Organization / Workplace
ABB Offshore Wind ConnectionsLocation
Sor-Trondelag County, Norway NorwayOccupation
Offshore Project Planning LeadIndustry
Energy / Oil
About
The assignment at ABB OWC includes responsibility for the planning and monitoring of all offshore operations, in connection with the installation, hook-up and completion of the DolWin Beta HVDC platform. In addition to the offshore operations, the assignment includes management and control of personnel on board (POB), as well as coordination of vessels in connection with cable pull-in and other vessel-related operations until trial test periods and final handover to the customer – TenneT Offshore GmbH. Primavera P6 is used as the planning tool at ABB OWC.