CASTORO 12
OFFSHORE
CASTORO 12
PRINCIPAL DIMENSIONS
& CAPACITIES
Length of hull: 106 m
Length overall (LOA) including
truss: 115 m
Breadth overall: 29.35 m
Depth: 5 m
Operating draught (typical): 1.4 m
Class Notation: LRS X 100 AT Pontoon
and RMRS KE II C π
Helideck: 19.5 m dia. for Super Puma
AS332L2
Flag: Kazakhstan
PIPELAY EQUIPMENT
Maximum pipe size: 40”
30 t Remacut Tensioner
A&R winch 30 tons
Welding PASSO system
Line-up system,
two multi directional rollers
2 bevelling stations
3 welding stations
1 NDT (UT) station
1 repair station
2 field joint stations
Maximum deepwater pipelay: 12 m
MOORING SYSTEM
5 double drum anchor winches:
MEP AT25000
Max. pull: 35 tons
Polyester rope 60 mm dia., 400 m length
10 anchors: 2.5 tons Delta Flipper type
POWER GENERATION
Main generators three @ 800 kw,
380 V, 50 Hz
LIFTING EQUIPMENT
Pedestal crane: 35 tons
Boom length: 30 m
Foldable crane: 20 tons
ACCOMMODATION FACILITIES
Up to 150 people in single, double,
4 bed cabins. Offices, common spaces
and crew recreation facilities.
Water maker generator: Tasman Sea
72m³/day (Danfoss Sea Recovery Corp)
SHALLOW WATER PIPELAY BARGE,
CASPIAN SEA SERVICE
10.2013
People, Skills, Equipment.
Saipem S.p.A.
Via Martiri di Cefalonia, 67 - 20097 San Donato Milanese, Milan - Italy
Tel. +39.02.520.1 - Fax +39.02.520.44415
saipem.com - A subsidiary of Eni S.p.A.

More Related Content

Similar to 1041spm_cast12_L01_1

Fugro-Synergy_(2010)_Drillship-Brochure_FWS
Fugro-Synergy_(2010)_Drillship-Brochure_FWSFugro-Synergy_(2010)_Drillship-Brochure_FWS
Fugro-Synergy_(2010)_Drillship-Brochure_FWSErik-André Albrecht
 
Lifting Plan for INSTALLATION XCR40 & XCR41 by using Crawler Crane CC2800-1 &...
Lifting Plan for INSTALLATION XCR40 & XCR41 by using Crawler Crane CC2800-1 &...Lifting Plan for INSTALLATION XCR40 & XCR41 by using Crawler Crane CC2800-1 &...
Lifting Plan for INSTALLATION XCR40 & XCR41 by using Crawler Crane CC2800-1 &...Abdul Karim
 
PC 375 catalogue(in english)
PC 375 catalogue(in english)PC 375 catalogue(in english)
PC 375 catalogue(in english)Zorareh Nouri
 
Seven borealis
Seven borealisSeven borealis
Seven borealisBarry Gray
 
Seven Borealis
Seven BorealisSeven Borealis
Seven BorealisBarry Gray
 
Seven borealis
Seven borealisSeven borealis
Seven borealisBarry Gray
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Gensol Engineering Limited
 
Altus exertus-specification
Altus exertus-specificationAltus exertus-specification
Altus exertus-specificationpatel170591
 
St36x80 tech spec (2) (1)
St36x80 tech spec (2) (1)St36x80 tech spec (2) (1)
St36x80 tech spec (2) (1)Oscar044
 
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3Santosh Verma
 
Three gorges project
Three gorges projectThree gorges project
Three gorges projectEndu Tesfa
 
Cable pulling machines winches manufacturer!
Cable pulling machines winches manufacturer!Cable pulling machines winches manufacturer!
Cable pulling machines winches manufacturer!cablepullingmachines
 
Coiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdfCoiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdfsalem123gmaal
 
Setia selam-ii-meds
Setia selam-ii-medsSetia selam-ii-meds
Setia selam-ii-medspatel170591
 
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]Gerald Patrick Soriano
 

Similar to 1041spm_cast12_L01_1 (20)

Fugro-Synergy_(2010)_Drillship-Brochure_FWS
Fugro-Synergy_(2010)_Drillship-Brochure_FWSFugro-Synergy_(2010)_Drillship-Brochure_FWS
Fugro-Synergy_(2010)_Drillship-Brochure_FWS
 
Lifting Plan for INSTALLATION XCR40 & XCR41 by using Crawler Crane CC2800-1 &...
Lifting Plan for INSTALLATION XCR40 & XCR41 by using Crawler Crane CC2800-1 &...Lifting Plan for INSTALLATION XCR40 & XCR41 by using Crawler Crane CC2800-1 &...
Lifting Plan for INSTALLATION XCR40 & XCR41 by using Crawler Crane CC2800-1 &...
 
1023spm_sFDS_L01_13_
1023spm_sFDS_L01_13_1023spm_sFDS_L01_13_
1023spm_sFDS_L01_13_
 
PC 375 catalogue(in english)
PC 375 catalogue(in english)PC 375 catalogue(in english)
PC 375 catalogue(in english)
 
Seven borealis
Seven borealisSeven borealis
Seven borealis
 
Seven Borealis
Seven BorealisSeven Borealis
Seven Borealis
 
Seven borealis
Seven borealisSeven borealis
Seven borealis
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
 
Road Header and Bolter Miner
Road Header and Bolter MinerRoad Header and Bolter Miner
Road Header and Bolter Miner
 
Altus exertus-specification
Altus exertus-specificationAltus exertus-specification
Altus exertus-specification
 
St36x80 tech spec (2) (1)
St36x80 tech spec (2) (1)St36x80 tech spec (2) (1)
St36x80 tech spec (2) (1)
 
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3
 
Three gorges project
Three gorges projectThree gorges project
Three gorges project
 
Cable Drum Trailers Manufacturer!
Cable Drum Trailers Manufacturer!Cable Drum Trailers Manufacturer!
Cable Drum Trailers Manufacturer!
 
Cable pulling machines winches manufacturer!
Cable pulling machines winches manufacturer!Cable pulling machines winches manufacturer!
Cable pulling machines winches manufacturer!
 
Seven_Oceans
Seven_OceansSeven_Oceans
Seven_Oceans
 
Coiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdfCoiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdf
 
Normand Cutter
Normand CutterNormand Cutter
Normand Cutter
 
Setia selam-ii-meds
Setia selam-ii-medsSetia selam-ii-meds
Setia selam-ii-meds
 
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
 

1041spm_cast12_L01_1

  • 2. CASTORO 12 PRINCIPAL DIMENSIONS & CAPACITIES Length of hull: 106 m Length overall (LOA) including truss: 115 m Breadth overall: 29.35 m Depth: 5 m Operating draught (typical): 1.4 m Class Notation: LRS X 100 AT Pontoon and RMRS KE II C π Helideck: 19.5 m dia. for Super Puma AS332L2 Flag: Kazakhstan PIPELAY EQUIPMENT Maximum pipe size: 40” 30 t Remacut Tensioner A&R winch 30 tons Welding PASSO system Line-up system, two multi directional rollers 2 bevelling stations 3 welding stations 1 NDT (UT) station 1 repair station 2 field joint stations Maximum deepwater pipelay: 12 m MOORING SYSTEM 5 double drum anchor winches: MEP AT25000 Max. pull: 35 tons Polyester rope 60 mm dia., 400 m length 10 anchors: 2.5 tons Delta Flipper type POWER GENERATION Main generators three @ 800 kw, 380 V, 50 Hz LIFTING EQUIPMENT Pedestal crane: 35 tons Boom length: 30 m Foldable crane: 20 tons ACCOMMODATION FACILITIES Up to 150 people in single, double, 4 bed cabins. Offices, common spaces and crew recreation facilities. Water maker generator: Tasman Sea 72m³/day (Danfoss Sea Recovery Corp) SHALLOW WATER PIPELAY BARGE, CASPIAN SEA SERVICE
  • 3.
  • 4. 10.2013 People, Skills, Equipment. Saipem S.p.A. Via Martiri di Cefalonia, 67 - 20097 San Donato Milanese, Milan - Italy Tel. +39.02.520.1 - Fax +39.02.520.44415 saipem.com - A subsidiary of Eni S.p.A.