Call Girls Aurangabad Just Call 9907093804 Top Class Call Girl Service Available
Biorisk management
1. Measurement and analysis of biorisk
management system and
performance
Submitted to:- Mam Rida Saleem
Submitted by:- Muhammad Imran
Reg no:- 2019-amj-020
2. Biorisk management system
• The organization shall establish, document,
implement and maintain a biorisk management
system in accordance with the requirements of this
laboratory biorisk management standard.
3. Establishing a biorisk
management system:-
• policy and objectives relevant to the organization’s
business as a whole;
• legal and other requirements;
• historical and current performance by the
organization;
• needs of other interested parties;
• opportunities and need for continual improvement;
• resources needed;
• contributions of employees.
4. Tools to measure biorisk
management system
• Audits
• Inspection
• Questionnaires
• Interview
• Training evaluation
• Incident reports
5. Audits:-
• When qualified professional comes and they
looking to the lab documents.
• Also look the compliance and procedures
6. Inspection:-
• Formal evaluation
• In which common examination of the system
(laboratory)
• Immediate assessment
• Focus on specific aspects
• Inspection can be done unannounced or may be
announced.
7. Questionnaires
• It is a major tool
• You can design and provide the questions for
laboratrians to gathering theinformation about
laboratory system.
•
8. Interview:-
• It is the conversation between two people
• An interviewer get information and get the opinion
of that person which giving the interview and know
depth of details through the interview by asking
relative questions.
•
9. Training evaluation:-
• Enhanced the competency of laboratrians that
organized the workshop or other training program
on biorisk management system.
• Immediate feedback. (How the workshop and What
participate think about trainer.)
10. Incident reports:-
• report against Unusual things happen in laboratory.
• Safe the laboratory from unusual incident