20141019 Han Show Tech sched
- 1.
Stage
preset
Open Closed Dry
Wet Dry Wet Other
21:30 21:30 21:30
22:00 22:00 22:00
22:30 22:30 22:30
23:00 23:00 23:00
23:30 23:30 23:30
Stage
preset
Open Closed Dry
Wet Dry Wet Other
00:00 00:00 00:00
00:30 00:30 00:30
01:00 01:00 1 01:00
01:30 01:30 01:30
02:00 02:00 2 02:00
02:30 02:30 02:30
03:00 03:00 3 03:00
03:30 03:30 03:30
04:00 04:00 4 04:00
04:30 04:30 04:30
05:00 05:00 5 05:00 05:00
05:30 05:30 05:30 Dry Wet Other 05:30
06:00 06:00 6 06:00 1 06:00
06:30 06:30 06:30 06:30
07:00 07:00 7 07:00 2 07:00
07:30 07:30 07:30 07:30
08:00 08:00 8 08:00 08:00
08:30 08:30 08:30 3 08:30
09:00 09:00 9 09:00 09:00
09:30 09:30 09:30 4 09:30
10:00 10:00 10:00 10:00
10:30 10:30 10:30 5 10:30
11:00 11:00 11:00 11:00
11:30 11:30 11:30 11:30
12:00 12:00 12:00 12:00
12:30 12:30 12:30 6 12:30
13:00 13:00 13:00 13:00
13:30 13:30 13:30 7 13:30
14:00 14:00 14:00 14:00
14:30 14:30 14:30 8 14:30
15:00 15:00 15:00 15:00
15:30 15:30 15:30 9 15:30
16:00 16:00 16:00 16:00
16:30 16:30 16:30 10 16:30
17:00 17:00 17:00 17:00
17:30 17:30 17:30 17:30
18:00 18:00 18:00 18:00
18:30 18:30 18:30 18:30
19:00 19:00 19:00 19:00
19:30 19:30 19:30 19:30
20:00 20:00 20:00 20:00
20:30 20:30 20:30 20:30
21:00 21:00 21:00 21:00
21:30 21:30 21:30 21:30
22:00 22:00 22:00 22:00
22:30 22:30 22:30 22:30
23:00 23:00 23:00 23:00
23:30 23:30 23:30 23:30
00:00 00:00 00:00 00:00
00:30 00:30 00:30 00:30
2D
jets
synchro
and
commissioning
-‐
HJC
20141019
-‐
Sunday,
October
19,
2014
Saturday
Evening,
October
18
Seats Lift
All
at
+0
Water
and
Flame
Focus,
TBD
with
Projection
Preset
Water
SFX
Water
SFX
Seats Lift Overnight
Day
Filling
grease
to
guide
rollers
under
lifting
seat
cylindars;
and
reinforcement
and
welding
at
the
connection
between
cylinder
sleeves
and
structures
of
lifting
seats-‐
BSEDI
Cable
tray
installation
at
rear
wall
-‐
Starlight
Intercom
Out Flame
effect
test
-‐
XCC
(until
0200)
V2
safe
edges
-‐
Dafeng
(until
0200)
Remove
and
repair
Mondo
as
needed
on
wet
lifts
-‐
Quisheng
Solenoid
valve
synchro
of
dry/wet
rain
and
FOW
(0200
-‐
0800)
Fixed
seat
lights
install
and
seat
adjustment
-‐
Dafeng
RAs
Resistanace
install
for
all
encoders
of
RAs-‐
BSEDI
RA1
Cleaning
-‐
BSEDI
RA1
Commissioning,
screen
adjst.,
cable
mgt
-‐
Lopu
V10,
L9,
CL
@
-‐3m;
others
at
+0
Dafeng
Vom
2,
10
and
apron
@
-‐1.5m;
all
others
+0
Reinforcement
and
welding
in
lifting
seats
-‐
BSEDI
(to
23:59)
Wet
rain
focus
-‐
HJC
Requires
grid
and
house
work
lights
(until
0800)
Water
SFX
Lisa
Schultz
Smith
185-‐7147-‐7944
Chain
Mail
install
Testing
water
and
SFX
together
-‐
HJC
Lighting
and
seat
adjustment
-‐
fixed
seats
-‐
Dafeng
Filling
grease
in
guild
rails
on
lifting
seats
-‐
BSEDI
Safety
edge
of
Apron-‐
Dafeng
Apron
@
+0;
All
others
@
-‐
1.5m
RA
encoders
-‐
BSEDI
Cable
trays
install
at
rear
wall
-‐
Starlight
LED
screen
commissioning
and
maintenance
-‐
Lopu