SlideShare a Scribd company logo
1 of 1
PA R K E R N . W IL L IA M S
1 7 3 6 R A N SER R D  M A N H A T T A N , K S  6 6 5 0 2
( 8 1 6 ) 8 0 3 - 9 5 8 4  WI LLI P A R 0 0 0 @ A O L. C O M
Bachelor ofScience Degree in Chemical Engineering August 2011-Present
Minors: Business, Economics, and Chemistry
Kansas St. University, Manhattan, KS
GPA 3.4/4.0
Expected Graduation Date:May 2016
LEADERSHIP/WORK EXPERIENCE
Cargill, Blair, NE May-August 2015
Project Engineering Intern
 Assessed root cause for boiler O2 probe failures and implemented a solution
 Assisted with product expansion projects including concrete and pressure safety valve installations
 Developed the scope and implemented a compressed air line purge in a fermentation facility with a food grade
environment
 Collected temperature data and collaborated with vendors to implement an automated cooling system on
crystalseparators
 Participated in safety programs and the safety culture
Cargill, Memphis, TN January-August 2014
Natural Resources Co-op
 Interpreted energy balances, trends,and coded VBA in excel documents to generate energy reports
 Supervised several energy saving projects,saving projections of over $300,000 annually
 Helped in a plant wide energy saving collaboration involving heat exchange across several plant processes
 Worked with all departments to optimize energy use in process
 Managed contractors for technical projects
 Guided contractors through the plant for analysis on over 300 steam traps
 Experienced hands-on failure maintenance and preventative maintenance
De Soto Aquatic Center, De Soto, KS
Manager Summer 2013
 Coordinated a staff of over 20 employees
 Delegated employee work loads
 Analyzed chemical levels and maintained backwash pressure systems to ensure safety
 Resolved conflicts between patrons
Lifeguard Summer 2009-2012
 Oversaw an area of around 25-30 patrons and ensured safety through close attention to detail and teamwork
Kaw Valley Arabians, Bonner Springs, KS
Farm Hand 2009-Present
 Tended to 15 horses on a daily basis
 Constructed a 40 X 60 ft. fully insulated barn
 Maintained the facility by building fences, fixing pipes, and supporting construction projects
VOLUNTEER WORK
N.A.S.A at Kansas State University, Manhattan,KS 2012
 Participated in physical testing for graduate students who worked with N.A.S.A to research the physical demand on
astronauts
Habitat for Humanity, Manhattan,KS 2013
 Worked with a team to improve the living standard for families in the Manhattan and Ogden areas

More Related Content

Similar to Parker Williams resume

Michael Ising Resume
Michael Ising ResumeMichael Ising Resume
Michael Ising ResumeMichael Ising
 
Kyle Hicks Resume
Kyle Hicks ResumeKyle Hicks Resume
Kyle Hicks ResumeKyle Hicks
 
Wyatt Tharp Resume
Wyatt Tharp ResumeWyatt Tharp Resume
Wyatt Tharp ResumeWyatt Tharp
 
Ian M. Boysen Resume
Ian M. Boysen ResumeIan M. Boysen Resume
Ian M. Boysen ResumeIan Boysen
 
Ilasi-Engineer-Resume
Ilasi-Engineer-ResumeIlasi-Engineer-Resume
Ilasi-Engineer-ResumeMichael Ilasi
 
Curriculum vitae hanlin_song
Curriculum vitae hanlin_songCurriculum vitae hanlin_song
Curriculum vitae hanlin_songElliot Song
 
Ilasi-Engineer-Resume--Oct2014
Ilasi-Engineer-Resume--Oct2014Ilasi-Engineer-Resume--Oct2014
Ilasi-Engineer-Resume--Oct2014Michael Ilasi
 
Ilasi-Engineer-Resume_Linkedin
Ilasi-Engineer-Resume_LinkedinIlasi-Engineer-Resume_Linkedin
Ilasi-Engineer-Resume_LinkedinMichael Ilasi
 
Tom Fay Resume Spring 2015
Tom Fay Resume Spring 2015Tom Fay Resume Spring 2015
Tom Fay Resume Spring 2015Thomas Fay
 
Dunbar_Process_resume2016
Dunbar_Process_resume2016Dunbar_Process_resume2016
Dunbar_Process_resume2016Paul Dunbar
 
John Hoffner Resume Dec 2014
John Hoffner Resume Dec 2014John Hoffner Resume Dec 2014
John Hoffner Resume Dec 2014John Hoffner
 
Dunbar process resume2016
Dunbar process resume2016Dunbar process resume2016
Dunbar process resume2016Paul Dunbar
 
Ian M. Boysen Resume
Ian M. Boysen ResumeIan M. Boysen Resume
Ian M. Boysen ResumeIan Boysen
 
Nathan Martin Resume 2017 Rev 2
Nathan Martin Resume 2017 Rev 2Nathan Martin Resume 2017 Rev 2
Nathan Martin Resume 2017 Rev 2Nathan Martin
 

Similar to Parker Williams resume (20)

Michael Ising Resume
Michael Ising ResumeMichael Ising Resume
Michael Ising Resume
 
Engineering Resume 5_17
Engineering Resume 5_17Engineering Resume 5_17
Engineering Resume 5_17
 
Kyle Hicks Resume
Kyle Hicks ResumeKyle Hicks Resume
Kyle Hicks Resume
 
Wyatt Tharp Resume
Wyatt Tharp ResumeWyatt Tharp Resume
Wyatt Tharp Resume
 
Ian M. Boysen Resume
Ian M. Boysen ResumeIan M. Boysen Resume
Ian M. Boysen Resume
 
Ilasi-Engineer-Resume
Ilasi-Engineer-ResumeIlasi-Engineer-Resume
Ilasi-Engineer-Resume
 
Curriculum vitae hanlin_song
Curriculum vitae hanlin_songCurriculum vitae hanlin_song
Curriculum vitae hanlin_song
 
DBWise_Resume
DBWise_ResumeDBWise_Resume
DBWise_Resume
 
Update Resume 12-4
Update Resume 12-4Update Resume 12-4
Update Resume 12-4
 
Ilasi-Engineer-Resume--Oct2014
Ilasi-Engineer-Resume--Oct2014Ilasi-Engineer-Resume--Oct2014
Ilasi-Engineer-Resume--Oct2014
 
Resume
ResumeResume
Resume
 
Ilasi-Engineer-Resume_Linkedin
Ilasi-Engineer-Resume_LinkedinIlasi-Engineer-Resume_Linkedin
Ilasi-Engineer-Resume_Linkedin
 
Tom Fay Resume Spring 2015
Tom Fay Resume Spring 2015Tom Fay Resume Spring 2015
Tom Fay Resume Spring 2015
 
Dunbar_Process_resume2016
Dunbar_Process_resume2016Dunbar_Process_resume2016
Dunbar_Process_resume2016
 
John Hoffner Resume Dec 2014
John Hoffner Resume Dec 2014John Hoffner Resume Dec 2014
John Hoffner Resume Dec 2014
 
Tolu Adesanwo _Resume
Tolu Adesanwo _ResumeTolu Adesanwo _Resume
Tolu Adesanwo _Resume
 
Dunbar process resume2016
Dunbar process resume2016Dunbar process resume2016
Dunbar process resume2016
 
Ian M. Boysen Resume
Ian M. Boysen ResumeIan M. Boysen Resume
Ian M. Boysen Resume
 
Nathan Martin Resume 2017 Rev 2
Nathan Martin Resume 2017 Rev 2Nathan Martin Resume 2017 Rev 2
Nathan Martin Resume 2017 Rev 2
 
Resume
ResumeResume
Resume
 

Parker Williams resume

  • 1. PA R K E R N . W IL L IA M S 1 7 3 6 R A N SER R D  M A N H A T T A N , K S  6 6 5 0 2 ( 8 1 6 ) 8 0 3 - 9 5 8 4  WI LLI P A R 0 0 0 @ A O L. C O M Bachelor ofScience Degree in Chemical Engineering August 2011-Present Minors: Business, Economics, and Chemistry Kansas St. University, Manhattan, KS GPA 3.4/4.0 Expected Graduation Date:May 2016 LEADERSHIP/WORK EXPERIENCE Cargill, Blair, NE May-August 2015 Project Engineering Intern  Assessed root cause for boiler O2 probe failures and implemented a solution  Assisted with product expansion projects including concrete and pressure safety valve installations  Developed the scope and implemented a compressed air line purge in a fermentation facility with a food grade environment  Collected temperature data and collaborated with vendors to implement an automated cooling system on crystalseparators  Participated in safety programs and the safety culture Cargill, Memphis, TN January-August 2014 Natural Resources Co-op  Interpreted energy balances, trends,and coded VBA in excel documents to generate energy reports  Supervised several energy saving projects,saving projections of over $300,000 annually  Helped in a plant wide energy saving collaboration involving heat exchange across several plant processes  Worked with all departments to optimize energy use in process  Managed contractors for technical projects  Guided contractors through the plant for analysis on over 300 steam traps  Experienced hands-on failure maintenance and preventative maintenance De Soto Aquatic Center, De Soto, KS Manager Summer 2013  Coordinated a staff of over 20 employees  Delegated employee work loads  Analyzed chemical levels and maintained backwash pressure systems to ensure safety  Resolved conflicts between patrons Lifeguard Summer 2009-2012  Oversaw an area of around 25-30 patrons and ensured safety through close attention to detail and teamwork Kaw Valley Arabians, Bonner Springs, KS Farm Hand 2009-Present  Tended to 15 horses on a daily basis  Constructed a 40 X 60 ft. fully insulated barn  Maintained the facility by building fences, fixing pipes, and supporting construction projects VOLUNTEER WORK N.A.S.A at Kansas State University, Manhattan,KS 2012  Participated in physical testing for graduate students who worked with N.A.S.A to research the physical demand on astronauts Habitat for Humanity, Manhattan,KS 2013  Worked with a team to improve the living standard for families in the Manhattan and Ogden areas