PPT Schedule
1. Apr. 29
Removed
Apr20
-1F-1
People routeway
Cargo routeway
Staircase
AccommodationArea
1F-1
1F-4
1F-2
Site Plan
1F-31.5F-1
1.5F-2
2F-1
-1F-2
Discharge platform, to be
remove on Apr 20
Elevator, to be
remove on Apr 23Apr 27 to
May 20
Apr 20 to
May 10
May 1 to May 20
Apr 20 to
May 5
Apr 30 to
May 20
May 10 to
May 25
Fence
Access No. Size Period in use
-1F-1 1500×2100 Permanent
-1F-2 / Present - Apr 30
1F-1 2600×3100 Permanent
1F-2 2000×2100 Permanent
1F-3 5600×2650 Permanent
1F-4 3000×2100 Permanent
1F - 5 3200×3200
(8)
After May 27
Temporary After May 15
1.5F-1 / Present - Apr 29
1.5F-2 / Present - Apr 25
2F-1 3000×2100 Permanent
1F-5
Apr 21 to 30
Apr 26 to May 5
Apr 30 to May 9
Apr 30 to May 10
Apr 26 to May 5
Apr 29 to 30
Apr 18 to 20
3. Control Milestones
Construction
o MEP T&C, May 5, 2013 – May 12, 2013
o Steel Staircase, May 10, 2013
o Road, Apr 21 – May 20
o Self- leveling, Apr 30, 2013
o Elevator/escalator, Apr 10, 2013 – Jun 20, 2013
( - including license obtained; - first 2 ready to use by May 27)
o IT ready for use, Apr 27, 2013
Utilities
o Water Supply, Apr 30, 2013
o Power Supply, Apr 30, 2103
o Yixing Road, Mar 20 – May 20
o YiYuan Road , Sep, 2013
Fire Testing and Commissioning
o Sub-system/pipeline testing, Apr.4, 2013 – Apr.30, 2013
o Interlock Testing, May 1, 2013 – May 15, 2013
o Third Part Testing, May 15, 2013 – May 19 2013
o Fire Bureau Submission, May 20, 2013.
o Obtain Fire Acceptance Report, Jun 10, 2013
RFO - Apr 18 , 2013 – Jun 18, 2013
o Lower Rack delivery to site, Apr 16, 2013
o High Racks delivery to site, Apr 15, 2013
CBU May 27, 2013
4. South car lane
Apr. 27
市政配套要求
Utility
宜家商场
IKEA Store
WestCarLane
Apr9
南侧道路 卸货区 SouthRoad/Loading Area
Apr.1 - May 2, 2013
东侧道路EastRoad
施工周期4月7日到5月7日
西侧道路WestRoad
施工周期4月2日到5月2日
宜兴路 Yixing road
施工周期 3月15日到5月15日
Steel Staircase, May. 20, 2013
北侧道路 North Road
施工周期 3月30日到4月30日
1st line Optical
第一路电讯光纤接入
3月15日前
两路供电接入
2 line incoming power
4月20日前
第一路自来水接入
1st water pipe
3月下旬
Water Drainage pipe link point
雨水/污水管线施工,需要
宜园路接口位置和标高
4月中旬 mid Apr.
第二路自来水接入
2nd water pipe
5月20日前
宜园路
Backup Optical
第二路电讯光纤接入
6月30日前
Water Drainage
雨水/污水排放
5月10日前可以接入
市政管网
5. Steel Staircase
Main structure finished 2013.01.31
South car lane
ST14/15(790y/z)
Finished
ST1/2(790a/b)
Finished
ST25/26(790aa/bb)
Foundation: Apr 20 to 30
Installation: Apr 30 to May 3
ST3/4(790c/d)
Foundation: Apr 20 to 30
Installation: Apr 30 to May 10
ST5/6(790e/f)
Finished
ST27/28(790g/k)
Finished
ST7/8/9(790h/i/j)
Foundation: Finished
Installation: Mar 23 to Apr 10
ST16/17(790yy/zz)
Foundation: Feb 28 to Mar 17
Installation: Apr 5 to 18
ST10/11(790m/n)
Foundation: Finished
Installation: Mar 21 to 30
ST18/19(790p/q)
Finished
ST12/13(790r/s)
Foundation: Apr17 to 25
Installation: Apr 26 to May 5
ST24(790t)
Foundation: Finished
Installation: Apr 29 to 30
ST22/23(790u/v)
Foundation: Apr 17 to 25
Installation: Mar 26 to May 5
ST20/21(790w/x)
Foundation: Finished
Installation: Apr 18 to 20
6. 1 5 8 11
R
M
B
A
1 5 8 11
R
M
B
A
1st Flr Flooring Plan
Legend:
Wear-resistant
self-leveling
Ordinary
self-leveling
Apr 1 to 15Apr 6 to 20Apr 16 to 30
Concrete untreated
Apr 21 to May 10
Include mezzanine floor
Done
7. 2nd Flr Flooring Plan
Legend:
PVC tile
Ordinary
self-leveling
Apr 6 to 20
Concrete untreated
Apr 14 to 26
Apr 3 to 16
Done
CFO/RFO
Others
Apr 26 to May 10
1 5 8 11
R
M
B
A
1 5 8 11
R
M
B
A