Examination Paper of Project Management
1
IIBM Institute of Business Management
IIBM Institute of Business Management
Examination Paper MM.100
Project Management
Section A: Objective Type & Short Questions (30 marks)
 This section consists of Multiples choice and Short Note Type questions.
 Answer all the questions.
 Part one carries 1 mark each and Part Two carries 4 marks each.
Part One:
Multiple choices:
1. Liquidation value of the firm’s assets could be considered as________________
a. The minimum wealth of shareholder
b. The maximum wealth of shareholder
c. The average wealth of shareholder
d. None
2. If ‘P’ be the initial investment, ‘I’ be the interest rate and ‘T’ be the time period for which
funds are invested then interest earned will be______________
a. P*I/T
b. P*T/I
c. (P*I*T)2
d. P*I*T
3. Following the above given conditions, compound Interest be given by___________
a. P*(1+I)1/T
b. P*(1+I)T
c. (P*I*T)T
d. Can not be calculated
4. Firms resorting to ‘Proactive Growth’?
a. Do constant strategic planning
b. Watch things happening
c. Never plan but work on fortune
d. None
5. ‘SPACE’ stands for___________________
6. Increasing marketing expenditure leading to an increased market share is known
as________________
a. Market development
b. Market penetration
c. Market expansion
d. Market growth
Examination Paper of Project Management
2
IIBM Institute of Business Management
7. If profit after tax is ‘A’ ,depreciation be ‘B’ and interest be ‘I’ then Interest cover ratio
is given by______________
8. E-V rule is also called_____________
a. Mean co variance rule
b. Mean variance rule
c. Mean deviation rule
d. None
9. In case of internally generated funds the opportunity cost to the firm is____________
a. Zero
b. The lending rate
c. The borrowing rate
d. None
10. ‘PERT’ stands for__________________
Part Two:
1. Write a note on ‘Sinking Fund Payment’.
2. Differentiate between PERT and CPM Model?
3. What is ‘Capital Asset Pricing Model (CAPM)’?
4. What do you understand by PBP (Payback Period Method)?
5. Briefly explain the planning for procurement?
END OF SECTION A
Section B: Caselets (40 marks)
 This section consists of Caselets.
 Answer all the questions.
 Each caselet carries 20 marks.
 Detailed information should form the part of your answer (Word limit 150 to 200 words).
Caselet 1
Project partnering at British Airports Authority (BAA)
The construction sector in recent times has not been noted for its high levels of performance. Firms
like BAA, who own and operate airports including Heathrow and Gatwick – London’s two major
airports – rely heavily on their suppliers, including their construction suppliers, for their own
performance. Where construction projects are delayed, the financial consequences can be disastrous.
Furthermore, the disciplines of working on airport premises, including the security issues, play a
Examination Paper of Project Management
3
IIBM Institute of Business Management
significant part in the daily working lives of project staff. New firms bringing new staff onto the
airport sites invariably require time to bring them up to speed with the appropriate ways of working.
Particular problems include:
 Security – all personnel with access to airside parts of the airport (i.e. past passport control) must
be security vetted and trained. The vetting process takes six weeks, so firms must prepare project
staff in advance;
 Deliveries – getting materials into the airport is problematic, due to significant congestion and
lack of availability of areas for storage;
 Constant use of terminal buildings by passengers – the closing of areas causes problems with
passenger capacity. The firms are required to work with the constraints of passengers using the
areas around where the work is being carried out and physical and noise intrusion must be kept to
a minimum;
 The commercial activities (shops and restaurants) are the economic lifeblood of the business, with
large ground-rents. The objective of projects involving these areas is not simply to complete
works on time but as early as possible, so that the areas can start to generate rental incomes.
The traditional approach to managing fit-out projects (changing internal layouts to accommodate
different facilities and in particular new retail facilities) was that every contract was different, and
would be negotiated with different contractors. These would then employ their own sub-contractors to
carry out parts of the work. The approach that has worked far better for all concerned has been
through the appointment of lead contractors, with long-term contracts – in most cases 10 years – to be
the prime supplier of fit-out services to B.A.A. This particular contract was awarded to MACE. As
part of the agreement, BAA has paid for MACE staff to attend training programmes. This has
extended further, with help being offered to their suppliers – of both materials and labour – for
development. Where particular problems are identified, the supplier can be asked to take part in an
improvement programme. Satisfactory completion can result in similar long-term deals (tied to
continual improvement) being offered to those suppliers. In some cases the problems – particularly
with designs for areas – have been the responsibility of BAA. The mechanisms are now in place to
identify these problems and to introduce new practices to avoid them in future.
1) Summarise the arguments for such a policy of partnering with a major supplier such as BAA and
MACE have done here.
2) Carry out further research to identify further examples of partnering in projects. How well do they
appear to be working?
Caselet 2
The Big Dig
Any project that involves tunnelling is risky. Any project that involved tunneling under a city whilst
trying to keep that city fully operational, is very risky. When that city is bottom in the USA, it is in a
risk category all of its own. This does not, how – ever, excuse the financial performance of this
project, the results of which are exceptional and even make the performance of previous ‘stars of
disaster’ such as the Channel Tunnel, look good. During the 1950s, the Commonwealth of
Massachusetts commissioned new roads as part of a national road-building frenzy that took place at
that time. The result was a partly elevated freeway that cut the city off from its old harbour and over
time coped increasingly less well with the volumes of traffic that were trying to use it. For many
years, the project had been the subject of much politicking and had been rejected by a number of
national administrations. In 1993, it was given the go-ahead. At this time the budget was $US2.6
Examination Paper of Project Management
4
IIBM Institute of Business Management
billion, an enormous sum of money for an 8-mile tunnel, but given the technical complexity of the
task, this was considered acceptable. Gradually the costs rose, until in 1998, the estimated final cost
was 410.4 billion. By mid-2000 this had risen to $13 billion and by mid-2001 to over $15 billion. It
was still considered a technical success, but both politically and economically, it was a disaster. In
project management terms it is also a disaster – a 500 per cent-plus overrun on budget can only be
described as ‘talented’. How did such a financial disaster occur? The first is a feature of many large
‘political’ projects – that the ‘real cost’ would not be politically acceptable. The original budget was
deliberately deflated to make the project happen. The second is technical risk – that of the tunnelling
process. The ground through which the tunnelling is being carried out is reclaimed land that was
originally under the sea. The tunnelling process being used was also new, presenting a degree of
technical novelty.
1) How might the project be considered a technical success but an economic, political and project
management disaster?
2) Suggest how the 500 per cent-plus overrun might have come about.
END OF SECTION B
Section C: Applied Theory (30 marks)
 This section consists of Long Questions.
 Answer all the questions.
 Each question carries 15 marks.
 Detailed information should form the part of your answer (Word limit 200 to 250 words).
1. Define the term Integration Management? And how would you explain the Project plan in detail?
2. The funds and personnel requirements of the project change significantly with the stage of its life
cycle. What are the stages in the life cycle of project? Describe them.
END OF SECTION C
S-2-300813

More Related Content

What's hot

CHALLENGES OT THE BETTER, FASTER, CHEPER PHILOSOPHY OF AERONAUTICAL DESIGN
CHALLENGES OT THE BETTER, FASTER, CHEPER PHILOSOPHY OF AERONAUTICAL DESIGNCHALLENGES OT THE BETTER, FASTER, CHEPER PHILOSOPHY OF AERONAUTICAL DESIGN
CHALLENGES OT THE BETTER, FASTER, CHEPER PHILOSOPHY OF AERONAUTICAL DESIGN
guest3b4ea
 
Project Delivery Methods
Project Delivery MethodsProject Delivery Methods
Project Delivery Methods
Stacy Abernathy
 

What's hot (8)

CHALLENGES OT THE BETTER, FASTER, CHEPER PHILOSOPHY OF AERONAUTICAL DESIGN
CHALLENGES OT THE BETTER, FASTER, CHEPER PHILOSOPHY OF AERONAUTICAL DESIGNCHALLENGES OT THE BETTER, FASTER, CHEPER PHILOSOPHY OF AERONAUTICAL DESIGN
CHALLENGES OT THE BETTER, FASTER, CHEPER PHILOSOPHY OF AERONAUTICAL DESIGN
 
CFW Supply Chain Development
CFW Supply Chain DevelopmentCFW Supply Chain Development
CFW Supply Chain Development
 
CRNM - CARICOM Construction & Installation Services Sector
CRNM - CARICOM Construction & Installation Services SectorCRNM - CARICOM Construction & Installation Services Sector
CRNM - CARICOM Construction & Installation Services Sector
 
Recent developments in Capacity Remuneration Mechanisms
Recent developments in Capacity Remuneration MechanismsRecent developments in Capacity Remuneration Mechanisms
Recent developments in Capacity Remuneration Mechanisms
 
Project Delivery Methods
Project Delivery MethodsProject Delivery Methods
Project Delivery Methods
 
Approach presentation hyperlinks 05292007 3
Approach presentation hyperlinks 05292007 3Approach presentation hyperlinks 05292007 3
Approach presentation hyperlinks 05292007 3
 
Building Economics Tutorial
Building Economics TutorialBuilding Economics Tutorial
Building Economics Tutorial
 
Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...
Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...
Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...
 

Viewers also liked (9)

My Resume
My ResumeMy Resume
My Resume
 
Día de la PAZ
Día de la PAZDía de la PAZ
Día de la PAZ
 
Juegos autoctonos canarios
Juegos autoctonos canariosJuegos autoctonos canarios
Juegos autoctonos canarios
 
Dr Muhammad Yunus
Dr Muhammad YunusDr Muhammad Yunus
Dr Muhammad Yunus
 
What Factors Affect the Garments_Textile Industry in Bangladesh_Faizan
What Factors Affect the Garments_Textile Industry in Bangladesh_FaizanWhat Factors Affect the Garments_Textile Industry in Bangladesh_Faizan
What Factors Affect the Garments_Textile Industry in Bangladesh_Faizan
 
Alfabeto Corporal
Alfabeto CorporalAlfabeto Corporal
Alfabeto Corporal
 
Juegos Tradicionales Canarios
Juegos Tradicionales CanariosJuegos Tradicionales Canarios
Juegos Tradicionales Canarios
 
Econometrics project - Faizan
Econometrics project - FaizanEconometrics project - Faizan
Econometrics project - Faizan
 
Project management 250613
Project management 250613Project management 250613
Project management 250613
 

Similar to Project management 250613

1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
MargaritoWhitt221
 
Changing the Face at the Busiest Airport in the World th.docx
Changing the Face  at the Busiest Airport  in the World th.docxChanging the Face  at the Busiest Airport  in the World th.docx
Changing the Face at the Busiest Airport in the World th.docx
cravennichole326
 
Changing the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docxChanging the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docx
cravennichole326
 
2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects
Tim McManus
 
I B M Rankan Failure Of I T Projects
I B M  Rankan  Failure Of  I T  ProjectsI B M  Rankan  Failure Of  I T  Projects
I B M Rankan Failure Of I T Projects
Rankanidhi Panigrahy
 
Entrepreneurship Prepration of Project report.ppt
Entrepreneurship Prepration of Project report.pptEntrepreneurship Prepration of Project report.ppt
Entrepreneurship Prepration of Project report.ppt
RenuLamba8
 

Similar to Project management 250613 (20)

Heathrow Airport - Refurbishment of Terminal 1
Heathrow Airport - Refurbishment of Terminal 1Heathrow Airport - Refurbishment of Terminal 1
Heathrow Airport - Refurbishment of Terminal 1
 
CHAPTER 1 - Project Management.pdf
CHAPTER 1 - Project Management.pdfCHAPTER 1 - Project Management.pdf
CHAPTER 1 - Project Management.pdf
 
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
 
CHAPTER-1 INTRODUCTION.pdf
CHAPTER-1 INTRODUCTION.pdfCHAPTER-1 INTRODUCTION.pdf
CHAPTER-1 INTRODUCTION.pdf
 
IRJET- Risk Management in BOT PNG Toll Plaza
IRJET- Risk Management in BOT PNG Toll PlazaIRJET- Risk Management in BOT PNG Toll Plaza
IRJET- Risk Management in BOT PNG Toll Plaza
 
Chunnel project project cost management
Chunnel  project project cost managementChunnel  project project cost management
Chunnel project project cost management
 
Changing the Face at the Busiest Airport in the World th.docx
Changing the Face  at the Busiest Airport  in the World th.docxChanging the Face  at the Busiest Airport  in the World th.docx
Changing the Face at the Busiest Airport in the World th.docx
 
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECTHOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
 
Changing the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docxChanging the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docx
 
2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects
 
I B M Rankan Failure Of I T Projects
I B M  Rankan  Failure Of  I T  ProjectsI B M  Rankan  Failure Of  I T  Projects
I B M Rankan Failure Of I T Projects
 
Tokyo Bay Mega- Float
Tokyo Bay Mega- FloatTokyo Bay Mega- Float
Tokyo Bay Mega- Float
 
Assignment 1 Project Scope And Scheduling
Assignment 1 Project Scope And SchedulingAssignment 1 Project Scope And Scheduling
Assignment 1 Project Scope And Scheduling
 
(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 Sigma(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 Sigma
 
cost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriacost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeria
 
Entrepreneurship Prepration of Project report.ppt
Entrepreneurship Prepration of Project report.pptEntrepreneurship Prepration of Project report.ppt
Entrepreneurship Prepration of Project report.ppt
 
Mario megaprojekt 2 11.4.2021
Mario megaprojekt 2 11.4.2021Mario megaprojekt 2 11.4.2021
Mario megaprojekt 2 11.4.2021
 
Toronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy StudyToronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy Study
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
 
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...
 

Recently uploaded

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 

Recently uploaded (20)

👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 

Project management 250613

  • 1. Examination Paper of Project Management 1 IIBM Institute of Business Management IIBM Institute of Business Management Examination Paper MM.100 Project Management Section A: Objective Type & Short Questions (30 marks)  This section consists of Multiples choice and Short Note Type questions.  Answer all the questions.  Part one carries 1 mark each and Part Two carries 4 marks each. Part One: Multiple choices: 1. Liquidation value of the firm’s assets could be considered as________________ a. The minimum wealth of shareholder b. The maximum wealth of shareholder c. The average wealth of shareholder d. None 2. If ‘P’ be the initial investment, ‘I’ be the interest rate and ‘T’ be the time period for which funds are invested then interest earned will be______________ a. P*I/T b. P*T/I c. (P*I*T)2 d. P*I*T 3. Following the above given conditions, compound Interest be given by___________ a. P*(1+I)1/T b. P*(1+I)T c. (P*I*T)T d. Can not be calculated 4. Firms resorting to ‘Proactive Growth’? a. Do constant strategic planning b. Watch things happening c. Never plan but work on fortune d. None 5. ‘SPACE’ stands for___________________ 6. Increasing marketing expenditure leading to an increased market share is known as________________ a. Market development b. Market penetration c. Market expansion d. Market growth
  • 2. Examination Paper of Project Management 2 IIBM Institute of Business Management 7. If profit after tax is ‘A’ ,depreciation be ‘B’ and interest be ‘I’ then Interest cover ratio is given by______________ 8. E-V rule is also called_____________ a. Mean co variance rule b. Mean variance rule c. Mean deviation rule d. None 9. In case of internally generated funds the opportunity cost to the firm is____________ a. Zero b. The lending rate c. The borrowing rate d. None 10. ‘PERT’ stands for__________________ Part Two: 1. Write a note on ‘Sinking Fund Payment’. 2. Differentiate between PERT and CPM Model? 3. What is ‘Capital Asset Pricing Model (CAPM)’? 4. What do you understand by PBP (Payback Period Method)? 5. Briefly explain the planning for procurement? END OF SECTION A Section B: Caselets (40 marks)  This section consists of Caselets.  Answer all the questions.  Each caselet carries 20 marks.  Detailed information should form the part of your answer (Word limit 150 to 200 words). Caselet 1 Project partnering at British Airports Authority (BAA) The construction sector in recent times has not been noted for its high levels of performance. Firms like BAA, who own and operate airports including Heathrow and Gatwick – London’s two major airports – rely heavily on their suppliers, including their construction suppliers, for their own performance. Where construction projects are delayed, the financial consequences can be disastrous. Furthermore, the disciplines of working on airport premises, including the security issues, play a
  • 3. Examination Paper of Project Management 3 IIBM Institute of Business Management significant part in the daily working lives of project staff. New firms bringing new staff onto the airport sites invariably require time to bring them up to speed with the appropriate ways of working. Particular problems include:  Security – all personnel with access to airside parts of the airport (i.e. past passport control) must be security vetted and trained. The vetting process takes six weeks, so firms must prepare project staff in advance;  Deliveries – getting materials into the airport is problematic, due to significant congestion and lack of availability of areas for storage;  Constant use of terminal buildings by passengers – the closing of areas causes problems with passenger capacity. The firms are required to work with the constraints of passengers using the areas around where the work is being carried out and physical and noise intrusion must be kept to a minimum;  The commercial activities (shops and restaurants) are the economic lifeblood of the business, with large ground-rents. The objective of projects involving these areas is not simply to complete works on time but as early as possible, so that the areas can start to generate rental incomes. The traditional approach to managing fit-out projects (changing internal layouts to accommodate different facilities and in particular new retail facilities) was that every contract was different, and would be negotiated with different contractors. These would then employ their own sub-contractors to carry out parts of the work. The approach that has worked far better for all concerned has been through the appointment of lead contractors, with long-term contracts – in most cases 10 years – to be the prime supplier of fit-out services to B.A.A. This particular contract was awarded to MACE. As part of the agreement, BAA has paid for MACE staff to attend training programmes. This has extended further, with help being offered to their suppliers – of both materials and labour – for development. Where particular problems are identified, the supplier can be asked to take part in an improvement programme. Satisfactory completion can result in similar long-term deals (tied to continual improvement) being offered to those suppliers. In some cases the problems – particularly with designs for areas – have been the responsibility of BAA. The mechanisms are now in place to identify these problems and to introduce new practices to avoid them in future. 1) Summarise the arguments for such a policy of partnering with a major supplier such as BAA and MACE have done here. 2) Carry out further research to identify further examples of partnering in projects. How well do they appear to be working? Caselet 2 The Big Dig Any project that involves tunnelling is risky. Any project that involved tunneling under a city whilst trying to keep that city fully operational, is very risky. When that city is bottom in the USA, it is in a risk category all of its own. This does not, how – ever, excuse the financial performance of this project, the results of which are exceptional and even make the performance of previous ‘stars of disaster’ such as the Channel Tunnel, look good. During the 1950s, the Commonwealth of Massachusetts commissioned new roads as part of a national road-building frenzy that took place at that time. The result was a partly elevated freeway that cut the city off from its old harbour and over time coped increasingly less well with the volumes of traffic that were trying to use it. For many years, the project had been the subject of much politicking and had been rejected by a number of national administrations. In 1993, it was given the go-ahead. At this time the budget was $US2.6
  • 4. Examination Paper of Project Management 4 IIBM Institute of Business Management billion, an enormous sum of money for an 8-mile tunnel, but given the technical complexity of the task, this was considered acceptable. Gradually the costs rose, until in 1998, the estimated final cost was 410.4 billion. By mid-2000 this had risen to $13 billion and by mid-2001 to over $15 billion. It was still considered a technical success, but both politically and economically, it was a disaster. In project management terms it is also a disaster – a 500 per cent-plus overrun on budget can only be described as ‘talented’. How did such a financial disaster occur? The first is a feature of many large ‘political’ projects – that the ‘real cost’ would not be politically acceptable. The original budget was deliberately deflated to make the project happen. The second is technical risk – that of the tunnelling process. The ground through which the tunnelling is being carried out is reclaimed land that was originally under the sea. The tunnelling process being used was also new, presenting a degree of technical novelty. 1) How might the project be considered a technical success but an economic, political and project management disaster? 2) Suggest how the 500 per cent-plus overrun might have come about. END OF SECTION B Section C: Applied Theory (30 marks)  This section consists of Long Questions.  Answer all the questions.  Each question carries 15 marks.  Detailed information should form the part of your answer (Word limit 200 to 250 words). 1. Define the term Integration Management? And how would you explain the Project plan in detail? 2. The funds and personnel requirements of the project change significantly with the stage of its life cycle. What are the stages in the life cycle of project? Describe them. END OF SECTION C S-2-300813