SlideShare a Scribd company logo
1 of 1
Download to read offline
R
Cityplace Center
Dallas, Texas
Architect: Cossutta & Associates
Job Captain: Ruben Caro
Construction Cost: $250M (Total Project
Cost)
Cityplace tower is a 42-story building that
includes 1.4 million square feet of office
space. It sits on 10 acres that include four
retail/office pad sites and underground
parking. The tower has a Brazilian royal red
granite exterior with both a flamed and
polished finish. The ground floor lobby is
finished with African mahogany paneling
and five varieties of Spanish marble. Every
5 stories included an atrium located within
the service core of the building.
The original design was for two towers and
a connecting bridge over and existing
highway. In addition, 10 low rise buildings,
to be used as retails space, were to surround
the tower. All of the additional buildings
were to be constructed using the same
materials.
RCC CCOONNSSUULLTTIINNGG FFOORR AARRCCHHIITTEECCTTSS -- OOFFFFIICCEE BBUUIILLDDIINNGGSS

More Related Content

More from Ruben Caro

correctional facilities 3
correctional facilities 3correctional facilities 3
correctional facilities 3
Ruben Caro
 
office building page 3
office building page 3office building page 3
office building page 3
Ruben Caro
 
correctional facilities 4
correctional facilities 4correctional facilities 4
correctional facilities 4
Ruben Caro
 
correctional facilities 2-A
correctional facilities 2-Acorrectional facilities 2-A
correctional facilities 2-A
Ruben Caro
 
correctional facilities 1
correctional facilities 1correctional facilities 1
correctional facilities 1
Ruben Caro
 
educational projects page 1
educational projects page 1educational projects page 1
educational projects page 1
Ruben Caro
 

More from Ruben Caro (7)

correctional facilities 3
correctional facilities 3correctional facilities 3
correctional facilities 3
 
office building page 3
office building page 3office building page 3
office building page 3
 
Courthouses-1
Courthouses-1Courthouses-1
Courthouses-1
 
correctional facilities 4
correctional facilities 4correctional facilities 4
correctional facilities 4
 
correctional facilities 2-A
correctional facilities 2-Acorrectional facilities 2-A
correctional facilities 2-A
 
correctional facilities 1
correctional facilities 1correctional facilities 1
correctional facilities 1
 
educational projects page 1
educational projects page 1educational projects page 1
educational projects page 1
 

office building page 2

  • 1. R Cityplace Center Dallas, Texas Architect: Cossutta & Associates Job Captain: Ruben Caro Construction Cost: $250M (Total Project Cost) Cityplace tower is a 42-story building that includes 1.4 million square feet of office space. It sits on 10 acres that include four retail/office pad sites and underground parking. The tower has a Brazilian royal red granite exterior with both a flamed and polished finish. The ground floor lobby is finished with African mahogany paneling and five varieties of Spanish marble. Every 5 stories included an atrium located within the service core of the building. The original design was for two towers and a connecting bridge over and existing highway. In addition, 10 low rise buildings, to be used as retails space, were to surround the tower. All of the additional buildings were to be constructed using the same materials. RCC CCOONNSSUULLTTIINNGG FFOORR AARRCCHHIITTEECCTTSS -- OOFFFFIICCEE BBUUIILLDDIINNGGSS