SlideShare a Scribd company logo
1 of 4
Download to read offline
Jojo B. Santiago
Page 1 of 4
Work Experiences :
 October 5, 2008 to Present : Site Engineer
Habtoor Leighton Group
Al Habtoor Leighton LLC
P.O. Box 10869, Dubai, U.A.E.
PROJECTS UNDERTAKEN:
SHEIKH SHAKHBOUT MEDICAL CITY (SITE HLMR-835)
732 Bed General Hospital (Out-Patient Clinical Unit 2B+G+2), (2 In-Patient 2B+G+9),
(2 In-Patient 2B+G+11), Annex Building (2B+G+4)
SEHA Project – Al Mafraq, Abu Dhabi, UAE (March 2014 – onwards)
CONSTRUCTION OF QUSAHWIRA PROJECT and SERVICES (SITE 281)
ADCO (Abu Dhabi Company for Onshore Oil Operation) (Oct 2012 to Dec. 2014)
(1yr. 5mos)
THE LANDMARK TOWER PROJECT (SITE HC-1000)
Residential, Commercial & Offices
(LOT C20-C21) W5 P.O. Box 109488
Corniche Road, Abu Dhabi (Jan 2011 to Sept 2012) (1yr. 8mos)
BUILDINGS BY DAMAN (SITE 620)
Residential, Commercial & Offices Complex
Plot No. PA 03/04, D.I.F.C. (April 2010 to Sept 2010) (6mos.)
EMERALD PALACE - KEMPINSKI RESIDENCES (SITE 607)
Hotel, Apartments and Villas
Palm Jumeirah, Dubai (Oct. 2008 to March 2010) (1yr. 6mos.)
Duties and Responsibilities :
 Interpret and executes approved shop drawing, method of statement and specification, as per
contract.
 To organize the work at site in accordance to the daily, weekly plan in order to ensure productivity
and quality is achieved based on the project schedule.
 Monitor the progress of the construction activities on a regular basis and hold regular status
meetings with all the sub-teams (Mechanical, Electrical, Plumbing, etc).
 Prepares progress report at site to the Project Manager on regular basis – highlighting the
requirements on site, material, labor, possible delays, etc.
 Prepare necessary documents for inspection to be submitted to the consultant.
 Evaluate and resolve any discrepancies on Architectural, Electrical, Mechanical, Plumbing, and
problems arising during construction which affect the quality of works performed
 Prepare estimate for balance materials during finishing stage. And ensure to have spare materials
during handing over of the project. Ensuring that all materials used at site are as per specifications.
 To execute all the works in accordance to the safety regulations and environment measures in
order to prevent any accident or injury to happen.
Citizenship : Filipino
Marital Status : Married
Dependent : 2
E-mail Address : jojosantiago04@yahoo.com
Contact Number : +97156-604-7335
Current Address : Electra, Tourist Club, Abu Dhabi, UAE
Home Address : Malapit, San Isidro, Nueva Ecija,
Philippines, 3106
Passport Number : EB4998685
UAE Driver’s License : 2234388
Jojo B. Santiago
Page 2 of 4
 February 27, 2008 to October 3, 2008 : Finishing Engineer
Megawide Construction Corporation
#66 Sct. De Guia, Cor. Sct. Tobias,
Brgy. Laging Handa, Quezon City,
Philippines
PROJECTS UNDERTAKEN:
BELLEVUE EXECUTIVE TOWER
22 Storey Commercial Building w/ 4 Basement
North Bridgeway, Northgate Cyberzone,
Alabang, Muntinlupa City
 May 2, 2006 to January 25, 2008 : Project In-Charge
D.A.Q. NICOLAS & Associates
010 VIR Bulilding, E. Rodriguez Avenue
Cubao, Quezon City, Philippines
PROJECTS UNDERTAKEN:
AYALA GREENFIELDS ESTATES
Calamba Laguna, Philippines
 PUSAG RESIDENCE
2 Storey Residential Building
Inclusive Dates: May 2, 2006 to August 4, 2006
 CRAGG RESIDENCE
2 Storey Residential Building
Inclusive Dates: July 21, 2006 to October 7, 2006
 KAMPF RESIDENCE
2 Storey Residential Building
Inclusive Dates: September 6, 2006 to November 30 2006
 CRUZ RESIDENCE
2 Storey Residential Building
Inclusive Dates: February 17, 2007 to January 25, 2008
 EXCONDE RESIDENCE
2 Storey Residential Building with basement
Inclusive Dates: November 15, 2007 to January 25, 2008
 NAVEA RESIDENCE
2 Storey Residential Building with basement
Inclusive Dates: August 28, 2007 to January 25, 2008
 TANJANCO RESIDENCE
2 Storey Residential Building with basement
Inclusive Dates: January 2, 2006 to February 16, 2007
AYALA WESTGROVE HEIGHTS
Silang Cavite, Philippines
 PASCUAL RESIDENCE
2 Storey Residential Building with basement
Inclusive Dates: October 28, 2006 to February 24, 2007
 HEVENER RESIDENCE
2 Storey Residential Building with basement
Inclusive Dates: June 18, 2007 to January 25, 2008
Jojo B. Santiago
Page 3 of 4
PALMS POINTE FILINVEST
Alabang MuntinlupaCity, Philippines
 BUTLER RESIDENCE
2 Storey Residential Building
Inclusive Dates: November 15, 2006 to December 7, 2006
 HUMANA WELLNESS CENTER
4 Storey Commercial Building with basement
Inclusive Dates: July 2, 2007 up to September 12, 2007
Duties and Responsibilities :
 Supervision of the project/s and ensure that work shown on the AFC Drawings and described on
Specifications should be followed in faithful manner and in conformity with all Contract documents.
 Check and examine all materials proposed to be used in the project/s and to ascertain that the
same are in accordance with the plans/ specifications and conform to the Designer’s requirements.
 Review and check all construction plans for any possible variation considering the following:
Structural and Architectural, Electrical, Mechanical, Fire protection and Sanitary/ Plumbing works
and make recommendation if necessary for approval by the designers and the owner itself.
 Monitor the progress of the work to determine that it is completely in accordance with time duration
based on construction general schedule of the project.
 Check and monitor all labor and materials used that may lead variations to original work, the
objective is to ascertain the contractor’s claim for any addition and deduction to the contract
 Responsible for the evaluation of Contractor’s accomplishment including preparation of monthly
executive and over-all status report of the project.
 Prepare, coordinate and monitor delivery schedules of Owner-furnished materials and ensure same
are properly documented and stored properly to warehouse/lay-down areas.
Trainings / Seminars Attended:
 Construction Safety Essentials (CSE) (13 Modules)
Philippine Society of Safety Professionals PSSP-Abu Dhabi UAE
August 29, 2014
 One-Day British Safety Council’s Certificate in Risk Assessment Level 2
Al Habtoor Engineering Training Center
August 13, 2009
 Job Hazard Analysis
Al Habtoor Engineering Training Center
July 7, 2009
 Passive Fire Protection Technology Seminar
Bellevue Manila Tower - North Bridgeway, Northgate Cyberzone,
Alabang Muntinlupa City - May 8, 2008
 Post - Installed Anchor Technology Seminar
Bellevue Manila Tower - North Bridgeway, Northgate Cyberzone,
Alabang Muntinlupa City - September 8, 2007
 Orientation Seminar on REBAR WORKS, FORM WORKS, and CONCRETE WORKS
CMDC – Bo. Salawag, Dasmariñas, Cavite - February 4-6, 2004
 Orientation Seminar on Waste and Water Management,
Subic Bay, Olongapo City - October 2, 2003
 PICE Seminar on Computer Aided Structural Analysis and Design of Structure
NEUST School Library - March 25, 2003
Jojo B. Santiago
Page 4 of 4
 March 7, 2005 to May 1, 2006 : Loan Technician
Bangko Luzon Inc.
Poblacion, San Isidro, Nueva Ecija
Philippines
Duties and Responsibilities :
 Occasionally process loan applications and facilitate salary loan releases.
 Check signatures of loan committee and the dates of release and maturity on the day it was
granted.
 Maintain good relation with clients. Properly coordination and approach.
 Liable for delivering progress report on associate companies.
 Liable for receiving and withdrawing Manager’s check and other related checks.
 To monitor accounts with maturing obligations for the present and coming months.
 Recommends delinquent accounts for litigation or court action after one month of due or after 3
visitation, or upon failing to fulfill an agreed promise/compromise.
Educational Background:
Bachelor of Science in Civil Engineering (BSCE)
Nueva Ecija University of Science and Technology
Poblacion, San Isidro, Nueva Ecija
1999 - 2004
General de Jesus Colleges
Poblacion, San Isidro, Nueva Ecija
1995 - 1999
San Isidro Elementary School
Poblacion, San Isidro, Nueva Ecija
1989 - 1995
Organization Affiliation:
PICE Member – Philippine Institute of Civil Engineers
Technical Skills:
Knowledge in the use of Personal Computers and Software Applications, Microsoft Excel, Word,
Power point, Outlook, Autocad 2007, Aconex, Adobe Photoshop Basic.
I hereby certify that the above information is true and correct to the best of my knowledge
and belief.
JOJO B. SANTIAGO
Applicant

More Related Content

Similar to CV_Jojo B. Santiago

Similar to CV_Jojo B. Santiago (20)

Richard castro_CV
Richard castro_CVRichard castro_CV
Richard castro_CV
 
Jozwel cv
Jozwel cvJozwel cv
Jozwel cv
 
Marlon CV Updated
Marlon CV UpdatedMarlon CV Updated
Marlon CV Updated
 
Curriculum Vitae_BBU_Updated_3-5-2016_new
Curriculum Vitae_BBU_Updated_3-5-2016_newCurriculum Vitae_BBU_Updated_3-5-2016_new
Curriculum Vitae_BBU_Updated_3-5-2016_new
 
Updated CV Roberto_Salvio
Updated CV Roberto_SalvioUpdated CV Roberto_Salvio
Updated CV Roberto_Salvio
 
Harley's CV1
Harley's  CV1Harley's  CV1
Harley's CV1
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae lim
 
olafare michael CV2
olafare michael CV2olafare michael CV2
olafare michael CV2
 
Harley's cv
Harley's  cvHarley's  cv
Harley's cv
 
Harley's cv
Harley's  cvHarley's  cv
Harley's cv
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
Updated CV as of May 6, 2016
Updated CV as of May 6, 2016Updated CV as of May 6, 2016
Updated CV as of May 6, 2016
 
CV OF MVV
CV OF MVVCV OF MVV
CV OF MVV
 
curriculum vitae 1.1nw
curriculum vitae 1.1nwcurriculum vitae 1.1nw
curriculum vitae 1.1nw
 
Updated CV Nov 26 2015
Updated CV Nov 26 2015Updated CV Nov 26 2015
Updated CV Nov 26 2015
 
Ajay Surendran
Ajay SurendranAjay Surendran
Ajay Surendran
 
CURRICULUM VITAE - Allan Jingo november 2015
CURRICULUM VITAE - Allan Jingo november 2015CURRICULUM VITAE - Allan Jingo november 2015
CURRICULUM VITAE - Allan Jingo november 2015
 
Teogenes Masas CV . (1)
Teogenes Masas CV . (1)Teogenes Masas CV . (1)
Teogenes Masas CV . (1)
 
RESUME
RESUMERESUME
RESUME
 
ANNA CRISELLE FADRIQUELA -updated (1) 2
ANNA CRISELLE FADRIQUELA -updated (1) 2ANNA CRISELLE FADRIQUELA -updated (1) 2
ANNA CRISELLE FADRIQUELA -updated (1) 2
 

CV_Jojo B. Santiago

  • 1. Jojo B. Santiago Page 1 of 4 Work Experiences :  October 5, 2008 to Present : Site Engineer Habtoor Leighton Group Al Habtoor Leighton LLC P.O. Box 10869, Dubai, U.A.E. PROJECTS UNDERTAKEN: SHEIKH SHAKHBOUT MEDICAL CITY (SITE HLMR-835) 732 Bed General Hospital (Out-Patient Clinical Unit 2B+G+2), (2 In-Patient 2B+G+9), (2 In-Patient 2B+G+11), Annex Building (2B+G+4) SEHA Project – Al Mafraq, Abu Dhabi, UAE (March 2014 – onwards) CONSTRUCTION OF QUSAHWIRA PROJECT and SERVICES (SITE 281) ADCO (Abu Dhabi Company for Onshore Oil Operation) (Oct 2012 to Dec. 2014) (1yr. 5mos) THE LANDMARK TOWER PROJECT (SITE HC-1000) Residential, Commercial & Offices (LOT C20-C21) W5 P.O. Box 109488 Corniche Road, Abu Dhabi (Jan 2011 to Sept 2012) (1yr. 8mos) BUILDINGS BY DAMAN (SITE 620) Residential, Commercial & Offices Complex Plot No. PA 03/04, D.I.F.C. (April 2010 to Sept 2010) (6mos.) EMERALD PALACE - KEMPINSKI RESIDENCES (SITE 607) Hotel, Apartments and Villas Palm Jumeirah, Dubai (Oct. 2008 to March 2010) (1yr. 6mos.) Duties and Responsibilities :  Interpret and executes approved shop drawing, method of statement and specification, as per contract.  To organize the work at site in accordance to the daily, weekly plan in order to ensure productivity and quality is achieved based on the project schedule.  Monitor the progress of the construction activities on a regular basis and hold regular status meetings with all the sub-teams (Mechanical, Electrical, Plumbing, etc).  Prepares progress report at site to the Project Manager on regular basis – highlighting the requirements on site, material, labor, possible delays, etc.  Prepare necessary documents for inspection to be submitted to the consultant.  Evaluate and resolve any discrepancies on Architectural, Electrical, Mechanical, Plumbing, and problems arising during construction which affect the quality of works performed  Prepare estimate for balance materials during finishing stage. And ensure to have spare materials during handing over of the project. Ensuring that all materials used at site are as per specifications.  To execute all the works in accordance to the safety regulations and environment measures in order to prevent any accident or injury to happen. Citizenship : Filipino Marital Status : Married Dependent : 2 E-mail Address : jojosantiago04@yahoo.com Contact Number : +97156-604-7335 Current Address : Electra, Tourist Club, Abu Dhabi, UAE Home Address : Malapit, San Isidro, Nueva Ecija, Philippines, 3106 Passport Number : EB4998685 UAE Driver’s License : 2234388
  • 2. Jojo B. Santiago Page 2 of 4  February 27, 2008 to October 3, 2008 : Finishing Engineer Megawide Construction Corporation #66 Sct. De Guia, Cor. Sct. Tobias, Brgy. Laging Handa, Quezon City, Philippines PROJECTS UNDERTAKEN: BELLEVUE EXECUTIVE TOWER 22 Storey Commercial Building w/ 4 Basement North Bridgeway, Northgate Cyberzone, Alabang, Muntinlupa City  May 2, 2006 to January 25, 2008 : Project In-Charge D.A.Q. NICOLAS & Associates 010 VIR Bulilding, E. Rodriguez Avenue Cubao, Quezon City, Philippines PROJECTS UNDERTAKEN: AYALA GREENFIELDS ESTATES Calamba Laguna, Philippines  PUSAG RESIDENCE 2 Storey Residential Building Inclusive Dates: May 2, 2006 to August 4, 2006  CRAGG RESIDENCE 2 Storey Residential Building Inclusive Dates: July 21, 2006 to October 7, 2006  KAMPF RESIDENCE 2 Storey Residential Building Inclusive Dates: September 6, 2006 to November 30 2006  CRUZ RESIDENCE 2 Storey Residential Building Inclusive Dates: February 17, 2007 to January 25, 2008  EXCONDE RESIDENCE 2 Storey Residential Building with basement Inclusive Dates: November 15, 2007 to January 25, 2008  NAVEA RESIDENCE 2 Storey Residential Building with basement Inclusive Dates: August 28, 2007 to January 25, 2008  TANJANCO RESIDENCE 2 Storey Residential Building with basement Inclusive Dates: January 2, 2006 to February 16, 2007 AYALA WESTGROVE HEIGHTS Silang Cavite, Philippines  PASCUAL RESIDENCE 2 Storey Residential Building with basement Inclusive Dates: October 28, 2006 to February 24, 2007  HEVENER RESIDENCE 2 Storey Residential Building with basement Inclusive Dates: June 18, 2007 to January 25, 2008
  • 3. Jojo B. Santiago Page 3 of 4 PALMS POINTE FILINVEST Alabang MuntinlupaCity, Philippines  BUTLER RESIDENCE 2 Storey Residential Building Inclusive Dates: November 15, 2006 to December 7, 2006  HUMANA WELLNESS CENTER 4 Storey Commercial Building with basement Inclusive Dates: July 2, 2007 up to September 12, 2007 Duties and Responsibilities :  Supervision of the project/s and ensure that work shown on the AFC Drawings and described on Specifications should be followed in faithful manner and in conformity with all Contract documents.  Check and examine all materials proposed to be used in the project/s and to ascertain that the same are in accordance with the plans/ specifications and conform to the Designer’s requirements.  Review and check all construction plans for any possible variation considering the following: Structural and Architectural, Electrical, Mechanical, Fire protection and Sanitary/ Plumbing works and make recommendation if necessary for approval by the designers and the owner itself.  Monitor the progress of the work to determine that it is completely in accordance with time duration based on construction general schedule of the project.  Check and monitor all labor and materials used that may lead variations to original work, the objective is to ascertain the contractor’s claim for any addition and deduction to the contract  Responsible for the evaluation of Contractor’s accomplishment including preparation of monthly executive and over-all status report of the project.  Prepare, coordinate and monitor delivery schedules of Owner-furnished materials and ensure same are properly documented and stored properly to warehouse/lay-down areas. Trainings / Seminars Attended:  Construction Safety Essentials (CSE) (13 Modules) Philippine Society of Safety Professionals PSSP-Abu Dhabi UAE August 29, 2014  One-Day British Safety Council’s Certificate in Risk Assessment Level 2 Al Habtoor Engineering Training Center August 13, 2009  Job Hazard Analysis Al Habtoor Engineering Training Center July 7, 2009  Passive Fire Protection Technology Seminar Bellevue Manila Tower - North Bridgeway, Northgate Cyberzone, Alabang Muntinlupa City - May 8, 2008  Post - Installed Anchor Technology Seminar Bellevue Manila Tower - North Bridgeway, Northgate Cyberzone, Alabang Muntinlupa City - September 8, 2007  Orientation Seminar on REBAR WORKS, FORM WORKS, and CONCRETE WORKS CMDC – Bo. Salawag, Dasmariñas, Cavite - February 4-6, 2004  Orientation Seminar on Waste and Water Management, Subic Bay, Olongapo City - October 2, 2003  PICE Seminar on Computer Aided Structural Analysis and Design of Structure NEUST School Library - March 25, 2003
  • 4. Jojo B. Santiago Page 4 of 4  March 7, 2005 to May 1, 2006 : Loan Technician Bangko Luzon Inc. Poblacion, San Isidro, Nueva Ecija Philippines Duties and Responsibilities :  Occasionally process loan applications and facilitate salary loan releases.  Check signatures of loan committee and the dates of release and maturity on the day it was granted.  Maintain good relation with clients. Properly coordination and approach.  Liable for delivering progress report on associate companies.  Liable for receiving and withdrawing Manager’s check and other related checks.  To monitor accounts with maturing obligations for the present and coming months.  Recommends delinquent accounts for litigation or court action after one month of due or after 3 visitation, or upon failing to fulfill an agreed promise/compromise. Educational Background: Bachelor of Science in Civil Engineering (BSCE) Nueva Ecija University of Science and Technology Poblacion, San Isidro, Nueva Ecija 1999 - 2004 General de Jesus Colleges Poblacion, San Isidro, Nueva Ecija 1995 - 1999 San Isidro Elementary School Poblacion, San Isidro, Nueva Ecija 1989 - 1995 Organization Affiliation: PICE Member – Philippine Institute of Civil Engineers Technical Skills: Knowledge in the use of Personal Computers and Software Applications, Microsoft Excel, Word, Power point, Outlook, Autocad 2007, Aconex, Adobe Photoshop Basic. I hereby certify that the above information is true and correct to the best of my knowledge and belief. JOJO B. SANTIAGO Applicant