1. CURRICULUM VITA [MR.FAHAD MAIRAJ]
1
COVER LETTER
To,
Human Resource Manager
Dear Sir / Madam,
Good Day!
At first, I would like to thank you for giving your time for reviewing my resume.
This letter is to express my interest in joining your firm’s as Electronic Technician,supervisor,
Assistant Technician, Electrical Technician,supervisor,supply Chain with a solid background in
connected field; I would like to give more strength to my career, associating myself with an
organizationof yourrepute.Iam quite interestedtoworkwithanorganizationlike yoursanddo
hope my resume meets your requirements. I know I can make a positive contribution to your
firm.
Briefly, my experience Include:
I am committed, ambitious and very fast in grasping the new systems. I possess as Electronic
Technician supervisor, Assistant Technician, Electrical Technician,supervisor,Supply chain, of
professional experience. I am seeking a challenging position in a company that is rapidly
expanding and offer advancement potential professional and personally. I would like to see
myself, as a team member where I can pick up any additional skills that may be required and
confident of my own skills and capabilities.
I am here with enclosing my CV for your kind consideration.
I wouldappreciate the opportunitytomeetwithyou to explore how my experience could best
meet your needs.
Sincerely yours,
FahadMairaj
2. CURRICULUM VITA [MR.FAHAD MAIRAJ]
2
CURRICULAM VITA
MR.FAHAD
R-5 BLOCK-1 SHARIFABAD F.B.AREA,Karachi, PAKISTAN.
Cell#: +92 3102006464 or +92 2136371844
E-mail: m.fahadmairaj@yahoo.com
Father’sName : Mairajuddin
Date of Birth : May,01, 1987
Nationality : Pakistani
Religion : Islam
Civil Status : Married
NICNo. : 42101-4479680-5
Passportno : AC0926801
GENERAL SKILLS:
Excellent organizational skills with good time management.
Extensive knowledge in Windows Office and other Electronics software’s.
Excellent in oral and written communication.
TECHNICAL SKILLS:
CONTROL TECHNOLOGY:
course on control technologyfrom (PAK SWISS).
Contentare blow:-
1. Pneumatics. 4. Electro-Pneumatics.
2. P.L.C. 3. Electro-Hydraulics.
MICRO-CONTROLLER:
Micro-Controller& It’s INDUSTRIAL APPLICATIONS from
(S.D.C. SKILL DEVELOPMENT COUNCIL).
COMPUTER LITERACY:
WINDOWSXP.
Ms WORD.
NET SERCHING.
LANGUAGE:
Course of English language from(P.A.C.C,PAKISTAN AMERICANCULTURAL CENTER).
3. CURRICULUM VITA [MR.FAHAD MAIRAJ]
3
WORK HISTORY
(JUNE2015 to Till now inK.T.D (KAUSAR TRADE DISTRIBUTORS) S.I.T.E Karachi.
(ELECTRONICS/ELECTRICAL ENGINEER)
Maintenance andTrouble Shootingof differentC.N.CmachinesonFANUCcontrolsand
itsseries.
Maintenance andTrouble Shooting of Turningcenter,millingmachines,tappingcenter
wire-cutmachine,E-D-Mmachine,D.R.OSCALES,pressandmachiningcenter
Electrical wiring.
Installationof newHUSTAND SINTECH C.N.Ccontrol .
P.L.Cprogramming.
Card repairing.
Complains.
(1st jan 2013 toMAY 2015 inSILICON INTERNATIONAL Sarmad center,sadder Karachi).
(SENIOR ELECTRICAL/ELECTRONICS TECHNICIAN)
Trouble Shooting.
Electrical wiring.
Newcontrolling,pannel designing,controlling.
P.L.Cprogramming.
Over-headcranescontrolling andinstallation.
Mobile crane and 4 wheel R-Tcrene S.L.Isystemandupper andlowerunit
communicationsysteminstallationandcontrollingandcard repairing.
Complains.
Projects.
27-06-2011 to 28-12-2012 inHANTEX DENIM (National High Way Landhi Karachi).
(ELECTRONICS/ELECTRICALTECHNICIAN)
ResponsibilityforAll ProductionConcern,Routine &Preventive Maintenance of:-
Trouble Shooting.
Electrical wiring.
TasudokomaZax-e AirjetLooms.(zex-e proffissional,zex andzex-e)
Warping(Benninger).
Sizing (benninger).
Sizing (suckermuller).
Re-beaming/re-beamer.
looptex dyeing.
ropetex dyeing.
Sanforizing(Monforts).
Washing(China).
Singeing(Germany).
Packing(Taiwan).
Inspection(China).
(1st Dec 2008 to 26-06-2011 in SILICONINTERNATIONAL Sarmad center, sadderKarachi).
4. CURRICULUM VITA [MR.FAHAD MAIRAJ]
4
(ELECTRICAL TECHNICIAN)
Electrical wiringbothsingle phase andthree phase.
Troble shotting.
(1st June 2007 to 2nd Sep 2008 inSM DENIM (S.I.T.E)).
(ELECTRONICS TECHNICIAN)
ResponsibilityforAll ProductionConcern,Routine &Preventive Maintenance of:-
Trouble Shooting.
Warping(Benninger).
Indigodyeing(SukkerMuller).
Sanforizing(Monforts).
Washing(China).
Singeing(Germany).
Packing(Taiwan).
Inspection(China).
(March 2003 to 2005 in SILICONINTERNATIONAL Sarmad center,sadder Karachi).
(ASST.TECHNICIAN)
Reverse Engineeringof ElectronicsCards.
Assembling&Repairingof ElectronicsCards.
(Jan 2002 to December2002 inARIF ENGINEERING WORKS, at Bhangoriagoth,nearbaloch
hotel,Karachi.)
(HELPER)
Didmechanical workof making(DAI-MOLD) or (Dai).
ACADEMIC QUALIFICATION:
DEGREE YEAR MARKS INSTITUTE
B-tech inElectronics. 2011 Passed
New portuniversityNorthNazimabadcampus
karachi.
One year Diplomain
Industrial Electronic
2009 321
Technical TrainingCenter(T.T.C) North
Nazimabadkarachi.
Three years Diploma in
(Electronic)(D.A.E)
2005 2203
Board of Technical Education(S.B.T) from
(govt.college of technology-G.C.T)(S.I.T.E),
Karachi.
S.S.C (Science) 2002 467
Board of Secondary Educationfrom(ROYAL
ACADEMY SHARIFABADKARACHI).
Language Known
5. CURRICULUM VITA [MR.FAHAD MAIRAJ]
5
ENGLISH Read,write & converse
URDU Read,write & converse
Reference:
Available uponrequest.
I herebydeclare thatall the above mentioneddetailsare true andbestof my knowledge.
MR.FAHAD
Applicant.