INFORMATION
TOWER CRANE
SPAN = 43m
1 2 3 4
5
6
7
8
9
10
EXISTING
GROUND LEVEL
APPROX 54.300 PILING MATT 600mm
APPROX 54.000
PILING MATT 600mm
APPROX 53.000
EXISTING
GROUND LEVEL
APPROX 54.300
(VARIES)
HOUSES 1-5 HOUSES 6-10
TREE PROTECTION
ZONE
TREE PROTECTION
ZONE
INDICATIVE
CRANE POSITION
1 3 5
2 4 6
7
KEY DATES
TYPICAL WORK SEQUENCE
HOUSE No.10
TYPICAL WORK
SEQUENCE
OK-RW-TWS-01
NTS(A1)13/05/2011

More Related Content

Viewers also liked

Libya Building Development Case Study
Libya Building Development Case StudyLibya Building Development Case Study
Libya Building Development Case Study
Essa Essa
 

Viewers also liked (20)

MTECH BIM project case study
MTECH BIM project case studyMTECH BIM project case study
MTECH BIM project case study
 
Green buildings dec 14
Green buildings dec 14Green buildings dec 14
Green buildings dec 14
 
Overview of project management in engineering environment
Overview of project management in engineering environmentOverview of project management in engineering environment
Overview of project management in engineering environment
 
REVIT ARCHITECTURE COURSE
REVIT ARCHITECTURE COURSEREVIT ARCHITECTURE COURSE
REVIT ARCHITECTURE COURSE
 
A New Year, New Look for Lynda.com
A New Year, New Look for Lynda.comA New Year, New Look for Lynda.com
A New Year, New Look for Lynda.com
 
99 Days Revit Architecture Training Detailed Syllabus
99 Days Revit Architecture Training Detailed Syllabus99 Days Revit Architecture Training Detailed Syllabus
99 Days Revit Architecture Training Detailed Syllabus
 
Top Down Construction Presentation.
Top Down Construction Presentation.Top Down Construction Presentation.
Top Down Construction Presentation.
 
Airport Construction
Airport ConstructionAirport Construction
Airport Construction
 
Top down construction
Top down constructionTop down construction
Top down construction
 
Hennepin County Brookdale Regional Center - High Performance Building Case Study
Hennepin County Brookdale Regional Center - High Performance Building Case StudyHennepin County Brookdale Regional Center - High Performance Building Case Study
Hennepin County Brookdale Regional Center - High Performance Building Case Study
 
Project Execution Plan for High Rise Building
Project Execution Plan for High Rise BuildingProject Execution Plan for High Rise Building
Project Execution Plan for High Rise Building
 
Burj Khalifa
Burj KhalifaBurj Khalifa
Burj Khalifa
 
Construction Methods & Sequence
Construction  Methods & SequenceConstruction  Methods & Sequence
Construction Methods & Sequence
 
Burj Khalifa
Burj KhalifaBurj Khalifa
Burj Khalifa
 
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
 
Libya Building Development Case Study
Libya Building Development Case StudyLibya Building Development Case Study
Libya Building Development Case Study
 
Burj khalifa presentation ppt
Burj khalifa presentation pptBurj khalifa presentation ppt
Burj khalifa presentation ppt
 
Yale Art + Architecture Building - Case Study
Yale Art + Architecture Building - Case StudyYale Art + Architecture Building - Case Study
Yale Art + Architecture Building - Case Study
 
case study of chandigarh college of architecture
case study of chandigarh college of architecturecase study of chandigarh college of architecture
case study of chandigarh college of architecture
 
Presentation on burj khalifa
Presentation on burj khalifaPresentation on burj khalifa
Presentation on burj khalifa
 

Contract, Construction Sequence 01 rev 00, 13,05,11 start date 23,05,11.PDF

  • 1. St Andrews House 1 Dreadnought Street Greenwich London SE10 0PU 020 8858 9124 www.okeefe.co.uk title: drawing: date: scale: checked by:drawn by: J.B.A.S. O'KEEFECONSTRUCTION (Greenwich) LTD 115 Ridgeway, Wimbledon INFORMATION TOWER CRANE SPAN = 43m 1 2 3 4 5 6 7 8 9 10 EXISTING GROUND LEVEL APPROX 54.300 PILING MATT 600mm APPROX 54.000 PILING MATT 600mm APPROX 53.000 EXISTING GROUND LEVEL APPROX 54.300 (VARIES) HOUSES 1-5 HOUSES 6-10 TREE PROTECTION ZONE TREE PROTECTION ZONE INDICATIVE CRANE POSITION 1 3 5 2 4 6 7 KEY DATES TYPICAL WORK SEQUENCE HOUSE No.10 TYPICAL WORK SEQUENCE OK-RW-TWS-01 NTS(A1)13/05/2011