SlideShare a Scribd company logo
1 of 110
Download to read offline
Shire of Esperance
2011/2012 Annual Report
2 Shire of Esperance 2011/2012 Annual Report
Our Vision
The spirit of Esperance is unique, we take pride in being a creative, caring, and
supportive community.
We live in a diverse and dynamic region with outstanding opportunities for all.
As custodians, we are committed to protect our spectacular natural environment.
Esperance has a sense of community ownership with a commitment to
determine its own direction.
We make it happen!
Mission
The Shire of Esperance will listen to its people and provide services in a
caring, responsive and consultative manner through Councillors and staff
that are well equipped to meet community needs, and show leadership in
development at regional and higher levels.
3
Contents
Shire President’s Report  4
CEO’s Report 6
Your Councillors 8
Executive Team 9
Executive Services 10
Community Services 14
Engineering Services 34
Development Services 36
Corporate Services 40
Annual Financial Report 47
4 Shire of Esperance 2011/2012 Annual Report
Shire Presidents Report
It is with a great deal of pleasure that I present to you
the Shire of Esperance Annual Report for 2011/2012.
Council elections held in October 2011 installed a
new Council which I believe has operated as a strong
dynamic team during the year. I wish to sincerely
thank my fellow Councillors, the CEO and Council
staff for their dedicated contribution to enable
Council to achieve what it has over the 2011/2012
year. We are fortunate to have such an enthusiastic
and professional team and I thank each and every
member of our Council for their contribution.
As we reflect on the year I would describe it as a
year of steady achievement punctuated with some
highs and a few lows. We have had a steady stream
of good news stories which is always guaranteed
to attract a politician or two. It’s even better if they
come bearing a cheque which we have been able,
on each occasion, to put to good use.
The year has been dominated by Esperance being
selected as a SuperTown which presented an
opportunity to compete for a share of an $85m pool
earmarked for the nine SuperTowns. The Council
worked frantically to prepare business cases for
our prioritised programs. A collaborative effort and
pooling of resources with the Goldfields Esperance
Development Commission (GEDC) and Esperance
Chamber of Commerce and Industry (ECCI)
produced four very professional submissions.
These were assessed by the SuperTowns panel
and Esperance was very fortunate to receive the
requested funding on three of the four projects.
The number one community endorsed project which
received $12.65m was the Esperance Waterfront
Project (formerly called the Esperance Foreshore
Protection and Enhancement project).
“As we reflect on
the year I would
describe it as a year
of steady achievement
punctuated with some
highs and a few lows.“
5
In addition Council has produced and endorsed, in
conjunction with the GEDC and ECCI, an interim
Growth Plan for the South East Region which will
provide direction and strategic priorities for the region
for the next twenty years. The final Growth Plan will
be completed within the next few months.
The Shire has continued its good work in the
asset management arena and now has a number
of maintenance or management plans in place
to preserve the value of our community assets
and extend their useful life span. Ongoing asset
management plans will continue into the future until
such time as we have a long term financial plan for
all our community assets.
The Council has a goal to provide quality services
to the community at an affordable cost. With
increasing utility and other costs, this has not been a
simple exercise. In accordance with the community’s
expectations, Council has prioritised where to spend
its resources to achieve the most cost effective
outcome and still provide a quality level of service.
In closing I wish to acknowledge the input and interest
of our local community in all these developments
within our wonderful town. For Esperance to achieve
and continue to achieve a team effort is required
involving the community, Industry groups, Shire
staff, Councillors and our local Politicians. I am very
pleased to say, because of all these ingredients
Esperance is a SuperTown and will continue to be
a safe and wonderful environment to visit or more
importantly, to raise a family in.
I would like to thank our CEO Mal Osborne for his
guidance, leadership and dedication during the past
12 months.
I conclude by saying that 2011/2012 was a watershed
year and 2012/2013 will be even better.
Malcolm Heasman
Shire President.
I know the community of Esperance will be delighted
to see this long awaited project commence and
hopefully resolve the erosion and other issues
concerning on our foreshore. The Waterfront
project will extend beyond the seawall and also
include foreshore landscaped park land and amenity
which will link the town centre to our foreshore.
Our landscape planners were appointed in June
2012 and we look forward to community input in the
finalisation of these project plans.
Whilst on the subject of infrastructure development
there is a lot either happening or about to happen.
The State and Federal funded Port Access Corridor
project has commenced and on completion will
make transport movement, not only to and from
the Port, but traversing the railway line much more
user friendly. In addition the High School hostel and
new Esperance Primary School developments have
commenced. Esperance Hospital upgrades have
been announced and we are exhausting all avenues
to obtain funding for the Greater Sports Ground
development.
The Local Government Minister introduced the
Integrated Planning and Reporting Framework
requiring Council to prepare medium and long
term planning documents for implementation. A
refinement of our Draft Strategic Community Plan
which summarises our community long term vision,
values, priorities and aspirations for the next ten
years is near completion and will be circulated for
comment to the community early in the next financial
year. We continue working on our Corporate Business
Plan (four year plan) so that both of these plans will
be ready for implementation by the deadline date of
June 2013.
6 Shire of Esperance 2011/2012 Annual Report
CEO’s Report
The 2011/2012 financial year
has been especially rewarding
for the Shire of Esperance due
to the number of significant
projects and opportunities that
have become available to the
Esperance community. This
was achieved by the hard work and commitment
of Council and the staff, by the contributions of
our community organisations, by partnerships with
government agencies and the active participation of
our community members.
The October 2011 Local Government Elections saw
a substantial change to the makeup of the Council. A
complete spill of all 11 existing Councillors occurred,
with 9 positions contested at the election. This was a
recommendation by the previous Council to reduce
the number of elected representatives as part of the
State Government’s Structural reform process. The
Esperance Community saw this as an opportunity to
have their input with a record number of nominees
and voter turnout being recorded. The election
saw 3 returning Councillors (Crs Rodgers, Stewart
 Walker) and 6 new Councillors (Crs Heasman,
Brown, Bowman, Griffiths, McIntyre and Mansell)
being elected to represent the Shire of Esperance.
I would like to acknowledge the retiring Councillors,
especially Ian Mickel, who was Shire president
and Councillor for 22 years. 74 years of collective
Council experience was contributed by the outgoing
Councillors. They are to be applauded for ensuring
that Esperance continually embraced development
and reacted positively to change for the benefit of
the whole Shire. The time and energy committed
as elected representatives is greatly appreciated by
all members of the community.
I would like to extend a welcome to Cr Malcolm
Heasman as our new Shire President and all current
Councillors, who as a whole, have challenged the
status quo and encouraged fresh initiatives, whilst
ensuring strong and visionary leadership within the
community. We look forward to continuing to build
on this relationship to ensure the delivery of the
Community’s aspirations and goals.
The State Government’s Royalties for Regions
program announced the SuperTowns initiative and
in early 2012 Esperance was selected as one of
nine towns identified as future regional centres.
The impact of the SuperTowns funding will be felt
positively throughout the community. We are now
able to begin work on the Esperance Waterfront,
which is a transformational project along the
foreshore. Funding was also secured for Town
Centre Revitalisation and Economic Development
Projects, both of which look at social and economic
drivers that will encourage investment and growth
in a sustainable manner. Royalties for Regions has
also included funding for Esperance Residential
College, Esperance Primary School and upgrades
to the Esperance Hospital.
Extensive work has been carried out within the Shire
to develop the required plans under the Integrated
Planning and Reporting Framework. These plans are
designed to assist in equipping our organisation to
respond to short, medium and long term community
requirements. The Strategic Community Plan is in
draft format and will be advertised as an overarching
plan that guides the future directions of Council’s
policies, plans, projects and decision making over
the next ten years to 2022.
Asset Management Plans (AMP) have been further
advanced this year with the majority of the Shire’s
asset classes AMP’s now being completed. These
AMP’s identify our current assets, current and
future expenditure requirements and the assets
condition. This information then feeds into our Long
Term Financial Plan which will determine priorities
and identify any funding shortfalls. The Long Term
Financial Plan needs to balance the services needed
by the community with the resources available.
Drafts have been completed for the Strategic
Community Plan, the Corporate Business Plan and
the Workforce Plan. These documents are required
by the State Government to be in place by 1 July
2013 under the Integrated Planning and Reporting
Framework. The Draft Strategic Community Plan
is an overarching plan outlining community visions
and aspirations which guide Council actions. It will
7
be advertised for public comment in October 2012.
The Corporate Business Plan is the operational plan
for Shire Staff to deliver on services and projects
identified as important to the community.
Some major challenges faced at the Shire this
financial year include the temporary closure of the
Myrup Truck wash due to environmental constraints.
This site has subsequently been reopened however
additional funding is being sought to ensure
the facility meets best practice standards in
environmental management.. The redevelopment of
the truck wash facility will include the integration of
a liquid waste facility, therefore ensuring efficiencies
and better practice in liquid waste management for
the Esperance community.
Legislative changes regarding baggage and security
screening at Airports saw major capital works take
place at the Esperance Airport. Security screening,
incorporating x-raying of checked in and hand
luggage, explosive trace detection and passenger
screening had to be in place by July 2012. This
deadline was met through some great organisation
and project management by the Staff involved.
Additional upgrades to the terminal include an
expansion of the departure lounge that will be
completed later in 2012.
Executive and Managerial staff have remained
relatively consistent over the financial year allowing
for stability and the building of local knowledge. The
one significant change was the loss of our Director
Corporate Services, Darren Kennedy who took the
opportunity to move into a role in the private sector.
I would like to thank Darren for his commitment and
contribution to the Shire of Esperance.
The Shire was very fortunate to secure the services
of Shane Burge as the incoming Director Corporate
Services. Shane had previously worked for the Shire
and came back to Esperance from his role as CEO
at the Shire of Derby-West Kimberley.
Workforce training has been undertaken to ensure all
staff have the skills required to perform their duties
efficiently and effectively. A need to become more
proficient in project management throughout the
organisation was identified therefore a Diploma in
Project Management course was conducted locally.
Staff across all levels of the organisation committed
to investing personal time to complete the study
required. Our commitment to providing skills based
training will assist in retaining a stronger more
efficient workforce.
There are exciting times ahead for the Shire of
Esperance and the broader community as the
Esperance Waterfront project gets under way.
This will build a better foreshore by protecting
existing infrastructure and building environmental
and picnic related infrastructure. The Town Centre
Revitalisation project will be working towards the
development of a town centre that boosts both
economic and social investment. As an organisation
we are very excited to be living and working in such
a dynamic environment. I wish to thank all staff for
their ongoing commitment and efforts and extend on
behalf of the Shire, appreciation to all community
groups and individuals that have supported and
assisted Shire staff over these past twelve months.
Mal Osborne
Chief Executive Officer
“We are poised to grab
hold of the opportunities
and address the challenges
that come our way in
such a rapidly changing
landscape.“
8 Shire of Esperance 2011/2012 Annual Report
Cr Malcom Heasman
Shire President
Town Ward
Term expires 2015
Cr Roger Mansell
Town Ward
Term expires 2015
Cr Wayne (Buck) Rodgers
Town Ward
Term expires 2013
Cr Victoria Brown
Deputy Shire President
Rural Ward
Term expires 2015
Cr Natalie Bowman
Rural Ward
Term expires 2015
Cr Beverley Stewart
Town Ward
Term expires 2013
Cr Paul Griffiths
Town Ward
Term expires 2013
Cr Nigel Walker
Rural Ward
Term expires 2013
Cr Lara McIntyre
Town Ward
Term expires 2015
Cr M Heasman
H: 9076 1483 	 M: 0428 713 444
E: malcolm.heasman@esperance.wa.gov.au
Cr L McIntyre
H: 9072 0006	 M: 0429 301 066
E: lara.mcintyre@esperance.wa.gov.au
Cr R Mansell
H: 9072 0146 	 M: 0428 720 146
E: roger.mansell@esperance.wa.gov.au
Cr V Brown
H: 9076 6088 	 M: 0418 905 407
E: victoria.brown@esperance.wa.gov.au
Cr W Rodgers
H: 9072 0093	 M: 0457 720 093
E: wayne.rodgers@esperance.wa.gov.au
Cr P Griffiths
H: 9071 4106 	 M: 0458 381 840
E: paul.griffiths@esperance.wa.gov.au
Cr N Walker
H: 9076 5089	 M: 0427 081 856
E: nigel.walker@esperance.wa.gov.au
Cr N Bowman
H: 9075 7034	 M: 0427 757 034
E: natalie.bowman@esperance.wa.gov.au
Cr B Stewart
H: 9072 0737	 M: 0427 720 737
E: beverley.stewart@esperance.wa.gov.au
Your Councillors
Contact details
9
Shane Burge
Director Corporate Services
Gavin Harris
Director Engineering Services
Richard Hindley
Director Development Services
Rod Hilton
Director Community Services
Executive Team
Mal Osborne
Chief Executive Officer
10 Shire of Esperance 2011/2012 Annual Report
Executive Services
The Executive Services Team has been working
towards achieving compliance with the Integrated
Planning and Reporting Framework that was
introduced late in 2011. Community forums were
held in the late stages of 2011 to re-evaluate the
community’s visions and aspirations for the future
growth of our Shire. These views, along with those
established from previous community consultation,
the community perception survey and community
engagement through the SuperTowns initiative,
form the foundations of the Esperance Strategic
Community Plan. The community showed great
enthusiasm and passion to see Esperance grow in
an economically sustainable manner whilst retaining
our current inclusive community spirit and pristine
environment.
The Esperance Strategic Community Plan is
now in draft format and work has begun on the
Corporate Business Plan. The Corporate Business
Plan coordinates the processes required to
ensure the aspirations and goals identified in the
Strategic Community plan are utilised to drive
Shire operations. The Corporate Business Plan is
a planning document that outlines priorities and
major projects being undertaken within the Shire in
addition to outlining business as usual activities.
Work will continue on the integration of asset
management, workforce and long term financial
plans ensuring the Shire is in a position to resource
an appropriate level of service satisfactory to the
community whilst maintaining an acceptable level of
sustainability.
The promotion of health and well being in the
workplace has been actively encouraged throughout
the organisation this financial year. With new
initiatives being introduced around healthy work
place practices for internal and external staff,
improving safety and producing a more positive
work environment.
The Shire of Esperance, via the Emergency
Services Levy (ESL) was allocated funding through
the 2011/2012 Capital Grant allocation. This meant
eight new fire fighting appliances are to be supplied
to replace aging equipment throughout the Shire
and a further six appliances are offered as part of
the 2012/2013 allocation.
These new trucks will replace existing fleet vehicles
at a cost of $3.6m. Neridup and Commalbidgup
Bush Fire Brigade were the first to receive their
new appliances, with trucks to arrive for Cascade,
Munglinup, Grass Patch and Beaumont in the near
future.
Executive Services is responsible for the coordination
of Elected Members of Council; emergency services
management;governance;humanservices;occupational
safety and health; media and communications; major
projects; strategic planning and economic and business
development.
11
SuperTowns
We were excited to be announced as one of
nine SuperTowns across the Southern part of
Western Australia by the State Government.
This announcement provided us with significant
Royalties for Regions funds to undertake long-term
community planning (Esperance SuperTown Growth
and Implementation Plan) and access to almost
$80m of competitive project funding.
The SuperTowns program has resulted in a fantastic
working relationship being developed between
the Shire, Goldfields-Esperance Development
Commission and Esperance Chamber of Commerce
and Industries, which has huge benefits for the
whole of the Esperance community. Development
of the Growth and Implementation Plan is due to
be finalised by the end of October 2012, with the
significant community input received to this point
being extremely valuable.
We have been successful in attracting funding for
three projects from the competitive funding round.
The major funding contribution is $12.65m for the
Waterfront project, which means we now have
enough funds to commence physical works on the
project. We also received funding for preparing a
Town Centre Revitalisation program and undertaking
an Economic Development Program. These three
projects will provide Esperance with a strong platform
for community driven growth and development into
the future, with all three projects to commence by
the end of 2012.
One of the outcomes of the local partnership that we
are looking forward to in the near future is the Town
Centre Conference, an opportunity to showcase
Esperance as a place and highlight the skills and
abilities of the people of Esperance to organise and
deliver an event of significance to the State.
Future funding opportunities will continue to be
explored to allow the SuperTowns program to
continue to be delivered and we look forward to
continuing this in a collaborative environment with
the Esperance community.
“The Team has been working
towards achieving compliance
with the Integrated Planning
and Reporting Framework”
12 Shire of Esperance 2011/2012 Annual Report
Executive Services
Elected Members
There was some significant changes in the Council
for Shire of Esperance during the 2011/2012 financial
year with Local Government elections being held in
October 2011. Prior to this election Council made a
decision to reduce the number of Elected Members
from eleven to nine therefore a complete spill of
Council was undertaken. Fourteen nominations
were received for the six town ward positions and
seven for the rural ward. The number of nominations
received generated significant community interest
which saw a record turnout in the amount of voters.
The Town Ward representatives are:
Cr Malcolm Heasman		
Cr Lara McIntyre
Cr Wayne (Buck) Rodgers	
Cr Roger Mansell	
Cr Paul Griffiths		
Cr Beverley Stewart
The Rural Ward representatives are:
Cr Victoria Brown		
Cr Natalie Bowman
Cr Nigel Walker
Due to the nature of this election four Councillors
terms were condensed to a two year period allowing
for an election in 2013. After this date all terms will
be for a four year period with Elections being held
every two years, this allows for half the council seats
to be contested each time.
The Council meets on the evening of the fourth
Tuesday of every month as part of a monthly
business cycle, with Council meetings being open to
the general public. Reports to Council are the formal
method by which the administration provides advice
to the Elected Members. The majority of business is
dealt with by the All Purpose Committee of Council,
which makes recommendations to the Council. The
All Purpose Committee comprises all nine Elected
Members.
Agendas for Council and Committee meetings are
made available to members of the public on the
Shire’s website, as well as at the ShireAdministration
Offices and Library. Minutes of all Council and
Committee meetings are also publicly available.
13
14 Shire of Esperance 2011/2012 Annual Report
Community Services
Community Services covers a range of services within
the Shire, including: rangers; Senior Citizens Centre;
Home and Community Care centre; Museum; Library;
Bay of Isles Leisure Centre; Civic Centre; Volunteer
Resource Centre; community development funds;
culture; recreation reserves and playgrounds and
tourism and events.
15
16 Shire of Esperance 2011/2012 Annual Report
Community Services
Key Outcomes
The Library loaned 119,426 items from July 2011 to
June 2012
•	 Ongoing informal surveying indicates a
continuing high level of community satisfaction
with library services however usage patterns
are slowly changing with reduced loans of
print materials beginning to emerge as a trend.
•	 TheLibrarywasvisitedby82,962peopleduring
2011/2012 and 40,867 of these people loaned
items. Other reasons for visiting the library, but
not necessarily loaning items, include using
the Public Access Computers and Internet,
attending various library events and activities,
accessing the Tax Help programme, utilising
other services, reading newspapers or seeking
information. See Figure 1.
•	 Regular Children’s programmes are well
attended with two Toddler Time and Story Time
sessions held each week during school term.
On average 75 children per week access these
programmes which are provided free and are
available to both locals and visitors. These
programmes are interactive and provide a
learning and social environment in a positive
way to encourage children to enjoy their trip to
the Library. In addition the library runs Better
Beginnings Early Literacy programmes and
School Holiday Activities throughout the year,
both have high attendance rates.
•	 The library held two main Family events which
were rewarded by excellent attendances.
They were the 2011 National Science Week
Dinosaur Discoveries night and the 2012
Heavens Above: Family Stargazing Night.
•	 The Library has retained a team of experienced
Staff and is greatly benefitted by their combined
skills and strengths in many different areas of
library services.
Major Achievements
•	 Library staff were excited to be Finalist’s in
the Community Services Category of the 2011
Esperance Chamber of Commerce Business
Awards. We are also thrilled to be announced
as a Finalist in the 2012 Awards and are proud
of our Library Trainee Mel Harper who is also
a Finalist in the Trainee section of the 2012
Awards.
The Esperance Public Library provides an essential service to the Esperance Community
and its visitors. It offers a variety of items available for loan such as books, DVD’s Electronic
resources, magazines and jigsaws. The library also provides reliable internet access,
photocopying, printing, faxing and scanning services, all of which are utilised regularly.
Esperance Public Library
Figure 1 - 2011/2012 Library Statistics
17
•	 To celebrate 40 years of library services in the
existing building a Library Open Week was
held in February 2012 to highlight the diverse
range of services and resources provided
by the library. The priority focus was the
introduction of more electronic, digital services
and resources.
•	 Adult events and activities also continue to be
appreciated, for example:
•	 The 2012 Telstra Connected Seniors
Computer Classes have attracted over 70
participants
•	 Adult Learners’ Week workshops in
2011 offered Cooking on a Budget, Cake
Decorating, Laptop Lessons and an Art
Class and were attended by 100 participants
•	 The 2012 Great Gardens Show featuring
John Colwill and The Great Gardens team
from Perth was very popular with over 170
attendees
•	 Local authors Jim Finnerty and Fleur
MacDonald featured in lunchtime Meet
the Author sessions and the popularity of
these sessions encouraged the formation of
a Library Book Club, Reading Between the
Wines. This group has over 30 participants
who meet monthly in various locations to
discuss a range of literary issues and also
has an online presence through the library’s
Facebook site
•	 TheeighthStateLibraryDiscardBookSalewas
held over the Easter long weekend and was a
great example of teamwork between the State
Library, Esperance Library staff, Esperance
Library Friends (ELF) and other volunteers.
More than 3000 people attended and it was
fantastic to see how much enthusiasm the
community has for reading. The Esperance
Library benefitted from the publicity and the
donation of over 500 Large Print books left
over from the sale.
•	 The Esperance Library Friends (ELF) group
had another successful year with sales from
the ELF Discard Book Shop supporting Early
Literacy programmes and the purchase of
other resources. ELF also assisted staff with
activities and events such as visiting author
sessions, the Library Open Week and the
State Library Discard Book Sale. They are a
fantastic volunteer group who work towards
making better resources and services available
to all members of our community.
•	 The library has taken another step into the
future by introducing, in a staged rollout, a
range of electronic resources, namely Ebooks,
Downloadable Audio and Ezines.
•	 The Structural Reform of Public Libraries is a
lengthy process and is impacting on activities
currently being undertaken at the Esperance
Library. Staff are monitoring the changes
being implemented and sourcing alternatives
to continue to provide essential community
services.
“The library has taken
another step into the
future by introducing
E - Services.”
18 Shire of Esperance 2011/2012 Annual Report
Community Services
Ranger Services has seen significant improvements
over the last twelve months thanks to the hard
work and ongoing team commitment of all staff. By
working as a team and receiving amazing ongoing
support from all Shire staff, various businesses in
town and animal support groups such as SAFE
(Save Animals from Euthanasia) and the RSPCA we
have achieved great things.
Outstanding achievements include:
•	 The introduction of the “Pound Pooch”
program involving ongoing advertising of our
pound dogs and re homing them into safe and
wonderful homes through out Esperance and
beyond – one of our dogs was even returned
to his original breeder in the Northern Territory.
This has resulted in an amazing 100 dogs being
re homed in the financial year 2011/2012.
•	 Ongoing works on the Coastal Reserves
targeting Quagi and Alexander Bay including
maintenance, upgrades and signage as well as
the introduction of the Camp Hosts program.
•	 Upgrades and self registration for overflow
camping on the Greater Sports Ground over
Xmas, New Year and Easter 2011 into 2012
•	 Development of ongoing relationships with
a variety of organisations in town inclusive
of Fisheries, Police, Customs, DEC, support
organisations and a multitude of other people
and businesses.
•	 Heightened awareness through out the
community of Ranger Services and what we
offer through media support and pro active
work engaging all staff with the community
Ranger Services are extremely proud of these
achievements and are all looking forward in
2012/2013 to ongoing engagement within the
community of Esperance to ensure a safe, happy
and well balanced lifestyle in what is a magnificent
natural environment.
Ranger Services
Rangers are responsible for dog and cat control, parking control, litter
control, coastal reserves patrols and maintenance and block inspections
under the Bushfires Act.
19
Illegal Camping
A total of 195 illegal campers were issued with
written cautions and 50 verbal cautions were issued.
The illegal campers were requested to move on to
authorised camping grounds and the overflow camp
ground was offered as an alternative when it was
available.
The Greater Sports Ground was utilised for an
overflow camping ground during Christmas, New
Year and Easter due to the town’s caravan parks and
camping grounds being full.As part of a new initiative
for the overflow camping ground the introduction of
self registration was trialled for Easter 2012. This
proved extremely successful and in conjunction with
signage will be continued into the ensuing years for
the overflow area.
This resulted in a marked reduction in the number
of hours spent by Ranger Services staff conducting
fee collection duties resulting in staff being able to
attend to other matters over this busy period of the
year.
Ranger Services staff utilised early starts to catch
illegal campers and language translation sheets to
convey positive messages as to why illegal camping
was not permitted in the Shire of Esperance.
Parking
A total of five parking cautions were issued during
the year with no specific problem areas in town.
Rangers respond to public complaints regarding
parking, we do not actively conduct parking patrols.
Fire Control/Unsightly blocks
Rangers inspected a total of 650 vacant blocks
during the fire season, and subsequently 53 Notice
to Comply were sent out to property owners to
ensure that blocks were brought up to the required
standards.
Local Laws
Quarterly inspections were conducted of all verges
and thoroughfares during the year resulting in six
cautions and nil infringement notices being issued
for non compliance.
“We have a heightened
awareness through
out the community of
Ranger Services.”
20 Shire of Esperance 2011/2012 Annual Report
Community Services
Ranger Services
Litter Control
Rangers received a total of 34 illegal dumping
reports. One written warning and four infringements
were issued for illegal dumping/littering. Rangers
continued to conduct random patrols to detect
offenders in this regard but rely heavily on community
support to be effective.
Coastal Reserve
All coastal reserves continued to be occupied to
their maximum capacity during the summer months
with ongoing maintenance carried out during this
period. During the winter months upgrades and
maintenance works were carried out by Ranger
Services staff as part of the annual works program.
After Hours
Rangers Emergency after Hours Service was very
busy over the year. Rangers received a total of 943
after hour calls during the year resulting in Rangers
attending to 76 call outs after hours.
Currently rangers respond to out of hours call outs
which are related to, dog attacks, livestock roaming,
emergency services requiring assistance and shark
sightings.
Telephone enquiries
Telephone enquiries are one of our largest sources
of information with a total of 1932 inquiries received
during the 2011/2012 year.
This included 943 out of hours calls from Insight (all
calls taken after 4:30 pm daily) and a total of 989
jobs on the ranger services job register. Dealing
with dog related complaints still constitutes the main
percentage of Ranger Services work.
The jobs on the job register are calls taken by the on
call ranger for that week from Monday to Friday 7:30
am to 4:30 pm daily. See Figure 2.
Dog control
Dog control and education of the public remained
the biggest single issue for rangers during the year.
19 cautions were issued in relation to dog matters
with an increased focus on dogs off lead and dogs
roaming. 71 infringements were issued in matters
ranging from dogs causing nuisance to dogs
roaming. Figure 3 provides additional information
regarding animal control.
There appears to have been a marked increase
in the number of dog attacks over the 2011/2012
financial year however, this could possibly be due
to increased media releases regarding responsible
dog ownership and encouraging residents to report
dog attack incidents.
Due to the strong Pound Pooch re homing program,
ongoing business and local support and continued
support from dog support agencies SAFE and
RSPCA, the number of dogs successfully re homed
has considerably increased. This financial year
Ranger Services reached a milestone re homing
their 100th pound pooch.
21
Figure 2 - Ranger Services Telephone enquiries
2007/2008 2008/2009 2009/2010 2010/2011 2011/2012
Dogs 2654 2847 2522 939 831
RSPCA 57 56 18 8 13
Livestock 175 154 185 66 56
Litter 29 29 43 34 35
Cats 166 233 219 56 54
Fire 216 364 152 49 54
Parking 104 103 90 21 14
Camping 73 142 117 50 49
General Enquiries 811 934 787 139 149
After Hours Not known Not known Not known 501 943
Total 4285 4862 4133 1863 2198
Figure 3 - Animal Control
2007/2008 2008/2009 2009/2010 2010/2011 2011/2012
Impounded dogs 479 416 390 296 275
Dogs returned to owners
after impounded
179 149 179 150 149
Dogs Euthanized 99 106 61 66 30
Rehoused Dogs N/A 49 53 70 88
Feral cats Euthanized 24 41 25 20 15
22 Shire of Esperance 2011/2012 Annual Report
Community Services
The Esperance Visitor’s Centre has enjoyed another
successful year. The 2011/2012 financial year saw
a slight decrease in our ‘door count’ numbers from
125,399 in 2010/2011 to 123,600 in 2011/2012 - see
Figure 4.
Despite slightly decreased numbers, the Esperance
Visitors Centre did achieve an increase in income.
Key outcomes include:
•	 Accommodation bookings through the
Esperance Visitors Centre rose from $539,470
in 2010/2011 to $678,670 in 2011/2012, a rise
of 25.8%.
•	 Overall commissions rose from $117,357
in 10/11 to $123,734 in 2011/2012, a 5.4%
increase. This figure was severely affected by
commissions earned from tour bookings that
fell from $10,085 in 2010/2011 to $1,273 in
2011/2012 – a direct result of the change in
ownership of the Woody Island Cruises with
the new owners not wishing to use the Visitors
Centre as a booking agent.
•	 Advertising revenue (from building and website
advertising) rose from $4,571 in 2010/2011 to
$7,920 in 2011/2012, a 73.275 increase.
•	 Souvenirs and CALM Pass sales rose from
$109,593 in 2010/2011 to $114,462, a 4.4%
increase.
Our Web site continues to be popular with 187,138
unique visits in 2011/2012, averaging 3,599 visits a
week. This represents a 23% increase in visitation
to our website. The average web visitor looked at 4
pages per visit and each visitor spent an average of
3-4 minutes on our site with 84% of visitors coming
to the site via search engines – this represents no
real change from the 2010/2011 Financial Year.
Other Esperance Visitors Centre highlights from the
2011/2012 Financial Year include:
•	 In October 2011 The Esperance Visitors
Centre was represented at the annual Visitors
Centre Association of Western Australia
(VACWA) conference, held in Kununurra. The
conference ran for three days and featured a
series of guest speakers on a diverse range
of topics including, staff recruitment, staff
training, using social media as a promotional
tool, the impact of natural disasters on tourism
and the impact of cane toads on tourism.
•	 On the 1st of December 2011 the Esperance
Visitors Centre co-hosted (with Tourism
Esperance) the December ‘ECCI Business
After Hours’. The function went well with
about 30 guests attending the function held at
the Visitor Centre.
•	 InApril 2012 Ross Beckett attended the Sydney
Caravan, Camping and Touring Supershow
and represented Australia’s Golden Outback
(AGO). This involved ‘manning’ the AGO
booth on the Tourism WA stand and answering
questions from prospective visitors about
things to see and do around the AGO and the
Esperance regions. Costs were covered by
AGO.
Esperance Visitor Centre
The Esperance Visitor Centre provides a gateway for tourists to the
Esperance Region.
23
Figure 4 - Visitor Centre Door Count
“The Visitor Centre
web site averages
3,599 visits a week.”
•	 In May 2012 Visitor Centre Representatives
spent half a day with The Hon. Kim Hames
MLA – Minister for Tourism. The Minister was
taken on a cruise to Woody Island which was
also attended by representatives from Tourism
Esperance, ECCI and Cr. Paul Griffiths.
•	 In June 2012 it was announced that Lucky
Bay won the ‘Natural Resource Management
Award’ at the ‘Keep Australia Beautiful WA
Clean Beaches Awards’; the submission was
put together by Tahnee Adamson, and Milton
Valli represented the Visitor Centre at the
Awards Breakfast on Wednesday 13th June.
•	 The Australian Traveller Magazine “100 Best
Views in Australia” awared Esperance the 31st
spot due to a picture submitted of the Great
Ocean Walk Cycle way.
24 Shire of Esperance 2011/2012 Annual Report
Community Services
Entertainment
During the 2011/2012 financial year the Esperance
Civic Centre presented 26 shows (up from 24 in the
2010/2011 financial year). Seven of these shows
were venue hire’s, which was an increase of six from
the previous financial year. This year there were two
simulcast shows (both venue hire’s) from the Perth
Concert Hall they were the Vienna Philharmonic
Orchestra and the Western Australian Symphony
Orchestra. The Civic Centre also continued its
collaborative relationship with the Bijou Theatre by
assisting in the sale of tickets for all their shows.
In 2011/2012, 6,743 tickets were sold to all shows
at and presented by Esperance Civic Centre and at
The Bijou Theatre. Ticket sales included:
•	 779 Concession Card holders and Seniors
Card holders (a 32.4% decrease)
•	 25 Companion Card holders (up from 21)
•	 224 Friends of Esperance Civic Centre (up
from 175)
•	 2,082 internet sales (a 10.1% decrease)
•	 469 from the Library and The Visitors Centre
(down from 734)
The total figure of 6,743 represents a 14.2%
decrease on 2010/2011 ticket sales. However
our revenue increased by 10.5% - $191,993.5 in
2011/2012 compared to $173,753 in 2010/2011.
The increase in expenditure for the 2011/2012
financial year is matched by an increase in income
for the same period. In dollar terms there was an
increase of $50,787 (this is a 7.8% increase) in
expenditure and an increase of $57,852 (23.8%) in
income - detailed in Figure 5.
Esperance Civic Centre
The Esperance Civic Centre provides the focal point of entertainment in the
south east of Western Australia.
Figure 5 -Civic Centre Income and Expenditure
25
Venue Hire / Use
The Civic Centre hosted a wide variety of functions
across the 2011/2012 financial year, including:
•	 92 meeting days
•	 32 private functions and wedding receptions
•	 13 funerals
•	 4 Blue Light Dance Parties
Other highlights at the Esperance Civic Centre
included:
•	 Annual Shire Senior Citizens dinner
•	 Annual Esperance Senior High School Ball
and careers day
•	 Annual Esperance Music Festival over three
days
•	 Annual Dance School End of Year Concert(s)
•	 Bridge Club Conference over four days
•	 Apex Teenage Fashion Awards
•	 Esperance Chamber of Commerce and
Industry awards night
•	 Esperance District Recreation Association
Sports Star of The Year award
•	 Six School graduations (plus rehearsals) South
East Premium Wheat Growers Association
Ladies Day
•	 Woolworths Charity Ball
•	 The Yellow Dot Ball
•	 Jehovah’s Witness Convention – a three day
event
•	 Seventh Day Adventist services – seven days
over a three week period
The Esperance Civic Centre was also the venue
for two significant community celebrations and the
funeral for a former civic leader.
•	 In January 2012 Fred DeGrussa celebrated
his 100th birthday surrounded by family and
friends.
•	 In March 2012 former Shire President Ian
Mickle was made a ‘Freemen of the Shire’.
•	 Also in March 2012 former Shire President
David Reichstein’s life was celebrated at a
funeral in the Auditorium.
In 2011/2012 The Esperance Civic Centre continued
its strong association with both CircuitWest and
Country Arts WA. Ross Beckett continued as a
Management Committee member of CircuitWest
and a Board Member (representing Regional
Performing Arts Venues) of Country Arts WA. Mr
Beckett attended two special CircuitWest meetings,
the Australian Performing Arts Centres Association
annual conference and Long Paddock, in Perth and
both were funded by Country Arts WA. Mr Beckett
also represented CountryArts WAand the Esperance
Civic Centre at the “Open Your Eyes” Regional Arts
Conference in September of 2011 in Geraldton.
“The venue is utilised
for a wide variety of
community events”
26 Shire of Esperance 2011/2012 Annual Report
Community Services
In this financial year attendance through the Bay
of Isles Leisure Centre (BOILC) has dropped by
30,000 in total - see Figure 6. However, 24,000 of
this decrease is from casual pool visits and matches
with anecdotal observation that the pools have been
quieter this year, without any determinable reason.
The other areas suffering decreases in attendance
are explainable. Firstly, group fitness has had the
effect of ESP Fitness opening in town and offering a
larger suite of classes, particularly evening classes
which BOILC cannot offer, this inturn impacts crèche
attendance. There was also a noticeable drop in
Function and Sports Hall attendance. However, this
figure is already under-reported by possibly 50%
since gymnastics and taekwondo user groups do
not register their entry into the facility. In 2010/2011
payments were made at reception but in 2011/2012
user groups are invoiced directly and do not at any
time need to approach reception. Once Entry Control
systems are operating these attendance statistic will
increase dramatically.
Improvements made at the BOILC to increase
efficiencies, reduce costs and ensure legislative
compliance include, but are not limited to, the
following:
•	 An energy audit of the facility was conducted
and the recommendations resulted in
improvements including the reactivation of
automatic temperature control systems for the
four swimming pools and investigation into the
air handling unit control systems. Changing
from manual to automatic control has shown
a trend to fewer spikes in gas use and a more
consistent gas use pattern.
•	 Backwash waters from the swimming pools is
now discharged on site to sewer from a holding
tank at a controlled low flow rate.
•	 The chlorine gas storage area was upgraded
to comply with the Dangerous Goods Storage
Act and simultaneously the on site storage
area for chemicals was improved ensuring
staff safety.
•	 Sight glasses were installed into the backwash
discharge lines enabling water to go to waste
for only as long as needed rather than for a set
period of time. There will be a reduced duration
and frequency of backwash for the coming
years with anticipated large water savings and
associated reduction in pool chemical use.
•	 An automatic floor cleaning machine for the
pool concourse was purchased. This provides
a more hygienic and clean surface whilst using
less water and man hours.
Bay of Isles Leisure Centre
The Bay of Isles Leisure Centre provides access to a number of services for the
community. This includes recreational, lap and hydrotherapy pools, gym, fitness
classes, venue hire for sporting groups, sauna and spa.
27
Figure 6 - Attendance Statistics
2009/2010 2010/2011 2011/2012
Memberships sold 1001 979 976
Casual Gym 3887 4557 4474
Casual Class 1997 2741 1831
Member Gym 29484 35873 32068
Member Class 7863 8857 8922
Casual Pool 95129 91390 67772
Member Pool 30158 27674 27126
Staff entry (all) - 2206 2101
Swim School Enrol 2265 1874 1830
Crèche 3748 3540 2884
Function  Sports 4494 3986 2723
Total entries 176,760 180,824 149,901
(Health  Fitness) 47798 52028 47295
(Pools) 125287 119064 94898
•	 Permanent pool blanket rollers were installed
for the rehabilitation and lagoon pool which
now enables a single staff member to complete
the job. The 25m pool blanket trolleys are now
stored on a newly built paved area immediately
outside the deep end of the facility. These will
soon be operational now the dive blocks have
been removed.
•	 A Preventative Maintenance Schedule has
been created and maintained. This was
achieved in consultation with all Shire Buildings
and it is now possible to refer to a single
document to determine when inspections and
programmed maintenance is due. This will
also lead to savings as potential suppliers can
be approached for multi-year contracts.
“Improvements have
been made to increase
efficiencies, reduce costs
and ensure legislative
compliance”
28 Shire of Esperance 2011/2012 Annual Report
Finances
Operating figures in Figure 7 are taken from the
‘BOILC Business Plan Operating Report’. This does
not include:
	 i) depreciation of the building ($127k),
	 ii) building expenses ($398k) or
	 iii) Shire’s administration allocation ($88k).
The BOILC does not currently pay for gas use, which
is approximately $235,000 per year. Our operational
cost recovery has remained at 74% which is a positive
statistic given the large decrease in total attendance.
The decrease in total attendance increased the ‘cost
per attendance’ figure for the facility.
Benchmarking services engaged in 2011/2012
consider the total cost, rather than just operating,
and BOILC compared similarly to most WA facilities
of similar size. Our cost per visit was $3.09 in
comparison to $2.80 for the others. However, once
a figure for gas consumption is included the cost will
increase. This is also a result of our low attendance
and small catchment population. However, BOILC
was fifth top on the whole list for attendance based
on catchment population indicating our small
population use the facility frequently.
Figure 8 details are taken from the ‘BOILC
Committee Operating Report’ and include all costs
associated with the facility. Rec Centre Building
expenses were $400,000 this year, $150,000 over
budget – primarily due to urgent repairs required
on the lagoon pool wall and the requirement for the
chlorine gas storage area to become compliant with
the Dangerous Goods Storage Act.
In 2010/2011 benchmarking, only Swan Park Leisure
Centre in Perth had a worse cost per visit figure
with $6.35. They too had significant capital building
expenditure in that year. Augusta-Margaret River
had a cost recovery of only 49% and a comparable
metro facility, Leisurepark Balga had 60%.
The largest of metropolitan centres achieved 93%
cost recovery primarily due to their very large health
and fitness centre operations generating significant
profit to offset the costs of operating swimming pools.
The Shire of Esperance needs to determine an
acceptable cost recovery figure and therefore
estimate the proportion of the expenses of the
facility supported by rate payers as a service to the
community versus the revenue generated by the
facility. In a positive development, both attendance
and income will be highly likely to increase in
2012/2013 with the implementation of Entry Control
systems to the facility for the first time and the
employment of a Health and Fitness Supervisor
to improve membership retention and customer
service.
Figure 7 - Annual Figures: Operating
2009/2010 2010/2011 2011/2012
Expenditure $1,021,927 $1,105,950 $1,178,472
Income $762,523 $813,093 $876,469
Deficit $259,404 $292,857 $302,003
Total Attendance 176760 180824 149901
Cost per visit $1.46 $1.62 $2.01
Cost Recovery 74% 73% 74%
Figure 8 - Annual Figures: All expenses
2009/2010 2010/2011 2011/2012
Expenditure $1,446,870 $1,620,999 $1,794,747
Income $762,523 $813,093 $876,469
Deficit $684,347 $807,906 $918,278
Total Attendance 176760 180824 149901
Cost per visit $3.87 $4.46 $6.12
Cost Recovery 53% 50% 49%
Community Services
Bay of Isles Leisure Centre
29
Health and Fitness Attendances
Figure 9 indicates the total member and non-
member attendance to both the gym and group
fitness classes. It is apparent that the general shape
of the graph is the same as the preceding year with
troughs in the school holidays, particularly over the
summer break and Easter. Attendance in the pre-
Christmas period was inflated with the attendance
of Horizon Power and John Holland employees who
were on short-term corporate memberships with
the facility. Post-Christmas many of their individual
memberships were not renewed and, combined
with the lower Group Fitness attendance left our
attendance lower than the corresponding period in
the previous year.
Membership levels have been higher or equal to the
previous year.
Aquatics
Once again a very different pattern to metropolitan
centres is seen with the complete absence of a heat
related increase in pool attendance during January
to March as shown in Figure 10. There is a similar
trend over both years with an Easter trough evident
but with a clear reduction in attendance this year
across all the months. We can only speculate as to
the reason, it’s not immediately evident.
Swim School
Swim School continues to struggle to attract and
retain Swim Instructors. However this has stabilised
over the latter half of 2011/2012. The young
instructors now have a year of teaching experience
which helps with the parents’ perception. A dip in
Term 4 this year in comparison to last year is due
to a greater range of classes offered by VacSwim
(Education Department) over summer and parents
opting for this. Total numbers for the year were 31
less than the previous year.
Group Fitness Classes
Esperance appears to have an inverse attendance
pattern to metropolitan centres with our numbers
reducing in summer time, seemingly due to people
departing during school holidays. However, unique
to 2011/12 was the opening of a new Group
Fitness facility in Esperance in direct competition
to our programs. This occurred in December and
exacerbated the usual drop in attendance at that
time. The new business offered free three month
memberships plus regular evening classes which
immediately caused some of our members to leave
to obtain better value for money and access to more
classes.
During autumn our numbers have increased once
more and happily are not too much below last year.
May had a spike in total numbers as it was a five
week month with only four weekends included.
Figure 9 - Health and Fitness Attendance
Figure 10 - Aquatics Attendance
30 Shire of Esperance 2011/2012 Annual Report
Community Services
Greater Sports Ground Re-Development
Update
The Football Development Commission released
its report about football in Esperance and the
main recommendation was for Ports Football Club
to remain located on the Greater Sports Ground
(GSG). The potential playing field space around
Ports is considered more than adequate for a
significant increase in participant numbers based on
the highest estimates of likely growth. Consequently
the GSG Master Plan was amended to retain Ports
Oval.
Following this decision Indoor Stadium user
groups were consulted with at length regarding
future requirements in the proposed new stadium.
Ultimately several alternative options of court and
room layouts were considered, all of which fit inside
the proposed building ‘footprint’. This footprint
has been approved by Council and along with the
southern car park being upgraded to a sealed and
kerbed surface.
Future GSG direction involves seeking a feasibility
study to be carried out by an independent consultant,
final plans to be sought and most importantly Council
to determine when funding will be made available
so that Community Sports and Recreation Facilities
Fund (CSRFF) funds can be applied for. This will
require the engagement of the Department of Sports
and Recreation as there are other projects likely to
be asking for over $1 million in the region.
Once a timeline is found then a number of other
jobs within the GSG can be scheduled including
demolition of badminton hall and netball hall,
potential tennis club courts extension, creation of an
ablution block in the north east corner and alterations
to the agricultural society buildings. These jobs will
cascade once the stadium redevelopment occurs.
Funding Partnership With Sports Clubs
Four projects were funded this financial year by the
Department for Sport and Recreation through the
CSRFF, the associated sporting clubs and the Shire.
•	 The Esperance Motocross Club received
funding to upgrade its ablution block.
•	 Grass Patch Tennis club upgraded its tennis
court playing surfaces.
•	 Esperance Cricket Association upgraded its
nets on Esperance Oval and installed new
nets on Newtown Oval.
•	 Esperance Soccer installed lighting towers on
Little Lords Oval.
Public Open Space Strategy
Recently there was an audit of the Shire’s parks and
reserves completed. This was necessary to gain a
complete understanding of the asset management
issues for all reserves without splitting these
into separate components such as playground
equipment,reticulation,mowing.Thisauditleadtothe
development of a single document addressing public
open space and may serve to consolidate various
previous stand-alone documents such as the Trails
Master Plan, Playgrounds Strategy and Physical
Activity Plan all of which had involvement from the
Manager Recreation and Youth. Department of Sport
and Recreation have expressed a strong interest
in providing input at an early stage, particularly in
relation to Education Department lands and their
accessibility or otherwise to the public.
Bay of Isles Leisure Centre
31
Looking Ahead
Entry control systems will be installed in Spring 2012
as the final phase of an upgrade to the entry and
foyer area of the leisure centre. It is expected that
this will increase recorded participation and revenue
significantly plus improve the safety of young
children around the aquatic area.
Recommendations were made in the EnergyAudit for
installation of Solar Heating systems to pre-heat the
pool water thereby reducing the gas consumption.
Although the regular use of pool blankets is likely
to reduce gas consumption by around 20% the
unit cost of gas is likely to continue to increase. It
is imperative that the Council prepare for the effect
of paying full price for gas consumption in 2023 by
allocating money for suitable capital improvements
to reduce consumption prior to this date.
A report from an independent consultant into the
potential for redevelopment of the Bay of Isles ‘dry
side’ is expected around November. It is expected
that this will provide direction for revenue-generating
improvements to the facility, positively affecting
membership numbers and group fitness class
attendance.
A significant increase in the number of group
fitness classes offered at BOILC is going to occur
in September with the implementation of Les MillsTM
pre-choreographed classes. Restricted attendance
evening classes will be added to the time table and
will be conducted in the current indoor cycling room.
This is not an ideal situation but evening classes
are paramount for the success of a group fitness
program and it is hoped the redevelopment of the
Health and Fitness area will prioritise the creation
of a dedicated Group Fitness Studio and turn the
Group Fitness area of the facility into the revenue
generating exciting area of the facility it ought to be.
During the 2012/2013 financial year a new 0.5 FTE
Health and Fitness Supervisor position will be filled
with the primary aim to drive membership retention
and customer service of the dry side of the facility
plus supervision of the group fitness program.
This should have an immediate positive effect on
membership numbers and participation.
32 Shire of Esperance 2011/2012 Annual Report
Community Services
The Esperance Volunteer Centre was successful
in winning the Best Local Community Group award
at the 2011 Esperance Chamber of Commerce and
Industry awards for the second year running. The
centre officially opened its doors on 4 May 1999
with the assistance of funding from the Federal
Department of Health and Aged Care, at the time,
through their Volunteer Management Program,
auspiced by the Shire of Esperance. The funding
model of short annual funding has remained fairly
unchanged over the years. However, in late June
2012 we finalised negotiations to continue our
Federal Funding for a further three years and we
were successful in bidding for State Government
funding which covers the next five years. The Centre
has never before had the luxury of knowing funding
was guaranteed into the future for this length of time.
In the last year the centre has assisted 299 people to
volunteer either through individual interview, phone
contact or email assistance. We have worked with
over 70 agency enquiries from the short query about
volunteer insurance to the longer assistance on how
to review and change a Constitution. The Centre
organised and facilitated over 16 training sessions
with 319 volunteers and volunteer managers
attending topics as diverse as Mental Health First
Aid and Suicide Prevention through to Governance
and Recruiting, Recognising and Retention of
Volunteers. Figure 11 provides a comparisson of
individualls and organisations assisted.
The Esperance Volunteer Resource Centre was
involved in the 2012 Kids Fun Day, a large and very
successful event held annually in Esperance. The
centre was able to help as part of the management
committee for the event and assisted in the recruiting
and management of the volunteers on the day.
The Volunteer Resource Centre would like to
acknowledge all members of the community who
volunteer, without your commitment to volunteering
some community events could not occur or would be
of a smaller scale.
The winning of our second Best Local Community
Group award was fantastic and is something we
could not achieve without the assistance of many
wonderful community members who volunteer their
time.
2009/2010 2010/1011 2011/2012
Individuals assisted to volunteer 283 119 299
Community organisations assisted 80 72 71
Volunteers Trained 188 236 228
Volunteer Managers Trained 88 96 86
Esperance Volunteer Resource Centre
Esperance Volunteer Resource Centre provides information and support to
volunteers and agencies working with volunteers.
“we were successful
in bidding for State
Government funding
which covers the next
five years.”
Figure 11
33
34 Shire of Esperance 2011/2012 Annual Report
Engineering Services
A significant part of the year has been spent in
developing the Esperance Waterfront Project ready
for works to commence in the 2012/2013 financial
year. Along with this a number of peripheral projects
have commenced including a review of the Norfolk
Pines throughout the Esperance townsite, review
of all playground equipment for compliance with
Australian Safety standards, a review of the Road
Network Hierarchy, commencement of a Public
Open Space review and an audit of the Eastern
Suburbs Waste Water Reuse Scheme.
Also officers have been working to secure funding for
the new Myrup Waste Water Facility which will see
the upgrading of the existing truckwash facility and
the integration of the waste water facility currently
located at the Wylie Bay Waste Facility.
Roads
The Shire of Esperance is responsible for the
management and maintenance of the largest
road network of any local government in Western
Australia with 819 km of sealed roads and 3,679 km
of unsealed roads
In the 2011/2012 financial year we were able to
complete the following works –
•	 Gravel re-sheeting of approximately 113km of
gravel roads including 59km on the Cascade -
Lake King Road.
•	 Limestone re-sheeted of approximately 55km
of limestone roads
•	 Reconstructed approximately 10km of rural
sealed roads
•	 Resealed approximately 16.5km of rural
sealed roads
•	 Construction of approximately 3.2km of new
rural sealed roads to the value of $ 425,576
•	 Asphalt overlays on urban roads to the value
of $378,467
•	 Footpaths – Replaced 1km of slab footpaths
with brickpaved paths, constructed
approximately 1km of new footpaths
•	 Spent $51,184 on new kerbing in the residential
and industrial areas in Esperance.
•	 A number of solar lights were installed in
remote location along the Twilight Beach
footpath
Parks and Gardens
Works were completed on the new Walker Street
Playground, valued at $180,000, which included
playground equipment, landscaping, street furniture,
footpaths, nature trail and tree top viewing area. This
project represents the continuation of the Esperance
reserve upgrade strategy, designed to develop more
usable recreation space.
This year also saw a review of Parks and Gardens
operations and infrastructure, to develop more
efficient work programs and an increased level of
service for our recreation spaces. The review also
determined that a significant amount of investment
was required to upgrade our existing aging
reticulation network. This program is commencing in
the 2012/2013 financial year.
Engineering Services is responsible for: infrastructure
and property services, local roads, bridges, footpaths,
drainage; asset management; airport; waste collection
and recycling; cemeteries and foreshore erosion
management and development.
35
Waste Management
This year saw the commencement of a review of
waste management within the Shire of Esperance
and the development of a Waste Disposal Strategy
which looks at the future of the Wylie Bay Waste
Facility. The review is being developed further in
consultation with the Department of Environment
and Conservation prior to discussion with the
community.
The Wylie Bay recycling centre also celebrated its
10 year anniversary with the Esperance community
having recycled over 10,000 ton of material in
that period. The recycling centre has continued to
operate in an efficient manner and sent 1,300 ton
of product to Perth for recycling in 2011/2012. This
year saw the introduction of e-waste and florescent
globe recycling.
Esperance Airport
This year saw the commencement of the Airport
redevelopment for the introduction of security
screening on 1 July 2012. The works involved
a $2.5 million upgrade of the airport terminal to
accommodate the screening equipment and a
secure boarding area. The screening equipment
was purchased with the assistance of a federal
governmentgrantandisvaluedat$650,000. Thecost
of the equipment including running and replacement
and the engagement of a contractor to undertake the
screening also will see an increase in airfare prices
between Esperance and Perth of $40 per person
on the outbound ticket. This price represents the
total cost of screening per passenger per ticket. The
2011/2012 financial year saw approximately 48,000
passengers travel through the airport.
Asset Management
This year saw the continuation of data collection
and the development of asset management plans
for all shire assets. The asset management plans
identify our assets, what they are, where they are,
what condition are they in and what needs to be
spent on them in the future to maintain them. This
information then feeds into the long term financial
plan to determine what Council needs to be
allocating for the maintenance of our existing assets
into the future. Currently our asset base is valued at
approximately $651m.
The Shire road asset’s were also reviewed with the
introduction of new asset management software
(ROMAN II). This also involved the collection of
condition data on our entire sealed and unsealed
road network. The entire road network was traversed
over a five week period with a variety of data
collected for input into the new software system.
This information will be used to develop the Roads
Asset Management Plan in 2012/2013.
“The Wylie Bay Waste
Facility celebrated it’s
10 year anniversary in
2011”
36 Shire of Esperance 2011/2012 Annual Report
Development Services
Town Planning
Amendments 6, 8, 9 and 10 to Local Planning
Scheme No. 23 were Gazetted in 2011/2012.
A further 5 Scheme Amendments were being
processed throughout the year.
A significant number of development applications
were received and determined, by shire staff as per
Figure 12.
The Commercial Centre Strategy was also adopted
by Council. This Strategy aims to guide the provision
of commercial and associated activities within the
region during the next 10 to 15 years.
A Business Case for the Town Centre Revitalisation
Plan was prepared for the SuperTowns project,
and was sucessful in receiving $380,000. The
Background Analysis document for the Plan has
been developed, and will continue to develop over
the next year.
Audits were carried out by our Planning staff to
provide input in developing draft stategies for access
and parking, residential and industrial land. These
strategies are temporarily on hold to allow for the
development of the SuperTowns Growth Strategy
and Town Centre Revitalisation plan.
Local Planning Policies for Holiday Homes and Wind
Turbines were adopted in 2012, and a further policy
for Industrial Precinct Design Guidelines will be
considered by Council in late 2012.
Further development has been made into the
implementation of a Geographic Information System
(GIS). The improvements, both in the range of data
that is displayed as well as the quality of the data
available, are enabling officers to more fully and
efficiently assess development applications.
Figure 12 - 2011/2012 Development Application Approvals
Applications
Received
Applications
Determined
Development Applications 292 276
Subdivisions 23 23
Home Occupations 5 5
Home Occupation Renewals1
17 13
1
Home Occupation Renewals have reduced based on a number becoming
exempt under Local Planning Scheme No. 23.
Development Services is responsible for: health
services such as water and food inspection,
immunisation services, toilet facilities, noise control and
meat inspections and animal control; building services,
including inspections, licensing, certification and
enforcement; planning and development approval and
environmental services.
37
38 Shire of Esperance 2011/2012 Annual Report
Development Services
Environmental Health
During 2011/2012, Environmental Health and Environment Services
continued to undertake inspections and actions to promote community
health and well being.
This included undertaking a range of activities including inspections,
monitoring of Shire activities, audits, provision of educational material,
complaint investigation and resolution. The Environmental Health team
completed over 1000 assigned tasks associated with actives relating
to food premises, caravan parks and camping grounds, environmental
protection, public buildings, accommodation and aquatic facilities and
a number of other health related premises. Some of this activity is
outlined in Figure 13.
Figure 13
Inspections Eastern Suburbs Water supply Scheme
Food 333 Chemistry 36
Effluent Disposal Systems 39 Microbiological 240
Caravan Parks  Camping Grounds 9 Myrup Truckwash 6
Hairdressing and Skin Penetration 4 Recreational Water 55
Lodging House 27 Food Safe Workshops provided 7
Offensive Trade 5
Public Buildings 106 Meat Inspection –Animals Inspected
Aquatic facilities 10 Bovine 13,551
Ovine 116,821
Sampling Activity
Food: 	
West Australian Department
of Health Co-ordinated Food
Sampling Programs Participation
Samples collected
14
21
Rainwater Tank Sampling 18
Aquatic Facilities 137
Air Handling Systems 24
Mosquito 21
Potable Water (Microbiological) 102
Landfills 48
39
Figure 14 - Breakdown of Building Approvals
2010/2011 2011/2012
Description Number Value Number Value
New Single Dwellings/Duplexes 72 $22,313,885 52 $14,969,358
Alter to Dwellings 45 $2,905,259 25 $2,432,174
Approval Certificates Dwellings
(Retrospective Approval)
0 0 0 0
Industrial, Commercial 16 $11,450,982 14 $5,320,689
Alter to Industrial, Commercial 13 $1,008,414 15 $9,990,503
Approval Certificates Industrial,
Commercial (Retrospective Approval)
0 0 2 $13,000
Outbuildings 126 $1,842,915 106 $1,573,716
Alter to Outbuildings 16 $127,737 6 $25,000
Approval Certificates Outbuilding
(Retrospective Approval)
1 $18,000 0 0
Sundry Structures (Retaining walls,
Fencing, etc)
19 $198,000 18 $172,998
Sundry Structures (Retaining walls,
Fencing, etc) (Retrospective Approval)
0 0 0 0
Demolition 5 $78,275 4 $28,355
Pools 2 $59,000 4 $57,500
Total 315 $40,002,467 246 $34,583,293
Building
During the 2011/2012 financial year, Building
Services prepared for new building projects such as
the West Beach toilets (currently at design stage)
and overseeing additions to existing buildings, some
of which were the Home Care Building (kitchen
additions) and Bay of Isles Leisure Centre chemical
storage area.
The Building Maintenance Program has been split
into two areas, planned and reactive maintenance
so that a measure can be put into place to confirm
that planned maintenance of the Shires built
assets is having the desired effect which is to
minimise reactive maintenance by implementing
a comprehensive maintenance program. Council
allocated funds in the 2011/2012 year for building
asset maintenance which is also being used to
inspect and rationalise existing buildings, ensuring
that they will be brought up to standard, complying
with legislative requirements.
Building Legislation Changes
In April 2012 sections of the Local Government
(Miscellaneous Provisions) Act 1960 were repealed
so that the new Building Act 2011 could take full
effect. The changes have resulted in considerable
administration and building approval process
changes.
Building Approvals
In total, 246 building permits were issued by the Shire
of Esperance, worth over $34 million dollars. These
comprised of 52 residential dwellings, 14 commercial
and industrial buildings, 112 outbuildings and 68
additions and alterations made up the remainder of
the approvals. See Figure 14 for details.
40 Shire of Esperance 2011/2012 Annual Report
Corporate Services
Corporate Services changed leadership this year
with Mr Darren Kennedy leaving the Shire to take
up other opportunities. Mr Kennedy was an asset
to the Shire implementing many improvements for
the long term benefit of the Shire and its residents.
Mr Shane Burge has taken on the role since May
2012 and is keen to capitalise on the opportunities
and challenges open to the Shire to ensure ongoing
sustainability.
New legislation introduced by the State Government
has seen local government make preparations for
the Integrated Planning and Reporting Framework.
The new framework is designed to improve the
overall standard of long term strategic planning and
financial management within Western Australian
local governments. A particular emphasis has
been placed on community engagement with the
preparation of the strategic plans and for financial
planning to take a longer term view.
As a result of these changes the annual Shire budget
commencing 2013/2014 and subsequent annual
budgets will need to be predominately derived from
a Council adopted Corporate Business Plan and
accompanying Long Term Financial Plan. These
changesareamajordeviationfromwhattheShireand
local government have traditionally done in the past
although Council and staff are progressively working
through the new legislative framework to ensure
that compliance is achieved within the stipulated
timeframes. The majority of the changes will enable
the local government industry within WA to move
towards closer uniformity with the rest of Australia.
Corporate Services is responsible for: audit and grant
management ; finance management; long term financial
planning; information technology; records management;
statutory reporting; administration; customer service;
licensing and rates.
“Emphasis has been
placed on community
engagement with the
preparation of Strategic
Plans for long term
Financial Planning”
41
Information Technology
In the year leading up to 7 November 2011, IT
conducted the “Managed Services Migration”
project. This was an extensive project to inform and
prepare staff for the transition of most IT systems to
a secure data centre in Sydney. The majority of the
project focused around analysis of staff interaction
with the IT systems, and then defining and mitigating
risks with the move. The move was well tested, and
successfully completed on the 7 November 2011.
The result of the move to a “Managed Services”
environment has ensured the Shire has complete
business continuity and a disaster recovery system
with respect to its IT systems.
A new Council Agendas and Minutes system know
as InfoCouncil was deployed during the year. This
program allows agendas and minutes to be managed
through dedicated software and includes processes
to upload minutes directly to the Shire’s website.
Preparation for telephone services to move to VOIP
(TIPT) was performed, which included re-cabling of
the Shire’s Admin building’s wired network, and a
logical redesign of the whole Shire’s physical network
(Administration building and attached out-centres). A
new Customer Request Module(CRM) system was
configured and is ready for testing.
Over the coming year there will be an assessment
of the in-house Management Accounting Reporting
Software (MARS) that was developed in-house.
This software is no longer supported from an IT
perspective therefore a sustainable IT solution
needs to be implemented to ensure a continuance of
management reports can be retained within the Shire.
42 Shire of Esperance 2011/2012 Annual Report
Corporate Services
Statutory Reports
Report under Section 29(2) of the Disability
Services Act 1993
The Shire of Esperance has continued its
commitment to provided improved access for people
with disabilities.
The Disability Access and Inclusion Plan Working
Party monitor’s the Disability Access and Inclusion
Plan 2010/2012 (DAIP). Key projects are identified
and an implementation schedule is set out for each
financial year. For the 2011/2012 financial year the
following projects were undertaken:
•	 Promote and publish details of the DAIP and
how persons with a disability or their carers
can have input into the plan.
•	 Publish and advertise the process for lodging
complaints or requests for works with the
Shire.
•	 Advertise and promote the options available
for people to receive information in differing
formats from the Shire.
•	 Over the last five years the Shire has been
replacing all concrete slab footpaths in the
central business district to ensure smooth and
easy access for all community members, this
year saw the annual works program complete
this project along The Esplanade. The Shire
also regularly sweeps concrete footpaths
of loose stones, installs kerb ramps in new
footpaths, and requires provisions for disabled
people in new commercial buildings and where
major alterations have been undertaken in
existing buildings.
•	 The Bay of Isles Leisure Centre installed
two new machines in the gymnasium that
specifically target strength training and can be
utilised by able bodied patrons and patrons
with a disability. The cardiovascular machine
is for upper body training only whilst the Multi
Plex station provides a full body workout
when required, both machines are wheelchair
friendly. Health and Fitness staff have been
trained to work with people with disabilities to
assist in providing guidance and safety advice
on the use of all equipment.
•	 The introduction of the Swim ability squad has
allowed children with disabilities to maintain
their water fitness and increases the likelihood
of their inclusion into a mainstream swimming
school program.
Compliance with the State Records Act 2000
The Shire submitted an amended Recordkeeping
Plan to the State Records Office on 26 July 2011.
This amended plan was approved by the State
Records Commission on 2 December 2011.
This Plan describes the Shire’s commitment to
good and compliant recordkeeping procedures and
identifies future projects.
The Shire main focus in Records has been improving
the Electronic Document Management System
(EDMS) TRIM, enhanced with a new business
classification system and semi automated retention
and disposal of folders.
The Shire has also been addressing the disposition
backlog of hardcopy files held in storage within
Records. The Shire has currently sentenced 8,285
folders, of which:
•	 575 files identified as permanent archives
•	 1,336 files identified as local archives
•	 3,053 files identified as inactive records, for
future disposal, and
•	 3,321 files identified for destruction, which
have since been destroyed.
43
National Competition Policy
The Competition Principles Agreement is an Inter-
government Agreement between
the Commonwealth and State/Territory Governments
that sets out how government will apply National
Competition Policy principles to public sector
organisations within their jurisdiction.
The State Government released a Policy Statement
effective from July 1996 called the Clause 7
Statement, which forms part of the Competition
PrinciplesAgreement. The Clause 7 policy document
sets out nominated principles from the Agreement
that now apply to Local Government. The provisions
of Clause 7 of the Competition Principles Agreement
require local government to report annually as to
the implementation, application and effects of the
Competition Policy.
The Competition Principles Agreement, under
Clause 7, specifies three broad areas of reporting.
These are:
1. Competitive Neutrality;
2. Structural Review of Public Monopolies; and
3. Legislative Review.
In accordance with the requirements of the National
Competition Policy, the Shire of Esperance makes
the following disclosures for 2011/2012.
Performance Indicators
The Records Department is currently maintaining
statistical information for work processes within the
department. In accordance with the State Records
Act 2000 the Shire has developed performance
indicators based on the statistical information
gathered.
Information Statement
On 19 April 2012, the Shire updated and approved
the Information Statement as required by the
Freedom of Information Act 1992. The Information
Statement can be obtained from the Shire’s website,
Administration Office or on request.
Records Training
The Shire has developed a structured induction
and training program to ensure that employees,
contractors and elected members are aware of their
role and responsibilities in regard to compliance with
the Shire’s Recordkeeping Plan.
The Training consists of:
•	 Introduction to Records Management
•	 Records Awareness Training (RAT)
•	 TRIM (Electronic Document Management
System) Training Manual
•	 Specific TRIM training targeting priority areas.
•	 Advice to staff regarding recordkeeping or
TRIM on an ongoing as needs basis.
This training is provided to all employees who have
record keeping duties. Employees are advised
of any additional information such as policies and
procedures which are published on the Shire’s
intranet.
44 Shire of Esperance 2011/2012 Annual Report
Competitive Neutrality
The objective of competitive neutrality is the
elimination of resource allocation distortions arising
out of local government ownership of significant
business activities.
The Shire of Esperance has previously assessed its
operations and considers that it has one business
activity that would be classed as significant under
the current guidelines. Also the Shire of Esperance
does not operate a business enterprise that has been
classified by the Australian Bureau of Statistics as
either a Public Trading Enterprise or Public Financial
Enterprise.
The number of activities to which competitive
neutrality principles have been applied in the
reporting period is Zero (0).
The number of activities to which competitive
neutrality principles have been considered but not
applied in the reporting period is Zero (0).
During the reporting period the Shire of Esperance
did not become aware of any allegations of non-
compliance with the competitive neutrality principles
made by a private entity against the Shire.
Structural Review of Public Monopolies
In relation to Structural review of public monopolies,
the Shire of Esperance discloses the following:
Structural reform principles have been applied to the
following number of activities in the reporting period:
Zero (0); and
Structural reform principles have been considered
but not applied to the following number of activities
in the reporting period: Zero (0).
As no structural reform has been applied to any
activities, the review requirements of principal SR.3
of Clause 7 of the Competition Policy Statement
have not been undertaken.
Legislative Review
Parties to the National Competition Policy package
agreed that legislation should not restrict competition
unless:
The benefits of the restriction to the community as a
whole outweigh the costs; and
The objectives of the legislation can only be achieved
by restricting competition.
Accordingly, the Shire of Esperance is required to
implement a systematic review of all of its existing
legislation to determine whether there are any direct
or indirect effects on competition.
The Local Government Act 1995 requires all existing
Local Laws to be reviewed every eight years. As part
of this process the intention to review Local Laws
is advertised in the media giving residents and rate
payers the opportunity to comment on any proposed
changes, additions or deletions to the Shire’s Local
Laws. For the 2011/2012 Financial year there were
no changes to the Shire’s Local Laws:
•	 As at the reporting date the number of by-laws
and Local Laws which have been reviewed
and reformed as a result of any legislative
review is Zero (0); and
•	 As at the reporting date the number of by-laws
and Local Laws which the application of any
legislative review principles were considered
but not applied is Zero (0).
Corporate Services
45
Plan for the Future
Section 5.56 of the Local Government Act 1995
(the Act) requires a local government to plan for the
future of the district. Furthermore, Section 5.53(e)
of the Act requires local government to provide an
overview of the Plan for the Future in its Annual
Report, including major initiatives that are proposed
to commence or continue in the following financial
year.
The Shire’s Plan for the Future was last reviewed
during 2009/2010 and nominates the following
initiatives as projects of key strategic importance:
•	 Esperance Foreshore Protection and
Enhancement Project, now known as the
Esperance Waterfront Project
•	 Greater Sports Ground Redevelopment;
•	 Tanker Jetty Maintenance;
The Plan also identifies the imperatives of Asset
Management and Information and Communication
Technologies as key operational objectives for
the Shire for the period of the Plan. The Shire has
performed significant work in both of these areas to
ensure sustainable asset management is planned
for now and into the future and that new technologies
are embraced when proven efficiencies can be
identified.
A copy of the Plan is available from the
Administration Office or from the Shire website
www.esperance.wa.gov.au
Employee Remuneration
Pursuant to Regulation 19B of the Local Government
(Administration) Regulation 1996, the following table
sets out, in bands of $10,000, the number of Shire
employees entitled to an annual salary of $100,000
or more:
Salary Band (S) 2012 2011 2010
$100,000 - $109,999 - 3 2
$110,000 - $119,999 2 1 -
$120,000 - $129,999 2 - -
$160,000 - $169,000 - - 1
$170,000 - $179,999 - 1 -
$200,000 – 209,999 1 - -
Complaints
Section 5.53(2)(hb) of the Local Government Act
1995 requires the Annual report to contain details of
entries made under section 5.121 during the financial
year in the Register of Complaints. The 2011/2012
year saw zero (0) entries made in this regard.
46 Shire of Esperance 2011/2012 Annual Report
47
TABLE OF CONTENTS
Page
Statement by Chief Executive Officer (i)
Independent Audit Report (ii) - (iii)
Statement of Comprehensive Income by Nature or Type 1
Statement of Comprehensive Income by Program 2
Statement of Financial Position 3
Statement of Changes in Equity 4
Statement of Cash Flows 5
Rate Setting Statement 6
Notes to and Forming Part of the Financial Report Note
Significant Accounting Policies 1 7
Revenues and Expenses 2 21
Cash and Cash Equivalents 3 26
Trade and Other Receivables 4 27
Inventories 5 27
Property, Plant and Equipment 6 28
Infrastructure 7 30
Trade and Other Payables 8 32
Long Term Borrowings 9 32
Provisions 10 32
Reserves - Asset Revaluation 11 32
Reserves - Cash Backed 12 33
Notes to the Cash Flow Statement 13 39
Capital and Leasing Commitments 14 40
Contingent Liabilities 15 40
Joint Venture 16 40
Assets by Function and Activity 17 41
Financial Ratios 18 41
Trust Funds 19 42
Disposal of Assets 20 42
Information on Borrowings 21 43
Rating Information 22 45
Discounts, Incentives, Concessions and Write-offs 23 48
Interest Charges and Instalments 24 48
Fees and Charges 25 49
Grant Revenue 26 49
Employee Numbers 27 49
Councillors' Remuneration 28 49
Major Land Transactions 29 50
Major Trading Undertakings 30 53
Financial Risk Management 31 55
SHIRE OF ESPERANCE
Windich Street, Esperance Western Australia, 6450
Tel: (08) 9071 0666, Fax: (08) 9071 0600 Email: shire @esperance.wa.gov.au
www.esperance.wa.gov.au
Annual Financial Report
For the year ended 30th June 2012
Table of Contents
2011-12
(i)
Annual Financial Report
For the year ended 30th June 2012
Audit Report
2011-12
(ii)
Annual Financial Report
For the year ended 30th June 2012
Audit Report
2011-12
(iii)
Annual Financial Report
For the year ended 30th June 2012
Audit Report
2011-12
Page 1
NOTE 2012 2012 2011
Actual Budget Actual
$ $ $
Revenue
Rates 22 12,187,696 12,236,861 11,388,430
Operating Grants, Subsidies and
Contributions 26 9,230,839 6,115,712 8,032,526
Fees and Charges 25 6,395,373 5,687,890 6,528,332
Interest Earnings 2(a) 1,190,025 772,000 980,277
29,003,933 24,812,463 26,929,565
Expenses
Employee Costs (11,757,213) (11,471,982) (10,732,697)
Materials and Contracts (6,521,682) (6,024,493) (7,102,086)
Utility Charges (936,309) (918,740) (728,678)
Depreciation on Non-Current Assets 2(a) (8,588,017) (8,579,880) (8,606,104)
Interest Expenses 2(a) (54,999) (57,761) (43,600)
Insurance Expenses (excludes W.Comp) (473,578) (462,568) (421,886)
Other Expenditure (529,470) (616,220) (570,861)
(28,861,268) (28,131,644) (28,205,912)
Sub-total 142,665 (3,319,181) (1,276,347)
Non-Operating Grants, Subsidies and
Contributions 26 19,398,853 5,421,445 3,789,965
Profit on Asset Disposals 20 329,180 83,872 442,888
Loss on Asset Disposal 20 (16,187) (83,071) (89,079)
NET RESULT 19,854,511 2,103,065 2,867,427
Other Comprehensive Income - - -
Total Other Comprehensive Income - - -
TOTAL COMPREHENSIVE INCOME 19,854,511 2,103,065 2,867,427
This statement is to be read in conjunction with the accompanying notes.
Annual Financial Report
For the year ended 30th June 2012
Statement of Comprehensive Income
by Nature  Type
2011-12
Page 2
NOTE 2012 2012 2011
Actual Budget Actual
$ $ $
Revenue
Governance 221,647 126,750 216,988
General Purpose Funding 18,643,845 16,019,419 16,369,377
Law, Order, Public Safety 351,855 320,989 758,791
Health 158,405 154,853 161,395
Education and Welfare 2,353,543 2,201,294 2,218,181
Community Amenities 2,659,854 2,299,800 2,569,867
Recreation and Culture 2,005,803 1,575,975 1,592,547
Transport 1,298,901 1,094,950 1,251,687
Economic Services 690,127 407,433 711,155
Other Property and Services 619,953 611,000 1,079,577
2 (a) 29,003,933 24,812,463 26,929,565
Expenses Excluding Finance Costs
Governance (1,219,015) (1,095,029) (1,087,820)
General Purpose Funding (384,080) (434,355) (341,288)
Law, Order, Public Safety (1,154,889) (1,152,935) (1,945,899)
Health (412,662) (386,501) (316,940)
Education and Welfare (2,542,779) (2,545,960) (2,401,933)
Community Amenities (3,783,020) (3,409,747) (3,538,407)
Recreation  Culture (5,806,630) (5,442,619) (5,741,809)
Transport (10,996,849) (10,848,353) (10,697,382)
Economic Services (1,651,299) (1,873,370) (1,010,423)
Other Property and Services (855,046) (885,014) (1,080,411)
2 (a) (28,806,269) (28,073,883) (28,162,312)
Finance Costs
Recreation  Culture (54,491) (57,761) (48,833)
Other Property and Services (508) - 5,233
(54,999) (57,761) (43,600)
Non-Operating Grants, Subsidies
and Contributions
Law, Order, Public Safety 26,227 12,713 38,190
Education and Welfare 22,651 20,000 99,213
Recreation  Culture 1,269,175 1,145 399,944
Transport 4,069,934 5,387,587 3,252,618
Economic Services 13,942,866 - -
Other Property and Services 68,000 - -
19,398,853 5,421,445 3,789,965
Profit on Disposal of Assets
Law, Order, Public Safety - 234 -
Education and Welfare 909 - -
Community Amenities - 4,484 -
Transport 177,699 79,154 56,608
Other Property and Services 150,572 - 386,280
329,180 83,872 442,888
Loss on Disposal of Assets
Governance - - (6,041)
Law, Order, Public Safety (4,924) (2,646) (6,996)
Community Amenities (6,691) - (5,002)
Transport (4,572) (75,884) (52,432)
Economic Services - (3,839) -
Other Property and Services - (702) (18,608)
(16,187) (83,071) (89,079)
NET RESULT 19,854,511 2,103,065 2,867,427
Other Comprehensive Income - - -
Total Other Comprehensive Income - - -
TOTAL COMPREHENSIVE INCOME 19,854,511 2,103,065 2,867,427
This statement is to be read in conjunction with the accompanying notes.
Annual Financial Report
For the year ended 30th June 2012
Statement of Comprehensive Income
by Program
2011-12
Page 3
NOTE 2012 2011
Actual Actual
$ $
CURRENT ASSETS
Cash and Cash Equivalents 3 32,946,714 13,974,222
Trade and Other Receivables 4 2,160,390 2,065,552
Inventories 5 395,813 394,803
TOTAL CURRENT ASSETS 35,502,917 16,434,577
NON-CURRENT ASSETS
Other Receivables 4 845,458 925,907
Inventories 5 10,604,952 10,410,993
Property, Plant and Equipment 6 36,214,149 35,167,321
Infrastructure 7 196,268,937 194,629,455
TOTAL NON-CURRENT ASSETS 243,933,496 241,133,676
TOTAL ASSETS 279,436,413 257,568,253
CURRENT LIABILITIES
Trade and Other Payables 8 2,638,200 903,627
Current Portion of Long Term Borrowings 9 127,779 76,541
Provisions 10 1,591,472 1,534,149
TOTAL CURRENT LIABILITIES 4,357,451 2,514,317
NON-CURRENT LIABILITIES
Long Term Borrowings 9 8,973,938 8,840,972
Provisions 10 219,170 181,621
TOTAL NON-CURRENT LIABILITIES 9,193,108 9,022,593
TOTAL LIABILITIES 13,550,559 11,536,910
NET ASSETS 265,885,854 246,031,343
EQUITY
Retained Surplus 236,122,784 232,356,754
Reserves - Cash Backed 12 29,763,070 13,674,589
TOTAL EQUITY 265,885,854 246,031,343
This statement is to be read in conjunction with the accompanying notes.
2011-12
Annual Financial Report
For the year ended 30th June 2012
Statement of Financial
Position
Page 4
RESERVES ASSET
RETAINED CASH REVALUATION TOTAL
NOTE SURPLUS BACKED RESERVE EQUITY
$ $ $ $
Balance as at 1 July 2010 127,415,662 11,363,104 104,385,150 243,163,916
Correction of Errors 104,385,150 0 (104,385,150) 0
Restated Balance 11 231,800,812 11,363,104 0 243,163,916
Net Result 2,867,427 - - 2,867,427
Total Other Comprehensive Income - - - -
Transfers from/(to) Reserve (2,311,485) 2,311,485 - -
Balance as at 30 June 2011 232,356,754 13,674,589 0 246,031,343
Net Result 19,854,511 - - 19,854,511
Total Other Comprehensive Income - - - -
Transfers from/(to) Reserve (16,088,481) 16,088,481 - -
Balance as at 30 June 2012 236,122,784 29,763,070 0 265,885,854
This statement is to be read in conjunction with the accompanying notes.
2011-12
Annual Financial Report
For the year ended 30th June 2012
Statement of Changes in Equity
Page 5
NOTE 2012 2012 2011
Actual Budget Actual
Cash Flows From Operating Activities $ $ $
Receipts
Rates 12,217,845 12,258,861 11,362,217
Operating Grants, Subsidies and
Contributions 9,445,780 6,190,712 8,318,079
Fees and Charges 6,219,060 5,833,469 6,552,302
Interest Earnings 1,082,155 772,000 976,483
Goods and Services Tax 3,028,167 2,100,000 1,690,512
31,993,007 27,155,042 28,899,593
Payments
Employee Costs (11,580,123) (11,272,427) (10,557,396)
Materials and Contracts (6,104,917) (5,093,238) (7,629,535)
Utility Charges (895,809) (918,740) (750,985)
Insurance Expenses (473,578) (462,568) (421,886)
Interest Expenses (49,471) (57,761) (48,882)
Goods and Services Tax (1,828,014) (2,100,000) (1,835,141)
Other Expenditure (528,220) (616,220) (570,861)
(21,460,132) (20,520,954) (21,814,686)
Net Cash Provided By
Operating Activities 13(b) 10,532,875 6,634,088 7,084,907
Cash Flows from Investing Activities
Payments for Development of
Land Held for Resale (469,441) (104,262) (1,050,984)
Payments for Purchase of
Property, Plant  Equipment (3,400,400) (6,299,078) (2,390,192)
Payments for Construction of
Infrastructure (8,146,229) (9,078,709) (7,103,076)
Advances to Community Groups (59,395) - (410,000)
Proceeds from Self Supporting Loans 63,659 113,837
Non-Operating Grants,
Subsidies and Contributions
used for the Development of Assets 19,398,853 5,421,445 3,789,965
Proceeds from Sale of Assets 868,366 662,762 1,268,771
Net Cash Used In
Investing Activities 8,255,413 (9,397,842) (5,781,679)
Cash Flows from Financing Activities
Repayment of Debentures (263,659) (78,611) (245,543)
Proceeds from New Debentures 447,863 64,330 809,877
Net Cash Provided By (Used In)
Financing Activities 184,204 (14,281) 564,334
Net Increase (Decrease) in Cash Held 18,972,492 (2,778,035) 1,867,562
Cash at Beginning of Year 13,974,222 13,945,514 12,106,660
Cash and Cash Equivalents
at the End of the Year 13(a) 32,946,714 11,167,479 13,974,222
This statement is to be read in conjunction with the accompanying notes.
2011-12
Annual Financial Report
For the year ended 30th June 2012
Statement of Cash Flows
Page 6
2012 2012 2011
NOTE Actual Budget Actual
$ $ $
Revenue
Governance 221,647 126,750 216,988
General Purpose Funding 6,456,149 3,782,558 4,980,947
Law, Order, Public Safety 378,082 333,936 796,981
Health 158,405 154,853 161,395
Education and Welfare 2,377,103 2,221,294 2,317,394
Community Amenities 2,659,854 2,304,284 2,569,867
Recreation and Culture 3,274,978 1,577,120 1,992,491
Transport 5,546,534 6,561,691 4,560,913
Economic Services 14,632,993 407,433 711,155
Other Property and Services 838,525 611,000 1,465,857
36,544,270 18,080,919 19,773,988
Expenses
Governance (1,219,015) (1,095,029) (1,093,861)
General Purpose Funding (384,080) (434,355) (341,288)
Law, Order, Public Safety (1,159,813) (1,155,581) (1,952,895)
Health (412,662) (386,501) (316,940)
Education and Welfare (2,542,779) (2,545,960) (2,401,933)
Community Amenities (3,789,711) (3,409,747) (3,543,409)
Recreation  Culture (5,861,121) (5,500,380) (5,790,642)
Transport (11,001,421) (10,924,237) (10,749,814)
Economic Services (1,651,299) (1,877,209) (1,010,423)
Other Property and Services (855,554) (885,716) (1,093,786)
(28,877,455) (28,214,715) (28,294,991)
Net Result Excluding Rates 7,666,815 (10,133,796) (8,521,003)
Adjustments for Cash Budget Requirements:
Non-Cash Expenditure and Revenue
(Profit)/Loss on Asset Disposals 20 (312,993) (801) (353,809)
Movement in Provisions and Accruals 47,015 153,639 70,069
Movement in Deferred Pensioner Rates 
Sundry Debtors (non-current)
24,947 - 27,218
Depreciation and Amortisation on Assets 2(a) 8,588,017 8,579,880 8,606,104
Capital Expenditure and Revenue
Purchase Land Held for Resale (469,441) (104,262) (1,050,984)
Purchase Land and Buildings (1,943,386) (3,650,893) (368,738)
Purchase Infrastructure Assets - Roads (6,505,702) (7,697,575) (5,963,412)
Purchase Infrastructure Assets - Other (1,640,527) (1,381,134) (1,139,664)
Purchase Plant and Equipment (1,285,060) (2,599,120) (1,931,018)
Purchase Furniture and Equipment (171,954) (49,065) (90,436)
Proceeds from Disposal of Assets 20 868,366 662,762 1,268,771
Repayment of Debentures 21(a) (263,659) (78,611) (245,543)
Proceeds from New Debentures 21(a) 447,863 64,330 809,877
Advances to Community Groups (59,395) (64,330) (410,000)
Self-Supporting Loan Principal Income 63,659 78,611 113,837
Transfers to Reserves (Restricted Assets) 12 (20,120,053) (1,923,175) (5,655,140)
Transfers from Reserves (Restricted Assets) 12 4,005,772 4,730,286 3,343,655
Surplus/(Deficit) July 1 B/Fwd 22(b) 939,573 1,196,393 1,041,359
Surplus/(Deficit) June 30 C/Fwd 2,067,553 20,000 939,573
Amount Required to be Raised from Rates 22(a) (12,187,696) (12,236,861) (11,388,430)
This statement is to be read in conjunction with the accompanying notes.
2011-12
Annual Financial Report
For the year ended 30th June 2012
Rate Setting Statement
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary
Shire of Esperance 2011/2012 Annual Report Summary

More Related Content

Viewers also liked

Port Hedland Annual Report13:14
Port Hedland Annual Report13:14Port Hedland Annual Report13:14
Port Hedland Annual Report13:14Mal Osborne
 
Grease LIVE - DIRECTV Promotion
Grease LIVE - DIRECTV PromotionGrease LIVE - DIRECTV Promotion
Grease LIVE - DIRECTV PromotionMax Wyeth
 
Comic-Con 2015 Coverage
Comic-Con 2015 CoverageComic-Con 2015 Coverage
Comic-Con 2015 CoverageMax Wyeth
 
Presentasi "Girls Generation" by : Dwi Astuti XII IPA 3
Presentasi "Girls Generation" by : Dwi Astuti XII IPA 3Presentasi "Girls Generation" by : Dwi Astuti XII IPA 3
Presentasi "Girls Generation" by : Dwi Astuti XII IPA 3hyuneunseo
 
YeeSukYi_Portfolio
YeeSukYi_PortfolioYeeSukYi_Portfolio
YeeSukYi_PortfolioSuk Yi Yee
 
Drinking session conversation
Drinking session conversationDrinking session conversation
Drinking session conversationgengobajeneveb
 
Association for Talent Development APAC Conference Taipei 2016
Association for Talent Development APAC Conference Taipei 2016Association for Talent Development APAC Conference Taipei 2016
Association for Talent Development APAC Conference Taipei 2016Bernard Coulaty
 

Viewers also liked (8)

Redes Sociales
Redes SocialesRedes Sociales
Redes Sociales
 
Port Hedland Annual Report13:14
Port Hedland Annual Report13:14Port Hedland Annual Report13:14
Port Hedland Annual Report13:14
 
Grease LIVE - DIRECTV Promotion
Grease LIVE - DIRECTV PromotionGrease LIVE - DIRECTV Promotion
Grease LIVE - DIRECTV Promotion
 
Comic-Con 2015 Coverage
Comic-Con 2015 CoverageComic-Con 2015 Coverage
Comic-Con 2015 Coverage
 
Presentasi "Girls Generation" by : Dwi Astuti XII IPA 3
Presentasi "Girls Generation" by : Dwi Astuti XII IPA 3Presentasi "Girls Generation" by : Dwi Astuti XII IPA 3
Presentasi "Girls Generation" by : Dwi Astuti XII IPA 3
 
YeeSukYi_Portfolio
YeeSukYi_PortfolioYeeSukYi_Portfolio
YeeSukYi_Portfolio
 
Drinking session conversation
Drinking session conversationDrinking session conversation
Drinking session conversation
 
Association for Talent Development APAC Conference Taipei 2016
Association for Talent Development APAC Conference Taipei 2016Association for Talent Development APAC Conference Taipei 2016
Association for Talent Development APAC Conference Taipei 2016
 

Similar to Shire of Esperance 2011/2012 Annual Report Summary

Strategic Community Plan 2012-22
Strategic Community Plan 2012-22Strategic Community Plan 2012-22
Strategic Community Plan 2012-22Wilmari
 
City of Cockburn Strategic Community plan 2012-22
City of Cockburn Strategic Community plan 2012-22City of Cockburn Strategic Community plan 2012-22
City of Cockburn Strategic Community plan 2012-22MrsWNel
 
Highland Council SNP Group - Manifesto 22 FINAL single - Highlighted for Firs...
Highland Council SNP Group - Manifesto 22 FINAL single - Highlighted for Firs...Highland Council SNP Group - Manifesto 22 FINAL single - Highlighted for Firs...
Highland Council SNP Group - Manifesto 22 FINAL single - Highlighted for Firs...Derek Louden
 
Highland Council SNP Group - Manifesto 22 FINAL SlideShare.pdf
Highland Council SNP Group - Manifesto 22 FINAL SlideShare.pdfHighland Council SNP Group - Manifesto 22 FINAL SlideShare.pdf
Highland Council SNP Group - Manifesto 22 FINAL SlideShare.pdfDerek Louden
 
Manifiesto para un gobierno local fuerte y eficaz. Irlanda del Norte
Manifiesto para un gobierno local fuerte y eficaz. Irlanda del NorteManifiesto para un gobierno local fuerte y eficaz. Irlanda del Norte
Manifiesto para un gobierno local fuerte y eficaz. Irlanda del NorteRamón Galindo Noriega
 
Sdc this way_2031_consultation_document_web
Sdc this way_2031_consultation_document_webSdc this way_2031_consultation_document_web
Sdc this way_2031_consultation_document_webKatrinJohnston
 
Peter Cammarano Campaign Promises
Peter Cammarano Campaign PromisesPeter Cammarano Campaign Promises
Peter Cammarano Campaign PromisesHoboken Resistance
 
UCPCOG Annual Report FY19
UCPCOG Annual Report FY19UCPCOG Annual Report FY19
UCPCOG Annual Report FY19Robert Hiett
 
Long Term Integrated Community Facilities Plan 2015
Long Term Integrated Community Facilities Plan 2015Long Term Integrated Community Facilities Plan 2015
Long Term Integrated Community Facilities Plan 2015Council2016
 
ECOS: A Sustainable Future for Chittenden County
ECOS: A Sustainable Future for Chittenden CountyECOS: A Sustainable Future for Chittenden County
ECOS: A Sustainable Future for Chittenden CountyRPO America
 
Pickens County Vision 2025 July 2010 Update
Pickens County Vision 2025 July 2010 Update  Pickens County Vision 2025 July 2010 Update
Pickens County Vision 2025 July 2010 Update Gerald Sweitzer
 
2014 ECICOG Annual Report
2014 ECICOG Annual Report 2014 ECICOG Annual Report
2014 ECICOG Annual Report ECICOG
 
City of Gainesville, FL Public Works Department Strategic Plan FY 15-19
City of Gainesville, FL Public Works Department Strategic Plan FY 15-19City of Gainesville, FL Public Works Department Strategic Plan FY 15-19
City of Gainesville, FL Public Works Department Strategic Plan FY 15-19Tracy Quintana
 
Carbondale Comp Plan - Overview
Carbondale Comp Plan - OverviewCarbondale Comp Plan - Overview
Carbondale Comp Plan - OverviewMikePierceall
 
CRT Strategy 2016 to 2019
CRT Strategy 2016 to 2019CRT Strategy 2016 to 2019
CRT Strategy 2016 to 2019Andy Lock
 

Similar to Shire of Esperance 2011/2012 Annual Report Summary (20)

Strategic Community Plan 2012-22
Strategic Community Plan 2012-22Strategic Community Plan 2012-22
Strategic Community Plan 2012-22
 
City of Cockburn Strategic Community plan 2012-22
City of Cockburn Strategic Community plan 2012-22City of Cockburn Strategic Community plan 2012-22
City of Cockburn Strategic Community plan 2012-22
 
SP - ERavineTC Ver. 26-08-06
SP - ERavineTC Ver. 26-08-06SP - ERavineTC Ver. 26-08-06
SP - ERavineTC Ver. 26-08-06
 
Highland Council SNP Group - Manifesto 22 FINAL single - Highlighted for Firs...
Highland Council SNP Group - Manifesto 22 FINAL single - Highlighted for Firs...Highland Council SNP Group - Manifesto 22 FINAL single - Highlighted for Firs...
Highland Council SNP Group - Manifesto 22 FINAL single - Highlighted for Firs...
 
Highland Council SNP Group - Manifesto 22 FINAL SlideShare.pdf
Highland Council SNP Group - Manifesto 22 FINAL SlideShare.pdfHighland Council SNP Group - Manifesto 22 FINAL SlideShare.pdf
Highland Council SNP Group - Manifesto 22 FINAL SlideShare.pdf
 
Annual Report final 1415
Annual Report final 1415Annual Report final 1415
Annual Report final 1415
 
Manifiesto para un gobierno local fuerte y eficaz. Irlanda del Norte
Manifiesto para un gobierno local fuerte y eficaz. Irlanda del NorteManifiesto para un gobierno local fuerte y eficaz. Irlanda del Norte
Manifiesto para un gobierno local fuerte y eficaz. Irlanda del Norte
 
2011 State of the City
2011 State of the City2011 State of the City
2011 State of the City
 
Sdc this way_2031_consultation_document_web
Sdc this way_2031_consultation_document_webSdc this way_2031_consultation_document_web
Sdc this way_2031_consultation_document_web
 
Peter Cammarano Campaign Promises
Peter Cammarano Campaign PromisesPeter Cammarano Campaign Promises
Peter Cammarano Campaign Promises
 
UCPCOG Annual Report FY19
UCPCOG Annual Report FY19UCPCOG Annual Report FY19
UCPCOG Annual Report FY19
 
Long Term Integrated Community Facilities Plan 2015
Long Term Integrated Community Facilities Plan 2015Long Term Integrated Community Facilities Plan 2015
Long Term Integrated Community Facilities Plan 2015
 
Sustainability Initiative
Sustainability InitiativeSustainability Initiative
Sustainability Initiative
 
ECOS: A Sustainable Future for Chittenden County
ECOS: A Sustainable Future for Chittenden CountyECOS: A Sustainable Future for Chittenden County
ECOS: A Sustainable Future for Chittenden County
 
Pickens County Vision 2025 July 2010 Update
Pickens County Vision 2025 July 2010 Update  Pickens County Vision 2025 July 2010 Update
Pickens County Vision 2025 July 2010 Update
 
2014 ECICOG Annual Report
2014 ECICOG Annual Report 2014 ECICOG Annual Report
2014 ECICOG Annual Report
 
City of Gainesville, FL Public Works Department Strategic Plan FY 15-19
City of Gainesville, FL Public Works Department Strategic Plan FY 15-19City of Gainesville, FL Public Works Department Strategic Plan FY 15-19
City of Gainesville, FL Public Works Department Strategic Plan FY 15-19
 
Carbondale Comp Plan - Overview
Carbondale Comp Plan - OverviewCarbondale Comp Plan - Overview
Carbondale Comp Plan - Overview
 
CRT Strategy 2016 to 2019
CRT Strategy 2016 to 2019CRT Strategy 2016 to 2019
CRT Strategy 2016 to 2019
 
COR_SOE_1011
COR_SOE_1011COR_SOE_1011
COR_SOE_1011
 

Shire of Esperance 2011/2012 Annual Report Summary

  • 2. 2 Shire of Esperance 2011/2012 Annual Report Our Vision The spirit of Esperance is unique, we take pride in being a creative, caring, and supportive community. We live in a diverse and dynamic region with outstanding opportunities for all. As custodians, we are committed to protect our spectacular natural environment. Esperance has a sense of community ownership with a commitment to determine its own direction. We make it happen! Mission The Shire of Esperance will listen to its people and provide services in a caring, responsive and consultative manner through Councillors and staff that are well equipped to meet community needs, and show leadership in development at regional and higher levels.
  • 3. 3 Contents Shire President’s Report 4 CEO’s Report 6 Your Councillors 8 Executive Team 9 Executive Services 10 Community Services 14 Engineering Services 34 Development Services 36 Corporate Services 40 Annual Financial Report 47
  • 4. 4 Shire of Esperance 2011/2012 Annual Report Shire Presidents Report It is with a great deal of pleasure that I present to you the Shire of Esperance Annual Report for 2011/2012. Council elections held in October 2011 installed a new Council which I believe has operated as a strong dynamic team during the year. I wish to sincerely thank my fellow Councillors, the CEO and Council staff for their dedicated contribution to enable Council to achieve what it has over the 2011/2012 year. We are fortunate to have such an enthusiastic and professional team and I thank each and every member of our Council for their contribution. As we reflect on the year I would describe it as a year of steady achievement punctuated with some highs and a few lows. We have had a steady stream of good news stories which is always guaranteed to attract a politician or two. It’s even better if they come bearing a cheque which we have been able, on each occasion, to put to good use. The year has been dominated by Esperance being selected as a SuperTown which presented an opportunity to compete for a share of an $85m pool earmarked for the nine SuperTowns. The Council worked frantically to prepare business cases for our prioritised programs. A collaborative effort and pooling of resources with the Goldfields Esperance Development Commission (GEDC) and Esperance Chamber of Commerce and Industry (ECCI) produced four very professional submissions. These were assessed by the SuperTowns panel and Esperance was very fortunate to receive the requested funding on three of the four projects. The number one community endorsed project which received $12.65m was the Esperance Waterfront Project (formerly called the Esperance Foreshore Protection and Enhancement project). “As we reflect on the year I would describe it as a year of steady achievement punctuated with some highs and a few lows.“
  • 5. 5 In addition Council has produced and endorsed, in conjunction with the GEDC and ECCI, an interim Growth Plan for the South East Region which will provide direction and strategic priorities for the region for the next twenty years. The final Growth Plan will be completed within the next few months. The Shire has continued its good work in the asset management arena and now has a number of maintenance or management plans in place to preserve the value of our community assets and extend their useful life span. Ongoing asset management plans will continue into the future until such time as we have a long term financial plan for all our community assets. The Council has a goal to provide quality services to the community at an affordable cost. With increasing utility and other costs, this has not been a simple exercise. In accordance with the community’s expectations, Council has prioritised where to spend its resources to achieve the most cost effective outcome and still provide a quality level of service. In closing I wish to acknowledge the input and interest of our local community in all these developments within our wonderful town. For Esperance to achieve and continue to achieve a team effort is required involving the community, Industry groups, Shire staff, Councillors and our local Politicians. I am very pleased to say, because of all these ingredients Esperance is a SuperTown and will continue to be a safe and wonderful environment to visit or more importantly, to raise a family in. I would like to thank our CEO Mal Osborne for his guidance, leadership and dedication during the past 12 months. I conclude by saying that 2011/2012 was a watershed year and 2012/2013 will be even better. Malcolm Heasman Shire President. I know the community of Esperance will be delighted to see this long awaited project commence and hopefully resolve the erosion and other issues concerning on our foreshore. The Waterfront project will extend beyond the seawall and also include foreshore landscaped park land and amenity which will link the town centre to our foreshore. Our landscape planners were appointed in June 2012 and we look forward to community input in the finalisation of these project plans. Whilst on the subject of infrastructure development there is a lot either happening or about to happen. The State and Federal funded Port Access Corridor project has commenced and on completion will make transport movement, not only to and from the Port, but traversing the railway line much more user friendly. In addition the High School hostel and new Esperance Primary School developments have commenced. Esperance Hospital upgrades have been announced and we are exhausting all avenues to obtain funding for the Greater Sports Ground development. The Local Government Minister introduced the Integrated Planning and Reporting Framework requiring Council to prepare medium and long term planning documents for implementation. A refinement of our Draft Strategic Community Plan which summarises our community long term vision, values, priorities and aspirations for the next ten years is near completion and will be circulated for comment to the community early in the next financial year. We continue working on our Corporate Business Plan (four year plan) so that both of these plans will be ready for implementation by the deadline date of June 2013.
  • 6. 6 Shire of Esperance 2011/2012 Annual Report CEO’s Report The 2011/2012 financial year has been especially rewarding for the Shire of Esperance due to the number of significant projects and opportunities that have become available to the Esperance community. This was achieved by the hard work and commitment of Council and the staff, by the contributions of our community organisations, by partnerships with government agencies and the active participation of our community members. The October 2011 Local Government Elections saw a substantial change to the makeup of the Council. A complete spill of all 11 existing Councillors occurred, with 9 positions contested at the election. This was a recommendation by the previous Council to reduce the number of elected representatives as part of the State Government’s Structural reform process. The Esperance Community saw this as an opportunity to have their input with a record number of nominees and voter turnout being recorded. The election saw 3 returning Councillors (Crs Rodgers, Stewart Walker) and 6 new Councillors (Crs Heasman, Brown, Bowman, Griffiths, McIntyre and Mansell) being elected to represent the Shire of Esperance. I would like to acknowledge the retiring Councillors, especially Ian Mickel, who was Shire president and Councillor for 22 years. 74 years of collective Council experience was contributed by the outgoing Councillors. They are to be applauded for ensuring that Esperance continually embraced development and reacted positively to change for the benefit of the whole Shire. The time and energy committed as elected representatives is greatly appreciated by all members of the community. I would like to extend a welcome to Cr Malcolm Heasman as our new Shire President and all current Councillors, who as a whole, have challenged the status quo and encouraged fresh initiatives, whilst ensuring strong and visionary leadership within the community. We look forward to continuing to build on this relationship to ensure the delivery of the Community’s aspirations and goals. The State Government’s Royalties for Regions program announced the SuperTowns initiative and in early 2012 Esperance was selected as one of nine towns identified as future regional centres. The impact of the SuperTowns funding will be felt positively throughout the community. We are now able to begin work on the Esperance Waterfront, which is a transformational project along the foreshore. Funding was also secured for Town Centre Revitalisation and Economic Development Projects, both of which look at social and economic drivers that will encourage investment and growth in a sustainable manner. Royalties for Regions has also included funding for Esperance Residential College, Esperance Primary School and upgrades to the Esperance Hospital. Extensive work has been carried out within the Shire to develop the required plans under the Integrated Planning and Reporting Framework. These plans are designed to assist in equipping our organisation to respond to short, medium and long term community requirements. The Strategic Community Plan is in draft format and will be advertised as an overarching plan that guides the future directions of Council’s policies, plans, projects and decision making over the next ten years to 2022. Asset Management Plans (AMP) have been further advanced this year with the majority of the Shire’s asset classes AMP’s now being completed. These AMP’s identify our current assets, current and future expenditure requirements and the assets condition. This information then feeds into our Long Term Financial Plan which will determine priorities and identify any funding shortfalls. The Long Term Financial Plan needs to balance the services needed by the community with the resources available. Drafts have been completed for the Strategic Community Plan, the Corporate Business Plan and the Workforce Plan. These documents are required by the State Government to be in place by 1 July 2013 under the Integrated Planning and Reporting Framework. The Draft Strategic Community Plan is an overarching plan outlining community visions and aspirations which guide Council actions. It will
  • 7. 7 be advertised for public comment in October 2012. The Corporate Business Plan is the operational plan for Shire Staff to deliver on services and projects identified as important to the community. Some major challenges faced at the Shire this financial year include the temporary closure of the Myrup Truck wash due to environmental constraints. This site has subsequently been reopened however additional funding is being sought to ensure the facility meets best practice standards in environmental management.. The redevelopment of the truck wash facility will include the integration of a liquid waste facility, therefore ensuring efficiencies and better practice in liquid waste management for the Esperance community. Legislative changes regarding baggage and security screening at Airports saw major capital works take place at the Esperance Airport. Security screening, incorporating x-raying of checked in and hand luggage, explosive trace detection and passenger screening had to be in place by July 2012. This deadline was met through some great organisation and project management by the Staff involved. Additional upgrades to the terminal include an expansion of the departure lounge that will be completed later in 2012. Executive and Managerial staff have remained relatively consistent over the financial year allowing for stability and the building of local knowledge. The one significant change was the loss of our Director Corporate Services, Darren Kennedy who took the opportunity to move into a role in the private sector. I would like to thank Darren for his commitment and contribution to the Shire of Esperance. The Shire was very fortunate to secure the services of Shane Burge as the incoming Director Corporate Services. Shane had previously worked for the Shire and came back to Esperance from his role as CEO at the Shire of Derby-West Kimberley. Workforce training has been undertaken to ensure all staff have the skills required to perform their duties efficiently and effectively. A need to become more proficient in project management throughout the organisation was identified therefore a Diploma in Project Management course was conducted locally. Staff across all levels of the organisation committed to investing personal time to complete the study required. Our commitment to providing skills based training will assist in retaining a stronger more efficient workforce. There are exciting times ahead for the Shire of Esperance and the broader community as the Esperance Waterfront project gets under way. This will build a better foreshore by protecting existing infrastructure and building environmental and picnic related infrastructure. The Town Centre Revitalisation project will be working towards the development of a town centre that boosts both economic and social investment. As an organisation we are very excited to be living and working in such a dynamic environment. I wish to thank all staff for their ongoing commitment and efforts and extend on behalf of the Shire, appreciation to all community groups and individuals that have supported and assisted Shire staff over these past twelve months. Mal Osborne Chief Executive Officer “We are poised to grab hold of the opportunities and address the challenges that come our way in such a rapidly changing landscape.“
  • 8. 8 Shire of Esperance 2011/2012 Annual Report Cr Malcom Heasman Shire President Town Ward Term expires 2015 Cr Roger Mansell Town Ward Term expires 2015 Cr Wayne (Buck) Rodgers Town Ward Term expires 2013 Cr Victoria Brown Deputy Shire President Rural Ward Term expires 2015 Cr Natalie Bowman Rural Ward Term expires 2015 Cr Beverley Stewart Town Ward Term expires 2013 Cr Paul Griffiths Town Ward Term expires 2013 Cr Nigel Walker Rural Ward Term expires 2013 Cr Lara McIntyre Town Ward Term expires 2015 Cr M Heasman H: 9076 1483 M: 0428 713 444 E: malcolm.heasman@esperance.wa.gov.au Cr L McIntyre H: 9072 0006 M: 0429 301 066 E: lara.mcintyre@esperance.wa.gov.au Cr R Mansell H: 9072 0146 M: 0428 720 146 E: roger.mansell@esperance.wa.gov.au Cr V Brown H: 9076 6088 M: 0418 905 407 E: victoria.brown@esperance.wa.gov.au Cr W Rodgers H: 9072 0093 M: 0457 720 093 E: wayne.rodgers@esperance.wa.gov.au Cr P Griffiths H: 9071 4106 M: 0458 381 840 E: paul.griffiths@esperance.wa.gov.au Cr N Walker H: 9076 5089 M: 0427 081 856 E: nigel.walker@esperance.wa.gov.au Cr N Bowman H: 9075 7034 M: 0427 757 034 E: natalie.bowman@esperance.wa.gov.au Cr B Stewart H: 9072 0737 M: 0427 720 737 E: beverley.stewart@esperance.wa.gov.au Your Councillors Contact details
  • 9. 9 Shane Burge Director Corporate Services Gavin Harris Director Engineering Services Richard Hindley Director Development Services Rod Hilton Director Community Services Executive Team Mal Osborne Chief Executive Officer
  • 10. 10 Shire of Esperance 2011/2012 Annual Report Executive Services The Executive Services Team has been working towards achieving compliance with the Integrated Planning and Reporting Framework that was introduced late in 2011. Community forums were held in the late stages of 2011 to re-evaluate the community’s visions and aspirations for the future growth of our Shire. These views, along with those established from previous community consultation, the community perception survey and community engagement through the SuperTowns initiative, form the foundations of the Esperance Strategic Community Plan. The community showed great enthusiasm and passion to see Esperance grow in an economically sustainable manner whilst retaining our current inclusive community spirit and pristine environment. The Esperance Strategic Community Plan is now in draft format and work has begun on the Corporate Business Plan. The Corporate Business Plan coordinates the processes required to ensure the aspirations and goals identified in the Strategic Community plan are utilised to drive Shire operations. The Corporate Business Plan is a planning document that outlines priorities and major projects being undertaken within the Shire in addition to outlining business as usual activities. Work will continue on the integration of asset management, workforce and long term financial plans ensuring the Shire is in a position to resource an appropriate level of service satisfactory to the community whilst maintaining an acceptable level of sustainability. The promotion of health and well being in the workplace has been actively encouraged throughout the organisation this financial year. With new initiatives being introduced around healthy work place practices for internal and external staff, improving safety and producing a more positive work environment. The Shire of Esperance, via the Emergency Services Levy (ESL) was allocated funding through the 2011/2012 Capital Grant allocation. This meant eight new fire fighting appliances are to be supplied to replace aging equipment throughout the Shire and a further six appliances are offered as part of the 2012/2013 allocation. These new trucks will replace existing fleet vehicles at a cost of $3.6m. Neridup and Commalbidgup Bush Fire Brigade were the first to receive their new appliances, with trucks to arrive for Cascade, Munglinup, Grass Patch and Beaumont in the near future. Executive Services is responsible for the coordination of Elected Members of Council; emergency services management;governance;humanservices;occupational safety and health; media and communications; major projects; strategic planning and economic and business development.
  • 11. 11 SuperTowns We were excited to be announced as one of nine SuperTowns across the Southern part of Western Australia by the State Government. This announcement provided us with significant Royalties for Regions funds to undertake long-term community planning (Esperance SuperTown Growth and Implementation Plan) and access to almost $80m of competitive project funding. The SuperTowns program has resulted in a fantastic working relationship being developed between the Shire, Goldfields-Esperance Development Commission and Esperance Chamber of Commerce and Industries, which has huge benefits for the whole of the Esperance community. Development of the Growth and Implementation Plan is due to be finalised by the end of October 2012, with the significant community input received to this point being extremely valuable. We have been successful in attracting funding for three projects from the competitive funding round. The major funding contribution is $12.65m for the Waterfront project, which means we now have enough funds to commence physical works on the project. We also received funding for preparing a Town Centre Revitalisation program and undertaking an Economic Development Program. These three projects will provide Esperance with a strong platform for community driven growth and development into the future, with all three projects to commence by the end of 2012. One of the outcomes of the local partnership that we are looking forward to in the near future is the Town Centre Conference, an opportunity to showcase Esperance as a place and highlight the skills and abilities of the people of Esperance to organise and deliver an event of significance to the State. Future funding opportunities will continue to be explored to allow the SuperTowns program to continue to be delivered and we look forward to continuing this in a collaborative environment with the Esperance community. “The Team has been working towards achieving compliance with the Integrated Planning and Reporting Framework”
  • 12. 12 Shire of Esperance 2011/2012 Annual Report Executive Services Elected Members There was some significant changes in the Council for Shire of Esperance during the 2011/2012 financial year with Local Government elections being held in October 2011. Prior to this election Council made a decision to reduce the number of Elected Members from eleven to nine therefore a complete spill of Council was undertaken. Fourteen nominations were received for the six town ward positions and seven for the rural ward. The number of nominations received generated significant community interest which saw a record turnout in the amount of voters. The Town Ward representatives are: Cr Malcolm Heasman Cr Lara McIntyre Cr Wayne (Buck) Rodgers Cr Roger Mansell Cr Paul Griffiths Cr Beverley Stewart The Rural Ward representatives are: Cr Victoria Brown Cr Natalie Bowman Cr Nigel Walker Due to the nature of this election four Councillors terms were condensed to a two year period allowing for an election in 2013. After this date all terms will be for a four year period with Elections being held every two years, this allows for half the council seats to be contested each time. The Council meets on the evening of the fourth Tuesday of every month as part of a monthly business cycle, with Council meetings being open to the general public. Reports to Council are the formal method by which the administration provides advice to the Elected Members. The majority of business is dealt with by the All Purpose Committee of Council, which makes recommendations to the Council. The All Purpose Committee comprises all nine Elected Members. Agendas for Council and Committee meetings are made available to members of the public on the Shire’s website, as well as at the ShireAdministration Offices and Library. Minutes of all Council and Committee meetings are also publicly available.
  • 13. 13
  • 14. 14 Shire of Esperance 2011/2012 Annual Report Community Services Community Services covers a range of services within the Shire, including: rangers; Senior Citizens Centre; Home and Community Care centre; Museum; Library; Bay of Isles Leisure Centre; Civic Centre; Volunteer Resource Centre; community development funds; culture; recreation reserves and playgrounds and tourism and events.
  • 15. 15
  • 16. 16 Shire of Esperance 2011/2012 Annual Report Community Services Key Outcomes The Library loaned 119,426 items from July 2011 to June 2012 • Ongoing informal surveying indicates a continuing high level of community satisfaction with library services however usage patterns are slowly changing with reduced loans of print materials beginning to emerge as a trend. • TheLibrarywasvisitedby82,962peopleduring 2011/2012 and 40,867 of these people loaned items. Other reasons for visiting the library, but not necessarily loaning items, include using the Public Access Computers and Internet, attending various library events and activities, accessing the Tax Help programme, utilising other services, reading newspapers or seeking information. See Figure 1. • Regular Children’s programmes are well attended with two Toddler Time and Story Time sessions held each week during school term. On average 75 children per week access these programmes which are provided free and are available to both locals and visitors. These programmes are interactive and provide a learning and social environment in a positive way to encourage children to enjoy their trip to the Library. In addition the library runs Better Beginnings Early Literacy programmes and School Holiday Activities throughout the year, both have high attendance rates. • The library held two main Family events which were rewarded by excellent attendances. They were the 2011 National Science Week Dinosaur Discoveries night and the 2012 Heavens Above: Family Stargazing Night. • The Library has retained a team of experienced Staff and is greatly benefitted by their combined skills and strengths in many different areas of library services. Major Achievements • Library staff were excited to be Finalist’s in the Community Services Category of the 2011 Esperance Chamber of Commerce Business Awards. We are also thrilled to be announced as a Finalist in the 2012 Awards and are proud of our Library Trainee Mel Harper who is also a Finalist in the Trainee section of the 2012 Awards. The Esperance Public Library provides an essential service to the Esperance Community and its visitors. It offers a variety of items available for loan such as books, DVD’s Electronic resources, magazines and jigsaws. The library also provides reliable internet access, photocopying, printing, faxing and scanning services, all of which are utilised regularly. Esperance Public Library Figure 1 - 2011/2012 Library Statistics
  • 17. 17 • To celebrate 40 years of library services in the existing building a Library Open Week was held in February 2012 to highlight the diverse range of services and resources provided by the library. The priority focus was the introduction of more electronic, digital services and resources. • Adult events and activities also continue to be appreciated, for example: • The 2012 Telstra Connected Seniors Computer Classes have attracted over 70 participants • Adult Learners’ Week workshops in 2011 offered Cooking on a Budget, Cake Decorating, Laptop Lessons and an Art Class and were attended by 100 participants • The 2012 Great Gardens Show featuring John Colwill and The Great Gardens team from Perth was very popular with over 170 attendees • Local authors Jim Finnerty and Fleur MacDonald featured in lunchtime Meet the Author sessions and the popularity of these sessions encouraged the formation of a Library Book Club, Reading Between the Wines. This group has over 30 participants who meet monthly in various locations to discuss a range of literary issues and also has an online presence through the library’s Facebook site • TheeighthStateLibraryDiscardBookSalewas held over the Easter long weekend and was a great example of teamwork between the State Library, Esperance Library staff, Esperance Library Friends (ELF) and other volunteers. More than 3000 people attended and it was fantastic to see how much enthusiasm the community has for reading. The Esperance Library benefitted from the publicity and the donation of over 500 Large Print books left over from the sale. • The Esperance Library Friends (ELF) group had another successful year with sales from the ELF Discard Book Shop supporting Early Literacy programmes and the purchase of other resources. ELF also assisted staff with activities and events such as visiting author sessions, the Library Open Week and the State Library Discard Book Sale. They are a fantastic volunteer group who work towards making better resources and services available to all members of our community. • The library has taken another step into the future by introducing, in a staged rollout, a range of electronic resources, namely Ebooks, Downloadable Audio and Ezines. • The Structural Reform of Public Libraries is a lengthy process and is impacting on activities currently being undertaken at the Esperance Library. Staff are monitoring the changes being implemented and sourcing alternatives to continue to provide essential community services. “The library has taken another step into the future by introducing E - Services.”
  • 18. 18 Shire of Esperance 2011/2012 Annual Report Community Services Ranger Services has seen significant improvements over the last twelve months thanks to the hard work and ongoing team commitment of all staff. By working as a team and receiving amazing ongoing support from all Shire staff, various businesses in town and animal support groups such as SAFE (Save Animals from Euthanasia) and the RSPCA we have achieved great things. Outstanding achievements include: • The introduction of the “Pound Pooch” program involving ongoing advertising of our pound dogs and re homing them into safe and wonderful homes through out Esperance and beyond – one of our dogs was even returned to his original breeder in the Northern Territory. This has resulted in an amazing 100 dogs being re homed in the financial year 2011/2012. • Ongoing works on the Coastal Reserves targeting Quagi and Alexander Bay including maintenance, upgrades and signage as well as the introduction of the Camp Hosts program. • Upgrades and self registration for overflow camping on the Greater Sports Ground over Xmas, New Year and Easter 2011 into 2012 • Development of ongoing relationships with a variety of organisations in town inclusive of Fisheries, Police, Customs, DEC, support organisations and a multitude of other people and businesses. • Heightened awareness through out the community of Ranger Services and what we offer through media support and pro active work engaging all staff with the community Ranger Services are extremely proud of these achievements and are all looking forward in 2012/2013 to ongoing engagement within the community of Esperance to ensure a safe, happy and well balanced lifestyle in what is a magnificent natural environment. Ranger Services Rangers are responsible for dog and cat control, parking control, litter control, coastal reserves patrols and maintenance and block inspections under the Bushfires Act.
  • 19. 19 Illegal Camping A total of 195 illegal campers were issued with written cautions and 50 verbal cautions were issued. The illegal campers were requested to move on to authorised camping grounds and the overflow camp ground was offered as an alternative when it was available. The Greater Sports Ground was utilised for an overflow camping ground during Christmas, New Year and Easter due to the town’s caravan parks and camping grounds being full.As part of a new initiative for the overflow camping ground the introduction of self registration was trialled for Easter 2012. This proved extremely successful and in conjunction with signage will be continued into the ensuing years for the overflow area. This resulted in a marked reduction in the number of hours spent by Ranger Services staff conducting fee collection duties resulting in staff being able to attend to other matters over this busy period of the year. Ranger Services staff utilised early starts to catch illegal campers and language translation sheets to convey positive messages as to why illegal camping was not permitted in the Shire of Esperance. Parking A total of five parking cautions were issued during the year with no specific problem areas in town. Rangers respond to public complaints regarding parking, we do not actively conduct parking patrols. Fire Control/Unsightly blocks Rangers inspected a total of 650 vacant blocks during the fire season, and subsequently 53 Notice to Comply were sent out to property owners to ensure that blocks were brought up to the required standards. Local Laws Quarterly inspections were conducted of all verges and thoroughfares during the year resulting in six cautions and nil infringement notices being issued for non compliance. “We have a heightened awareness through out the community of Ranger Services.”
  • 20. 20 Shire of Esperance 2011/2012 Annual Report Community Services Ranger Services Litter Control Rangers received a total of 34 illegal dumping reports. One written warning and four infringements were issued for illegal dumping/littering. Rangers continued to conduct random patrols to detect offenders in this regard but rely heavily on community support to be effective. Coastal Reserve All coastal reserves continued to be occupied to their maximum capacity during the summer months with ongoing maintenance carried out during this period. During the winter months upgrades and maintenance works were carried out by Ranger Services staff as part of the annual works program. After Hours Rangers Emergency after Hours Service was very busy over the year. Rangers received a total of 943 after hour calls during the year resulting in Rangers attending to 76 call outs after hours. Currently rangers respond to out of hours call outs which are related to, dog attacks, livestock roaming, emergency services requiring assistance and shark sightings. Telephone enquiries Telephone enquiries are one of our largest sources of information with a total of 1932 inquiries received during the 2011/2012 year. This included 943 out of hours calls from Insight (all calls taken after 4:30 pm daily) and a total of 989 jobs on the ranger services job register. Dealing with dog related complaints still constitutes the main percentage of Ranger Services work. The jobs on the job register are calls taken by the on call ranger for that week from Monday to Friday 7:30 am to 4:30 pm daily. See Figure 2. Dog control Dog control and education of the public remained the biggest single issue for rangers during the year. 19 cautions were issued in relation to dog matters with an increased focus on dogs off lead and dogs roaming. 71 infringements were issued in matters ranging from dogs causing nuisance to dogs roaming. Figure 3 provides additional information regarding animal control. There appears to have been a marked increase in the number of dog attacks over the 2011/2012 financial year however, this could possibly be due to increased media releases regarding responsible dog ownership and encouraging residents to report dog attack incidents. Due to the strong Pound Pooch re homing program, ongoing business and local support and continued support from dog support agencies SAFE and RSPCA, the number of dogs successfully re homed has considerably increased. This financial year Ranger Services reached a milestone re homing their 100th pound pooch.
  • 21. 21 Figure 2 - Ranger Services Telephone enquiries 2007/2008 2008/2009 2009/2010 2010/2011 2011/2012 Dogs 2654 2847 2522 939 831 RSPCA 57 56 18 8 13 Livestock 175 154 185 66 56 Litter 29 29 43 34 35 Cats 166 233 219 56 54 Fire 216 364 152 49 54 Parking 104 103 90 21 14 Camping 73 142 117 50 49 General Enquiries 811 934 787 139 149 After Hours Not known Not known Not known 501 943 Total 4285 4862 4133 1863 2198 Figure 3 - Animal Control 2007/2008 2008/2009 2009/2010 2010/2011 2011/2012 Impounded dogs 479 416 390 296 275 Dogs returned to owners after impounded 179 149 179 150 149 Dogs Euthanized 99 106 61 66 30 Rehoused Dogs N/A 49 53 70 88 Feral cats Euthanized 24 41 25 20 15
  • 22. 22 Shire of Esperance 2011/2012 Annual Report Community Services The Esperance Visitor’s Centre has enjoyed another successful year. The 2011/2012 financial year saw a slight decrease in our ‘door count’ numbers from 125,399 in 2010/2011 to 123,600 in 2011/2012 - see Figure 4. Despite slightly decreased numbers, the Esperance Visitors Centre did achieve an increase in income. Key outcomes include: • Accommodation bookings through the Esperance Visitors Centre rose from $539,470 in 2010/2011 to $678,670 in 2011/2012, a rise of 25.8%. • Overall commissions rose from $117,357 in 10/11 to $123,734 in 2011/2012, a 5.4% increase. This figure was severely affected by commissions earned from tour bookings that fell from $10,085 in 2010/2011 to $1,273 in 2011/2012 – a direct result of the change in ownership of the Woody Island Cruises with the new owners not wishing to use the Visitors Centre as a booking agent. • Advertising revenue (from building and website advertising) rose from $4,571 in 2010/2011 to $7,920 in 2011/2012, a 73.275 increase. • Souvenirs and CALM Pass sales rose from $109,593 in 2010/2011 to $114,462, a 4.4% increase. Our Web site continues to be popular with 187,138 unique visits in 2011/2012, averaging 3,599 visits a week. This represents a 23% increase in visitation to our website. The average web visitor looked at 4 pages per visit and each visitor spent an average of 3-4 minutes on our site with 84% of visitors coming to the site via search engines – this represents no real change from the 2010/2011 Financial Year. Other Esperance Visitors Centre highlights from the 2011/2012 Financial Year include: • In October 2011 The Esperance Visitors Centre was represented at the annual Visitors Centre Association of Western Australia (VACWA) conference, held in Kununurra. The conference ran for three days and featured a series of guest speakers on a diverse range of topics including, staff recruitment, staff training, using social media as a promotional tool, the impact of natural disasters on tourism and the impact of cane toads on tourism. • On the 1st of December 2011 the Esperance Visitors Centre co-hosted (with Tourism Esperance) the December ‘ECCI Business After Hours’. The function went well with about 30 guests attending the function held at the Visitor Centre. • InApril 2012 Ross Beckett attended the Sydney Caravan, Camping and Touring Supershow and represented Australia’s Golden Outback (AGO). This involved ‘manning’ the AGO booth on the Tourism WA stand and answering questions from prospective visitors about things to see and do around the AGO and the Esperance regions. Costs were covered by AGO. Esperance Visitor Centre The Esperance Visitor Centre provides a gateway for tourists to the Esperance Region.
  • 23. 23 Figure 4 - Visitor Centre Door Count “The Visitor Centre web site averages 3,599 visits a week.” • In May 2012 Visitor Centre Representatives spent half a day with The Hon. Kim Hames MLA – Minister for Tourism. The Minister was taken on a cruise to Woody Island which was also attended by representatives from Tourism Esperance, ECCI and Cr. Paul Griffiths. • In June 2012 it was announced that Lucky Bay won the ‘Natural Resource Management Award’ at the ‘Keep Australia Beautiful WA Clean Beaches Awards’; the submission was put together by Tahnee Adamson, and Milton Valli represented the Visitor Centre at the Awards Breakfast on Wednesday 13th June. • The Australian Traveller Magazine “100 Best Views in Australia” awared Esperance the 31st spot due to a picture submitted of the Great Ocean Walk Cycle way.
  • 24. 24 Shire of Esperance 2011/2012 Annual Report Community Services Entertainment During the 2011/2012 financial year the Esperance Civic Centre presented 26 shows (up from 24 in the 2010/2011 financial year). Seven of these shows were venue hire’s, which was an increase of six from the previous financial year. This year there were two simulcast shows (both venue hire’s) from the Perth Concert Hall they were the Vienna Philharmonic Orchestra and the Western Australian Symphony Orchestra. The Civic Centre also continued its collaborative relationship with the Bijou Theatre by assisting in the sale of tickets for all their shows. In 2011/2012, 6,743 tickets were sold to all shows at and presented by Esperance Civic Centre and at The Bijou Theatre. Ticket sales included: • 779 Concession Card holders and Seniors Card holders (a 32.4% decrease) • 25 Companion Card holders (up from 21) • 224 Friends of Esperance Civic Centre (up from 175) • 2,082 internet sales (a 10.1% decrease) • 469 from the Library and The Visitors Centre (down from 734) The total figure of 6,743 represents a 14.2% decrease on 2010/2011 ticket sales. However our revenue increased by 10.5% - $191,993.5 in 2011/2012 compared to $173,753 in 2010/2011. The increase in expenditure for the 2011/2012 financial year is matched by an increase in income for the same period. In dollar terms there was an increase of $50,787 (this is a 7.8% increase) in expenditure and an increase of $57,852 (23.8%) in income - detailed in Figure 5. Esperance Civic Centre The Esperance Civic Centre provides the focal point of entertainment in the south east of Western Australia. Figure 5 -Civic Centre Income and Expenditure
  • 25. 25 Venue Hire / Use The Civic Centre hosted a wide variety of functions across the 2011/2012 financial year, including: • 92 meeting days • 32 private functions and wedding receptions • 13 funerals • 4 Blue Light Dance Parties Other highlights at the Esperance Civic Centre included: • Annual Shire Senior Citizens dinner • Annual Esperance Senior High School Ball and careers day • Annual Esperance Music Festival over three days • Annual Dance School End of Year Concert(s) • Bridge Club Conference over four days • Apex Teenage Fashion Awards • Esperance Chamber of Commerce and Industry awards night • Esperance District Recreation Association Sports Star of The Year award • Six School graduations (plus rehearsals) South East Premium Wheat Growers Association Ladies Day • Woolworths Charity Ball • The Yellow Dot Ball • Jehovah’s Witness Convention – a three day event • Seventh Day Adventist services – seven days over a three week period The Esperance Civic Centre was also the venue for two significant community celebrations and the funeral for a former civic leader. • In January 2012 Fred DeGrussa celebrated his 100th birthday surrounded by family and friends. • In March 2012 former Shire President Ian Mickle was made a ‘Freemen of the Shire’. • Also in March 2012 former Shire President David Reichstein’s life was celebrated at a funeral in the Auditorium. In 2011/2012 The Esperance Civic Centre continued its strong association with both CircuitWest and Country Arts WA. Ross Beckett continued as a Management Committee member of CircuitWest and a Board Member (representing Regional Performing Arts Venues) of Country Arts WA. Mr Beckett attended two special CircuitWest meetings, the Australian Performing Arts Centres Association annual conference and Long Paddock, in Perth and both were funded by Country Arts WA. Mr Beckett also represented CountryArts WAand the Esperance Civic Centre at the “Open Your Eyes” Regional Arts Conference in September of 2011 in Geraldton. “The venue is utilised for a wide variety of community events”
  • 26. 26 Shire of Esperance 2011/2012 Annual Report Community Services In this financial year attendance through the Bay of Isles Leisure Centre (BOILC) has dropped by 30,000 in total - see Figure 6. However, 24,000 of this decrease is from casual pool visits and matches with anecdotal observation that the pools have been quieter this year, without any determinable reason. The other areas suffering decreases in attendance are explainable. Firstly, group fitness has had the effect of ESP Fitness opening in town and offering a larger suite of classes, particularly evening classes which BOILC cannot offer, this inturn impacts crèche attendance. There was also a noticeable drop in Function and Sports Hall attendance. However, this figure is already under-reported by possibly 50% since gymnastics and taekwondo user groups do not register their entry into the facility. In 2010/2011 payments were made at reception but in 2011/2012 user groups are invoiced directly and do not at any time need to approach reception. Once Entry Control systems are operating these attendance statistic will increase dramatically. Improvements made at the BOILC to increase efficiencies, reduce costs and ensure legislative compliance include, but are not limited to, the following: • An energy audit of the facility was conducted and the recommendations resulted in improvements including the reactivation of automatic temperature control systems for the four swimming pools and investigation into the air handling unit control systems. Changing from manual to automatic control has shown a trend to fewer spikes in gas use and a more consistent gas use pattern. • Backwash waters from the swimming pools is now discharged on site to sewer from a holding tank at a controlled low flow rate. • The chlorine gas storage area was upgraded to comply with the Dangerous Goods Storage Act and simultaneously the on site storage area for chemicals was improved ensuring staff safety. • Sight glasses were installed into the backwash discharge lines enabling water to go to waste for only as long as needed rather than for a set period of time. There will be a reduced duration and frequency of backwash for the coming years with anticipated large water savings and associated reduction in pool chemical use. • An automatic floor cleaning machine for the pool concourse was purchased. This provides a more hygienic and clean surface whilst using less water and man hours. Bay of Isles Leisure Centre The Bay of Isles Leisure Centre provides access to a number of services for the community. This includes recreational, lap and hydrotherapy pools, gym, fitness classes, venue hire for sporting groups, sauna and spa.
  • 27. 27 Figure 6 - Attendance Statistics 2009/2010 2010/2011 2011/2012 Memberships sold 1001 979 976 Casual Gym 3887 4557 4474 Casual Class 1997 2741 1831 Member Gym 29484 35873 32068 Member Class 7863 8857 8922 Casual Pool 95129 91390 67772 Member Pool 30158 27674 27126 Staff entry (all) - 2206 2101 Swim School Enrol 2265 1874 1830 Crèche 3748 3540 2884 Function Sports 4494 3986 2723 Total entries 176,760 180,824 149,901 (Health Fitness) 47798 52028 47295 (Pools) 125287 119064 94898 • Permanent pool blanket rollers were installed for the rehabilitation and lagoon pool which now enables a single staff member to complete the job. The 25m pool blanket trolleys are now stored on a newly built paved area immediately outside the deep end of the facility. These will soon be operational now the dive blocks have been removed. • A Preventative Maintenance Schedule has been created and maintained. This was achieved in consultation with all Shire Buildings and it is now possible to refer to a single document to determine when inspections and programmed maintenance is due. This will also lead to savings as potential suppliers can be approached for multi-year contracts. “Improvements have been made to increase efficiencies, reduce costs and ensure legislative compliance”
  • 28. 28 Shire of Esperance 2011/2012 Annual Report Finances Operating figures in Figure 7 are taken from the ‘BOILC Business Plan Operating Report’. This does not include: i) depreciation of the building ($127k), ii) building expenses ($398k) or iii) Shire’s administration allocation ($88k). The BOILC does not currently pay for gas use, which is approximately $235,000 per year. Our operational cost recovery has remained at 74% which is a positive statistic given the large decrease in total attendance. The decrease in total attendance increased the ‘cost per attendance’ figure for the facility. Benchmarking services engaged in 2011/2012 consider the total cost, rather than just operating, and BOILC compared similarly to most WA facilities of similar size. Our cost per visit was $3.09 in comparison to $2.80 for the others. However, once a figure for gas consumption is included the cost will increase. This is also a result of our low attendance and small catchment population. However, BOILC was fifth top on the whole list for attendance based on catchment population indicating our small population use the facility frequently. Figure 8 details are taken from the ‘BOILC Committee Operating Report’ and include all costs associated with the facility. Rec Centre Building expenses were $400,000 this year, $150,000 over budget – primarily due to urgent repairs required on the lagoon pool wall and the requirement for the chlorine gas storage area to become compliant with the Dangerous Goods Storage Act. In 2010/2011 benchmarking, only Swan Park Leisure Centre in Perth had a worse cost per visit figure with $6.35. They too had significant capital building expenditure in that year. Augusta-Margaret River had a cost recovery of only 49% and a comparable metro facility, Leisurepark Balga had 60%. The largest of metropolitan centres achieved 93% cost recovery primarily due to their very large health and fitness centre operations generating significant profit to offset the costs of operating swimming pools. The Shire of Esperance needs to determine an acceptable cost recovery figure and therefore estimate the proportion of the expenses of the facility supported by rate payers as a service to the community versus the revenue generated by the facility. In a positive development, both attendance and income will be highly likely to increase in 2012/2013 with the implementation of Entry Control systems to the facility for the first time and the employment of a Health and Fitness Supervisor to improve membership retention and customer service. Figure 7 - Annual Figures: Operating 2009/2010 2010/2011 2011/2012 Expenditure $1,021,927 $1,105,950 $1,178,472 Income $762,523 $813,093 $876,469 Deficit $259,404 $292,857 $302,003 Total Attendance 176760 180824 149901 Cost per visit $1.46 $1.62 $2.01 Cost Recovery 74% 73% 74% Figure 8 - Annual Figures: All expenses 2009/2010 2010/2011 2011/2012 Expenditure $1,446,870 $1,620,999 $1,794,747 Income $762,523 $813,093 $876,469 Deficit $684,347 $807,906 $918,278 Total Attendance 176760 180824 149901 Cost per visit $3.87 $4.46 $6.12 Cost Recovery 53% 50% 49% Community Services Bay of Isles Leisure Centre
  • 29. 29 Health and Fitness Attendances Figure 9 indicates the total member and non- member attendance to both the gym and group fitness classes. It is apparent that the general shape of the graph is the same as the preceding year with troughs in the school holidays, particularly over the summer break and Easter. Attendance in the pre- Christmas period was inflated with the attendance of Horizon Power and John Holland employees who were on short-term corporate memberships with the facility. Post-Christmas many of their individual memberships were not renewed and, combined with the lower Group Fitness attendance left our attendance lower than the corresponding period in the previous year. Membership levels have been higher or equal to the previous year. Aquatics Once again a very different pattern to metropolitan centres is seen with the complete absence of a heat related increase in pool attendance during January to March as shown in Figure 10. There is a similar trend over both years with an Easter trough evident but with a clear reduction in attendance this year across all the months. We can only speculate as to the reason, it’s not immediately evident. Swim School Swim School continues to struggle to attract and retain Swim Instructors. However this has stabilised over the latter half of 2011/2012. The young instructors now have a year of teaching experience which helps with the parents’ perception. A dip in Term 4 this year in comparison to last year is due to a greater range of classes offered by VacSwim (Education Department) over summer and parents opting for this. Total numbers for the year were 31 less than the previous year. Group Fitness Classes Esperance appears to have an inverse attendance pattern to metropolitan centres with our numbers reducing in summer time, seemingly due to people departing during school holidays. However, unique to 2011/12 was the opening of a new Group Fitness facility in Esperance in direct competition to our programs. This occurred in December and exacerbated the usual drop in attendance at that time. The new business offered free three month memberships plus regular evening classes which immediately caused some of our members to leave to obtain better value for money and access to more classes. During autumn our numbers have increased once more and happily are not too much below last year. May had a spike in total numbers as it was a five week month with only four weekends included. Figure 9 - Health and Fitness Attendance Figure 10 - Aquatics Attendance
  • 30. 30 Shire of Esperance 2011/2012 Annual Report Community Services Greater Sports Ground Re-Development Update The Football Development Commission released its report about football in Esperance and the main recommendation was for Ports Football Club to remain located on the Greater Sports Ground (GSG). The potential playing field space around Ports is considered more than adequate for a significant increase in participant numbers based on the highest estimates of likely growth. Consequently the GSG Master Plan was amended to retain Ports Oval. Following this decision Indoor Stadium user groups were consulted with at length regarding future requirements in the proposed new stadium. Ultimately several alternative options of court and room layouts were considered, all of which fit inside the proposed building ‘footprint’. This footprint has been approved by Council and along with the southern car park being upgraded to a sealed and kerbed surface. Future GSG direction involves seeking a feasibility study to be carried out by an independent consultant, final plans to be sought and most importantly Council to determine when funding will be made available so that Community Sports and Recreation Facilities Fund (CSRFF) funds can be applied for. This will require the engagement of the Department of Sports and Recreation as there are other projects likely to be asking for over $1 million in the region. Once a timeline is found then a number of other jobs within the GSG can be scheduled including demolition of badminton hall and netball hall, potential tennis club courts extension, creation of an ablution block in the north east corner and alterations to the agricultural society buildings. These jobs will cascade once the stadium redevelopment occurs. Funding Partnership With Sports Clubs Four projects were funded this financial year by the Department for Sport and Recreation through the CSRFF, the associated sporting clubs and the Shire. • The Esperance Motocross Club received funding to upgrade its ablution block. • Grass Patch Tennis club upgraded its tennis court playing surfaces. • Esperance Cricket Association upgraded its nets on Esperance Oval and installed new nets on Newtown Oval. • Esperance Soccer installed lighting towers on Little Lords Oval. Public Open Space Strategy Recently there was an audit of the Shire’s parks and reserves completed. This was necessary to gain a complete understanding of the asset management issues for all reserves without splitting these into separate components such as playground equipment,reticulation,mowing.Thisauditleadtothe development of a single document addressing public open space and may serve to consolidate various previous stand-alone documents such as the Trails Master Plan, Playgrounds Strategy and Physical Activity Plan all of which had involvement from the Manager Recreation and Youth. Department of Sport and Recreation have expressed a strong interest in providing input at an early stage, particularly in relation to Education Department lands and their accessibility or otherwise to the public. Bay of Isles Leisure Centre
  • 31. 31 Looking Ahead Entry control systems will be installed in Spring 2012 as the final phase of an upgrade to the entry and foyer area of the leisure centre. It is expected that this will increase recorded participation and revenue significantly plus improve the safety of young children around the aquatic area. Recommendations were made in the EnergyAudit for installation of Solar Heating systems to pre-heat the pool water thereby reducing the gas consumption. Although the regular use of pool blankets is likely to reduce gas consumption by around 20% the unit cost of gas is likely to continue to increase. It is imperative that the Council prepare for the effect of paying full price for gas consumption in 2023 by allocating money for suitable capital improvements to reduce consumption prior to this date. A report from an independent consultant into the potential for redevelopment of the Bay of Isles ‘dry side’ is expected around November. It is expected that this will provide direction for revenue-generating improvements to the facility, positively affecting membership numbers and group fitness class attendance. A significant increase in the number of group fitness classes offered at BOILC is going to occur in September with the implementation of Les MillsTM pre-choreographed classes. Restricted attendance evening classes will be added to the time table and will be conducted in the current indoor cycling room. This is not an ideal situation but evening classes are paramount for the success of a group fitness program and it is hoped the redevelopment of the Health and Fitness area will prioritise the creation of a dedicated Group Fitness Studio and turn the Group Fitness area of the facility into the revenue generating exciting area of the facility it ought to be. During the 2012/2013 financial year a new 0.5 FTE Health and Fitness Supervisor position will be filled with the primary aim to drive membership retention and customer service of the dry side of the facility plus supervision of the group fitness program. This should have an immediate positive effect on membership numbers and participation.
  • 32. 32 Shire of Esperance 2011/2012 Annual Report Community Services The Esperance Volunteer Centre was successful in winning the Best Local Community Group award at the 2011 Esperance Chamber of Commerce and Industry awards for the second year running. The centre officially opened its doors on 4 May 1999 with the assistance of funding from the Federal Department of Health and Aged Care, at the time, through their Volunteer Management Program, auspiced by the Shire of Esperance. The funding model of short annual funding has remained fairly unchanged over the years. However, in late June 2012 we finalised negotiations to continue our Federal Funding for a further three years and we were successful in bidding for State Government funding which covers the next five years. The Centre has never before had the luxury of knowing funding was guaranteed into the future for this length of time. In the last year the centre has assisted 299 people to volunteer either through individual interview, phone contact or email assistance. We have worked with over 70 agency enquiries from the short query about volunteer insurance to the longer assistance on how to review and change a Constitution. The Centre organised and facilitated over 16 training sessions with 319 volunteers and volunteer managers attending topics as diverse as Mental Health First Aid and Suicide Prevention through to Governance and Recruiting, Recognising and Retention of Volunteers. Figure 11 provides a comparisson of individualls and organisations assisted. The Esperance Volunteer Resource Centre was involved in the 2012 Kids Fun Day, a large and very successful event held annually in Esperance. The centre was able to help as part of the management committee for the event and assisted in the recruiting and management of the volunteers on the day. The Volunteer Resource Centre would like to acknowledge all members of the community who volunteer, without your commitment to volunteering some community events could not occur or would be of a smaller scale. The winning of our second Best Local Community Group award was fantastic and is something we could not achieve without the assistance of many wonderful community members who volunteer their time. 2009/2010 2010/1011 2011/2012 Individuals assisted to volunteer 283 119 299 Community organisations assisted 80 72 71 Volunteers Trained 188 236 228 Volunteer Managers Trained 88 96 86 Esperance Volunteer Resource Centre Esperance Volunteer Resource Centre provides information and support to volunteers and agencies working with volunteers. “we were successful in bidding for State Government funding which covers the next five years.” Figure 11
  • 33. 33
  • 34. 34 Shire of Esperance 2011/2012 Annual Report Engineering Services A significant part of the year has been spent in developing the Esperance Waterfront Project ready for works to commence in the 2012/2013 financial year. Along with this a number of peripheral projects have commenced including a review of the Norfolk Pines throughout the Esperance townsite, review of all playground equipment for compliance with Australian Safety standards, a review of the Road Network Hierarchy, commencement of a Public Open Space review and an audit of the Eastern Suburbs Waste Water Reuse Scheme. Also officers have been working to secure funding for the new Myrup Waste Water Facility which will see the upgrading of the existing truckwash facility and the integration of the waste water facility currently located at the Wylie Bay Waste Facility. Roads The Shire of Esperance is responsible for the management and maintenance of the largest road network of any local government in Western Australia with 819 km of sealed roads and 3,679 km of unsealed roads In the 2011/2012 financial year we were able to complete the following works – • Gravel re-sheeting of approximately 113km of gravel roads including 59km on the Cascade - Lake King Road. • Limestone re-sheeted of approximately 55km of limestone roads • Reconstructed approximately 10km of rural sealed roads • Resealed approximately 16.5km of rural sealed roads • Construction of approximately 3.2km of new rural sealed roads to the value of $ 425,576 • Asphalt overlays on urban roads to the value of $378,467 • Footpaths – Replaced 1km of slab footpaths with brickpaved paths, constructed approximately 1km of new footpaths • Spent $51,184 on new kerbing in the residential and industrial areas in Esperance. • A number of solar lights were installed in remote location along the Twilight Beach footpath Parks and Gardens Works were completed on the new Walker Street Playground, valued at $180,000, which included playground equipment, landscaping, street furniture, footpaths, nature trail and tree top viewing area. This project represents the continuation of the Esperance reserve upgrade strategy, designed to develop more usable recreation space. This year also saw a review of Parks and Gardens operations and infrastructure, to develop more efficient work programs and an increased level of service for our recreation spaces. The review also determined that a significant amount of investment was required to upgrade our existing aging reticulation network. This program is commencing in the 2012/2013 financial year. Engineering Services is responsible for: infrastructure and property services, local roads, bridges, footpaths, drainage; asset management; airport; waste collection and recycling; cemeteries and foreshore erosion management and development.
  • 35. 35 Waste Management This year saw the commencement of a review of waste management within the Shire of Esperance and the development of a Waste Disposal Strategy which looks at the future of the Wylie Bay Waste Facility. The review is being developed further in consultation with the Department of Environment and Conservation prior to discussion with the community. The Wylie Bay recycling centre also celebrated its 10 year anniversary with the Esperance community having recycled over 10,000 ton of material in that period. The recycling centre has continued to operate in an efficient manner and sent 1,300 ton of product to Perth for recycling in 2011/2012. This year saw the introduction of e-waste and florescent globe recycling. Esperance Airport This year saw the commencement of the Airport redevelopment for the introduction of security screening on 1 July 2012. The works involved a $2.5 million upgrade of the airport terminal to accommodate the screening equipment and a secure boarding area. The screening equipment was purchased with the assistance of a federal governmentgrantandisvaluedat$650,000. Thecost of the equipment including running and replacement and the engagement of a contractor to undertake the screening also will see an increase in airfare prices between Esperance and Perth of $40 per person on the outbound ticket. This price represents the total cost of screening per passenger per ticket. The 2011/2012 financial year saw approximately 48,000 passengers travel through the airport. Asset Management This year saw the continuation of data collection and the development of asset management plans for all shire assets. The asset management plans identify our assets, what they are, where they are, what condition are they in and what needs to be spent on them in the future to maintain them. This information then feeds into the long term financial plan to determine what Council needs to be allocating for the maintenance of our existing assets into the future. Currently our asset base is valued at approximately $651m. The Shire road asset’s were also reviewed with the introduction of new asset management software (ROMAN II). This also involved the collection of condition data on our entire sealed and unsealed road network. The entire road network was traversed over a five week period with a variety of data collected for input into the new software system. This information will be used to develop the Roads Asset Management Plan in 2012/2013. “The Wylie Bay Waste Facility celebrated it’s 10 year anniversary in 2011”
  • 36. 36 Shire of Esperance 2011/2012 Annual Report Development Services Town Planning Amendments 6, 8, 9 and 10 to Local Planning Scheme No. 23 were Gazetted in 2011/2012. A further 5 Scheme Amendments were being processed throughout the year. A significant number of development applications were received and determined, by shire staff as per Figure 12. The Commercial Centre Strategy was also adopted by Council. This Strategy aims to guide the provision of commercial and associated activities within the region during the next 10 to 15 years. A Business Case for the Town Centre Revitalisation Plan was prepared for the SuperTowns project, and was sucessful in receiving $380,000. The Background Analysis document for the Plan has been developed, and will continue to develop over the next year. Audits were carried out by our Planning staff to provide input in developing draft stategies for access and parking, residential and industrial land. These strategies are temporarily on hold to allow for the development of the SuperTowns Growth Strategy and Town Centre Revitalisation plan. Local Planning Policies for Holiday Homes and Wind Turbines were adopted in 2012, and a further policy for Industrial Precinct Design Guidelines will be considered by Council in late 2012. Further development has been made into the implementation of a Geographic Information System (GIS). The improvements, both in the range of data that is displayed as well as the quality of the data available, are enabling officers to more fully and efficiently assess development applications. Figure 12 - 2011/2012 Development Application Approvals Applications Received Applications Determined Development Applications 292 276 Subdivisions 23 23 Home Occupations 5 5 Home Occupation Renewals1 17 13 1 Home Occupation Renewals have reduced based on a number becoming exempt under Local Planning Scheme No. 23. Development Services is responsible for: health services such as water and food inspection, immunisation services, toilet facilities, noise control and meat inspections and animal control; building services, including inspections, licensing, certification and enforcement; planning and development approval and environmental services.
  • 37. 37
  • 38. 38 Shire of Esperance 2011/2012 Annual Report Development Services Environmental Health During 2011/2012, Environmental Health and Environment Services continued to undertake inspections and actions to promote community health and well being. This included undertaking a range of activities including inspections, monitoring of Shire activities, audits, provision of educational material, complaint investigation and resolution. The Environmental Health team completed over 1000 assigned tasks associated with actives relating to food premises, caravan parks and camping grounds, environmental protection, public buildings, accommodation and aquatic facilities and a number of other health related premises. Some of this activity is outlined in Figure 13. Figure 13 Inspections Eastern Suburbs Water supply Scheme Food 333 Chemistry 36 Effluent Disposal Systems 39 Microbiological 240 Caravan Parks Camping Grounds 9 Myrup Truckwash 6 Hairdressing and Skin Penetration 4 Recreational Water 55 Lodging House 27 Food Safe Workshops provided 7 Offensive Trade 5 Public Buildings 106 Meat Inspection –Animals Inspected Aquatic facilities 10 Bovine 13,551 Ovine 116,821 Sampling Activity Food: West Australian Department of Health Co-ordinated Food Sampling Programs Participation Samples collected 14 21 Rainwater Tank Sampling 18 Aquatic Facilities 137 Air Handling Systems 24 Mosquito 21 Potable Water (Microbiological) 102 Landfills 48
  • 39. 39 Figure 14 - Breakdown of Building Approvals 2010/2011 2011/2012 Description Number Value Number Value New Single Dwellings/Duplexes 72 $22,313,885 52 $14,969,358 Alter to Dwellings 45 $2,905,259 25 $2,432,174 Approval Certificates Dwellings (Retrospective Approval) 0 0 0 0 Industrial, Commercial 16 $11,450,982 14 $5,320,689 Alter to Industrial, Commercial 13 $1,008,414 15 $9,990,503 Approval Certificates Industrial, Commercial (Retrospective Approval) 0 0 2 $13,000 Outbuildings 126 $1,842,915 106 $1,573,716 Alter to Outbuildings 16 $127,737 6 $25,000 Approval Certificates Outbuilding (Retrospective Approval) 1 $18,000 0 0 Sundry Structures (Retaining walls, Fencing, etc) 19 $198,000 18 $172,998 Sundry Structures (Retaining walls, Fencing, etc) (Retrospective Approval) 0 0 0 0 Demolition 5 $78,275 4 $28,355 Pools 2 $59,000 4 $57,500 Total 315 $40,002,467 246 $34,583,293 Building During the 2011/2012 financial year, Building Services prepared for new building projects such as the West Beach toilets (currently at design stage) and overseeing additions to existing buildings, some of which were the Home Care Building (kitchen additions) and Bay of Isles Leisure Centre chemical storage area. The Building Maintenance Program has been split into two areas, planned and reactive maintenance so that a measure can be put into place to confirm that planned maintenance of the Shires built assets is having the desired effect which is to minimise reactive maintenance by implementing a comprehensive maintenance program. Council allocated funds in the 2011/2012 year for building asset maintenance which is also being used to inspect and rationalise existing buildings, ensuring that they will be brought up to standard, complying with legislative requirements. Building Legislation Changes In April 2012 sections of the Local Government (Miscellaneous Provisions) Act 1960 were repealed so that the new Building Act 2011 could take full effect. The changes have resulted in considerable administration and building approval process changes. Building Approvals In total, 246 building permits were issued by the Shire of Esperance, worth over $34 million dollars. These comprised of 52 residential dwellings, 14 commercial and industrial buildings, 112 outbuildings and 68 additions and alterations made up the remainder of the approvals. See Figure 14 for details.
  • 40. 40 Shire of Esperance 2011/2012 Annual Report Corporate Services Corporate Services changed leadership this year with Mr Darren Kennedy leaving the Shire to take up other opportunities. Mr Kennedy was an asset to the Shire implementing many improvements for the long term benefit of the Shire and its residents. Mr Shane Burge has taken on the role since May 2012 and is keen to capitalise on the opportunities and challenges open to the Shire to ensure ongoing sustainability. New legislation introduced by the State Government has seen local government make preparations for the Integrated Planning and Reporting Framework. The new framework is designed to improve the overall standard of long term strategic planning and financial management within Western Australian local governments. A particular emphasis has been placed on community engagement with the preparation of the strategic plans and for financial planning to take a longer term view. As a result of these changes the annual Shire budget commencing 2013/2014 and subsequent annual budgets will need to be predominately derived from a Council adopted Corporate Business Plan and accompanying Long Term Financial Plan. These changesareamajordeviationfromwhattheShireand local government have traditionally done in the past although Council and staff are progressively working through the new legislative framework to ensure that compliance is achieved within the stipulated timeframes. The majority of the changes will enable the local government industry within WA to move towards closer uniformity with the rest of Australia. Corporate Services is responsible for: audit and grant management ; finance management; long term financial planning; information technology; records management; statutory reporting; administration; customer service; licensing and rates. “Emphasis has been placed on community engagement with the preparation of Strategic Plans for long term Financial Planning”
  • 41. 41 Information Technology In the year leading up to 7 November 2011, IT conducted the “Managed Services Migration” project. This was an extensive project to inform and prepare staff for the transition of most IT systems to a secure data centre in Sydney. The majority of the project focused around analysis of staff interaction with the IT systems, and then defining and mitigating risks with the move. The move was well tested, and successfully completed on the 7 November 2011. The result of the move to a “Managed Services” environment has ensured the Shire has complete business continuity and a disaster recovery system with respect to its IT systems. A new Council Agendas and Minutes system know as InfoCouncil was deployed during the year. This program allows agendas and minutes to be managed through dedicated software and includes processes to upload minutes directly to the Shire’s website. Preparation for telephone services to move to VOIP (TIPT) was performed, which included re-cabling of the Shire’s Admin building’s wired network, and a logical redesign of the whole Shire’s physical network (Administration building and attached out-centres). A new Customer Request Module(CRM) system was configured and is ready for testing. Over the coming year there will be an assessment of the in-house Management Accounting Reporting Software (MARS) that was developed in-house. This software is no longer supported from an IT perspective therefore a sustainable IT solution needs to be implemented to ensure a continuance of management reports can be retained within the Shire.
  • 42. 42 Shire of Esperance 2011/2012 Annual Report Corporate Services Statutory Reports Report under Section 29(2) of the Disability Services Act 1993 The Shire of Esperance has continued its commitment to provided improved access for people with disabilities. The Disability Access and Inclusion Plan Working Party monitor’s the Disability Access and Inclusion Plan 2010/2012 (DAIP). Key projects are identified and an implementation schedule is set out for each financial year. For the 2011/2012 financial year the following projects were undertaken: • Promote and publish details of the DAIP and how persons with a disability or their carers can have input into the plan. • Publish and advertise the process for lodging complaints or requests for works with the Shire. • Advertise and promote the options available for people to receive information in differing formats from the Shire. • Over the last five years the Shire has been replacing all concrete slab footpaths in the central business district to ensure smooth and easy access for all community members, this year saw the annual works program complete this project along The Esplanade. The Shire also regularly sweeps concrete footpaths of loose stones, installs kerb ramps in new footpaths, and requires provisions for disabled people in new commercial buildings and where major alterations have been undertaken in existing buildings. • The Bay of Isles Leisure Centre installed two new machines in the gymnasium that specifically target strength training and can be utilised by able bodied patrons and patrons with a disability. The cardiovascular machine is for upper body training only whilst the Multi Plex station provides a full body workout when required, both machines are wheelchair friendly. Health and Fitness staff have been trained to work with people with disabilities to assist in providing guidance and safety advice on the use of all equipment. • The introduction of the Swim ability squad has allowed children with disabilities to maintain their water fitness and increases the likelihood of their inclusion into a mainstream swimming school program. Compliance with the State Records Act 2000 The Shire submitted an amended Recordkeeping Plan to the State Records Office on 26 July 2011. This amended plan was approved by the State Records Commission on 2 December 2011. This Plan describes the Shire’s commitment to good and compliant recordkeeping procedures and identifies future projects. The Shire main focus in Records has been improving the Electronic Document Management System (EDMS) TRIM, enhanced with a new business classification system and semi automated retention and disposal of folders. The Shire has also been addressing the disposition backlog of hardcopy files held in storage within Records. The Shire has currently sentenced 8,285 folders, of which: • 575 files identified as permanent archives • 1,336 files identified as local archives • 3,053 files identified as inactive records, for future disposal, and • 3,321 files identified for destruction, which have since been destroyed.
  • 43. 43 National Competition Policy The Competition Principles Agreement is an Inter- government Agreement between the Commonwealth and State/Territory Governments that sets out how government will apply National Competition Policy principles to public sector organisations within their jurisdiction. The State Government released a Policy Statement effective from July 1996 called the Clause 7 Statement, which forms part of the Competition PrinciplesAgreement. The Clause 7 policy document sets out nominated principles from the Agreement that now apply to Local Government. The provisions of Clause 7 of the Competition Principles Agreement require local government to report annually as to the implementation, application and effects of the Competition Policy. The Competition Principles Agreement, under Clause 7, specifies three broad areas of reporting. These are: 1. Competitive Neutrality; 2. Structural Review of Public Monopolies; and 3. Legislative Review. In accordance with the requirements of the National Competition Policy, the Shire of Esperance makes the following disclosures for 2011/2012. Performance Indicators The Records Department is currently maintaining statistical information for work processes within the department. In accordance with the State Records Act 2000 the Shire has developed performance indicators based on the statistical information gathered. Information Statement On 19 April 2012, the Shire updated and approved the Information Statement as required by the Freedom of Information Act 1992. The Information Statement can be obtained from the Shire’s website, Administration Office or on request. Records Training The Shire has developed a structured induction and training program to ensure that employees, contractors and elected members are aware of their role and responsibilities in regard to compliance with the Shire’s Recordkeeping Plan. The Training consists of: • Introduction to Records Management • Records Awareness Training (RAT) • TRIM (Electronic Document Management System) Training Manual • Specific TRIM training targeting priority areas. • Advice to staff regarding recordkeeping or TRIM on an ongoing as needs basis. This training is provided to all employees who have record keeping duties. Employees are advised of any additional information such as policies and procedures which are published on the Shire’s intranet.
  • 44. 44 Shire of Esperance 2011/2012 Annual Report Competitive Neutrality The objective of competitive neutrality is the elimination of resource allocation distortions arising out of local government ownership of significant business activities. The Shire of Esperance has previously assessed its operations and considers that it has one business activity that would be classed as significant under the current guidelines. Also the Shire of Esperance does not operate a business enterprise that has been classified by the Australian Bureau of Statistics as either a Public Trading Enterprise or Public Financial Enterprise. The number of activities to which competitive neutrality principles have been applied in the reporting period is Zero (0). The number of activities to which competitive neutrality principles have been considered but not applied in the reporting period is Zero (0). During the reporting period the Shire of Esperance did not become aware of any allegations of non- compliance with the competitive neutrality principles made by a private entity against the Shire. Structural Review of Public Monopolies In relation to Structural review of public monopolies, the Shire of Esperance discloses the following: Structural reform principles have been applied to the following number of activities in the reporting period: Zero (0); and Structural reform principles have been considered but not applied to the following number of activities in the reporting period: Zero (0). As no structural reform has been applied to any activities, the review requirements of principal SR.3 of Clause 7 of the Competition Policy Statement have not been undertaken. Legislative Review Parties to the National Competition Policy package agreed that legislation should not restrict competition unless: The benefits of the restriction to the community as a whole outweigh the costs; and The objectives of the legislation can only be achieved by restricting competition. Accordingly, the Shire of Esperance is required to implement a systematic review of all of its existing legislation to determine whether there are any direct or indirect effects on competition. The Local Government Act 1995 requires all existing Local Laws to be reviewed every eight years. As part of this process the intention to review Local Laws is advertised in the media giving residents and rate payers the opportunity to comment on any proposed changes, additions or deletions to the Shire’s Local Laws. For the 2011/2012 Financial year there were no changes to the Shire’s Local Laws: • As at the reporting date the number of by-laws and Local Laws which have been reviewed and reformed as a result of any legislative review is Zero (0); and • As at the reporting date the number of by-laws and Local Laws which the application of any legislative review principles were considered but not applied is Zero (0). Corporate Services
  • 45. 45 Plan for the Future Section 5.56 of the Local Government Act 1995 (the Act) requires a local government to plan for the future of the district. Furthermore, Section 5.53(e) of the Act requires local government to provide an overview of the Plan for the Future in its Annual Report, including major initiatives that are proposed to commence or continue in the following financial year. The Shire’s Plan for the Future was last reviewed during 2009/2010 and nominates the following initiatives as projects of key strategic importance: • Esperance Foreshore Protection and Enhancement Project, now known as the Esperance Waterfront Project • Greater Sports Ground Redevelopment; • Tanker Jetty Maintenance; The Plan also identifies the imperatives of Asset Management and Information and Communication Technologies as key operational objectives for the Shire for the period of the Plan. The Shire has performed significant work in both of these areas to ensure sustainable asset management is planned for now and into the future and that new technologies are embraced when proven efficiencies can be identified. A copy of the Plan is available from the Administration Office or from the Shire website www.esperance.wa.gov.au Employee Remuneration Pursuant to Regulation 19B of the Local Government (Administration) Regulation 1996, the following table sets out, in bands of $10,000, the number of Shire employees entitled to an annual salary of $100,000 or more: Salary Band (S) 2012 2011 2010 $100,000 - $109,999 - 3 2 $110,000 - $119,999 2 1 - $120,000 - $129,999 2 - - $160,000 - $169,000 - - 1 $170,000 - $179,999 - 1 - $200,000 – 209,999 1 - - Complaints Section 5.53(2)(hb) of the Local Government Act 1995 requires the Annual report to contain details of entries made under section 5.121 during the financial year in the Register of Complaints. The 2011/2012 year saw zero (0) entries made in this regard.
  • 46. 46 Shire of Esperance 2011/2012 Annual Report
  • 47. 47
  • 48. TABLE OF CONTENTS Page Statement by Chief Executive Officer (i) Independent Audit Report (ii) - (iii) Statement of Comprehensive Income by Nature or Type 1 Statement of Comprehensive Income by Program 2 Statement of Financial Position 3 Statement of Changes in Equity 4 Statement of Cash Flows 5 Rate Setting Statement 6 Notes to and Forming Part of the Financial Report Note Significant Accounting Policies 1 7 Revenues and Expenses 2 21 Cash and Cash Equivalents 3 26 Trade and Other Receivables 4 27 Inventories 5 27 Property, Plant and Equipment 6 28 Infrastructure 7 30 Trade and Other Payables 8 32 Long Term Borrowings 9 32 Provisions 10 32 Reserves - Asset Revaluation 11 32 Reserves - Cash Backed 12 33 Notes to the Cash Flow Statement 13 39 Capital and Leasing Commitments 14 40 Contingent Liabilities 15 40 Joint Venture 16 40 Assets by Function and Activity 17 41 Financial Ratios 18 41 Trust Funds 19 42 Disposal of Assets 20 42 Information on Borrowings 21 43 Rating Information 22 45 Discounts, Incentives, Concessions and Write-offs 23 48 Interest Charges and Instalments 24 48 Fees and Charges 25 49 Grant Revenue 26 49 Employee Numbers 27 49 Councillors' Remuneration 28 49 Major Land Transactions 29 50 Major Trading Undertakings 30 53 Financial Risk Management 31 55 SHIRE OF ESPERANCE Windich Street, Esperance Western Australia, 6450 Tel: (08) 9071 0666, Fax: (08) 9071 0600 Email: shire @esperance.wa.gov.au www.esperance.wa.gov.au Annual Financial Report For the year ended 30th June 2012 Table of Contents 2011-12
  • 49. (i) Annual Financial Report For the year ended 30th June 2012 Audit Report 2011-12
  • 50. (ii) Annual Financial Report For the year ended 30th June 2012 Audit Report 2011-12
  • 51. (iii) Annual Financial Report For the year ended 30th June 2012 Audit Report 2011-12
  • 52. Page 1 NOTE 2012 2012 2011 Actual Budget Actual $ $ $ Revenue Rates 22 12,187,696 12,236,861 11,388,430 Operating Grants, Subsidies and Contributions 26 9,230,839 6,115,712 8,032,526 Fees and Charges 25 6,395,373 5,687,890 6,528,332 Interest Earnings 2(a) 1,190,025 772,000 980,277 29,003,933 24,812,463 26,929,565 Expenses Employee Costs (11,757,213) (11,471,982) (10,732,697) Materials and Contracts (6,521,682) (6,024,493) (7,102,086) Utility Charges (936,309) (918,740) (728,678) Depreciation on Non-Current Assets 2(a) (8,588,017) (8,579,880) (8,606,104) Interest Expenses 2(a) (54,999) (57,761) (43,600) Insurance Expenses (excludes W.Comp) (473,578) (462,568) (421,886) Other Expenditure (529,470) (616,220) (570,861) (28,861,268) (28,131,644) (28,205,912) Sub-total 142,665 (3,319,181) (1,276,347) Non-Operating Grants, Subsidies and Contributions 26 19,398,853 5,421,445 3,789,965 Profit on Asset Disposals 20 329,180 83,872 442,888 Loss on Asset Disposal 20 (16,187) (83,071) (89,079) NET RESULT 19,854,511 2,103,065 2,867,427 Other Comprehensive Income - - - Total Other Comprehensive Income - - - TOTAL COMPREHENSIVE INCOME 19,854,511 2,103,065 2,867,427 This statement is to be read in conjunction with the accompanying notes. Annual Financial Report For the year ended 30th June 2012 Statement of Comprehensive Income by Nature Type 2011-12
  • 53. Page 2 NOTE 2012 2012 2011 Actual Budget Actual $ $ $ Revenue Governance 221,647 126,750 216,988 General Purpose Funding 18,643,845 16,019,419 16,369,377 Law, Order, Public Safety 351,855 320,989 758,791 Health 158,405 154,853 161,395 Education and Welfare 2,353,543 2,201,294 2,218,181 Community Amenities 2,659,854 2,299,800 2,569,867 Recreation and Culture 2,005,803 1,575,975 1,592,547 Transport 1,298,901 1,094,950 1,251,687 Economic Services 690,127 407,433 711,155 Other Property and Services 619,953 611,000 1,079,577 2 (a) 29,003,933 24,812,463 26,929,565 Expenses Excluding Finance Costs Governance (1,219,015) (1,095,029) (1,087,820) General Purpose Funding (384,080) (434,355) (341,288) Law, Order, Public Safety (1,154,889) (1,152,935) (1,945,899) Health (412,662) (386,501) (316,940) Education and Welfare (2,542,779) (2,545,960) (2,401,933) Community Amenities (3,783,020) (3,409,747) (3,538,407) Recreation Culture (5,806,630) (5,442,619) (5,741,809) Transport (10,996,849) (10,848,353) (10,697,382) Economic Services (1,651,299) (1,873,370) (1,010,423) Other Property and Services (855,046) (885,014) (1,080,411) 2 (a) (28,806,269) (28,073,883) (28,162,312) Finance Costs Recreation Culture (54,491) (57,761) (48,833) Other Property and Services (508) - 5,233 (54,999) (57,761) (43,600) Non-Operating Grants, Subsidies and Contributions Law, Order, Public Safety 26,227 12,713 38,190 Education and Welfare 22,651 20,000 99,213 Recreation Culture 1,269,175 1,145 399,944 Transport 4,069,934 5,387,587 3,252,618 Economic Services 13,942,866 - - Other Property and Services 68,000 - - 19,398,853 5,421,445 3,789,965 Profit on Disposal of Assets Law, Order, Public Safety - 234 - Education and Welfare 909 - - Community Amenities - 4,484 - Transport 177,699 79,154 56,608 Other Property and Services 150,572 - 386,280 329,180 83,872 442,888 Loss on Disposal of Assets Governance - - (6,041) Law, Order, Public Safety (4,924) (2,646) (6,996) Community Amenities (6,691) - (5,002) Transport (4,572) (75,884) (52,432) Economic Services - (3,839) - Other Property and Services - (702) (18,608) (16,187) (83,071) (89,079) NET RESULT 19,854,511 2,103,065 2,867,427 Other Comprehensive Income - - - Total Other Comprehensive Income - - - TOTAL COMPREHENSIVE INCOME 19,854,511 2,103,065 2,867,427 This statement is to be read in conjunction with the accompanying notes. Annual Financial Report For the year ended 30th June 2012 Statement of Comprehensive Income by Program 2011-12
  • 54. Page 3 NOTE 2012 2011 Actual Actual $ $ CURRENT ASSETS Cash and Cash Equivalents 3 32,946,714 13,974,222 Trade and Other Receivables 4 2,160,390 2,065,552 Inventories 5 395,813 394,803 TOTAL CURRENT ASSETS 35,502,917 16,434,577 NON-CURRENT ASSETS Other Receivables 4 845,458 925,907 Inventories 5 10,604,952 10,410,993 Property, Plant and Equipment 6 36,214,149 35,167,321 Infrastructure 7 196,268,937 194,629,455 TOTAL NON-CURRENT ASSETS 243,933,496 241,133,676 TOTAL ASSETS 279,436,413 257,568,253 CURRENT LIABILITIES Trade and Other Payables 8 2,638,200 903,627 Current Portion of Long Term Borrowings 9 127,779 76,541 Provisions 10 1,591,472 1,534,149 TOTAL CURRENT LIABILITIES 4,357,451 2,514,317 NON-CURRENT LIABILITIES Long Term Borrowings 9 8,973,938 8,840,972 Provisions 10 219,170 181,621 TOTAL NON-CURRENT LIABILITIES 9,193,108 9,022,593 TOTAL LIABILITIES 13,550,559 11,536,910 NET ASSETS 265,885,854 246,031,343 EQUITY Retained Surplus 236,122,784 232,356,754 Reserves - Cash Backed 12 29,763,070 13,674,589 TOTAL EQUITY 265,885,854 246,031,343 This statement is to be read in conjunction with the accompanying notes. 2011-12 Annual Financial Report For the year ended 30th June 2012 Statement of Financial Position
  • 55. Page 4 RESERVES ASSET RETAINED CASH REVALUATION TOTAL NOTE SURPLUS BACKED RESERVE EQUITY $ $ $ $ Balance as at 1 July 2010 127,415,662 11,363,104 104,385,150 243,163,916 Correction of Errors 104,385,150 0 (104,385,150) 0 Restated Balance 11 231,800,812 11,363,104 0 243,163,916 Net Result 2,867,427 - - 2,867,427 Total Other Comprehensive Income - - - - Transfers from/(to) Reserve (2,311,485) 2,311,485 - - Balance as at 30 June 2011 232,356,754 13,674,589 0 246,031,343 Net Result 19,854,511 - - 19,854,511 Total Other Comprehensive Income - - - - Transfers from/(to) Reserve (16,088,481) 16,088,481 - - Balance as at 30 June 2012 236,122,784 29,763,070 0 265,885,854 This statement is to be read in conjunction with the accompanying notes. 2011-12 Annual Financial Report For the year ended 30th June 2012 Statement of Changes in Equity
  • 56. Page 5 NOTE 2012 2012 2011 Actual Budget Actual Cash Flows From Operating Activities $ $ $ Receipts Rates 12,217,845 12,258,861 11,362,217 Operating Grants, Subsidies and Contributions 9,445,780 6,190,712 8,318,079 Fees and Charges 6,219,060 5,833,469 6,552,302 Interest Earnings 1,082,155 772,000 976,483 Goods and Services Tax 3,028,167 2,100,000 1,690,512 31,993,007 27,155,042 28,899,593 Payments Employee Costs (11,580,123) (11,272,427) (10,557,396) Materials and Contracts (6,104,917) (5,093,238) (7,629,535) Utility Charges (895,809) (918,740) (750,985) Insurance Expenses (473,578) (462,568) (421,886) Interest Expenses (49,471) (57,761) (48,882) Goods and Services Tax (1,828,014) (2,100,000) (1,835,141) Other Expenditure (528,220) (616,220) (570,861) (21,460,132) (20,520,954) (21,814,686) Net Cash Provided By Operating Activities 13(b) 10,532,875 6,634,088 7,084,907 Cash Flows from Investing Activities Payments for Development of Land Held for Resale (469,441) (104,262) (1,050,984) Payments for Purchase of Property, Plant Equipment (3,400,400) (6,299,078) (2,390,192) Payments for Construction of Infrastructure (8,146,229) (9,078,709) (7,103,076) Advances to Community Groups (59,395) - (410,000) Proceeds from Self Supporting Loans 63,659 113,837 Non-Operating Grants, Subsidies and Contributions used for the Development of Assets 19,398,853 5,421,445 3,789,965 Proceeds from Sale of Assets 868,366 662,762 1,268,771 Net Cash Used In Investing Activities 8,255,413 (9,397,842) (5,781,679) Cash Flows from Financing Activities Repayment of Debentures (263,659) (78,611) (245,543) Proceeds from New Debentures 447,863 64,330 809,877 Net Cash Provided By (Used In) Financing Activities 184,204 (14,281) 564,334 Net Increase (Decrease) in Cash Held 18,972,492 (2,778,035) 1,867,562 Cash at Beginning of Year 13,974,222 13,945,514 12,106,660 Cash and Cash Equivalents at the End of the Year 13(a) 32,946,714 11,167,479 13,974,222 This statement is to be read in conjunction with the accompanying notes. 2011-12 Annual Financial Report For the year ended 30th June 2012 Statement of Cash Flows
  • 57. Page 6 2012 2012 2011 NOTE Actual Budget Actual $ $ $ Revenue Governance 221,647 126,750 216,988 General Purpose Funding 6,456,149 3,782,558 4,980,947 Law, Order, Public Safety 378,082 333,936 796,981 Health 158,405 154,853 161,395 Education and Welfare 2,377,103 2,221,294 2,317,394 Community Amenities 2,659,854 2,304,284 2,569,867 Recreation and Culture 3,274,978 1,577,120 1,992,491 Transport 5,546,534 6,561,691 4,560,913 Economic Services 14,632,993 407,433 711,155 Other Property and Services 838,525 611,000 1,465,857 36,544,270 18,080,919 19,773,988 Expenses Governance (1,219,015) (1,095,029) (1,093,861) General Purpose Funding (384,080) (434,355) (341,288) Law, Order, Public Safety (1,159,813) (1,155,581) (1,952,895) Health (412,662) (386,501) (316,940) Education and Welfare (2,542,779) (2,545,960) (2,401,933) Community Amenities (3,789,711) (3,409,747) (3,543,409) Recreation Culture (5,861,121) (5,500,380) (5,790,642) Transport (11,001,421) (10,924,237) (10,749,814) Economic Services (1,651,299) (1,877,209) (1,010,423) Other Property and Services (855,554) (885,716) (1,093,786) (28,877,455) (28,214,715) (28,294,991) Net Result Excluding Rates 7,666,815 (10,133,796) (8,521,003) Adjustments for Cash Budget Requirements: Non-Cash Expenditure and Revenue (Profit)/Loss on Asset Disposals 20 (312,993) (801) (353,809) Movement in Provisions and Accruals 47,015 153,639 70,069 Movement in Deferred Pensioner Rates Sundry Debtors (non-current) 24,947 - 27,218 Depreciation and Amortisation on Assets 2(a) 8,588,017 8,579,880 8,606,104 Capital Expenditure and Revenue Purchase Land Held for Resale (469,441) (104,262) (1,050,984) Purchase Land and Buildings (1,943,386) (3,650,893) (368,738) Purchase Infrastructure Assets - Roads (6,505,702) (7,697,575) (5,963,412) Purchase Infrastructure Assets - Other (1,640,527) (1,381,134) (1,139,664) Purchase Plant and Equipment (1,285,060) (2,599,120) (1,931,018) Purchase Furniture and Equipment (171,954) (49,065) (90,436) Proceeds from Disposal of Assets 20 868,366 662,762 1,268,771 Repayment of Debentures 21(a) (263,659) (78,611) (245,543) Proceeds from New Debentures 21(a) 447,863 64,330 809,877 Advances to Community Groups (59,395) (64,330) (410,000) Self-Supporting Loan Principal Income 63,659 78,611 113,837 Transfers to Reserves (Restricted Assets) 12 (20,120,053) (1,923,175) (5,655,140) Transfers from Reserves (Restricted Assets) 12 4,005,772 4,730,286 3,343,655 Surplus/(Deficit) July 1 B/Fwd 22(b) 939,573 1,196,393 1,041,359 Surplus/(Deficit) June 30 C/Fwd 2,067,553 20,000 939,573 Amount Required to be Raised from Rates 22(a) (12,187,696) (12,236,861) (11,388,430) This statement is to be read in conjunction with the accompanying notes. 2011-12 Annual Financial Report For the year ended 30th June 2012 Rate Setting Statement