1. The large scale Cryogenic insulation shutdown
package with over 14,000 man hours was
delivered on schedule within agreed Target
Cost also achieving 0 accidents or incidents ,
Photo of the plant looking North.
James Tumilty Insulation Shutdown Manager
2. Wilton/Teesside
This manufacturing business operates a world-scale cracker,
which is going to be modified into a gas cracker using shale
gas-based feedstock coming from the US, and a 400 ktpa low
density polyethylene (LDPE) plant at Wilton. There is also an
Aromatics complex at North Tees and an ethylene liquefaction
facility. Beside this there are substantial logistical facilities at
Wilton and North Tees, including major storage capacity, a
cross-country pipelines network, and substantial distribution
and shipping services.