
Well Located Geologically
⢠Along trend and within the same gold belts
of a number of high profile producing mines
in Ghana
Q1 2018 Activities
⢠Finalized Afema joint venture with Sodim
Limited (51%, earning 70%)
⢠Initiated early-stage field exploration at both
the mine license and regional land package
totaling 1,400 km2
*Refer to Appendix â Afema Mine License Historical Resource Estimate
Ghana
CĂ´te dâIvoire
19. Afema Joint Venture
19
Afema
Mine License
Afema
Exploration
Permit
Afema
Exploration
Permit Afema
Exploration
Permit
AyamĂŠ Gold Horizon
(33k Strike Length)
Bafla Gold Horizon
(34 km Strike Length)
Sefwi-Bibiani Gold Belt
(34 km Strike Length)
Asankrangwa Gold Belt
(30 km Strike Length)
Andina Gold Horizon
(13 km Strike Length)
Next Steps
⢠Compile and review previous
technical data to assist in guiding
exploration programs
⢠Re-model historic resources to
identify areas for initial drilling
evaluation
⢠Anticipate initiation of a property-
wide stream-sediment BLEG
sampling program, soil sampling
and drilling during Q2 2018
21. 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
~$100M annual free cash flow* (11)
Significantly Increasing Production and Improving Free Cash Flow
21*Refer to Appendix â Non-IFRS Performance Measures
Refer to Appendix â Endnotes (3), (4), (5), (7) and (11)
Teranga Consolidated Production Profile (koz)(3),(4),(7)
350Koz
~$70M annual free cash flow*(5)
2020 â 2022
Sabodala + Wahgnion
~350Koz annual
production
Opportunities to maintain
production and free cash flow
through resource conversion &
discoveries at Sabodala &
Wahgnion
22. Strong Financial Position
22
$60 Million
Cash balance
as at March 31, 2018
+$90 Million(6)
Estimated cash flow from
Sabodala 2018-2019
$190 Million
Wahgnion Project debt +
Golden Hill facility
Solid Financial
Position
to optimize our Sabodala
Operations, bring Wahgnion
into production and to advance
Golden Hill through feasibility
Refer to Appendix â Endnote (6)
23. Top 10 Shareholders
% of o/s
shares
Shares Owned
as at May 10, 2018
1 Tablo Corporation 21.7% 23,322,400
2 Van Eck Associates Corporation 6.2% 6,683,022
3 Ruffer LLP 4.8% 5,176,743
4 Heartland Advisors 4.1% 4,350,000
5 Oppenheimer Funds 3.2% 3,380,828
6 Dimensional Fund Advisors 2.9% 3,100,539
7 Franklin Advisers 2.5% 2,707,200
8 Connor, Clark & Lunn Inv Mgmt 1.8% 1,875,000
9 Universal-Investment Gesellschaft 1.6% 1,735,000
10 LSV Asset Management 1.6% 1,719,540
23
Share Price Performance (TSX: TGZ)
(Closing price on December 12, 2017 â May 10, 2018)
Capital Structure and Recent Share Price Performance
Source: IR Insight on May 10, 2018
+6%
+12%
TGZ-TSX
GDXJ
Gold Price
Capital Structure (at March 31, 2018 unless otherwise noted)
Common shares outstanding 107.3M
Stock options outstanding 5.7M
Fully diluted 113.0M
Number of shares owned by insiders 23.8M
Market capitalization (May 10, 2018) C$576M
Cash / Net cash US$60M / US$45M
ASX Delisting
Completed Compulsory Sale Facility before markets open
on December 13 â stock price hit low of C$2.30
(compared to C$2.42 closing price on December 12)
+122%
24. Regular exploration updates
Initial resource estimations by year end
Golden HillSabodala
Production of 210Koz-225Koz
2018 News Flow and Milestones
24
Commence mill construction in Q2
Update resources in Q2
Update reserves in Q3
Update NI 43-101 technical report
Project updates from Guitry and Afema
Wahgnion CĂ´te dâIvoire
25. Potential for Significant Share Price Appreciation
25
Terangaâs Share Price (C$)
vs. Net Present Value* (NPV)(12) per Share
57%
*Refer to Appendix â Non-IFRS Performance Measures
Refer to Appendix â Endnote (12)
$5.37
$7.02
$8.42
Share Price
(May 10, 2018 close)
BMO NPV per Share
(Spot)
Revalued Share Price
0.9x
Current TGZ
NPV Trading
Multiple(12)
1.2x
Average NPV Multiple
for Medium
Producers(12)
Data Source: BMO GoldPages published May 7, 2018
617
609
350
339
287
165
143
88
Roxgold
B2Gold
Semafo
Golden Star
Endeavour
Teranga
Alacer
Perseus
EV/2P Reserves ($/oz)
EV/2018E EBITDA
3.3
3.4
4.2
5.1
5.8
5.9
29.5
Golden Star
Roxgold
Teranga
B2Gold
Semafo
Endeavour
Alacer
27. 2018 Outlook
27
Notes to 2018 Guidance
A. 22,500 ounces of gold production are to be sold to Franco-Nevada Corporation
at 20% of the spot gold price.
B. Total cash cost per ounce sold is a non-IFRS financial measure and does not
have a standard meaning under IFRS.
C. All-in sustaining costs per ounce is a non-IFRS financial measure and does not
have a standard meaning under IFRS. All-in sustaining costs per ounce sold
include total cash costs per ounce, administration expenses, share based
compensation and sustaining capital expenditures as defined by the World
Gold Council. All-in sustaining costs also include cash / (non-cash) inventory
movements and non-cash amortization of advanced royalties.
D. Exploration and evaluation costs includes both Expensed Exploration, primarily
attributable to exploration work on exploration permits, and Capitalized
Reserve Development, which is work performed on Mine Licenses.
E. Site development costs for 2018 include village relocation costs for the
Sabodala village.
F. Excludes capitalized deferred stripping costs, included in mine production
costs.
G. Construction readiness / early works expenditures for 2018 includes
anticipated expenditures for the construction of the Wahgnion Gold Project
prior to completion of a debt facility agreement.
Other
This forecast financial information is based on the following material assumptions
for 2018: gold price: $1,250 per ounce; light fuel oil price $0.87/L; heavy fuel oil
price $0.50/L; Euro:USD exchange rate of 1:1.17
Other important assumptions: any political events are not expected to impact
operations, including movement of people, supplies and gold shipments; grades
and recoveries will remain consistent with the life-of-mine plan to achieve the
forecast gold production; and no unplanned delays in or interruption of scheduled
production.
2018
Guidance
Operating Results
Ore mined (â000t) 2,000 â 2,500
Waste mined (â000t) 35,000 â 37,000
Total mined (â000t) 37,000 â 39,500
Grade mined (g/t) 2.50 â 3.00
Strip ratio waste/ore 16.5 â 18.5
Ore milled (â000t) 4,200 â 4,400
Head grade (g/t) 1.70 â 1.90
Recovery rate % 90.0 â 91.5
Gold produced A
(oz) 210,000 â 225,000
Cost of sales per ounce sold $/oz sold 950 â 1,025
Total cash cost per ounce sold B
$/oz sold 700 â 750
All-in sustaining costs C
$/oz sold 1,000 â 1,075
Cash / (non-cash) inventory movements and amortized advanced royalty
costs C $/oz sold -50
All-in sustaining costs (excluding cash / (non-cash) inventory movements
and amortized advanced royalty costs) C $/oz sold 950 â 1,025
Mining ($/t mined) 2.25 â 2.50
Mining long haul ($/t hauled) 2.50 â 3.50
Milling ($/t milled) 11.00 â 12.50
General and Administration ($/t milled) 4.25 â 4.50
Mine Production Costs $ millions 162.0 â 172.0
Corporate Administration Expense $ millions 11.0 â 13.0
Regional Administration Costs $ millions ~2.0
Community Social Responsibility Expense $ millions 4.0 â 5.0
Exploration and Evaluation D
$ millions ~15.0
Sabodala Capital Expenditures
Mine site sustaining $ millions 10.0 â 15.0
Site development costs E
$ millions 10.0 â 15.0
Total Sabodala Capital Expenditures F
$ millions 20.0 â 30.0
Growth Capital Expenditures
Wahgnion early works G
$ millions ~30.0
Wahgnion construction H
$ millions 140.0 â 160.0
Total Growth Capital Expenditures $ millions 170.0 â 190.0
28. 2828
Ma Prospect â Representative Drill SectionMa Prospect â Drill Plan
Excellent Grades Near Surface and to Depth at Ma Structural Complex
29. High-Grade, All Along Strike at Jackhammer Hill Prospect
29
Jackhammer Hill Prospect â Representative Drill SectionJackhammer Hill Prospect â Drill Plan
30. Executive Team
30
Richard Young, CPA
President & CEO
25+ years experience in gold mining
including 13 years at Barrick Gold including
finance and corporate development
Paul Chawrun, P.Eng, MBA
Chief Operating Officer
25+ years experience in mining including
serving as Director, Technical Services
at Detour Gold
Navin Dyal, CPA
Chief Financial Officer
13 years experience in mining including 7
years at Barrick Gold as Head of Finance
in copper business unit
David Savarie, LL.B
General Counsel & Corporate Secretary
11 years of Corporate Counsel experience
in mining including his role as Deputy
General Counsel and Corporate Secretary
of Gabriel Resources
Aziz Sy, P.Eng, M.Sc., MBA
General Manager, SGO
17+ years experience in managing gold
exploration projects, including his work as
Vice President Senegal Operations for the
Oromin Joint Venture Group until its
acquisition in 2014 by Teranga Gold
Sepanta Dorri, MAcc, MBA, CPA
VP, Corporate and Stakeholder Development
10 years experience in mining including 5 years at
Xstrata Nickel in Strategic Planning and M&A.
2012 winner of the WXN Top 100 Canada's Most
Powerful Women award, Trailblazers and
Trendsetters Category
David Mallo, B.Sc. Geology
VP, Exploration
35+ years of mineral exploration in project
evaluation and program management, playing
an integral role in acquisition, discovery, and
exploration of world-class deposits including
Eskay Creek and Cobre Panama
31. Alan Hill, M.Eng
Chairman
35+ years experience in
mining including 20 years at
Barrick Gold in project
evaluation and development
Christopher Lattanzi, B.Eng
Director
30 years experience in mining
property valuation, scoping, feasibility
studies and project monitoring on a
global basis. Founder of Micon
International
Richard Young, CPA
President & CEO
25+ years experience in gold
mining including 13 years at
Barrick Gold in finance and
corporate development
Jendayi Frazer, Ph.D.
Director
17 years experience in key roles
supporting initiatives and policies
to build Africaâs equity and commodity
markets. First woman U.S. Ambassador
to South Africa
William Biggar, MA, CPA
Director
25+ years experience in senior
executive positions in investment,
mining and real estate including
Barrick Gold and Merrill Lynch
Edward Goldenberg, MA, BCl
Director
Distinguished career in policy including
10 years as Senior Policy Advisor to the
Prime Minister of Canada and the Prime
Minister's Chief of Staff in 2003. Honourary
Doctorate of Laws from McGill University
David Mimran
Director & Terangaâs Largest Shareholder
CEO of Grands Moulins dâAbidjan and
Grands Moulins de Dakar, among the
largest producers of agri-food in West
Africa. Special Advisor to the Government
of the Republic of CĂ´te d'Ivoire
Alan Thomas, CPA
Director
30+ years mining and energy
industry experience in senior
financial and director roles including
6 years as VP and CFO of ShawCor
and 11 years as CFO of Noranda
Frank Wheatley, LL.B
Director
28 years mining industry experience as
director, senior officer and legal counsel.
Extensive experience in public financing,
project debt financing, permitting of large-
scale mining projects and strategic M&A
Board of Directors
31
32. Qualified Persons Statement
32
The technical information contained in this document relating to the Sabodala open pit mineral reserve estimates is based on, and fairly represents, information compiled by Mr. Stephen Ling, P. Eng who is a member of the Professional
Engineers Ontario. Mr. Ling is a full time employee of Teranga and is not "independent" within the meaning of NI 43-101. Mr. Ling has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a "Qualified Person" under NI 43-101 Standards of Disclosure for Mineral Projects. Mr. Ling has consented to the inclusion in this document of the matters based on his compiled
information in the form and context in which it appears in this document.
The technical information contained in this document relating to Sabodala mineral resource estimates is based on, and fairly represents, information compiled by Ms. Patti Nakai-Lajoie. Ms. Nakai-Lajoie, P. Geo., is a Member of the Association
of Professional Geoscientists of Ontario. Ms. Nakai-Lajoie is a full time employee of Teranga and is not "independent" within the meaning of NI 43-101. Ms. Nakai-Lajoie has sufficient experience which is relevant to the style of mineralisation
and type of deposit under consideration and to the activity which she is undertaking to qualify as a "Qualified Person" under NI 43-101 Standards of Disclosure for Mineral Projects. Ms. Nakai-Lajoie has consented to the inclusion in this
document of the matters based on her compiled information in the form and context in which it appears in this document.
The technical information contained in this document relating to the Sabodala underground ore reserves estimates is based on, and fairly represents, information compiled by Jeff Sepp, P. Eng., of Roscoe Postle Associates Inc. (âRPAâ), who is
a member of the Professional Engineers Ontario. Mr. Sepp is âindependentâ within the meaning of NI 43-101. Mr. Sepp has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity he is undertaking to qualify as a âQualified Personâ under NI 43-101 Standards of Disclosure for Mineral Projects. Mr. Sepp has consented to the inclusion in this document of the matters based on his compiled information in the form
and context in which it appears in this document.
The technical information contained in this document relating to the Wahgnion open pit mineral reserve estimates is based on, and fairly represents, information compiled by Mr. Glen Ehasoo, P. Eng., of RPA, who is a member of the Association
of Professional Engineers and Geoscientists of British Columbia. Mr. Ehasoo is "independent" within the meaning of NI 43-101. Mr. Ehasoo has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a âQualified Personâ under NI 43-101 Standards of Disclosure for Mineral Projects. Mr. Ehasoo has consented to the inclusion in this document of the matters based on his
compiled information in the form and context in which it appears in this document.
The technical information contained in this document relating to Wahgnion mineral resource estimates is based on, and fairly represents, information compiled by Mr. David Ross, P.Geo., of RPA, who is a Member of the Association of
Professional Geoscientists of Ontario. Mr. Ross is "independent" within the meaning of NI 43-101. Mr. Ross has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity
which he is undertaking to qualify as a âQualified Personâ under NI 43-101 Standards of Disclosure for Mineral Projects. Mr. Ross has consented to the inclusion in this document of the matters based on his compiled information in the form and
context in which it appears in this document.
Teranga's exploration programs are being managed by Peter Mann, FAusIMM. Mr. Mann is a full time employee of Teranga and is not "independent" within the meaning of NI 43-101. Mr. Mann has sufficient experience which is relevant to the
style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a âQualified Personâ as under NI 43-101 Standards of Disclosure for Mineral Projects. The technical information contained in
this document relating to exploration results are based on, and fairly represents, information compiled by Mr. Mann. Mr. Mann has verified and approved the data disclosed in this release, including the sampling, analytical and test data
underlying the information. The samples are prepared at site and assayed in the SGS laboratory located at the site. Analysis for diamond drilling is sent for fire assay analysis at ALS Johannesburg, South Africa. Mr. Mann has consented to the
inclusion in this document of the matters based on his compiled information in the form and context in which it appears in this document.
Teranga's disclosure of mineral reserve and mineral resource information is governed by NI 43-101 under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") Standards on Mineral Resources and
Mineral Reserves, adopted by the CIM Council, as may be amended from time to time by the CIM ("CIM Standards"). There can be no assurance that those portions of mineral resources that are not mineral reserves will ultimately be converted
into mineral reserves.
Teranga confirms that it is not aware of any new information or data that materially affects the information included in the technical reports for the Sabodala Project (August 30, 2017) and the Wahgnion Project (October 20, 2017) pursuant
to National Instrument 43-101 - Standards of Disclosure for Mineral Projects (the âTechnical Reportsâ), or year end 2017 results, market announcements and, in the case of estimates of Mineral Resources, that all material assumptions and
technical parameters underpinning the estimates in the relevant market announcements concerning the Technical Reports continue to apply and have not materially changed.
33. 33
Non-IFRS Performance Measures
The Company has included non-IFRS measures in this document, including âtotal cash costsâ, âtotal cash costs per ounce soldâ, âall-in sustaining costsâ (âAISCâ), âAISC (excluding cash / (non-cash) inventory movements
and amortized advanced royalty costs)â, âAISC per ounceâ, âAISC (excluding cash / (non-cash) inventory movements and amortized advanced royalty costs) per ounceâ, âaverage realized gold priceâ, âearnings before
interest, taxes, depreciation and amortizationâ (âEBITDAâ), âfree cash flowâ, âadjusted net profit attributable to shareholdersâ and âadjusted basic earnings per shareâ. These measures are intended to provide additional
information only and do not have any standardized definition under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measures are
not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate these measures differently.
âTotal cash costsâ figures are calculated in accordance with a standard developed by The Gold Institute, which was a worldwide association of suppliers of gold and gold products and included leading North American
gold producers. The Gold Institute ceased operations in 2002, but the standard is considered the accepted standard of reporting cash cost of production in North America. Adoption of the standard is voluntary and the
cost measures presented may not be comparable to other similarly titled measure of other companies. âTotal cash costs per ounce soldâ is a common financial performance measure in the gold mining industry but has
no standard meaning under IFRS. The Company reports total cash costs on a sales basis. The World Gold Council (âWGCâ) definition of AISC seeks to extend the definition of total cash costs by adding corporate
general and administrative costs, reclamation and remediation costs (including accretion and amortization), exploration and study costs (capital and expensed), capitalized stripping costs and sustaining capital
expenditures and represents the total costs of producing gold from current operations. AISC excludes income tax payments, interest costs, costs related to business acquisitions and items needed to normalize earnings.
Consequently, this measure is not representative of all of the Companyâs cash expenditures. In addition, the calculation of AISC does not include depreciation expense as it does not reflect the impact of expenditures
incurred in prior periods. Therefore, it is not indicative of the Companyâs overall profitability. The Company also expands upon the WGC definition of AISC by presenting an additional measure of âAISC (excluding cash /
(non-cash) inventory movements and amortized advanced royalty costs)â. This measure excludes cash and non-cash inventory movements and amortized advanced royalty costs which management does not believe to
be true cash costs and are not fully indicative of performance for the period. For Sabodala and Wahgnion, life of mine total cash costs and AISC figures used in this presentation are before cash/non-cash inventory
movements and exclude any allocation of corporate overheads. Consolidated total cash costs and all-in sustaining cost figures add corporate overhead costs.
âAverage realized priceâ excludes from revenues unrealized gains and losses on non-hedge derivative contracts. Management uses this measure to better understand the price realized in each reporting period for gold
and silver sales.
âEBITDAâ excludes income tax, finance costs (before accretion expense), interest income, depreciation and amortization, and non-cash impairment charges from net profits. EBITDA is intended to provide additional
information to investors and analysts and do not have any standardized definition under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.
Management believes that EBITDA is a valuable indicator of our ability to generate liquidity by producing operating cash flow to: fund working capital needs, service debt obligations, and fund capital expenditures.
âFree cash flowâ is calculated as net cash flow provided by operating activities less sustaining capital expenditures. The Company believes this to be a useful indicator of our ability generate cash for growth initiatives.
Starting in 2018, the Company adopted âadjusted net profit attributable to shareholdersâ and âadjusted basic earnings per shareâ as new non-IFRS financial measures. These non-IFRS financial measures are used by
management and investors to measure the underlying operating performance of the Company. Presenting these measures from period to period will help management and investors evaluate earnings trends more
readily in comparison with results from prior periods. The Company calculates âadjusted net profit attributable to shareholdersâ as net profit attributable to shareholders adjusted to exclude specific items that are
significant, but not reflective of the underlying operations of the Company, including: the impact of unrealized and realized foreign exchange gains and losses, gains and losses on derivative instruments, accretion
expense on long-term obligations, impairment provisions and reversals thereof, and other unusual or non-recurring items. âAdjusted basic earnings per shareâ is calculated using the weighted average number of shares
outstanding under the basic method of earnings per share as determined under IFRS.
For more information regarding these measures, please refer to the Companyâs managementâs discussion and analysis accessible on the Companyâs website at www.terangagold.com.
34. 34
A number of economic and technical studies have been prepared on the Afema project prior to Terangaâs entry into the Afema JV with Sodim. The most recent study, which included a mineral
resource estimate for the Afema mine license, was issued by RockRidge Consulting Services Geologists for and on behalf of TGL and is dated as of June 27, 2016 (the âJune 2016 Historical
Estimateâ). The June 2016 Historical Estimate includes an Indicated oxide resource estimate of 110Koz (comprised of 2.7Mt at an average grade of 1.26 g/t Au) and Inferred oxide resources of
122Koz (comprised of 3.0Mt at an average grade of 1.26 g/t Au). In addition, it includes an Indicated transitional resource estimate of 59Koz (comprised of 1.3Mt at an average grade of 1.39 g/t Au)
and an Inferred transitional resource of 28Koz (comprised of 0.8Mt at an average grade of 1.11 g/t Au). Finally, the June 2016 Historical Estimate provides a sulphide resource estimate as follows:
865Koz Indicated ounces (comprised of 17.3Mt at an average grade of 1.55 g/t Au) and 806Koz inferred ounces (comprised of 17.8Mt at an average grade of 1.40 g/t Au). This historical estimate is
reported as using a cut-off grade of 0.5 g/t Au.
RockRidge further states that it reviewed the geological and grade continuity to supplement the review of data quality in order to confirm the CIM mineral resource classification categories used. As
well, the June 2016 Historical Estimate states the following with respect to the basis of the mineral resource estimate:
⢠mineralized volumes were received for oxide, transitional and sulphide modelled volumes;
⢠gold grades were determined using ordinary kriging and Inverse distance squared interpolation (depending on data density) into a 3-dimensional block model constrained by
mineralization wireframes;
⢠the block models comprised sub-celled block dimensions of 5m x 5m x 1m and 5m x 5m x 2m (depending on data sampling interval);
⢠mineralized wireframes were truncated to the topographic surface reflecting the mining that had previously occurred on the property;
⢠gold values were investigated for outlier values and put though two statistical capping/cutting routines;
⢠Datamine Studio 3 was the modelling package; and
⢠relationship between geology and preliminary mining and economic factors was taken into account at all times.
Teranga considers the June 2016 Historical Estimate to be a âhistorical estimateâ as defined under NI 43-101 and relevant as the most recent resource estimate on the Afema project. Further
drilling, resource modelling and updates to key economic assumptions would be required to upgrade or verify these historical estimates as current mineral resources and accordingly they should be
relied upon only as a historical resource estimate. A Qualified Person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves and Teranga is
not treating the historical estimate as current mineral resources or mineral reserves.
Afema Mine License Historical Resource Estimate
35. Endnotes
35
1. Refers to proven and probable reserves of 1.2Moz for the Wahgnion project as per reserve estimate as of September 7, 2017 included in the Wahgnion technical report dated October 20, 2017 available on the
Companyâs website at www.terangagold.com and SEDAR at www.sedar.com.
2. Refers to proven and probable reserves of 2.7Moz for the Sabodala project as per reserve estimate as of June 30, 2017 included in the Sabodala NI 43-101 technical report dated August 30, 2017 available on
the Companyâs website at www.terangagold.com and SEDAR at www.sedar.com.
3. This production target is based on proven and probable reserves only from Terangaâs Sabodala Project as at June 30, 2017. For more information regarding Teranga Goldâs Mineral Reserves and Resources and
related notes, please refer to the NI 43-101 compliant technical report for the Sabodala Project dated August 30, 2017 available on the Companyâs website at www.terangagold.com and on SEDAR at
www.sedar.com.
4. This production target is based on proven and probable ore reserves only for Terangaâs Wahgnion Project as at September 7, 2017. For more information regarding the Wahgnionâs Mineral Reserves and
Resources and related notes, please refer to the NI 43-101 compliant technical report for the Wahgnion Project dated October 20, 2017 accessible on the Companyâs website at www.terangagold.com and on
SEDAR at www.sedar.com.
5. LOM assumptions include: Gold Price $1,250 per ounce
Heavy Fuel Oil (HFO): Wahgnion - $0.59 per litre; Sabodala - $0.46 per litre
Light Fuel Oil (LFO): Wahgnion - $1.04 per litre ($0.88 per litre during construction period); Sabodala - $0.81 per litre
Euro to USD Exchange Rate: $1.10
6. This Sabodala free cash flow is an estimate that is based on the updated life of mine plan and reserve estimate for the Sabodala project, as set out in the Technical Report of Teranga for the Sabodala Project,
Senegal, West Africa, dated August 30, 2017 (the âSabodala Technical Reportâ). See in particular Section 21 of the Sabodala Technical Report - Capital and Operating Costs.
7. See the NI 43-101 compliant technical report for the Wahgnion Project. This LOM production plan assumes that the Wahgnion Project plant construction will commence in Q1 2018. If the Wahgnion plant
construction commences in Q2 2018 instead, the LOM production plan is expected to shift by several months.
8. Other considerations (uses) is an estimate of potential other uses of the Companyâs cash during the period, including, but not limited to, discretionary exploration expenditures, financing costs and any cost overrun
or minimum cash requirements that might be contained in any completed debt financing agreement. Actual amounts may total more or less than the aggregate amount specified.
9. Terangaâs Sabodala Mineral Reserves and Mineral Resources estimates as at June 30, 2017. For more information regarding Sabodalaâs Mineral Reserves and Resources and related notes, please refer to the NI
43-101 compliant technical report for the Sabodala Project dated August 30, 2017 accessible on the Companyâs website at www.terangagold.com and on SEDAR at www.sedar.com.
10. Terangaâs Wahgnion Mineral Reserves and Mineral Resources estimates as at September 7, 2017. For more information regarding Wahgnionâs Mineral Reserves and Resources and related notes, please refer to
the NI 43-101 compliant technical report for the Wahgnion Project dated October 20, 2017 accessible on the Companyâs website at www.terangagold.com and on SEDAR at www.sedar.com.
11. Free cash flow excludes Wahgnion financing and corporate-wide resource development and exploration expenditures. Please see table on slide 7 of the Companyâs Investor & Analyst Workshop presentation
dated September 14, 2017, which was filed on www.sedar.com.
12. Net Present Value (âNPVâ) per share is a Non-IFRS financial measure. NPV per share, average NPV multiple of medium producers, and Terangaâs share price is as per BMO GoldPages published May 7, 2018.
According to BMO GoldPages, NPV per share is calculated using the net present value of the life of mine cash flows based on the NI 43-101 plan, less cash flow of corporate costs, less net debt per share, using
the model at SPOT commodity prices and exchange rates. The âRevalued Share Priceâ is calculated using the NPV per share at SPOT times the NPV multiples as listed. The BMO NPV calculation assumes a
US$1,345 SPOT gold price per ounce, 5% discount, 0.79 USD/CAD exchange rate.
36. Trish Moran
Head of Investor Relations
77 King Street West, Suite 2110
Toronto, ON M5K 2A1
T: +1.416.607.4507
E: investor@terangagold.com
W: terangagold.com
TSX:TGZ / OTCQX:TGCDF