This document contains the biodata of Mukesh J Modi, including personal details, educational qualifications, career history, and achievements. Some key points:
- Mukesh J Modi is 38 years old and has over 20 years of experience working in petrochemical plants at Reliance Industries Limited in various roles such as field operator, DCS panel officer, and current role as shift engineer.
- He has a diploma in chemical engineering from 1994 and a part-time degree in chemical engineering from 2009.
- As shift engineer, he supervises shift teams and is responsible for plant performance, commissioning, emergency handling, and training personnel.
- Mukesh has extensive experience operating
1. BIODATA
Name: MUKESH J MODI
Ph. No: 0919998962361
Email : mjm86981@gmail.com.
mjm86981@yahoo.com
Personal Details:
Date of Birth: 11.04.1976, Age: 38 year.
Nationality: Indian
Language Known: English, Hindi and Gujarati
Passport Number: -G 1896351 VALID UPTO 2017
Marital status: - Married having two children.
Notice period 3 months
Education and Qualification:
Qualification:
1) Passed part time degree program (sponsed by Reliance Industry Limited) of chemical engineering from reputed university
(SVNIT, SURAT) (3 year duration coarse) from april 2006 to April 2009.
2) Passed Diploma in chemical (petrochemical) Engineering in 1994.
Marks Obtain: 73% (Distinction in all six semester)
Passing Year: 1994
University: M S University, Baroda, Gujarat.
Current ctc:- 11.8 rs. lac per annum.
Reference:-
GOPAL BHATT, Senior manager, pta plant, Reliance industry limited, surat, hazira, phone no 0919998219164.
Rinto antony senior manager pta plant reliance industry limited surat hazira ph no 0919725056018,0918511182649
Career History: Total experience: 20 Years
Working in Indian largest private sector petrochemical complex RELIANCE INDUSTRY LIMITED from last 20
years.
shift engineer 3 Years,
dcs panel officer 8 years,
field operator 8 years.
2. From 24.04.1995 to 30.09.2003 worked as field operator and then after as dcs panel operator till october 2011 and then as
shift engineer to till date in 500 KTA Purified Terephthalic Acid Plant, licensed by ICI DuPond (NOW KNOWN AS
INVISTA) and involved in pre-commissioning, commissioning and erection of the two PTA plant.
Handled the following eqeuipments like sundyne pump , H2 plunger compressor, H2 diaphram compressor, Hydrogeation
reactor, crystallizer,centrifuge, rotary steam tube dryer, Hydrogen Generation unit, Hydrogen compressor, Nitrogen compressor,
effluent treatment plant, tankfarm.Hydrogen dryer with hydrogern pressure swing adsoption system, hydrogen deoxidizer.
Achievements:
• Promoted as panel officer after completion of 8 years from field operator.
• Promoted as shift engineer in october 2011.
Experience and Specializes:
AS SHIFT ENGINEER
knowledge:
•20 years shift leadership/supervisory experience in large scale PTA plant.
Experience shall include supervision and motivation of shift teams, commissioning and start up, SOP preparation, process equipment
troubleshooting, work permit system, emergency handling and fire fighting, plant performance monitoring and commissioning & start
up
•Detailed and expert process knowledge of PTA plant operation.
•Sound understanding of all relevant plant and equipment.
•Exposure to petrochemical production practices and techniques.
Skills:
• Excellent process equipment operational skills including DCS knowledge.
•Strong ability to handle emergency situation under pressure.
•Effective man management, team building and leadership skills.
•Fluent spoken and written English. Technical report writing skills.
•Excellent skills in PC operation using MS office,
•Effective and professional communication skills to act as the bridge between the management and floor shop workers.
•Ability to perform under pressure especially during plant emergencies to ensure safety of personnel and equipments.
•Effective counseling techniques with convincing ability.
•Ability to develop conducive work environment even under adverse working conditions.
Capability to teach, mentor and train personnel.
During Pre- commissioning and Commissioning Of PTA & Hydrogen Generation unit, I was actively involved in activities which
comprises of :
- Format checking for system
- Flushing plan preparation
- Leak test of the system
- Catalyst Loading
- Commissioning of Reciprocating & diaphram hydrogen compressors
- Commissioning of sundyne pump, hp motor driven centrifugal pump, reciprocating pumps.
- Commissioning of loops of process as well as utilities.
- Scheme Preparation for MP and LP Steam blowing
- Logic checking of the systems
- Control valve stroke checking
Thanks, Mukesh j modi.