1. install stop sign
install f.s.
lock gate
14 parking spots
25’
25’
install f.s.
lock gate
install site
id sign
25’
construct 3’ trailhead to
lower climbing trail
4’ wide raised
bed w/ natural
vegetation
barrier
4’ wide raised
bed w/ natural
vegetation
barrier
to salt lake
to alta
to wasatch
resort
storm drain
install underground 3’
pressure-pad alarm
system around property
line
existing road easement
10’
quarry silo to be
converted into opperation
center / storage garage
for LCC power plant
bay doors
remnant concrete structures
to remain. Future conversion
into storage possible
scale: 1/132” = 1’-0” N
highway 210
concrete walking path
connecting to trailhead
5’
asphalt access road