START PERMISSIVE
August 9, 2015 1
 Boiler Feed Pump:
 Boiler feed pump suction valve open Feed
Back
 Dearator level Normal.
Recirculation Line valve open feed back
 Condensate Extraction pump:
 Pump Feeder Healthy .
 No pump trip signal.
 Level greater than set point.
August 9, 2015 2
 ID FANS:
 ID Fan O/L Damper close feed back .
 ID Fan I/L Damper close feed back.
 Guillotine damper open.
 ID Fan MCC no trouble.
August 9, 2015 3
 Boiler trip:
 SH#1 Metal temperature Hi-Hi.
 SH#2 Metal temperature Hi-Hi.
 Drum level less than Low-Low.
 Drum Level Greater than Hi-Hi.
 Both ID fan Trip/ Stop feedback.
TRIP CONDITION
August 9, 2015 4
 Turbine trip:
 Main steam temperature Low-Low( 480 °c).
 Temp. of Turbine thrust pads & bearing liners
Hi-Hi (100 ° C), common.
 Return Oil temp. of bearing Hi-Hi (70 °C),
common.
 Condenser pressure Hi-Hi(-0.4 kg/cm²).
 Main steam pressure Low-Low (60.95 kg/cm²).
Hot well Level Low-Low (20%).
Lube oil pressure Low-Low ((0.3 kg/cm²).
August 9, 2015 5
Protection Oil pressure Low-Low (8 kg/cm²).
Tur. Rotor Axial displacement Hi-Hi(±1.5 mm).
Differential Expansion Hi-Hi(±1.5 mm).
Turbine front shaft vibration Hi-Hi( 0.07 mm).
Turbine rear shaft vibration Hi-Hi( 0.07 mm).
Generator front shaft vibration Hi-Hi( 0.07 mm).
Generator rear shaft vibration Hi-Hi( 0.07 mm).
August 9, 2015 6
 Turbine speed Hi-Hi (3360 RPM).
 Emergency Shutdown.
 Turbine emergency Stop (PB).
 Mechanical over speed trip.
 Turbine reset Push Button.
August 9, 2015 7
Generator Trip:
 Differential Protection (5%).
 Generator Rotor Earth Protection(1 stage-
alarm/2nd
stage- trip).
 Stator Frame Temperature Operated (80 °c
alarm /100°c trip)
 Emergency Trip Push Button Operated .
 Reverse Power Protection (0.5%) .
 Generator Winding Temperature Operated
(100°C –alarm/110 °C trip).
 Backup Impedence Protection.

Incase of air cooler tube leakage.?
August 9, 2015 8
Turbine Trip Solenoid:
 Low forward power Protection (05%).
 Loss of Excitation Protection.
 Under voltage protection (Drop out 70%)
 Gen. over current protection with time delay
unit (105%, 10 sec.)
 PT fuse failure relay (Met-A, Port- Gen. Ckt
closed).
 Gen. negative phase sequency protection
(1st=7.5%,
-Alarm , 12t= 10- Trip) .
August 9, 2015 9
 Over / under frequency port ( 1st
=2 sec-Alarm,
2nd
=2 sec-Trip.
 All devices connected for Turbine.
 Gen. over current voltage restraint port.
 Gen. over voltage protection (105%=0.3 sec.-
Alarm, 110%=2 sec.- Trip.
 Under voltage protection (80%= 3 sec- Trip.).
August 9, 2015 10
 TIE CIRCUIT BREAKER TRIP:
 Over /under Frequency (1st
- Alarm+ Trip)
Negative Phase sequence ( 1st
- Alarm+ Trip).
Over voltage / under voltage protection (1st
-
Alarm+ Trip).
 Vector surge protection (1st
- Alarm + Trip).
August 9, 2015 11

More Related Content

Similar to DCS_Logic

summer training report of Iocl,haldia
summer training report of Iocl,haldiasummer training report of Iocl,haldia
summer training report of Iocl,haldiasumanscience
 
Kiln Hydraulic Thrust Device.pdf
Kiln Hydraulic Thrust Device.pdfKiln Hydraulic Thrust Device.pdf
Kiln Hydraulic Thrust Device.pdfHamedMostafa10
 
GE Jebachers Gas Engine JGS620 technical specifications
GE Jebachers Gas Engine JGS620 technical specificationsGE Jebachers Gas Engine JGS620 technical specifications
GE Jebachers Gas Engine JGS620 technical specificationsMuhammad Asif Siddiqui
 
Transformer maintenance
Transformer maintenance Transformer maintenance
Transformer maintenance Molla Morshad
 
hydroelectric power plant_overview.ppt
hydroelectric power plant_overview.ppthydroelectric power plant_overview.ppt
hydroelectric power plant_overview.pptAnonymousYoutuber2
 
steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)Billa ParameswaraRao
 
MHRC-AE-060-VS-01_Submittal_Rev._1.15.pdf
MHRC-AE-060-VS-01_Submittal_Rev._1.15.pdfMHRC-AE-060-VS-01_Submittal_Rev._1.15.pdf
MHRC-AE-060-VS-01_Submittal_Rev._1.15.pdfnamnguyen62772
 
PC200-8 Improvement.ppt excavator kelas 20ton
PC200-8 Improvement.ppt excavator kelas 20tonPC200-8 Improvement.ppt excavator kelas 20ton
PC200-8 Improvement.ppt excavator kelas 20tonmulyadiwork
 
Aph operation and emergency handling
Aph operation and emergency handlingAph operation and emergency handling
Aph operation and emergency handlingParag Agrawal
 
Marine engineering pump
Marine engineering pumpMarine engineering pump
Marine engineering pumpZeeshan Ahmed
 
Service training top therm chiller 1 6 k w-eng_01.10.2014
Service training top therm chiller 1 6 k w-eng_01.10.2014Service training top therm chiller 1 6 k w-eng_01.10.2014
Service training top therm chiller 1 6 k w-eng_01.10.2014Nickna16
 

Similar to DCS_Logic (20)

Unit protection scheme
Unit protection schemeUnit protection scheme
Unit protection scheme
 
summer training report of Iocl,haldia
summer training report of Iocl,haldiasummer training report of Iocl,haldia
summer training report of Iocl,haldia
 
Kiln Hydraulic Thrust Device.pdf
Kiln Hydraulic Thrust Device.pdfKiln Hydraulic Thrust Device.pdf
Kiln Hydraulic Thrust Device.pdf
 
GE Jebachers Gas Engine JGS620 technical specifications
GE Jebachers Gas Engine JGS620 technical specificationsGE Jebachers Gas Engine JGS620 technical specifications
GE Jebachers Gas Engine JGS620 technical specifications
 
Transformer maintenance
Transformer maintenance Transformer maintenance
Transformer maintenance
 
hydroelectric power plant_overview.ppt
hydroelectric power plant_overview.ppthydroelectric power plant_overview.ppt
hydroelectric power plant_overview.ppt
 
steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)
 
Tg & blr protect
Tg & blr protectTg & blr protect
Tg & blr protect
 
1800REOZM_8_12b
1800REOZM_8_12b1800REOZM_8_12b
1800REOZM_8_12b
 
MHRC-AE-060-VS-01_Submittal_Rev._1.15.pdf
MHRC-AE-060-VS-01_Submittal_Rev._1.15.pdfMHRC-AE-060-VS-01_Submittal_Rev._1.15.pdf
MHRC-AE-060-VS-01_Submittal_Rev._1.15.pdf
 
1250REOZM_8_12b
1250REOZM_8_12b1250REOZM_8_12b
1250REOZM_8_12b
 
Tg section eqpt details
Tg section eqpt detailsTg section eqpt details
Tg section eqpt details
 
PC200-8 Improvement.ppt excavator kelas 20ton
PC200-8 Improvement.ppt excavator kelas 20tonPC200-8 Improvement.ppt excavator kelas 20ton
PC200-8 Improvement.ppt excavator kelas 20ton
 
Aph operation and emergency handling
Aph operation and emergency handlingAph operation and emergency handling
Aph operation and emergency handling
 
Gas Turbine Power Plant.pdf
Gas Turbine Power Plant.pdfGas Turbine Power Plant.pdf
Gas Turbine Power Plant.pdf
 
1600REOZM_8_12b
1600REOZM_8_12b1600REOZM_8_12b
1600REOZM_8_12b
 
Marine engineering pump
Marine engineering pumpMarine engineering pump
Marine engineering pump
 
2000REOZM_8_12b (1)
2000REOZM_8_12b (1)2000REOZM_8_12b (1)
2000REOZM_8_12b (1)
 
1500REOZM_8_12b
1500REOZM_8_12b1500REOZM_8_12b
1500REOZM_8_12b
 
Service training top therm chiller 1 6 k w-eng_01.10.2014
Service training top therm chiller 1 6 k w-eng_01.10.2014Service training top therm chiller 1 6 k w-eng_01.10.2014
Service training top therm chiller 1 6 k w-eng_01.10.2014
 

More from SUMAN CHATTERJEE

SUPERVISOR CERTIFICATE OF COMPETENCY
SUPERVISOR CERTIFICATE OF COMPETENCYSUPERVISOR CERTIFICATE OF COMPETENCY
SUPERVISOR CERTIFICATE OF COMPETENCYSUMAN CHATTERJEE
 
CONTRACTS-SUMAN CHATTERJEE
CONTRACTS-SUMAN CHATTERJEECONTRACTS-SUMAN CHATTERJEE
CONTRACTS-SUMAN CHATTERJEESUMAN CHATTERJEE
 
AIR INDIA ID SUMAN CHATTERJEE
AIR INDIA  ID SUMAN CHATTERJEEAIR INDIA  ID SUMAN CHATTERJEE
AIR INDIA ID SUMAN CHATTERJEESUMAN CHATTERJEE
 
SUPERVISOR CERTIFICATE OF COMPETENCY
SUPERVISOR CERTIFICATE OF COMPETENCYSUPERVISOR CERTIFICATE OF COMPETENCY
SUPERVISOR CERTIFICATE OF COMPETENCYSUMAN CHATTERJEE
 
CONFIRMATION & INCREMENT LETTER
CONFIRMATION & INCREMENT LETTERCONFIRMATION & INCREMENT LETTER
CONFIRMATION & INCREMENT LETTERSUMAN CHATTERJEE
 

More from SUMAN CHATTERJEE (9)

SUPERVISOR CERTIFICATE OF COMPETENCY
SUPERVISOR CERTIFICATE OF COMPETENCYSUPERVISOR CERTIFICATE OF COMPETENCY
SUPERVISOR CERTIFICATE OF COMPETENCY
 
CONTRACTS-SUMAN CHATTERJEE
CONTRACTS-SUMAN CHATTERJEECONTRACTS-SUMAN CHATTERJEE
CONTRACTS-SUMAN CHATTERJEE
 
SEMESTER ALL MARK SHEET
SEMESTER ALL MARK SHEETSEMESTER ALL MARK SHEET
SEMESTER ALL MARK SHEET
 
IQAMA_SUMAN CHATTERJEE
IQAMA_SUMAN CHATTERJEEIQAMA_SUMAN CHATTERJEE
IQAMA_SUMAN CHATTERJEE
 
OFFER OF EMPLOYMENT
OFFER OF EMPLOYMENTOFFER OF EMPLOYMENT
OFFER OF EMPLOYMENT
 
AIR INDIA ID SUMAN CHATTERJEE
AIR INDIA  ID SUMAN CHATTERJEEAIR INDIA  ID SUMAN CHATTERJEE
AIR INDIA ID SUMAN CHATTERJEE
 
Resume sumanchatterjee
Resume sumanchatterjeeResume sumanchatterjee
Resume sumanchatterjee
 
SUPERVISOR CERTIFICATE OF COMPETENCY
SUPERVISOR CERTIFICATE OF COMPETENCYSUPERVISOR CERTIFICATE OF COMPETENCY
SUPERVISOR CERTIFICATE OF COMPETENCY
 
CONFIRMATION & INCREMENT LETTER
CONFIRMATION & INCREMENT LETTERCONFIRMATION & INCREMENT LETTER
CONFIRMATION & INCREMENT LETTER
 

DCS_Logic

  • 1. START PERMISSIVE August 9, 2015 1  Boiler Feed Pump:  Boiler feed pump suction valve open Feed Back  Dearator level Normal. Recirculation Line valve open feed back
  • 2.  Condensate Extraction pump:  Pump Feeder Healthy .  No pump trip signal.  Level greater than set point. August 9, 2015 2
  • 3.  ID FANS:  ID Fan O/L Damper close feed back .  ID Fan I/L Damper close feed back.  Guillotine damper open.  ID Fan MCC no trouble. August 9, 2015 3
  • 4.  Boiler trip:  SH#1 Metal temperature Hi-Hi.  SH#2 Metal temperature Hi-Hi.  Drum level less than Low-Low.  Drum Level Greater than Hi-Hi.  Both ID fan Trip/ Stop feedback. TRIP CONDITION August 9, 2015 4
  • 5.  Turbine trip:  Main steam temperature Low-Low( 480 °c).  Temp. of Turbine thrust pads & bearing liners Hi-Hi (100 ° C), common.  Return Oil temp. of bearing Hi-Hi (70 °C), common.  Condenser pressure Hi-Hi(-0.4 kg/cm²).  Main steam pressure Low-Low (60.95 kg/cm²). Hot well Level Low-Low (20%). Lube oil pressure Low-Low ((0.3 kg/cm²). August 9, 2015 5
  • 6. Protection Oil pressure Low-Low (8 kg/cm²). Tur. Rotor Axial displacement Hi-Hi(±1.5 mm). Differential Expansion Hi-Hi(±1.5 mm). Turbine front shaft vibration Hi-Hi( 0.07 mm). Turbine rear shaft vibration Hi-Hi( 0.07 mm). Generator front shaft vibration Hi-Hi( 0.07 mm). Generator rear shaft vibration Hi-Hi( 0.07 mm). August 9, 2015 6
  • 7.  Turbine speed Hi-Hi (3360 RPM).  Emergency Shutdown.  Turbine emergency Stop (PB).  Mechanical over speed trip.  Turbine reset Push Button. August 9, 2015 7
  • 8. Generator Trip:  Differential Protection (5%).  Generator Rotor Earth Protection(1 stage- alarm/2nd stage- trip).  Stator Frame Temperature Operated (80 °c alarm /100°c trip)  Emergency Trip Push Button Operated .  Reverse Power Protection (0.5%) .  Generator Winding Temperature Operated (100°C –alarm/110 °C trip).  Backup Impedence Protection.  Incase of air cooler tube leakage.? August 9, 2015 8
  • 9. Turbine Trip Solenoid:  Low forward power Protection (05%).  Loss of Excitation Protection.  Under voltage protection (Drop out 70%)  Gen. over current protection with time delay unit (105%, 10 sec.)  PT fuse failure relay (Met-A, Port- Gen. Ckt closed).  Gen. negative phase sequency protection (1st=7.5%, -Alarm , 12t= 10- Trip) . August 9, 2015 9
  • 10.  Over / under frequency port ( 1st =2 sec-Alarm, 2nd =2 sec-Trip.  All devices connected for Turbine.  Gen. over current voltage restraint port.  Gen. over voltage protection (105%=0.3 sec.- Alarm, 110%=2 sec.- Trip.  Under voltage protection (80%= 3 sec- Trip.). August 9, 2015 10
  • 11.  TIE CIRCUIT BREAKER TRIP:  Over /under Frequency (1st - Alarm+ Trip) Negative Phase sequence ( 1st - Alarm+ Trip). Over voltage / under voltage protection (1st - Alarm+ Trip).  Vector surge protection (1st - Alarm + Trip). August 9, 2015 11