A Phase I ESA is an investigation of the current and historic uses of a
property, and an inspection of current conditions of the property to
determine the likelihood that contamination is present. The Phase I
environmental assessment is intended to be a standardized review process
looking for specific indications of contamination issues; it is not intended
to be an exhaustive search looking for contamination that is not there.
What is a Phase 1 ESA?
Simply stated, a Phase I ESA is looking for indications that current or
historic uses of the property may have resulted in contamination. The
Phase I also considers neighboring properties where contaminants may
have migrated onto the property through groundwater, etc.
Because the scope of the Phase 1 environmental site assessment is
focused on contamination issues, some organizations will decide to
augment the assessment to address other related issues, such as:
•Asbestos
•Lead-based paint
•Indoor air quality and industrial hygiene
•Compliance with environmental permits and environmental laws
•Compliance with OSHA rules and other health and safety issues
•Past company disposal practices in landfills, etc.
These other types of issues are not addressed in a Phase I ESA under the
ASTM standard; if you wish to have these issues addressed, you need to
discuss adding them with the environmental professional.
I N S I D E T H I S
B R I E F I N G
1 What is a Phase 1 ESA?
2 How Long Does a Phase 1
Take?
3 What is the Phase 1
Looking For?
4 Are There Different Kinds?
5 Can Anyone Conduct a
Phase 1 ESA?
6 Can I Use an Old ESA?
7 What Happens If My Phase
I Identifies An Issue?
Landowner Liability
Protections are available
only if a Phase I
Environmental Site
Assessment was
conducted prior to
purchasing property
What is the Phase 1 Looking For?
Regulatory Briefing
Phase 1 ESA
Buyer’s
Guide
December 2016
This will vary greatly between providers; you should allow at least two
weeks to complete the Phase I. Some providers will ask for significantly
more time, some requiring 4-6 weeks.
How Long Does A Phase 1 Take?
© Caltha LLP 2016
Page 2 Regulatory Briefing
Are There Different Kinds If Phase 1
ESA?
Different companies can use a variety of terms to refer to their own
initial or cursory review of environmental issues associated with a
property. It is sometimes difficult to determine what the review includes.
Therefore, to assure a comprehensive assessment, the only types of
Phase 1 ESA accepted by the US government, States and most lenders
uses the current ASTM standard method, referred to as “ASTM E 1527-13”
or "E 2247 – 08", with the later applying to large tracts of rural or forest
lands only. These ASTM standards are updated every five years, so older,
obsolete versions are referred to as E 1527-03, etc.
To compare services between companies, be sure that each is providing a
Phase I ESA that explicitly meets the ASTM E 1527-13 standard.
Other types of investigations exist, including:
 Transaction Screen
 Records Search With Risk Assessment
These types of investigations are appropriate for some limited situations,
or can be conducted to satisfy the environmental due diligence
requirements of specific organizations. For example, the Small Business
Administration has developed their own “Records Search With Risk
Assessment” procedure to provide an appropriate level of environmental
review for low risk properties. These types of investigations are not
equivalent to a Phase 1 Environmental Site Assessment.
Activity & Use
Restrictions (AULs)
AULs are explicit
restrictions on the uses
and/or activities that are
allowed on a property.
The existence of an AUL
should be considered an
indication that the
property is contaminated
and not suitable for
unrestricted use.
“Industrial Use Only”
restriction may indicate
that contamination was
partially cleaned up to
meet industrial standards.
Restrictions could also
limit physical changes to
the buildings, parking
lots, etc.
To be eligible for LLPs,
Owners must know and
have complied with all
AULs
Can anyone conduct a Phase I
Environmental Assessment?
Yes and no; legally, anyone can conduct a Phase I ESA. However, if you
want your assessment to meet the ASTM standard, then the
“environmental professional” you use will need to provide documentation
that they meet the specific qualification requirements contained in
ASTM E 1527-13.
Different organizations and lenders may have additional requirements on
who can conduct Environmental Site Assessments they will accept. For
example, the Small Business Administration (SBA) requires that the
environmental professional has a minimum of $1,000,0000 professional
liability insurance, in addition to meeting technical qualifications.
© Caltha LLP 2016
Regulatory Briefing Page 3
Lenders have a vested interest in the condition of a property they will accept as collateral. If
contamination is discovered later, the value of the property can be significantly reduced and can make the
property difficult to resell.
Make sure to discuss the Phase I ESA with your lender. They may have additional requirements that need to
be included. The lender may also need to be identified in the ESA report as an “additional user”, or may
require additional liability protections, such as a “reliance letter”. Some lenders prefer that they order the
Phase I ESA rather than having the borrower order one.
Understanding your lender’s requirements at the onset will save time and money, and will avoid having to
make last minute changes prior to closing.
How Is My Lender Involved?
Can I Use a Previous Phase I ESA Report?
Possibly; however the ASTM is specific on how old the ESA report can be. Reports completed
within the previous six months are valid; after six months some or all of the report will need to
be updated. Environmental assessments older than one year need to be redone.
Sometimes the Phase I will identify issues (referred to as “Recognized Environmental Conditions” or REC)
that indicate that contamination may be present on the property. In this case, the environmental
professional will recommend a Phase II Environmental Site Assessment be conducted. The Phase II ESA will
likely include collecting soil, groundwater or other samples to determine if contamination is actually
present.
If contamination is discovered during the Phase 2 ESA, the property owner may be obligated to report it to
State and/or Federal agencies, and may be required to conduct cleanup.
Finally, it is important to consider that the ESA process is only one element of environmental due
diligence (although it is the only element required for LLPs). Other business risks may be important to a
purchaser, which are not considered as part of the ASTM standard practice. These issues need to be
discussed with the environmental professional conducting the assessment.
What Happens If My Phase I Environmental Assessment
Identified An Issue?
Caltha LLP Services
Caltha LLP provides expert due diligence support to
Buyers, Sellers and Lenders. Click on the service
area below for more information:
Phase 1 Environmental Site Assessment
Phase 2 Investigations
Due Diligence Compliance Audits
Regulatory Briefings are published periodically by
Caltha to highlight new or proposed environmental,
health & safety regulations
Caltha LLP
Phone:
(763) 208-6430
Website:
http://www.calthacompany.com
E-mail:
info@calthacompany.com

More Related Content

More from Loren Larson, CHMM, CPEA

Management Systems Used By Environmental and Safety Professionals
Management Systems Used By Environmental and Safety ProfessionalsManagement Systems Used By Environmental and Safety Professionals
Management Systems Used By Environmental and Safety Professionals
Loren Larson, CHMM, CPEA
 
Overview of Clean Water Act and Related Rules
Overview of Clean Water Act and Related RulesOverview of Clean Water Act and Related Rules
Overview of Clean Water Act and Related Rules
Loren Larson, CHMM, CPEA
 
Value of Social Media Presence for EHS Professional
Value of Social Media Presence for EHS ProfessionalValue of Social Media Presence for EHS Professional
Value of Social Media Presence for EHS Professional
Loren Larson, CHMM, CPEA
 
Assessing Business Risks and Controls for the Financial Professional | Enviro...
Assessing Business Risks and Controls for the Financial Professional | Enviro...Assessing Business Risks and Controls for the Financial Professional | Enviro...
Assessing Business Risks and Controls for the Financial Professional | Enviro...
Loren Larson, CHMM, CPEA
 
NDDH North Dakota Industrial Stormwater Permit
NDDH North Dakota Industrial Stormwater PermitNDDH North Dakota Industrial Stormwater Permit
NDDH North Dakota Industrial Stormwater Permit
Loren Larson, CHMM, CPEA
 
Landowner Liability Protections and All Appropriate Inquiry
Landowner Liability Protections and All Appropriate InquiryLandowner Liability Protections and All Appropriate Inquiry
Landowner Liability Protections and All Appropriate Inquiry
Loren Larson, CHMM, CPEA
 
Addressing Environmental Liabilities When Buying Land or Business | Caltha LLP
Addressing Environmental Liabilities When Buying Land or Business | Caltha LLPAddressing Environmental Liabilities When Buying Land or Business | Caltha LLP
Addressing Environmental Liabilities When Buying Land or Business | Caltha LLP
Loren Larson, CHMM, CPEA
 
Summary of CHMMunity Volunteer Projects at Voyageurs National Park 2003 to 2005
Summary of CHMMunity Volunteer Projects at Voyageurs National Park 2003 to 2005Summary of CHMMunity Volunteer Projects at Voyageurs National Park 2003 to 2005
Summary of CHMMunity Volunteer Projects at Voyageurs National Park 2003 to 2005
Loren Larson, CHMM, CPEA
 
Derivation of Aquatic Life Screening Values | Harmonization of Office of Wate...
Derivation of Aquatic Life Screening Values | Harmonization of Office of Wate...Derivation of Aquatic Life Screening Values | Harmonization of Office of Wate...
Derivation of Aquatic Life Screening Values | Harmonization of Office of Wate...
Loren Larson, CHMM, CPEA
 
Voyageurs National Park Lyle Mine Remediation: Part 1-Environmental Assessment
Voyageurs National Park Lyle Mine Remediation: Part 1-Environmental AssessmentVoyageurs National Park Lyle Mine Remediation: Part 1-Environmental Assessment
Voyageurs National Park Lyle Mine Remediation: Part 1-Environmental Assessment
Loren Larson, CHMM, CPEA
 
Comparison of Industial Stormwater Benchmarks To Historical Industrial Sector...
Comparison of Industial Stormwater Benchmarks To Historical Industrial Sector...Comparison of Industial Stormwater Benchmarks To Historical Industrial Sector...
Comparison of Industial Stormwater Benchmarks To Historical Industrial Sector...
Loren Larson, CHMM, CPEA
 
Compliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit RequirementsCompliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit Requirements
Loren Larson, CHMM, CPEA
 
EHS Management Systems Overview For The Hazardous Materials Professional
EHS Management Systems Overview For The Hazardous Materials ProfessionalEHS Management Systems Overview For The Hazardous Materials Professional
EHS Management Systems Overview For The Hazardous Materials Professional
Loren Larson, CHMM, CPEA
 

More from Loren Larson, CHMM, CPEA (13)

Management Systems Used By Environmental and Safety Professionals
Management Systems Used By Environmental and Safety ProfessionalsManagement Systems Used By Environmental and Safety Professionals
Management Systems Used By Environmental and Safety Professionals
 
Overview of Clean Water Act and Related Rules
Overview of Clean Water Act and Related RulesOverview of Clean Water Act and Related Rules
Overview of Clean Water Act and Related Rules
 
Value of Social Media Presence for EHS Professional
Value of Social Media Presence for EHS ProfessionalValue of Social Media Presence for EHS Professional
Value of Social Media Presence for EHS Professional
 
Assessing Business Risks and Controls for the Financial Professional | Enviro...
Assessing Business Risks and Controls for the Financial Professional | Enviro...Assessing Business Risks and Controls for the Financial Professional | Enviro...
Assessing Business Risks and Controls for the Financial Professional | Enviro...
 
NDDH North Dakota Industrial Stormwater Permit
NDDH North Dakota Industrial Stormwater PermitNDDH North Dakota Industrial Stormwater Permit
NDDH North Dakota Industrial Stormwater Permit
 
Landowner Liability Protections and All Appropriate Inquiry
Landowner Liability Protections and All Appropriate InquiryLandowner Liability Protections and All Appropriate Inquiry
Landowner Liability Protections and All Appropriate Inquiry
 
Addressing Environmental Liabilities When Buying Land or Business | Caltha LLP
Addressing Environmental Liabilities When Buying Land or Business | Caltha LLPAddressing Environmental Liabilities When Buying Land or Business | Caltha LLP
Addressing Environmental Liabilities When Buying Land or Business | Caltha LLP
 
Summary of CHMMunity Volunteer Projects at Voyageurs National Park 2003 to 2005
Summary of CHMMunity Volunteer Projects at Voyageurs National Park 2003 to 2005Summary of CHMMunity Volunteer Projects at Voyageurs National Park 2003 to 2005
Summary of CHMMunity Volunteer Projects at Voyageurs National Park 2003 to 2005
 
Derivation of Aquatic Life Screening Values | Harmonization of Office of Wate...
Derivation of Aquatic Life Screening Values | Harmonization of Office of Wate...Derivation of Aquatic Life Screening Values | Harmonization of Office of Wate...
Derivation of Aquatic Life Screening Values | Harmonization of Office of Wate...
 
Voyageurs National Park Lyle Mine Remediation: Part 1-Environmental Assessment
Voyageurs National Park Lyle Mine Remediation: Part 1-Environmental AssessmentVoyageurs National Park Lyle Mine Remediation: Part 1-Environmental Assessment
Voyageurs National Park Lyle Mine Remediation: Part 1-Environmental Assessment
 
Comparison of Industial Stormwater Benchmarks To Historical Industrial Sector...
Comparison of Industial Stormwater Benchmarks To Historical Industrial Sector...Comparison of Industial Stormwater Benchmarks To Historical Industrial Sector...
Comparison of Industial Stormwater Benchmarks To Historical Industrial Sector...
 
Compliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit RequirementsCompliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit Requirements
 
EHS Management Systems Overview For The Hazardous Materials Professional
EHS Management Systems Overview For The Hazardous Materials ProfessionalEHS Management Systems Overview For The Hazardous Materials Professional
EHS Management Systems Overview For The Hazardous Materials Professional
 

Recently uploaded

How to Scan Tenants in NYC - You Should Know!
How to Scan Tenants in NYC - You Should Know!How to Scan Tenants in NYC - You Should Know!
How to Scan Tenants in NYC - You Should Know!
BelgiumManagement
 
Architectural & Interior design portfolio.pdf
Architectural & Interior design portfolio.pdfArchitectural & Interior design portfolio.pdf
Architectural & Interior design portfolio.pdf
susantebinum
 
Simpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate LogoSimpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate Logo
simpolosparkteam
 
Avrupa Konutlari Yenimahalle - Listing Turkey
Avrupa Konutlari Yenimahalle - Listing TurkeyAvrupa Konutlari Yenimahalle - Listing Turkey
Avrupa Konutlari Yenimahalle - Listing Turkey
Listing Turkey
 
Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...
Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...
Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...
Newman George Leech
 
Brigade Insignia at Yelahanka Brochure.pdf
Brigade Insignia at Yelahanka Brochure.pdfBrigade Insignia at Yelahanka Brochure.pdf
Brigade Insignia at Yelahanka Brochure.pdf
SachinChauhan191
 
One FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction UpdateOne FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction Update
One FNG
 
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Volition Properties
 
Killer Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing TurkeyKiller Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing Turkey
Listing Turkey
 
Torun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing TurkeyTorun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing Turkey
Listing Turkey
 
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
JagadishKR1
 
Optimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better ResultsOptimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better Results
Lead Generation Media
 
MC Heights-Best Construction Company in jhang
MC Heights-Best Construction Company in jhangMC Heights-Best Construction Company in jhang
MC Heights-Best Construction Company in jhang
laraibfatim009
 
Green Homes, Islamabad Presentation .pdf
Green Homes, Islamabad Presentation .pdfGreen Homes, Islamabad Presentation .pdf
Green Homes, Islamabad Presentation .pdf
ticktoktips
 
Types and Sources of Mortgage Leads: What You Need to Know
Types and Sources of Mortgage Leads: What You Need to KnowTypes and Sources of Mortgage Leads: What You Need to Know
Types and Sources of Mortgage Leads: What You Need to Know
Lead Generation Media
 
SVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property BroadcastSVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property Broadcast
SVN International Corp.
 
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
aashiyanastardevelop
 

Recently uploaded (17)

How to Scan Tenants in NYC - You Should Know!
How to Scan Tenants in NYC - You Should Know!How to Scan Tenants in NYC - You Should Know!
How to Scan Tenants in NYC - You Should Know!
 
Architectural & Interior design portfolio.pdf
Architectural & Interior design portfolio.pdfArchitectural & Interior design portfolio.pdf
Architectural & Interior design portfolio.pdf
 
Simpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate LogoSimpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate Logo
 
Avrupa Konutlari Yenimahalle - Listing Turkey
Avrupa Konutlari Yenimahalle - Listing TurkeyAvrupa Konutlari Yenimahalle - Listing Turkey
Avrupa Konutlari Yenimahalle - Listing Turkey
 
Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...
Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...
Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...
 
Brigade Insignia at Yelahanka Brochure.pdf
Brigade Insignia at Yelahanka Brochure.pdfBrigade Insignia at Yelahanka Brochure.pdf
Brigade Insignia at Yelahanka Brochure.pdf
 
One FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction UpdateOne FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction Update
 
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
 
Killer Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing TurkeyKiller Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing Turkey
 
Torun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing TurkeyTorun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing Turkey
 
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
 
Optimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better ResultsOptimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better Results
 
MC Heights-Best Construction Company in jhang
MC Heights-Best Construction Company in jhangMC Heights-Best Construction Company in jhang
MC Heights-Best Construction Company in jhang
 
Green Homes, Islamabad Presentation .pdf
Green Homes, Islamabad Presentation .pdfGreen Homes, Islamabad Presentation .pdf
Green Homes, Islamabad Presentation .pdf
 
Types and Sources of Mortgage Leads: What You Need to Know
Types and Sources of Mortgage Leads: What You Need to KnowTypes and Sources of Mortgage Leads: What You Need to Know
Types and Sources of Mortgage Leads: What You Need to Know
 
SVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property BroadcastSVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property Broadcast
 
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
 

Phase 1 Environmental Site Assessment Buyer's Guide | FAQ About Phase I ESA

  • 1. http://www.calthacompany.com A Phase I ESA is an investigation of the current and historic uses of a property, and an inspection of current conditions of the property to determine the likelihood that contamination is present. The Phase I environmental assessment is intended to be a standardized review process looking for specific indications of contamination issues; it is not intended to be an exhaustive search looking for contamination that is not there. What is a Phase 1 ESA? Simply stated, a Phase I ESA is looking for indications that current or historic uses of the property may have resulted in contamination. The Phase I also considers neighboring properties where contaminants may have migrated onto the property through groundwater, etc. Because the scope of the Phase 1 environmental site assessment is focused on contamination issues, some organizations will decide to augment the assessment to address other related issues, such as: •Asbestos •Lead-based paint •Indoor air quality and industrial hygiene •Compliance with environmental permits and environmental laws •Compliance with OSHA rules and other health and safety issues •Past company disposal practices in landfills, etc. These other types of issues are not addressed in a Phase I ESA under the ASTM standard; if you wish to have these issues addressed, you need to discuss adding them with the environmental professional. I N S I D E T H I S B R I E F I N G 1 What is a Phase 1 ESA? 2 How Long Does a Phase 1 Take? 3 What is the Phase 1 Looking For? 4 Are There Different Kinds? 5 Can Anyone Conduct a Phase 1 ESA? 6 Can I Use an Old ESA? 7 What Happens If My Phase I Identifies An Issue? Landowner Liability Protections are available only if a Phase I Environmental Site Assessment was conducted prior to purchasing property What is the Phase 1 Looking For? Regulatory Briefing Phase 1 ESA Buyer’s Guide December 2016 This will vary greatly between providers; you should allow at least two weeks to complete the Phase I. Some providers will ask for significantly more time, some requiring 4-6 weeks. How Long Does A Phase 1 Take?
  • 2. © Caltha LLP 2016 Page 2 Regulatory Briefing Are There Different Kinds If Phase 1 ESA? Different companies can use a variety of terms to refer to their own initial or cursory review of environmental issues associated with a property. It is sometimes difficult to determine what the review includes. Therefore, to assure a comprehensive assessment, the only types of Phase 1 ESA accepted by the US government, States and most lenders uses the current ASTM standard method, referred to as “ASTM E 1527-13” or "E 2247 – 08", with the later applying to large tracts of rural or forest lands only. These ASTM standards are updated every five years, so older, obsolete versions are referred to as E 1527-03, etc. To compare services between companies, be sure that each is providing a Phase I ESA that explicitly meets the ASTM E 1527-13 standard. Other types of investigations exist, including:  Transaction Screen  Records Search With Risk Assessment These types of investigations are appropriate for some limited situations, or can be conducted to satisfy the environmental due diligence requirements of specific organizations. For example, the Small Business Administration has developed their own “Records Search With Risk Assessment” procedure to provide an appropriate level of environmental review for low risk properties. These types of investigations are not equivalent to a Phase 1 Environmental Site Assessment. Activity & Use Restrictions (AULs) AULs are explicit restrictions on the uses and/or activities that are allowed on a property. The existence of an AUL should be considered an indication that the property is contaminated and not suitable for unrestricted use. “Industrial Use Only” restriction may indicate that contamination was partially cleaned up to meet industrial standards. Restrictions could also limit physical changes to the buildings, parking lots, etc. To be eligible for LLPs, Owners must know and have complied with all AULs Can anyone conduct a Phase I Environmental Assessment? Yes and no; legally, anyone can conduct a Phase I ESA. However, if you want your assessment to meet the ASTM standard, then the “environmental professional” you use will need to provide documentation that they meet the specific qualification requirements contained in ASTM E 1527-13. Different organizations and lenders may have additional requirements on who can conduct Environmental Site Assessments they will accept. For example, the Small Business Administration (SBA) requires that the environmental professional has a minimum of $1,000,0000 professional liability insurance, in addition to meeting technical qualifications.
  • 3. © Caltha LLP 2016 Regulatory Briefing Page 3 Lenders have a vested interest in the condition of a property they will accept as collateral. If contamination is discovered later, the value of the property can be significantly reduced and can make the property difficult to resell. Make sure to discuss the Phase I ESA with your lender. They may have additional requirements that need to be included. The lender may also need to be identified in the ESA report as an “additional user”, or may require additional liability protections, such as a “reliance letter”. Some lenders prefer that they order the Phase I ESA rather than having the borrower order one. Understanding your lender’s requirements at the onset will save time and money, and will avoid having to make last minute changes prior to closing. How Is My Lender Involved? Can I Use a Previous Phase I ESA Report? Possibly; however the ASTM is specific on how old the ESA report can be. Reports completed within the previous six months are valid; after six months some or all of the report will need to be updated. Environmental assessments older than one year need to be redone. Sometimes the Phase I will identify issues (referred to as “Recognized Environmental Conditions” or REC) that indicate that contamination may be present on the property. In this case, the environmental professional will recommend a Phase II Environmental Site Assessment be conducted. The Phase II ESA will likely include collecting soil, groundwater or other samples to determine if contamination is actually present. If contamination is discovered during the Phase 2 ESA, the property owner may be obligated to report it to State and/or Federal agencies, and may be required to conduct cleanup. Finally, it is important to consider that the ESA process is only one element of environmental due diligence (although it is the only element required for LLPs). Other business risks may be important to a purchaser, which are not considered as part of the ASTM standard practice. These issues need to be discussed with the environmental professional conducting the assessment. What Happens If My Phase I Environmental Assessment Identified An Issue? Caltha LLP Services Caltha LLP provides expert due diligence support to Buyers, Sellers and Lenders. Click on the service area below for more information: Phase 1 Environmental Site Assessment Phase 2 Investigations Due Diligence Compliance Audits Regulatory Briefings are published periodically by Caltha to highlight new or proposed environmental, health & safety regulations Caltha LLP Phone: (763) 208-6430 Website: http://www.calthacompany.com E-mail: info@calthacompany.com