708 Engine failure
The 708 came from SSYD with a # 2
Equipment Blower problem. When
started to check # 2 blower the diesel
was found to be making unusual
noises, it was immediately shut down
and inspected.
The inspection reveal that the R6 forward cam flange and R6 cam
journal had broken and separated.
Further inspection revealed that the R7 cam bearing had failed and
turned in the bore.
Measurement of the damaged R7 cam bore revealed the diameter to
be 5.492”-5.496”. GEK29341F specifies that this dimension should be
5.4985”-5.501”
An automotive cylinder hone was used to resized the R7 bore to
5.4995”. New bearings were installed in the R6 & R7 positions. Bore
misalignment was indicated as shown and found to be .005” vertical
and .003” horizontal. GEK 29341F specifies this tolerance to be .0045”
with the block supported at 4 points. These measurements were taken
with the rear of the assembled engine supported by the alternator.
New journals and cams were then installed in the engine. The cam
spins freely. Measurements of the oil clearance between the R7 cam
and journal were taken with feeler gauges passed between journal and
bearing on the crankcase and gear side. These measurements reveal
that the restored #7 cam bearing bore and subsequently the bearing
are “out of square” by as much as .010” with the cam and the rest of
the bearings. There is no tolerance specified in GEK 29341F to
address this condition.
There is .010” clearance at the 6 o’clock position on the crankcase side
of the #7 bearing and essentially none at the 12 o’clock position. On
the gear side there is .008” clearance at the 12 o’clock position, and .
002” at the 6 o’clock position.
Reference marks were filed in the R6 & R7 cam bearings to provide an
indication of the condition of the press fit of the new bearings installed
at these locations.
The repaired engine was installed in Locomotive 700. Initial start and load test
has revealed no unusual noises. The cam bearings at R6 & R7 have remained
in place so far.
The repaired engine was installed in Locomotive 700. Initial start and load test
has revealed no unusual noises. The cam bearings at R6 & R7 have remained
in place so far.

More Related Content

Viewers also liked

Industria power point grup 9
Industria power point grup 9Industria power point grup 9
Industria power point grup 9riocidacos
 
Cuestionario
CuestionarioCuestionario
CuestionarioMILKE09
 
Inteligencia linguistica
Inteligencia linguisticaInteligencia linguistica
Inteligencia linguisticaYohanny Caman
 
THE ROLES OF INVESTMENT BANKERS IN THE MOBILIZATION OF CORPORATE FUNDS
THE ROLES OF INVESTMENT BANKERS IN THE MOBILIZATION OF CORPORATE FUNDSTHE ROLES OF INVESTMENT BANKERS IN THE MOBILIZATION OF CORPORATE FUNDS
THE ROLES OF INVESTMENT BANKERS IN THE MOBILIZATION OF CORPORATE FUNDSOluwaseun Oredein
 
FINAL_StitchLabs_InventoryVisibility_Report_v2
FINAL_StitchLabs_InventoryVisibility_Report_v2FINAL_StitchLabs_InventoryVisibility_Report_v2
FINAL_StitchLabs_InventoryVisibility_Report_v2Thomas Marks
 
Godlove research proposal
Godlove research proposalGodlove research proposal
Godlove research proposalGodylove Mmari
 
Barcelona Cara al Mar
Barcelona Cara al MarBarcelona Cara al Mar
Barcelona Cara al MarAlba Ferrer
 
Texto argumentaivo castellano
Texto argumentaivo castellanoTexto argumentaivo castellano
Texto argumentaivo castellanoMisaki Usagi
 
Hernández, itziar 3 esob
Hernández, itziar 3 esobHernández, itziar 3 esob
Hernández, itziar 3 esobMisaki Usagi
 
CASO PRACTICO Nº3 IVA
CASO PRACTICO Nº3 IVACASO PRACTICO Nº3 IVA
CASO PRACTICO Nº3 IVAOrlando Oliva
 
Ermessenda
ErmessendaErmessenda
ErmessendaMireia17
 
El síndrome del pajar
El síndrome del pajarEl síndrome del pajar
El síndrome del pajarg saavedra
 
Presentació crédit de síntesi
Presentació crédit de síntesiPresentació crédit de síntesi
Presentació crédit de síntesiMisaki Usagi
 
Contabilidad del trúput
Contabilidad del trúputContabilidad del trúput
Contabilidad del trúputeaceved5
 

Viewers also liked (19)

Industria power point grup 9
Industria power point grup 9Industria power point grup 9
Industria power point grup 9
 
Cuestionario
CuestionarioCuestionario
Cuestionario
 
Inteligencia linguistica
Inteligencia linguisticaInteligencia linguistica
Inteligencia linguistica
 
THE ROLES OF INVESTMENT BANKERS IN THE MOBILIZATION OF CORPORATE FUNDS
THE ROLES OF INVESTMENT BANKERS IN THE MOBILIZATION OF CORPORATE FUNDSTHE ROLES OF INVESTMENT BANKERS IN THE MOBILIZATION OF CORPORATE FUNDS
THE ROLES OF INVESTMENT BANKERS IN THE MOBILIZATION OF CORPORATE FUNDS
 
Base de datos 1
Base de datos 1Base de datos 1
Base de datos 1
 
FINAL_StitchLabs_InventoryVisibility_Report_v2
FINAL_StitchLabs_InventoryVisibility_Report_v2FINAL_StitchLabs_InventoryVisibility_Report_v2
FINAL_StitchLabs_InventoryVisibility_Report_v2
 
Godlove research proposal
Godlove research proposalGodlove research proposal
Godlove research proposal
 
Pwp sortida
Pwp sortidaPwp sortida
Pwp sortida
 
CEC Forest Health
CEC Forest HealthCEC Forest Health
CEC Forest Health
 
Nelson mandela
Nelson mandelaNelson mandela
Nelson mandela
 
Barcelona Cara al Mar
Barcelona Cara al MarBarcelona Cara al Mar
Barcelona Cara al Mar
 
Texto argumentaivo castellano
Texto argumentaivo castellanoTexto argumentaivo castellano
Texto argumentaivo castellano
 
Hernández, itziar 3 esob
Hernández, itziar 3 esobHernández, itziar 3 esob
Hernández, itziar 3 esob
 
CASO PRACTICO Nº3 IVA
CASO PRACTICO Nº3 IVACASO PRACTICO Nº3 IVA
CASO PRACTICO Nº3 IVA
 
Ermessenda
ErmessendaErmessenda
Ermessenda
 
El síndrome del pajar
El síndrome del pajarEl síndrome del pajar
El síndrome del pajar
 
Presentació crédit de síntesi
Presentació crédit de síntesiPresentació crédit de síntesi
Presentació crédit de síntesi
 
Contabilidad del trúput
Contabilidad del trúputContabilidad del trúput
Contabilidad del trúput
 
Partes de un proyecto de vida
Partes de un proyecto de vidaPartes de un proyecto de vida
Partes de un proyecto de vida
 

Similar to 708 Engine failure

Reactor 7 Seal Repair 7-15-13
Reactor 7 Seal Repair 7-15-13Reactor 7 Seal Repair 7-15-13
Reactor 7 Seal Repair 7-15-13Watkins1j
 
Gen iii aluminumnewarcnocontrols
Gen iii aluminumnewarcnocontrolsGen iii aluminumnewarcnocontrols
Gen iii aluminumnewarcnocontrolsDon Neubauer
 
Motor assemlby
Motor assemlbyMotor assemlby
Motor assemlbysnakeaye
 
Case ih case international 1896 tractor service repair manual
Case ih case international 1896 tractor service repair manualCase ih case international 1896 tractor service repair manual
Case ih case international 1896 tractor service repair manualfujskekfmsme
 
Circulating Water Pump Overhauling Report (Capacity- 29,000 m3/hr)
Circulating Water Pump Overhauling Report (Capacity- 29,000 m3/hr)Circulating Water Pump Overhauling Report (Capacity- 29,000 m3/hr)
Circulating Water Pump Overhauling Report (Capacity- 29,000 m3/hr)Shah Jalal
 
Transmisión chevrolet_6R80_Actualizaciones.pdf
Transmisión chevrolet_6R80_Actualizaciones.pdfTransmisión chevrolet_6R80_Actualizaciones.pdf
Transmisión chevrolet_6R80_Actualizaciones.pdfpotionflamedrawings7
 
Hyster f005 (h4.50 xl) forklift service repair manual
Hyster f005 (h4.50 xl) forklift service repair manualHyster f005 (h4.50 xl) forklift service repair manual
Hyster f005 (h4.50 xl) forklift service repair manualfjsekkdmeik
 
Hyster f005 (h4.00 xl 5) forklift service repair manual
Hyster f005 (h4.00 xl 5) forklift service repair manualHyster f005 (h4.00 xl 5) forklift service repair manual
Hyster f005 (h4.00 xl 5) forklift service repair manualjfksekmmdme
 
Hyster f005 (h4.50 xl) forklift service repair manual
Hyster f005 (h4.50 xl) forklift service repair manualHyster f005 (h4.50 xl) forklift service repair manual
Hyster f005 (h4.50 xl) forklift service repair manualfjsjfjskeksmem
 
Hyster f005 (h4.00 xl 6) forklift service repair manual
Hyster f005 (h4.00 xl 6) forklift service repair manualHyster f005 (h4.00 xl 6) forklift service repair manual
Hyster f005 (h4.00 xl 6) forklift service repair manualfjskekdmmem
 
Hyster f005 (h3.50 xl) forklift service repair manual
Hyster f005 (h3.50 xl) forklift service repair manualHyster f005 (h3.50 xl) forklift service repair manual
Hyster f005 (h3.50 xl) forklift service repair manualfusjejfskekemm
 
Hyster f005 (h4.00 xl 5) forklift service repair manual
Hyster f005 (h4.00 xl 5) forklift service repair manualHyster f005 (h4.00 xl 5) forklift service repair manual
Hyster f005 (h4.00 xl 5) forklift service repair manualfjjskekdmmem
 
Hyster f005 (h4.50 xl) forklift service repair manual
Hyster f005 (h4.50 xl) forklift service repair manualHyster f005 (h4.50 xl) forklift service repair manual
Hyster f005 (h4.50 xl) forklift service repair manualfujsjejfkskemm
 
Hyster f005 (h4.00 xl 6) forklift service repair manual
Hyster f005 (h4.00 xl 6) forklift service repair manualHyster f005 (h4.00 xl 6) forklift service repair manual
Hyster f005 (h4.00 xl 6) forklift service repair manualfjsqazkekdmme
 
Hyster f005 (h4.50 xl) forklift service repair manual
Hyster f005 (h4.50 xl) forklift service repair manualHyster f005 (h4.50 xl) forklift service repair manual
Hyster f005 (h4.50 xl) forklift service repair manualfjskkesmdmm
 
Hyster f005 (h3.50 xl) forklift service repair manual
Hyster f005 (h3.50 xl) forklift service repair manualHyster f005 (h3.50 xl) forklift service repair manual
Hyster f005 (h3.50 xl) forklift service repair manualfusjfjskekmem
 
Hyster f005 (h4.00 xl 6) forklift service repair manual
Hyster f005 (h4.00 xl 6) forklift service repair manualHyster f005 (h4.00 xl 6) forklift service repair manual
Hyster f005 (h4.00 xl 6) forklift service repair manualufjjsjefkskekmme
 
Hyster f005 (h5.00 xl) forklift service repair manual
Hyster f005 (h5.00 xl) forklift service repair manualHyster f005 (h5.00 xl) forklift service repair manual
Hyster f005 (h5.00 xl) forklift service repair manualfudjsjfekskkem
 

Similar to 708 Engine failure (20)

Reactor 7 Seal Repair 7-15-13
Reactor 7 Seal Repair 7-15-13Reactor 7 Seal Repair 7-15-13
Reactor 7 Seal Repair 7-15-13
 
Gen iii aluminumnewarcnocontrols
Gen iii aluminumnewarcnocontrolsGen iii aluminumnewarcnocontrols
Gen iii aluminumnewarcnocontrols
 
Motor assemlby
Motor assemlbyMotor assemlby
Motor assemlby
 
On site Machining
On site MachiningOn site Machining
On site Machining
 
Case ih case international 1896 tractor service repair manual
Case ih case international 1896 tractor service repair manualCase ih case international 1896 tractor service repair manual
Case ih case international 1896 tractor service repair manual
 
Circulating Water Pump Overhauling Report (Capacity- 29,000 m3/hr)
Circulating Water Pump Overhauling Report (Capacity- 29,000 m3/hr)Circulating Water Pump Overhauling Report (Capacity- 29,000 m3/hr)
Circulating Water Pump Overhauling Report (Capacity- 29,000 m3/hr)
 
Transmisión chevrolet_6R80_Actualizaciones.pdf
Transmisión chevrolet_6R80_Actualizaciones.pdfTransmisión chevrolet_6R80_Actualizaciones.pdf
Transmisión chevrolet_6R80_Actualizaciones.pdf
 
Hyster f005 (h4.50 xl) forklift service repair manual
Hyster f005 (h4.50 xl) forklift service repair manualHyster f005 (h4.50 xl) forklift service repair manual
Hyster f005 (h4.50 xl) forklift service repair manual
 
Hyster f005 (h4.00 xl 5) forklift service repair manual
Hyster f005 (h4.00 xl 5) forklift service repair manualHyster f005 (h4.00 xl 5) forklift service repair manual
Hyster f005 (h4.00 xl 5) forklift service repair manual
 
Hyster f005 (h4.50 xl) forklift service repair manual
Hyster f005 (h4.50 xl) forklift service repair manualHyster f005 (h4.50 xl) forklift service repair manual
Hyster f005 (h4.50 xl) forklift service repair manual
 
Hyster f005 (h4.00 xl 6) forklift service repair manual
Hyster f005 (h4.00 xl 6) forklift service repair manualHyster f005 (h4.00 xl 6) forklift service repair manual
Hyster f005 (h4.00 xl 6) forklift service repair manual
 
Hyster f005 (h3.50 xl) forklift service repair manual
Hyster f005 (h3.50 xl) forklift service repair manualHyster f005 (h3.50 xl) forklift service repair manual
Hyster f005 (h3.50 xl) forklift service repair manual
 
Hyster f005 (h4.00 xl 5) forklift service repair manual
Hyster f005 (h4.00 xl 5) forklift service repair manualHyster f005 (h4.00 xl 5) forklift service repair manual
Hyster f005 (h4.00 xl 5) forklift service repair manual
 
Hyster f005 (h4.50 xl) forklift service repair manual
Hyster f005 (h4.50 xl) forklift service repair manualHyster f005 (h4.50 xl) forklift service repair manual
Hyster f005 (h4.50 xl) forklift service repair manual
 
Hyster f005 (h4.00 xl 6) forklift service repair manual
Hyster f005 (h4.00 xl 6) forklift service repair manualHyster f005 (h4.00 xl 6) forklift service repair manual
Hyster f005 (h4.00 xl 6) forklift service repair manual
 
Hyster f005 (h4.50 xl) forklift service repair manual
Hyster f005 (h4.50 xl) forklift service repair manualHyster f005 (h4.50 xl) forklift service repair manual
Hyster f005 (h4.50 xl) forklift service repair manual
 
Hyster f005 (h3.50 xl) forklift service repair manual
Hyster f005 (h3.50 xl) forklift service repair manualHyster f005 (h3.50 xl) forklift service repair manual
Hyster f005 (h3.50 xl) forklift service repair manual
 
Hyster f005 (h4.00 xl 6) forklift service repair manual
Hyster f005 (h4.00 xl 6) forklift service repair manualHyster f005 (h4.00 xl 6) forklift service repair manual
Hyster f005 (h4.00 xl 6) forklift service repair manual
 
Hyster f005 (h5.00 xl) forklift service repair manual
Hyster f005 (h5.00 xl) forklift service repair manualHyster f005 (h5.00 xl) forklift service repair manual
Hyster f005 (h5.00 xl) forklift service repair manual
 
Gearbox Class
Gearbox ClassGearbox Class
Gearbox Class
 

708 Engine failure

  • 1. 708 Engine failure The 708 came from SSYD with a # 2 Equipment Blower problem. When started to check # 2 blower the diesel was found to be making unusual noises, it was immediately shut down and inspected.
  • 2. The inspection reveal that the R6 forward cam flange and R6 cam journal had broken and separated.
  • 3. Further inspection revealed that the R7 cam bearing had failed and turned in the bore.
  • 4. Measurement of the damaged R7 cam bore revealed the diameter to be 5.492”-5.496”. GEK29341F specifies that this dimension should be 5.4985”-5.501”
  • 5. An automotive cylinder hone was used to resized the R7 bore to 5.4995”. New bearings were installed in the R6 & R7 positions. Bore misalignment was indicated as shown and found to be .005” vertical and .003” horizontal. GEK 29341F specifies this tolerance to be .0045” with the block supported at 4 points. These measurements were taken with the rear of the assembled engine supported by the alternator.
  • 6. New journals and cams were then installed in the engine. The cam spins freely. Measurements of the oil clearance between the R7 cam and journal were taken with feeler gauges passed between journal and bearing on the crankcase and gear side. These measurements reveal that the restored #7 cam bearing bore and subsequently the bearing are “out of square” by as much as .010” with the cam and the rest of the bearings. There is no tolerance specified in GEK 29341F to address this condition.
  • 7. There is .010” clearance at the 6 o’clock position on the crankcase side of the #7 bearing and essentially none at the 12 o’clock position. On the gear side there is .008” clearance at the 12 o’clock position, and . 002” at the 6 o’clock position.
  • 8. Reference marks were filed in the R6 & R7 cam bearings to provide an indication of the condition of the press fit of the new bearings installed at these locations.
  • 9. The repaired engine was installed in Locomotive 700. Initial start and load test has revealed no unusual noises. The cam bearings at R6 & R7 have remained in place so far.
  • 10. The repaired engine was installed in Locomotive 700. Initial start and load test has revealed no unusual noises. The cam bearings at R6 & R7 have remained in place so far.