FSAE
- 4. Measuring height from driver’s helmet to the point to point distance from the
highest points of the roll hoops.
- 5. Creating a flat plane to build a jig.
Placing the jig mounts to start building the chassis.
- 6. Chassis built with A-arms and uprights bolted into place.
Mock frame to test the adhesion of the aircraft fabric to the tubes.
- 7. Glue being applied to the mock frame.
Waiting a few minutes before applying the aircraft fabric.