Stage	
  preset	
  
Open Closed Dry	
   Wet Dry Wet Other
21:30 21:30 21:30
22:00 22:00 22:00
22:30 22:30 22:30
23:00 23:00 23:00
23:30 23:30 23:30
Stage	
  preset	
  
Open Closed Dry	
   Wet Dry Wet Other
00:00 00:00 00:00
00:30 00:30 00:30
01:00 01:00 1 01:00
01:30 01:30 01:30
02:00 02:00 2 02:00
02:30 02:30 02:30
03:00 03:00 3 03:00
03:30 03:30 03:30
04:00 04:00 4 04:00
04:30 04:30 04:30
05:00 05:00 5 05:00 05:00
05:30 05:30 05:30 Dry Wet Other 05:30
06:00 06:00 6 06:00 1 06:00
06:30 06:30 06:30 06:30
07:00 07:00 7 07:00 2 07:00
07:30 07:30 07:30 07:30
08:00 08:00 8 08:00 08:00
08:30 08:30 08:30 3 08:30
09:00 09:00 9 09:00 09:00
09:30 09:30 09:30 4 09:30
10:00 10:00 10:00 10:00
10:30 10:30 10:30 5 10:30
11:00 11:00 11:00 11:00
11:30 11:30 11:30 11:30
12:00 12:00 12:00 12:00
12:30 12:30 12:30 6 12:30
13:00 13:00 13:00 13:00
13:30 13:30 13:30 7 13:30
14:00 14:00 14:00 14:00
14:30 14:30 14:30 8 14:30
15:00 15:00 15:00 15:00
15:30 15:30 15:30 9 15:30
16:00 16:00 16:00 16:00
16:30 16:30 16:30 10 16:30
17:00 17:00 17:00 17:00
17:30 17:30 17:30 17:30
18:00 18:00 18:00 18:00
18:30 18:30 18:30 18:30
19:00 19:00 19:00 19:00
19:30 19:30 19:30 19:30
20:00 20:00 20:00 20:00
20:30 20:30 20:30 20:30
21:00 21:00 21:00 21:00
21:30 21:30 21:30 21:30
22:00 22:00 22:00 22:00
22:30 22:30 22:30 22:30
23:00 23:00 23:00 23:00
23:30 23:30 23:30 23:30
00:00 00:00 00:00 00:00
00:30 00:30 00:30 00:30
2D	
  jets	
  synchro	
  and	
  
commissioning	
  	
  -­‐	
  HJC
20141019	
  -­‐	
  Sunday,	
  October	
  19,	
  2014
Saturday	
  Evening,	
  October	
  18
Seats Lift
All	
  at	
  +0
Water	
  and	
  Flame	
  
Focus,	
  TBD	
  with	
  
Projection
Preset
Water	
  SFX
Water	
  SFX
Seats Lift Overnight
Day
Filling	
  grease	
  to	
  
guide	
  rollers	
  under	
  
lifting	
  seat	
  
cylindars;	
  and	
  
reinforcement	
  and	
  
welding	
  at	
  the	
  
connection	
  
between	
  cylinder	
  
sleeves	
  and	
  
structures	
  of	
  lifting	
  
seats-­‐	
  BSEDI
Cable	
  tray	
  
installation	
  at	
  rear	
  
wall	
  -­‐	
  Starlight
Intercom	
  Out Flame	
  effect	
  test	
  -­‐	
  
XCC	
  (until	
  0200)
V2	
  safe	
  edges	
  -­‐	
  
Dafeng	
  (until	
  
0200)
Remove	
  and	
  repair	
  
Mondo	
  as	
  needed	
  
on	
  wet	
  lifts	
  -­‐	
  
Quisheng
Solenoid	
  valve	
  
synchro	
  of	
  dry/wet	
  
rain	
  and	
  	
  FOW	
  
(0200	
  -­‐	
  0800)
Fixed	
  seat	
  lights	
  
install	
  and	
  seat	
  
adjustment	
  -­‐	
  
Dafeng
RAs	
  Resistanace	
  
install	
  for	
  all	
  
encoders	
  of	
  RAs-­‐	
  
BSEDI
RA1	
  Cleaning	
  -­‐	
  
BSEDI
RA1	
  
Commissioning,	
  
screen	
  adjst.,	
  	
  
cable	
  mgt	
  -­‐	
  Lopu
V10,	
  L9,	
  CL	
  
@	
  -­‐3m;	
  
others	
  at	
  +0
Dafeng
Vom	
  2,	
  10	
  
and	
  apron	
  
@	
  -­‐1.5m;	
  	
  
all	
  others	
  
+0
Reinforcement	
  and	
  
welding	
  in	
  lifting	
  
seats	
  -­‐	
  BSEDI	
  (to	
  
23:59)
Wet	
  rain	
  focus	
  -­‐	
  HJC
Requires	
  grid	
  and	
  house	
  work	
  
lights	
  (until	
  0800)
Water	
  SFX
Lisa	
  Schultz	
  Smith
185-­‐7147-­‐7944
Chain	
  Mail	
  install
Testing	
  water	
  and	
  
SFX	
  together	
  -­‐	
  HJC
Lighting	
  and	
  seat	
  
adjustment	
  -­‐	
  fixed	
  
seats	
  -­‐	
  Dafeng	
  
Filling	
  grease	
  in	
  guild	
  
rails	
  on	
  lifting	
  seats	
  -­‐	
  
BSEDI
Safety	
  edge	
  of	
  Apron-­‐
Dafeng
Apron	
  @	
  
+0;	
  All	
  
others	
  @
	
  -­‐	
  1.5m
RA	
  encoders	
  -­‐	
  BSEDI
Cable	
  trays	
  install	
  at	
  
rear	
  wall	
  -­‐	
  Starlight
LED	
  screen	
  
commissioning	
  and	
  
maintenance	
  -­‐	
  Lopu

More Related Content

Viewers also liked

The Jam Methodology by Claro Partners
The Jam Methodology by Claro PartnersThe Jam Methodology by Claro Partners
The Jam Methodology by Claro PartnersSwapsee
 
Chude01_nhom16
Chude01_nhom16 Chude01_nhom16
Chude01_nhom16 2244yen
 
Gruenberg relacion-indigena-naturaleza-2003
Gruenberg relacion-indigena-naturaleza-2003Gruenberg relacion-indigena-naturaleza-2003
Gruenberg relacion-indigena-naturaleza-2003Carla Rodas
 
Parallel Datalog Reasoning in RDFox Presentation
Parallel Datalog Reasoning in RDFox PresentationParallel Datalog Reasoning in RDFox Presentation
Parallel Datalog Reasoning in RDFox PresentationDBOnto
 
Beehive Homes Franchise Infomation PDF
Beehive Homes Franchise Infomation PDFBeehive Homes Franchise Infomation PDF
Beehive Homes Franchise Infomation PDFTroy Veach
 
Metodos de avances tecnologicos de la anticoncepcion
Metodos de avances tecnologicos de la anticoncepcionMetodos de avances tecnologicos de la anticoncepcion
Metodos de avances tecnologicos de la anticoncepcionMarisol Becerra Contreras
 
3 a 2n premi sant jordi
3 a 2n premi sant jordi3 a 2n premi sant jordi
3 a 2n premi sant jordicimioms
 
πασχαλινη καρτα
πασχαλινη καρταπασχαλινη καρτα
πασχαλινη καρταAnnet Dome
 

Viewers also liked (15)

The Jam Methodology by Claro Partners
The Jam Methodology by Claro PartnersThe Jam Methodology by Claro Partners
The Jam Methodology by Claro Partners
 
Chude01_nhom16
Chude01_nhom16 Chude01_nhom16
Chude01_nhom16
 
Gruenberg relacion-indigena-naturaleza-2003
Gruenberg relacion-indigena-naturaleza-2003Gruenberg relacion-indigena-naturaleza-2003
Gruenberg relacion-indigena-naturaleza-2003
 
Parallel Datalog Reasoning in RDFox Presentation
Parallel Datalog Reasoning in RDFox PresentationParallel Datalog Reasoning in RDFox Presentation
Parallel Datalog Reasoning in RDFox Presentation
 
Beehive Homes Franchise Infomation PDF
Beehive Homes Franchise Infomation PDFBeehive Homes Franchise Infomation PDF
Beehive Homes Franchise Infomation PDF
 
Metodos de avances tecnologicos de la anticoncepcion
Metodos de avances tecnologicos de la anticoncepcionMetodos de avances tecnologicos de la anticoncepcion
Metodos de avances tecnologicos de la anticoncepcion
 
Experimentado Con Vasos Sonoros
Experimentado Con Vasos SonorosExperimentado Con Vasos Sonoros
Experimentado Con Vasos Sonoros
 
Ancillary texts
Ancillary textsAncillary texts
Ancillary texts
 
Temario 8vo
Temario 8voTemario 8vo
Temario 8vo
 
Shooting 2
Shooting 2Shooting 2
Shooting 2
 
Practica2
Practica2Practica2
Practica2
 
Jefri
JefriJefri
Jefri
 
3 a 2n premi sant jordi
3 a 2n premi sant jordi3 a 2n premi sant jordi
3 a 2n premi sant jordi
 
πασχαλινη καρτα
πασχαλινη καρταπασχαλινη καρτα
πασχαλινη καρτα
 
Tensor
TensorTensor
Tensor
 

20141019 Han Show Tech sched

  • 1.                                                                         Stage  preset   Open Closed Dry   Wet Dry Wet Other 21:30 21:30 21:30 22:00 22:00 22:00 22:30 22:30 22:30 23:00 23:00 23:00 23:30 23:30 23:30 Stage  preset   Open Closed Dry   Wet Dry Wet Other 00:00 00:00 00:00 00:30 00:30 00:30 01:00 01:00 1 01:00 01:30 01:30 01:30 02:00 02:00 2 02:00 02:30 02:30 02:30 03:00 03:00 3 03:00 03:30 03:30 03:30 04:00 04:00 4 04:00 04:30 04:30 04:30 05:00 05:00 5 05:00 05:00 05:30 05:30 05:30 Dry Wet Other 05:30 06:00 06:00 6 06:00 1 06:00 06:30 06:30 06:30 06:30 07:00 07:00 7 07:00 2 07:00 07:30 07:30 07:30 07:30 08:00 08:00 8 08:00 08:00 08:30 08:30 08:30 3 08:30 09:00 09:00 9 09:00 09:00 09:30 09:30 09:30 4 09:30 10:00 10:00 10:00 10:00 10:30 10:30 10:30 5 10:30 11:00 11:00 11:00 11:00 11:30 11:30 11:30 11:30 12:00 12:00 12:00 12:00 12:30 12:30 12:30 6 12:30 13:00 13:00 13:00 13:00 13:30 13:30 13:30 7 13:30 14:00 14:00 14:00 14:00 14:30 14:30 14:30 8 14:30 15:00 15:00 15:00 15:00 15:30 15:30 15:30 9 15:30 16:00 16:00 16:00 16:00 16:30 16:30 16:30 10 16:30 17:00 17:00 17:00 17:00 17:30 17:30 17:30 17:30 18:00 18:00 18:00 18:00 18:30 18:30 18:30 18:30 19:00 19:00 19:00 19:00 19:30 19:30 19:30 19:30 20:00 20:00 20:00 20:00 20:30 20:30 20:30 20:30 21:00 21:00 21:00 21:00 21:30 21:30 21:30 21:30 22:00 22:00 22:00 22:00 22:30 22:30 22:30 22:30 23:00 23:00 23:00 23:00 23:30 23:30 23:30 23:30 00:00 00:00 00:00 00:00 00:30 00:30 00:30 00:30 2D  jets  synchro  and   commissioning    -­‐  HJC 20141019  -­‐  Sunday,  October  19,  2014 Saturday  Evening,  October  18 Seats Lift All  at  +0 Water  and  Flame   Focus,  TBD  with   Projection Preset Water  SFX Water  SFX Seats Lift Overnight Day Filling  grease  to   guide  rollers  under   lifting  seat   cylindars;  and   reinforcement  and   welding  at  the   connection   between  cylinder   sleeves  and   structures  of  lifting   seats-­‐  BSEDI Cable  tray   installation  at  rear   wall  -­‐  Starlight Intercom  Out Flame  effect  test  -­‐   XCC  (until  0200) V2  safe  edges  -­‐   Dafeng  (until   0200) Remove  and  repair   Mondo  as  needed   on  wet  lifts  -­‐   Quisheng Solenoid  valve   synchro  of  dry/wet   rain  and    FOW   (0200  -­‐  0800) Fixed  seat  lights   install  and  seat   adjustment  -­‐   Dafeng RAs  Resistanace   install  for  all   encoders  of  RAs-­‐   BSEDI RA1  Cleaning  -­‐   BSEDI RA1   Commissioning,   screen  adjst.,     cable  mgt  -­‐  Lopu V10,  L9,  CL   @  -­‐3m;   others  at  +0 Dafeng Vom  2,  10   and  apron   @  -­‐1.5m;     all  others   +0 Reinforcement  and   welding  in  lifting   seats  -­‐  BSEDI  (to   23:59) Wet  rain  focus  -­‐  HJC Requires  grid  and  house  work   lights  (until  0800) Water  SFX Lisa  Schultz  Smith 185-­‐7147-­‐7944 Chain  Mail  install Testing  water  and   SFX  together  -­‐  HJC Lighting  and  seat   adjustment  -­‐  fixed   seats  -­‐  Dafeng   Filling  grease  in  guild   rails  on  lifting  seats  -­‐   BSEDI Safety  edge  of  Apron-­‐ Dafeng Apron  @   +0;  All   others  @  -­‐  1.5m RA  encoders  -­‐  BSEDI Cable  trays  install  at   rear  wall  -­‐  Starlight LED  screen   commissioning  and   maintenance  -­‐  Lopu