SlideShare a Scribd company logo
1 of 18
Download to read offline
The Digital Twin for
an oilfield
IoT TechExpo Europe
Amsterdam
June 27th 2018
Lars Meløe
Kongsberg Digital
Statoil & KONGSBERG Restricted - Digital Twin for Unmanned Facilities - Feasibility Study
KONGSBERG group –
Technology innovation
page
02
Statoil & KONGSBERG Restricted - Digital Twin for Unmanned Facilities - Feasibility Study
Disruptive digitalization
projects
page
03
Statoil & KONGSBERG Restricted - Digital Twin for Unmanned Facilities - Feasibility Study
What is a Digital Twin?
• Comprehensive replica & accurate representation
• Advanced analytics and machine learning
• Static, historical and real-time data
• Technical to business operations usage
• Context dependent user interface
The Digital Twin
The installation
Digital Twin
Screenshots
Visualization &
Collaboration
Lifecycle
Management
Cyber
Security
Facility Roaming Assets
Physical
Asset
Well & Reservoir
Subsurface
Topside
Edge Gateway
IMS
SAS | Autonomy
Equipment Packages
Vessel
Helicopter
Drone
Digital Infrastructure
& Simulators
Models & Services
Real Time Data Historian
Asset
Models
Business
Data
3D
Models
App Framework
Analytics &
ML Engines
Simulation Engines
Physical / Mathematical Models
Data Driven (AI) Models
Hybrid Models
Visualization
Engine
GIS
AIS
Data
Services
Digital Platform
Application Programming Interfaces (API)
Application Areas
Functional
Integrated
Operation Center
Plan & Expert
Centers
Field Development
& Modifications
Drilling
& Wells
Production
Optimization
Operations
& Maintenance
Maritime Ops
& Logistics
Integrated Field
Development Team
Control Room,
Operation Center
Maintenance
Team
Vendors
Others
Client Data Platform
Statoil & Kongsberg - Digital Twin for Unmanned Facilities - Feasibility Study
Evolving
Operational Models
1
2
3
Statoil & Kongsberg - Digital Twin for Unmanned Facilities - Feasibility Study
«FieldOps»
Loop
Field Development &
Larger Modifications
Operations &
Maintenance
New Operational concept
Monitor performance and solve problems
page
013
Issue Work Order
1- Faulty gaslift valve must be
replaced.
2 – Reconfigure production settings to
maintain production
PREPARING THE TEAM
Maritime Operation
Digital Twin through
Life of Field
Feasibility
study
Concept
selection
FEED
Detailed
Engineering
Commissioning
Production
start
Operation Maintenance Modifications
DIGITAL TWINS UNLOCK SIGNIFICANT VALUE FOR OPERATORS
ACROSS THE VALUE CHAIN - EXAMPLES
SOURCE: McKinsey, Multiple cases from other industries, e.g. airline, chemicals, agriculture, automotive; O&G pilots; Estimates
Upstream value chain
Exploration
Drilling &
completion
Reservoir
management
Capital project
delivery
Operations
and
maintenance
Supply chain
& overhead
-30% cost
-30% time
+10 % prod.
- 20-60% cost
 30% - 70% reduction of engineering
cost and time
 Reduced materials costs
 Labor man hours reduced by 30-80%
across multiple key processes
 5-15% higher production by higher
uptime and prevention of unplanned
events and failures
 20-40% reduced maintenance costs
 30-100% reduction of offshore manning
Operations and maintenance
Capital project delivery

More Related Content

Similar to 15.00-Lars-Meloe.pdf

Lethabo Project Brochure
Lethabo Project BrochureLethabo Project Brochure
Lethabo Project Brochure
Ricky Swanepoel
 
TAG Manufacturing Kick Off Meeting, The Future of Manufacturing
TAG Manufacturing Kick Off Meeting, The Future of ManufacturingTAG Manufacturing Kick Off Meeting, The Future of Manufacturing
TAG Manufacturing Kick Off Meeting, The Future of Manufacturing
Melanie Brandt
 

Similar to 15.00-Lars-Meloe.pdf (20)

Offshore lytics rolloos_midih_presentation_oc2
Offshore lytics rolloos_midih_presentation_oc2Offshore lytics rolloos_midih_presentation_oc2
Offshore lytics rolloos_midih_presentation_oc2
 
Industry 4.0 for beginners
Industry 4.0 for beginnersIndustry 4.0 for beginners
Industry 4.0 for beginners
 
ProIndústria2018 - Sala Beta - A08
ProIndústria2018 - Sala Beta - A08 ProIndústria2018 - Sala Beta - A08
ProIndústria2018 - Sala Beta - A08
 
Introduction to Time Series Analytics with Microsoft Azure
Introduction to Time Series Analytics with Microsoft AzureIntroduction to Time Series Analytics with Microsoft Azure
Introduction to Time Series Analytics with Microsoft Azure
 
Lethabo Project Brochure
Lethabo Project BrochureLethabo Project Brochure
Lethabo Project Brochure
 
Cloudera - IoT & Smart Cities
Cloudera - IoT & Smart CitiesCloudera - IoT & Smart Cities
Cloudera - IoT & Smart Cities
 
Industry 4.0: Merging Internet and Factories
Industry 4.0: Merging Internet and FactoriesIndustry 4.0: Merging Internet and Factories
Industry 4.0: Merging Internet and Factories
 
Predix Builder Roadshow
Predix Builder RoadshowPredix Builder Roadshow
Predix Builder Roadshow
 
Noia Conference Presentation 2018 - Extending Internet of Things (IoT) to sub...
Noia Conference Presentation 2018 - Extending Internet of Things (IoT) to sub...Noia Conference Presentation 2018 - Extending Internet of Things (IoT) to sub...
Noia Conference Presentation 2018 - Extending Internet of Things (IoT) to sub...
 
New Innovative Additive Manufacturing processes
New Innovative Additive Manufacturing processes New Innovative Additive Manufacturing processes
New Innovative Additive Manufacturing processes
 
Miguel Angel Perdiguero - Head of BIG data & analytics Atos Iberia - semanain...
Miguel Angel Perdiguero - Head of BIG data & analytics Atos Iberia - semanain...Miguel Angel Perdiguero - Head of BIG data & analytics Atos Iberia - semanain...
Miguel Angel Perdiguero - Head of BIG data & analytics Atos Iberia - semanain...
 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)
 
Dell AI Oil and Gas Webinar
Dell AI Oil and Gas WebinarDell AI Oil and Gas Webinar
Dell AI Oil and Gas Webinar
 
Mindsphere: an open cloud-based IoT operating system for Industry
Mindsphere: an open cloud-based IoT operating system for IndustryMindsphere: an open cloud-based IoT operating system for Industry
Mindsphere: an open cloud-based IoT operating system for Industry
 
IoT Meetup September 2019
IoT Meetup September 2019IoT Meetup September 2019
IoT Meetup September 2019
 
Industrial Internet
Industrial InternetIndustrial Internet
Industrial Internet
 
Manuel cadenas - SIEMENS
Manuel cadenas - SIEMENSManuel cadenas - SIEMENS
Manuel cadenas - SIEMENS
 
TAG Manufacturing Kick Off Meeting, The Future of Manufacturing
TAG Manufacturing Kick Off Meeting, The Future of ManufacturingTAG Manufacturing Kick Off Meeting, The Future of Manufacturing
TAG Manufacturing Kick Off Meeting, The Future of Manufacturing
 
3. Camplone 22/06/2015 Fabbrica 4.0 Evento Nazionale | Roma - Confindustria
3. Camplone 22/06/2015 Fabbrica 4.0 Evento Nazionale | Roma - Confindustria3. Camplone 22/06/2015 Fabbrica 4.0 Evento Nazionale | Roma - Confindustria
3. Camplone 22/06/2015 Fabbrica 4.0 Evento Nazionale | Roma - Confindustria
 
Integrating Essential Components of Digital Twin for Energy Industry
Integrating Essential Components of Digital Twin for Energy IndustryIntegrating Essential Components of Digital Twin for Energy Industry
Integrating Essential Components of Digital Twin for Energy Industry
 

Recently uploaded

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Recently uploaded (20)

Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Cyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdfCyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdf
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 

15.00-Lars-Meloe.pdf

  • 1. The Digital Twin for an oilfield IoT TechExpo Europe Amsterdam June 27th 2018 Lars Meløe Kongsberg Digital
  • 2. Statoil & KONGSBERG Restricted - Digital Twin for Unmanned Facilities - Feasibility Study KONGSBERG group – Technology innovation page 02
  • 3. Statoil & KONGSBERG Restricted - Digital Twin for Unmanned Facilities - Feasibility Study Disruptive digitalization projects page 03
  • 4. Statoil & KONGSBERG Restricted - Digital Twin for Unmanned Facilities - Feasibility Study What is a Digital Twin? • Comprehensive replica & accurate representation • Advanced analytics and machine learning • Static, historical and real-time data • Technical to business operations usage • Context dependent user interface
  • 5. The Digital Twin The installation
  • 6.
  • 8. Visualization & Collaboration Lifecycle Management Cyber Security Facility Roaming Assets Physical Asset Well & Reservoir Subsurface Topside Edge Gateway IMS SAS | Autonomy Equipment Packages Vessel Helicopter Drone Digital Infrastructure & Simulators Models & Services Real Time Data Historian Asset Models Business Data 3D Models App Framework Analytics & ML Engines Simulation Engines Physical / Mathematical Models Data Driven (AI) Models Hybrid Models Visualization Engine GIS AIS Data Services Digital Platform Application Programming Interfaces (API) Application Areas Functional Integrated Operation Center Plan & Expert Centers Field Development & Modifications Drilling & Wells Production Optimization Operations & Maintenance Maritime Ops & Logistics Integrated Field Development Team Control Room, Operation Center Maintenance Team Vendors Others Client Data Platform
  • 9. Statoil & Kongsberg - Digital Twin for Unmanned Facilities - Feasibility Study Evolving Operational Models 1 2 3
  • 10. Statoil & Kongsberg - Digital Twin for Unmanned Facilities - Feasibility Study «FieldOps» Loop Field Development & Larger Modifications Operations & Maintenance
  • 12.
  • 13. Monitor performance and solve problems page 013
  • 14. Issue Work Order 1- Faulty gaslift valve must be replaced. 2 – Reconfigure production settings to maintain production
  • 17. Digital Twin through Life of Field Feasibility study Concept selection FEED Detailed Engineering Commissioning Production start Operation Maintenance Modifications
  • 18. DIGITAL TWINS UNLOCK SIGNIFICANT VALUE FOR OPERATORS ACROSS THE VALUE CHAIN - EXAMPLES SOURCE: McKinsey, Multiple cases from other industries, e.g. airline, chemicals, agriculture, automotive; O&G pilots; Estimates Upstream value chain Exploration Drilling & completion Reservoir management Capital project delivery Operations and maintenance Supply chain & overhead -30% cost -30% time +10 % prod. - 20-60% cost  30% - 70% reduction of engineering cost and time  Reduced materials costs  Labor man hours reduced by 30-80% across multiple key processes  5-15% higher production by higher uptime and prevention of unplanned events and failures  20-40% reduced maintenance costs  30-100% reduction of offshore manning Operations and maintenance Capital project delivery