PRESENTATION ON PPPL, ARP, MILL AND RWL PH-III
PRESENTED BY : PAUL OSENDE(Asst. Manager)
SCOPE OF PRESENTATION
HIGHLIGHTS
CRM DIVISION KPI’s AND KPA’s
PRODUCTION AND YIELD SUMMARY
FOR ALL LINES(CRM DIVISION)
TOTAL DIVISION YIELD
CONSUMPTION ANALYSIS PER LINE
WITH TRENDS
LTI FOR CRM DIVISION
HIGHLIGHTS
• TOTAL PRODUCTION OF 204,426.080 MT SINCE
COMMISIONING OF CRM
• ACHIEVED THE HIGHEST RECORDED YIELD OF 99.442% IN
JUNE 2016 AT MILL WITH AVERAGE YIELD AT 99.175%
SINCE JANUARY 2016
• HIGHEST DAILY PRODUCTION AT PPPL OF 571.270MT ON
31ST-05-2016 IN TWO SHIFTS
• PPPL AND ARP HAVE SPENT OVER 1090 DAYS WITHOUT
LTI
• NO LTI AT MILL AND RWL IN 2016
• ARP PRODUCED HIGHEST DAILY PRODUCTION OF 21.2KL
IN JULY 2016
• CONTINUOUS TRAINING OF STAFF ONGOING
CRM DIVISION KPI AND KPA
S.N
o
KPA KPI
Weightag
e
KPI(Measurement
criteria)
Scoring
Evaluation
Actual
Score
d
Reaso
n
1
Production of
required quantities as
per the production
plan
Productivity Production targets as
per marketing's
requirement
30
PPPL+CRM+
RWL-75%
90%-100% 30 100 30
2
Maintain the quality
and reduce as per the
production norms
Scrap Minimization Percentage rejection
of the total output 30
PPPL+CRM+
RWL<5.0%
<5.5% 30 6.156 26.803
3
Finished goods
inventory
Product stock
Analysis Production cycle time 20 CRC 3 Days 75%-100% 20 100 20
4 Timely delivery
Time committed
for completion of
special orders
Reduction in special
order production time 20
Completion
within 3-7
days
80%-100% 20 100 20
PPPL, ARP, MILL AND RWL PRODUCTION SUMMARY FOR AUG-OCT 2016
SECTION PPPL ARP MILL RWL
MONTH AUG SEPT OCT AUG SEPT OCT AUG SEPT OCT AUG SEPT OCT
PRODUCT HRPO(MT) REGENERATED ACID(KL) CRC(MT) TRIMMED CRC(MT)
CAPACITY 12500 468 12500 12500
TARGET 6500 5100 7850 240 200 300 6000 5400 7850 3600 7300 7300
PROD I/P 6548.720 5124.950 7894.180 248.100 204.900 308.200 6094.720 5517.050 7858.105 3806.295 7698.795 7736.610
PROD O/P 6513.140 5098.270 7853.540 338.900 295.300 390.200 6046.695 5477.585 7795.330 3622.645 7330.960 7319.115
YIELD % 99.457 99.479 99.485 99.212 99.285 99.201 95.175 95.222 94.604
UTILIZATION
PPPL CRM RWL
AUGUST 52.11% 48.37% 28.98%
SEPTEMBER 40.79% 43.82% 58.65%
OCTOBER 63.15% 62.36% 58.55%
52.11%
48.37%
28.98%
40.79%
43.82%
58.65%
63.15% 62.36%
58.55%
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
Utilization=(Production OP/Line capacity)
AUGUST SEPTEMBER OCTOBER
AUGUST SEPT OCT AVERAGE
PPPL%YIELD 99.457 99.479 99.485 99.474
CRM% YIELD 99.212 99.285 99.201 99.233
RWL% YIELD 95.175 95.259 94.604 95.013
99.457
99.479 99.485 99.474
99.212 99.285
99.201 99.233
95.175
95.259
94.604
95.013
94.5
95.5
96.5
97.5
98.5
99.5
100.5%YIELD PERCENTAGE YIELD PER MONTH CRM DIVISION
PPPL%YIELD CRM% YIELD RWL% YIELD
TOTAL YIELD FOR CRM DIVISION
AUGUST SEPTEMBER OCTOBER CURRENT AVERAGE PREVIOUS AVERAGE
TOTAL YIELD 93.845 94.023 93.29 93.934 93.664
KPI STANDARD 94.5 94.5 94.5 94.5 94.5
93.845
94.023
93.29
93.934
93.664
94.5 94.5 94.5 94.5 94.5
92.6
92.8
93
93.2
93.4
93.6
93.8
94
94.2
94.4
94.6
TOTALPERCENTAGEYIELD
MONTH
TOTAL YIELD KPI STANDARD
TOTAL AVERAGE YIELD PER YEAR CRM DIVISION
98.99
98.28
92.46
99.441
98.71
95.44
99.405
98.76
95.55
99.414
99.175
95.319
91.5
92.5
93.5
94.5
95.5
96.5
97.5
98.5
99.5
100.5
PPPL CRM RWL
PercentageYield
PRODUCTION LINE
Yield analysis trend 2013-2016
2013 2014 2015 2016
CRM YIELD ANALYSIS 2015/2016
98.806
98.642
98.514
98.604 98.592
98.689 98.687
98.804
98.663
98.858
99.093 99.1299.082
98.982
99.125
99.075
99.193
99.442
99.212
99.285
99.201
98
98.2
98.4
98.6
98.8
99
99.2
99.4
99.6
99.8
100
PERCENTATGEYIELD
MONTH
Yield per month
2015 2016 Linear (2015) Linear (2016)
1.526453707
0.922818168
0.38037308
2.55222
1.17205
0.3833806322.61695
0.63371
0
2.07170 0.77827
0.19019
8.301
4.03
1.215943949
3.497
1.89
0.276752934
0
1
2
3
4
5
6
7
8
9
WORK ROLL(um/ton) IMR(um/ton) BUR(um/ton)
um/MT
ALL ROLLS CONSUMPTION
AUGUST SEPTEMBER OCTOBER AVERAGE 2015 AVG 2016 AVG
2015 WR CONSUMPTION AVG=8.301um/MT
2016 WR CONSUMPTION AVG=3.497um/MT
Percentage decrease= 62.2%
2015 IMR CONSUMPTION AVG=4.03um/MT
2016 IMR CONSUMPTION AVG=1.89um/MT
Percentage decrease= 53.1%
CAUSES OF WORK ROLL CONSUMPTION
2.10017
2.44873
2.19402
0.15490
0.54732
1.19369
0.93392
2.02394
0.10587
0.82232
1.00549
0.35268
0.01773
0.12286
0.40036
0.00000
0.50000
1.00000
1.50000
2.00000
2.50000
3.00000
0
20
40
60
80
100
120
140
160
POWER
FLUC/FAILURE
HRC DEFECTS ELECTRICAL ROLLS PRODUCTION
Rollconsumption(um)
WR CONSUMPTION CAUSES
Trend analysis
2014 2015 2016 2014 mm/MT 2015 mm/MT 2016mm/MT
ROLLS’ CONSUMPTION TREND
2015/2016(mm/MT)
JAN FEB MAR APRIL MAY JUNE JULY AUG SEPT OCT NOV DEC
2015 0.00898 0.00743 0.00901 0.02002 0.01948 0.05739 0.00778 0.00953 0.01526 0.02048 0.00189 0.0084
2016 0.00573 0.00379 0.00721 0 0.00783 0.0049 0.00256 0.00044 0.00411 0.00325
0
0.01
0.02
0.03
0.04
0.05
0.06
0.07
CONSUMPTIONMM/MT
MONTH
All rolls’ consumption per MT 2015/2016 comparison
2015 2016
AUGUST SEPTEMBER OCTOBER
CURRENT
AVERAGE
PREVIOUS
AVERAGE
ROLLING OIL(kg/ton) 0.4895 0.3377 0.5696 0.4656 0.6025
0.4895
0.3377
0.5696
0.4656
0.6025
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
OILCONSUMPTION(kg/ton)
MONTH
ROLLING OIL CONSUMPTION(KG/TON)
ROLLING OIL(kg/ton)
ACID CONSUMED PER MT PRODUCED
52.95
55.18
50.54
54.07
52.06
48.00 49.00 50.00 51.00 52.00 53.00 54.00 55.00 56.00
AUGUST
SEPTEMBER
OCTOBER
AVERAGE
PREVIOUS AVERAGE
AUGUST SEPTEMBER OCTOBER AVERAGE PREVIOUS AVERAGE
Ltr/MT of Acid 52.95 55.18 50.54 54.07 52.06
LTR/MT OF ACID
Ltr/MT of Acid
ARP REGENERATED ACID COMPARISON
AUGUST SEPTEMBER OCTOBER
CURRENT
AVERAGE
PREVIOUS
AVERAGE
RA Produced(KL) 338.9 295.3 416.6 317.10 324.575
Ltr/m3 LPG 38.15 43.86 41.14 41.05 36.64
338.9
295.3
416.6
317.10 324.575
38.15
43.86
41.14
41.05
36.64
32.00
34.00
36.00
38.00
40.00
42.00
44.00
46.00
0
50
100
150
200
250
300
350
400
450
ACID(KL)
MONTH
ACID PRODUCED Vs. LPG CONSUMED
RA Produced(KL) Ltr/m3 LPG
LTI FOR CRM DIVISION
MILL &RWL PPPL & ARP
2014 3 0
2015 1 0
2016 0 0
3
0
1
00 0
0
0.5
1
1.5
2
2.5
3
3.5
2014/2015/2016 LTI
2014 2015 2016
CONTINUAL TRAININGS AT ALL LINES
Training on POR at 6 hi CRM
Training on Roll actuation systems at CRM
PPPL hands-on line training
HSE Training 02-08-2016
Training on HRC & CRC Defects
minimization
THANK
YOU

More Related Content

Similar to AUG-OCT MONTH CRM-PPPL-ARP-RWL PRESENTATION-3months

Sample of report & Snail trail Defect
Sample of report & Snail trail DefectSample of report & Snail trail Defect
Sample of report & Snail trail DefectShiv Verma
 
Nodal Insights for Generation Owners and Modeling with AURORAxmp
Nodal Insights for Generation Owners and Modeling with AURORAxmpNodal Insights for Generation Owners and Modeling with AURORAxmp
Nodal Insights for Generation Owners and Modeling with AURORAxmpEPIS Inc
 
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdfFiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdffujjsekmd8du
 
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdfFiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdff7sueijdkdkdm
 
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdfFiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdffujekddmdm3e4
 
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdfFiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdffujsekmdidjd3e
 
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdfFiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdfufjjksemd8id9i
 
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdfFiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdfuf8suidjdkm
 
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdfFiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdffjksekdmmd
 
Fiat kobelco ex455 excavator service repair manual
Fiat kobelco ex455 excavator service repair manualFiat kobelco ex455 excavator service repair manual
Fiat kobelco ex455 excavator service repair manualfjjskekkmemm
 
Fiat kobelco ex455 excavator service repair manual
Fiat kobelco ex455 excavator service repair manualFiat kobelco ex455 excavator service repair manual
Fiat kobelco ex455 excavator service repair manualfujjdjjkskemme
 
Fiat kobelco ex455 excavator service repair manual
Fiat kobelco ex455 excavator service repair manualFiat kobelco ex455 excavator service repair manual
Fiat kobelco ex455 excavator service repair manualufjjdfjkskekme
 
Fiat kobelco ex455 excavator service repair manual
Fiat kobelco ex455 excavator service repair manualFiat kobelco ex455 excavator service repair manual
Fiat kobelco ex455 excavator service repair manualfusjejfjskekemm
 
‎Idea‬ Cellular Ltd. Q2 FY16 Result Update
‎Idea‬ Cellular Ltd. Q2 FY16 Result Update‎Idea‬ Cellular Ltd. Q2 FY16 Result Update
‎Idea‬ Cellular Ltd. Q2 FY16 Result Updatechoice broking
 
Shimpo able vral_catalog
Shimpo able vral_catalogShimpo able vral_catalog
Shimpo able vral_catalogElectromate
 
Brent Goliath NCPC-SA
Brent Goliath NCPC-SABrent Goliath NCPC-SA
Brent Goliath NCPC-SA7391456
 
Michel Sacotte - Schneider Electric
Michel Sacotte - Schneider ElectricMichel Sacotte - Schneider Electric
Michel Sacotte - Schneider Electriccwiemeexpo
 
Comparison Study of Optimization of Surface Roughness Parameters in Turning E...
Comparison Study of Optimization of Surface Roughness Parameters in Turning E...Comparison Study of Optimization of Surface Roughness Parameters in Turning E...
Comparison Study of Optimization of Surface Roughness Parameters in Turning E...IRJET Journal
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakharMohammad IFTAKHAR
 

Similar to AUG-OCT MONTH CRM-PPPL-ARP-RWL PRESENTATION-3months (20)

Sample of report & Snail trail Defect
Sample of report & Snail trail DefectSample of report & Snail trail Defect
Sample of report & Snail trail Defect
 
Nodal Insights for Generation Owners and Modeling with AURORAxmp
Nodal Insights for Generation Owners and Modeling with AURORAxmpNodal Insights for Generation Owners and Modeling with AURORAxmp
Nodal Insights for Generation Owners and Modeling with AURORAxmp
 
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdfFiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
 
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdfFiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
 
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdfFiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
 
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdfFiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
 
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdfFiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
 
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdfFiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
 
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdfFiat Kobelco EX455 Excavator Service Repair Manual.pdf
Fiat Kobelco EX455 Excavator Service Repair Manual.pdf
 
Fiat kobelco ex455 excavator service repair manual
Fiat kobelco ex455 excavator service repair manualFiat kobelco ex455 excavator service repair manual
Fiat kobelco ex455 excavator service repair manual
 
Fiat kobelco ex455 excavator service repair manual
Fiat kobelco ex455 excavator service repair manualFiat kobelco ex455 excavator service repair manual
Fiat kobelco ex455 excavator service repair manual
 
Fiat kobelco ex455 excavator service repair manual
Fiat kobelco ex455 excavator service repair manualFiat kobelco ex455 excavator service repair manual
Fiat kobelco ex455 excavator service repair manual
 
Fiat kobelco ex455 excavator service repair manual
Fiat kobelco ex455 excavator service repair manualFiat kobelco ex455 excavator service repair manual
Fiat kobelco ex455 excavator service repair manual
 
‎Idea‬ Cellular Ltd. Q2 FY16 Result Update
‎Idea‬ Cellular Ltd. Q2 FY16 Result Update‎Idea‬ Cellular Ltd. Q2 FY16 Result Update
‎Idea‬ Cellular Ltd. Q2 FY16 Result Update
 
Shimpo able vral_catalog
Shimpo able vral_catalogShimpo able vral_catalog
Shimpo able vral_catalog
 
McCoy power reports
McCoy power reportsMcCoy power reports
McCoy power reports
 
Brent Goliath NCPC-SA
Brent Goliath NCPC-SABrent Goliath NCPC-SA
Brent Goliath NCPC-SA
 
Michel Sacotte - Schneider Electric
Michel Sacotte - Schneider ElectricMichel Sacotte - Schneider Electric
Michel Sacotte - Schneider Electric
 
Comparison Study of Optimization of Surface Roughness Parameters in Turning E...
Comparison Study of Optimization of Surface Roughness Parameters in Turning E...Comparison Study of Optimization of Surface Roughness Parameters in Turning E...
Comparison Study of Optimization of Surface Roughness Parameters in Turning E...
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakhar
 

AUG-OCT MONTH CRM-PPPL-ARP-RWL PRESENTATION-3months

  • 1. PRESENTATION ON PPPL, ARP, MILL AND RWL PH-III PRESENTED BY : PAUL OSENDE(Asst. Manager)
  • 2. SCOPE OF PRESENTATION HIGHLIGHTS CRM DIVISION KPI’s AND KPA’s PRODUCTION AND YIELD SUMMARY FOR ALL LINES(CRM DIVISION) TOTAL DIVISION YIELD CONSUMPTION ANALYSIS PER LINE WITH TRENDS LTI FOR CRM DIVISION
  • 3. HIGHLIGHTS • TOTAL PRODUCTION OF 204,426.080 MT SINCE COMMISIONING OF CRM • ACHIEVED THE HIGHEST RECORDED YIELD OF 99.442% IN JUNE 2016 AT MILL WITH AVERAGE YIELD AT 99.175% SINCE JANUARY 2016 • HIGHEST DAILY PRODUCTION AT PPPL OF 571.270MT ON 31ST-05-2016 IN TWO SHIFTS • PPPL AND ARP HAVE SPENT OVER 1090 DAYS WITHOUT LTI • NO LTI AT MILL AND RWL IN 2016 • ARP PRODUCED HIGHEST DAILY PRODUCTION OF 21.2KL IN JULY 2016 • CONTINUOUS TRAINING OF STAFF ONGOING
  • 4. CRM DIVISION KPI AND KPA S.N o KPA KPI Weightag e KPI(Measurement criteria) Scoring Evaluation Actual Score d Reaso n 1 Production of required quantities as per the production plan Productivity Production targets as per marketing's requirement 30 PPPL+CRM+ RWL-75% 90%-100% 30 100 30 2 Maintain the quality and reduce as per the production norms Scrap Minimization Percentage rejection of the total output 30 PPPL+CRM+ RWL<5.0% <5.5% 30 6.156 26.803 3 Finished goods inventory Product stock Analysis Production cycle time 20 CRC 3 Days 75%-100% 20 100 20 4 Timely delivery Time committed for completion of special orders Reduction in special order production time 20 Completion within 3-7 days 80%-100% 20 100 20
  • 5. PPPL, ARP, MILL AND RWL PRODUCTION SUMMARY FOR AUG-OCT 2016 SECTION PPPL ARP MILL RWL MONTH AUG SEPT OCT AUG SEPT OCT AUG SEPT OCT AUG SEPT OCT PRODUCT HRPO(MT) REGENERATED ACID(KL) CRC(MT) TRIMMED CRC(MT) CAPACITY 12500 468 12500 12500 TARGET 6500 5100 7850 240 200 300 6000 5400 7850 3600 7300 7300 PROD I/P 6548.720 5124.950 7894.180 248.100 204.900 308.200 6094.720 5517.050 7858.105 3806.295 7698.795 7736.610 PROD O/P 6513.140 5098.270 7853.540 338.900 295.300 390.200 6046.695 5477.585 7795.330 3622.645 7330.960 7319.115 YIELD % 99.457 99.479 99.485 99.212 99.285 99.201 95.175 95.222 94.604
  • 6. UTILIZATION PPPL CRM RWL AUGUST 52.11% 48.37% 28.98% SEPTEMBER 40.79% 43.82% 58.65% OCTOBER 63.15% 62.36% 58.55% 52.11% 48.37% 28.98% 40.79% 43.82% 58.65% 63.15% 62.36% 58.55% 0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 70.00% Utilization=(Production OP/Line capacity) AUGUST SEPTEMBER OCTOBER
  • 7. AUGUST SEPT OCT AVERAGE PPPL%YIELD 99.457 99.479 99.485 99.474 CRM% YIELD 99.212 99.285 99.201 99.233 RWL% YIELD 95.175 95.259 94.604 95.013 99.457 99.479 99.485 99.474 99.212 99.285 99.201 99.233 95.175 95.259 94.604 95.013 94.5 95.5 96.5 97.5 98.5 99.5 100.5%YIELD PERCENTAGE YIELD PER MONTH CRM DIVISION PPPL%YIELD CRM% YIELD RWL% YIELD
  • 8. TOTAL YIELD FOR CRM DIVISION AUGUST SEPTEMBER OCTOBER CURRENT AVERAGE PREVIOUS AVERAGE TOTAL YIELD 93.845 94.023 93.29 93.934 93.664 KPI STANDARD 94.5 94.5 94.5 94.5 94.5 93.845 94.023 93.29 93.934 93.664 94.5 94.5 94.5 94.5 94.5 92.6 92.8 93 93.2 93.4 93.6 93.8 94 94.2 94.4 94.6 TOTALPERCENTAGEYIELD MONTH TOTAL YIELD KPI STANDARD
  • 9. TOTAL AVERAGE YIELD PER YEAR CRM DIVISION 98.99 98.28 92.46 99.441 98.71 95.44 99.405 98.76 95.55 99.414 99.175 95.319 91.5 92.5 93.5 94.5 95.5 96.5 97.5 98.5 99.5 100.5 PPPL CRM RWL PercentageYield PRODUCTION LINE Yield analysis trend 2013-2016 2013 2014 2015 2016
  • 10. CRM YIELD ANALYSIS 2015/2016 98.806 98.642 98.514 98.604 98.592 98.689 98.687 98.804 98.663 98.858 99.093 99.1299.082 98.982 99.125 99.075 99.193 99.442 99.212 99.285 99.201 98 98.2 98.4 98.6 98.8 99 99.2 99.4 99.6 99.8 100 PERCENTATGEYIELD MONTH Yield per month 2015 2016 Linear (2015) Linear (2016)
  • 11. 1.526453707 0.922818168 0.38037308 2.55222 1.17205 0.3833806322.61695 0.63371 0 2.07170 0.77827 0.19019 8.301 4.03 1.215943949 3.497 1.89 0.276752934 0 1 2 3 4 5 6 7 8 9 WORK ROLL(um/ton) IMR(um/ton) BUR(um/ton) um/MT ALL ROLLS CONSUMPTION AUGUST SEPTEMBER OCTOBER AVERAGE 2015 AVG 2016 AVG 2015 WR CONSUMPTION AVG=8.301um/MT 2016 WR CONSUMPTION AVG=3.497um/MT Percentage decrease= 62.2% 2015 IMR CONSUMPTION AVG=4.03um/MT 2016 IMR CONSUMPTION AVG=1.89um/MT Percentage decrease= 53.1%
  • 12. CAUSES OF WORK ROLL CONSUMPTION 2.10017 2.44873 2.19402 0.15490 0.54732 1.19369 0.93392 2.02394 0.10587 0.82232 1.00549 0.35268 0.01773 0.12286 0.40036 0.00000 0.50000 1.00000 1.50000 2.00000 2.50000 3.00000 0 20 40 60 80 100 120 140 160 POWER FLUC/FAILURE HRC DEFECTS ELECTRICAL ROLLS PRODUCTION Rollconsumption(um) WR CONSUMPTION CAUSES Trend analysis 2014 2015 2016 2014 mm/MT 2015 mm/MT 2016mm/MT
  • 13. ROLLS’ CONSUMPTION TREND 2015/2016(mm/MT) JAN FEB MAR APRIL MAY JUNE JULY AUG SEPT OCT NOV DEC 2015 0.00898 0.00743 0.00901 0.02002 0.01948 0.05739 0.00778 0.00953 0.01526 0.02048 0.00189 0.0084 2016 0.00573 0.00379 0.00721 0 0.00783 0.0049 0.00256 0.00044 0.00411 0.00325 0 0.01 0.02 0.03 0.04 0.05 0.06 0.07 CONSUMPTIONMM/MT MONTH All rolls’ consumption per MT 2015/2016 comparison 2015 2016
  • 14. AUGUST SEPTEMBER OCTOBER CURRENT AVERAGE PREVIOUS AVERAGE ROLLING OIL(kg/ton) 0.4895 0.3377 0.5696 0.4656 0.6025 0.4895 0.3377 0.5696 0.4656 0.6025 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 OILCONSUMPTION(kg/ton) MONTH ROLLING OIL CONSUMPTION(KG/TON) ROLLING OIL(kg/ton)
  • 15. ACID CONSUMED PER MT PRODUCED 52.95 55.18 50.54 54.07 52.06 48.00 49.00 50.00 51.00 52.00 53.00 54.00 55.00 56.00 AUGUST SEPTEMBER OCTOBER AVERAGE PREVIOUS AVERAGE AUGUST SEPTEMBER OCTOBER AVERAGE PREVIOUS AVERAGE Ltr/MT of Acid 52.95 55.18 50.54 54.07 52.06 LTR/MT OF ACID Ltr/MT of Acid
  • 16. ARP REGENERATED ACID COMPARISON AUGUST SEPTEMBER OCTOBER CURRENT AVERAGE PREVIOUS AVERAGE RA Produced(KL) 338.9 295.3 416.6 317.10 324.575 Ltr/m3 LPG 38.15 43.86 41.14 41.05 36.64 338.9 295.3 416.6 317.10 324.575 38.15 43.86 41.14 41.05 36.64 32.00 34.00 36.00 38.00 40.00 42.00 44.00 46.00 0 50 100 150 200 250 300 350 400 450 ACID(KL) MONTH ACID PRODUCED Vs. LPG CONSUMED RA Produced(KL) Ltr/m3 LPG
  • 17. LTI FOR CRM DIVISION MILL &RWL PPPL & ARP 2014 3 0 2015 1 0 2016 0 0 3 0 1 00 0 0 0.5 1 1.5 2 2.5 3 3.5 2014/2015/2016 LTI 2014 2015 2016
  • 18. CONTINUAL TRAININGS AT ALL LINES Training on POR at 6 hi CRM Training on Roll actuation systems at CRM PPPL hands-on line training HSE Training 02-08-2016 Training on HRC & CRC Defects minimization

Editor's Notes

  1. Introduce my self Presenting for 4 lines My manager
  2. Summary of the presentation
  3. Reduction in scrap of between 38 and 52% since 2013 PPE conformance as per HSE engineer. Continuous training. Target is zero accidents. Training ensures high performance, repeatability and Quality in all processes highlighting employee safety always Feedback from user lines continuously ensuring that supplier provides good quality material(e.g. JFE complaint on smaller weight coils in October) As per IMS policy continual development of staff for better operations and longevity of machines. Seen higher material throughput which directly relates to productivity
  4. Total score of 96.803% Always produce as per production plan Highest quality attained and maintain zero rejects through rerolling processes as per control of non-conformance in IMS
  5. Highlight the reasons for difference in average yield and maximum capacities of the lines Highlight highest Yield at Mill(99.285%) Less yield at RWL in October due to stricter requirements of galvalume
  6. Time as a factor of utilization cannot give a clear image of performance of the machines hence we use production values PPPL and CRM have close utilizations as the delay between the two lines is less. Some accumulation of material occurs at RWL as its running depends on the CGL running program. Rough idea of the running time as we use standardized SOP and production throughput is almost the same.
  7. Less scrap at PPPL, Higher at RWL due to edge trimmings, baby coils, off-gauge and pencil coils. Drop in yield for RWL in October due to higher requirements for the galvalume material.
  8. Constantly adjusting operational parameters to achieve the highest possible yield in all sections KPI standard is a very ambitious target Benchmarking yields with other companies. Less than 90% in some Indian steel companies
  9. Approximately 52% REDUCTION IN SCRAP AT CRM SINCE 2013. Approximately 42% REDUCTION IN SCRAP IN PPPL SINCE 2013 Approximately 38% REDUCTION IN SCRAP IN RWL SINCE 2013
  10. CMI/ABB visit was at end of June through July. The trend shows this. The optimized parameters to reduce on impact of power fluctuation/failure thus the steady rise in yield Best work methods employed over time enhanced the productivity. Overall less power fluctuation and failure couple with better communication between utility company and RRM.
  11. WR ground depends on number of factors: Production output Power reliability Avg OP gauge Coolant consumption kg/MT Number of roll changes NOTE THE LEAST CONSUMPTION OF ROLLS IN NOVEMBER Analyze cost per mm for each roll type. WR: per mm IMR: per mm BUR: per mm 2015/2016 saw 58% decrease in WR consumption and 46.4% decrease in IMR consumption
  12. Note the trend in 2014-2016 for the various causes of WR consumption is down for all
  13. . CMI/ABB visit was at end of June through July. The trend shows this. The optimized parameters to reduce on impact of power fluctuation/failure thus the steady rise in yield Multiple power fluctuations in June 2016
  14. Always seek to optimize this metric. Least value that will not negatively impact on strip quality(SB, surface defects) and mill operational operators/equipment.(e.g. high load, roll damage). Maintain within supplier recommended value of 3%-4% coolant oil. Higher value in May due to new coolant made. Old disposed of. Used approx. 12 barrels to make coolant of 80,000 ltrs. Cost of 1kg is 6 euros Yearly average is 0.28kg/MT in 2015 Check overall rolled length/ gauge thickness average Relationship between stopping in the middle of the month and consumption in the next rolling oil consumption Continuous production reduces on oil consumption. SHYT DOWN PERIODS(23rd-7-31st-07; 01st-08-10th-08; 19th-09 to
  15. This is acid at 18% concentration by weight. Amount of acid depends on the lot(scale and rust), oxide formation on the surface some of which are a function of the Hot Rolling Process For example 420055.6km pickled in May = 1203Km/KL of acid. Compare with June with 205139Km =1221Km/KL FA: August-10.5MT Sept-11.30MT Oct-16.80MT
  16. ARP capacity at 468KL. Acid concentration taken as 18%(target). When no acid(WPL) is available the plant may run in water mode other than go off because it takes long and its costly to restart the plant AUG-23.8% SEPT-15% OCT-10%
  17. Most LTI occur at RWL due to nature of work at the line. Commendable for keeping this value low. As per Annual EHS report by safety department on December 2015-June 2016 Less LTI due to strong emphasis on safety procedures, SOP, enforcement by engineers and mgmt. and tool box talks as per IMS processes, team work. Continuous on Job training of all staff A lost time injury (LTI) is an injury sustained by an employee that will ultimately lead to the loss of productive work time in the form of worker delays or absenteeism 415 days minus LTI at CRM
  18. CRM was first department in history of RRM to conduct a training and there after test the participants Trainings are ongoing during the shutdown period