SlideShare a Scribd company logo
1 of 5
Download to read offline
ILARIA LOSA
ILARIALOSA@GMAIL.COM
EMAIL
+39 334 507 8475
TELEPHONE
HTTPS://IT.LINKEDIN.COM/IN/ILA
RIA-LOSA-1446776
LINKEDIN URL
SKILLS
Leadership coordinating
international team of
researchers involvedin
OBJECTIVE
ENGINEER BY DEGREE, RESEARCHER BY WORK
AND PIONEER BY PASSION HAS ALWAYS BEEN MY
OBJECTIVE OF MY CAREER. WITH MORE THAN
15+ ENGINEERING PUBLICATIONS ON SMART
GRIDS AND WITH 10 YEARS OF EXPERIENCE I AM
SEEKING AN CHALLENGING OPPORTUNITIES IN
ENGINEERING COMPANIES IN R&D OR PROJECTS
AS LEAD RESEARCHER/ENGINEER
EDUCATION
MASTER OF ENGINEERING, POLYTECHNIC INSTITUTE
OF MILAN (2000 – 2007)
Engineering Major:
Energy Engineering
Grade:
103/110
Principal Exams & Subjects:
Power System Architecture
Energy Production
2
EuropeanProjects.
Experience in writing and
reviewing articles and papers.
Participationin international
working groups and initiatives.
Public speaking and
participation/moderation of
round tables.
Preparation of proposals for
European funded projects.
LANGUAGES
Italian: Mother Tongue
English:
UNDERSTANDING C2
SPEAKING C2
WRITING C2
German:
UNDERSTANDING B1
SPEAKING B1
WRITING B1
Spanish:
UNDERSTANDING A1
SPEAKING A1
WRITING A1
INTERESTS / HOBBIES
Cinema
Theatre
EXPERIENCE
RESEARCHER / R.S.E. RICERCA SUL SISTEMA ENERGETICO
2007 – Till Present
In the capacity of a Researcher. I had held various role depending on the
projects assigned described in chronological descending order.
Latest Role (2011)-2016:
GRID4EU Work Package Coordinator
Reference Web Link:
http://www.grid4eu.eu/
Role Responsibilities:
 Coordination of the WP related to scalability analysis
and replicability potential with cost benefit analysis of
6 pilot projects of smart grids in Europe led by 6 DSOs.
Previous Role 2 2011-2014:
GRID+ work Package Coordinator /
Assistant to Project Coordinator
Reference Web Link:
http://www.gridplus.eu/
Role Responsibilities:
 Define & Apply “Mapping & Gap Analysis”
methodology for analysis of transmission and
distribution projects. This activity aims at mapping the
results of the European Pilot Projects against the
priorities of EEGI roadmap in accordance with
ENTSO-E and EDSO4SG.
 Definition of the KPIs of the EEGI initiatives.
 Event Organizing/Planning of interaction and
dissemination events (e.g.: INNOGRID2020+) aimed at
fostering the exchange of results of the smart grids
3
Scuba Diving
COMPUTER SKILLS
• Good command of Microsoft
Office™ tools;
• Experience of network planning
tools (DIGSILENT, SPIRA);
• Experience about market
simulation tools (PRIMES)
ADDITIONAL INFO
• Good communication skills
gained through my experience
as researcher involved in
European projects and during
my role of support to the
coordinator.
• Willing to Travel and Relocate
• Driving Licence B
pilot projects.
 The revision and the approval procedure of the GRID+
deliverables.
Previous Role 1 2008-2011
REALISEGRID: Power System Analyst
Reference Web Link:
http://realisegrid.rse-web.it/
Role Responsibilities:
 Development of Pan European Models that describe
the evolution of transmission networks in different
scenarios up to 2030 (based on ENTSO-E Stum model
winter 2008)
 Cost Benefit Analysis of infrastructural projects on
real-life case studies (9 electricity projects of common
Interest) in order both to validate the tool and to
understand the possible impact of the proposed
approach.
 Cooperation with different European Transmission
System Operators involved in the project: TenneT,
Verbund APG; Terna; RTE International
4
LIST OF PUBLICATIONS
[1] I. Losa e O. Bertoldi, « Regulation of continuity of Supply in the electricity sector in Iltay and costs of energy not
supplied in Europe,» in International Energy Workshop , Venezia, 2009 .
[2] I. Losa e G. Manzoni , «About the investments on transmiossion systems and the importance of the relevant
research.: positions of the most important Italian stakeholders,» L'Energia Elettrica , n. December-November, 2009.
[3] I. Losa, «Impact of wind power on security of supply - contribution to DELIVERABLE No 5.5.3 of the European
project SECURE: Security of Energy Considering its Uncertainty, Risk and Economic implications,» December 2009.
[Online]. Available: http://www.feem-project.net/secure/.
[4] I. Losa, «“Costs of electricity interruptions” contribution to DELIVERABLE No 5.6.3 - of the European project
SECURE: Security of Energy Considering its Uncertainty, Risk and Economic implication,» December 2009. [Online].
Available: http://www.feem-project.net/secure/.
[5] J. Kappauf, M. Urbani , A. L'Abbate e I. Losa, «REALISEGRID d 3.6.2 - Incentive schemes and regulation
framework for transmission development in Europe,» April 2010 . [Online]. Available: http://realisegrid.rse-
web.it/Publications-and-results.asp.
[6] L. Angelo, I. Losa e G. Migliavacca , «REALISEGRID - D 3.3.1 Possible criteria to assess technical-economic and
strategic benefits of specific transmission projects,» 09 2011. [Online]. Available: http://realisegrid.rse-web.it/Publications-
and-results.asp.
[7] I. Losa, R. Calisti e A. L'Abbate , «REALISEGRID D3.5.1 Application of the REALISEGRID framework to assess
technical-economic and strategic benefits of specific transmission projects,» Jluy 2011. [Online]. Available:
http://realisegrid.rse-web.it/Publications-and-results.asp.
[8] I. LOSA, M. de Nigris, T. VU VAN, I. HEROLD e W. HRIBERNIK, «Analysis of the on-going Research and
demonstration Efforts on Smart Grids in,» in CIRED , Stokholm, 2013.
[9] G. Migliavacca, A. L'Abbate, I. Losa e R. Calisti , «Planning future transmission grid expansion investments for a
sustainable pan-European energy system: the REALISEGRID approach,» in CIGRE, Paris, 2012.
[10] G. Migliavacca, A. L'Abbate, I. Losa, E. M. Carlini, A. Sallati e C. Vergine, «The REALISEGRID cost-benefit
methodology to rank pan-European infrastructure investments,» in IEEE PowerTech Conference, Trondheim, 2011.
[11] GRID+ consortium, «D 3.1 - EEGI Labelling methodology and FIRST RELEASE of EEGI Projects,» 09 02 2012.
[Online]. Available: http://www.gridplus.eu. [Consultato il giorno 10 02 2012].
[12] GRID+ consortium, «D 3.4 - Define EEGI Project and Programme KPIs,» [Online]. Available:
Http://www.gridplus.eu . [Consultato il giorno 08 02 2012].
[13] GRID+ consortium, «D3.6 “Portfolio of possible financing schemes”,» 15 12 2012. [Online]. Available:
Http://www.gridplus.eu. [Consultato il giorno 13 02 2013].
[14] I. Losa, M. de Nigris, T. Vu Van, C. Llanos Lecumberri, M. Galvez, N. Biegala, I. Herold e W. Hribernik, «D 1.1 -
Map of initiatives: Methodology definition for gap analysis,» September 2013. [Online]. Available: http://www.gridplus.eu.
[Consultato il giorno December 2013].
[15] I. Losa, G. Bissell, C. Costa Rausa, M. de Nigris, S. Galant, M. Margarone, J. Varela e T. Vu Van, «CIRED,» in
Definition and practical application of Key Performance Indicators to support European grid operators to enable the
energy policy goals (abstract), Rome, 2014.
5
[16] R. Cossent, A. Rodríguez, P. Frías, I. Losa, A. Bassini, C. Tornelli e G. Origo, «GRID4EU GWP3 Methodology for
the definition of scaling up and replication rules and cost-benefit analysis of smart grids pilot projects.,» November 2013.
[Online]. Available: www.grid4eu.com.
[17] I. Losa, M. de Nigris, G. Bissel, J. Varela, L. Sigrist e S. Galant, «Overview of the solutions developed by the
GRID+ project for supporting the European smart grids pilot projects in achieving the EEGI goals_ main findings and
lessons learnt,» in CIRED 2015, Lyom, 2015.
[18] I. Losa, «GRID+ D8.3 TECHNICAL PROGRESS & FINANCIAL REPORT,» November 2014. [Online]. Available:
http://www.gridplus.eu/publicationsandresults/publications.
[19] M. d. Nigris, G. R. Bissel, J. Varela e V. Janousek, «GRID + D 1.2 Map of initiatives and gap analysis – Second
release,» September 2014. [Online]. Available: www.gridplus.eu

More Related Content

Similar to Ilaria CV 2017

smart_strategy_interim_report_opdc_hypercat_final_jan_2016_new_cover
smart_strategy_interim_report_opdc_hypercat_final_jan_2016_new_coversmart_strategy_interim_report_opdc_hypercat_final_jan_2016_new_cover
smart_strategy_interim_report_opdc_hypercat_final_jan_2016_new_coverAnu Devi, DPhil
 
Data Decentralisation: Efficiency, Privacy and Fair Monetisation
Data Decentralisation: Efficiency, Privacy and Fair MonetisationData Decentralisation: Efficiency, Privacy and Fair Monetisation
Data Decentralisation: Efficiency, Privacy and Fair MonetisationAngelo Corsaro
 
Plan4business newsletter 01 2013
Plan4business newsletter 01 2013Plan4business newsletter 01 2013
Plan4business newsletter 01 2013plan4business
 
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET-  	  Redevelopment of Structure with the Help of Building Information M...IRJET-  	  Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...IRJET Journal
 
AGILE - Adoptive Gateways for dIverse MuLtiple Environments
AGILE -  Adoptive Gateways for dIverse MuLtiple EnvironmentsAGILE -  Adoptive Gateways for dIverse MuLtiple Environments
AGILE - Adoptive Gateways for dIverse MuLtiple EnvironmentsAGILE IoT
 
Adoptive Gateways for dIverse MuLtiple Environments
Adoptive Gateways for dIverse MuLtiple EnvironmentsAdoptive Gateways for dIverse MuLtiple Environments
Adoptive Gateways for dIverse MuLtiple EnvironmentsCharalampos Doukas
 
Euxdat newsletter 10_2020
Euxdat newsletter 10_2020Euxdat newsletter 10_2020
Euxdat newsletter 10_2020plan4all
 
Green Software at VU University Amsterdam
Green Software at VU University AmsterdamGreen Software at VU University Amsterdam
Green Software at VU University AmsterdamPatricia Lago
 
Self-Improving Sustainable Intelligent Transport System (ITS) Using Video Con...
Self-Improving Sustainable Intelligent Transport System (ITS) Using Video Con...Self-Improving Sustainable Intelligent Transport System (ITS) Using Video Con...
Self-Improving Sustainable Intelligent Transport System (ITS) Using Video Con...Mikolaj Leszczuk
 
INSPIRE Data Specification - Utility and Governamental Services v3.0
INSPIRE Data Specification - Utility and Governamental Services v3.0INSPIRE Data Specification - Utility and Governamental Services v3.0
INSPIRE Data Specification - Utility and Governamental Services v3.0Maksim Sestic
 
Smart Flanders: Tackling urban challenges through Open Data
Smart Flanders: Tackling urban challenges through Open DataSmart Flanders: Tackling urban challenges through Open Data
Smart Flanders: Tackling urban challenges through Open DataOpen Knowledge Belgium
 
Mastercourse Hortibusiness
Mastercourse HortibusinessMastercourse Hortibusiness
Mastercourse HortibusinessSjaak Wolfert
 
Standard geodata models for Energy Performance of Buildings: experiences from...
Standard geodata models for Energy Performance of Buildings: experiences from...Standard geodata models for Energy Performance of Buildings: experiences from...
Standard geodata models for Energy Performance of Buildings: experiences from...Piergiorgio Cipriano
 
Project Development Routemap UK – Caribbean Knowledge Exchange Programme
Project Development Routemap UK – Caribbean  Knowledge Exchange  ProgrammeProject Development Routemap UK – Caribbean  Knowledge Exchange  Programme
Project Development Routemap UK – Caribbean Knowledge Exchange ProgrammeCaribbean Development Bank
 
OPEN DEI Project Overview - OPEN DEI 1st Energy Domain Workshop
OPEN DEI Project Overview - OPEN DEI 1st Energy Domain WorkshopOPEN DEI Project Overview - OPEN DEI 1st Energy Domain Workshop
OPEN DEI Project Overview - OPEN DEI 1st Energy Domain WorkshopOPEN DEI
 
R2CITIES Newsletter 4/2015
R2CITIES Newsletter 4/2015R2CITIES Newsletter 4/2015
R2CITIES Newsletter 4/2015R2CITIES
 
Jarrar: Future Internet in Horizon 2020 Calls
Jarrar: Future Internet in Horizon 2020 CallsJarrar: Future Internet in Horizon 2020 Calls
Jarrar: Future Internet in Horizon 2020 CallsMustafa Jarrar
 

Similar to Ilaria CV 2017 (20)

smart_strategy_interim_report_opdc_hypercat_final_jan_2016_new_cover
smart_strategy_interim_report_opdc_hypercat_final_jan_2016_new_coversmart_strategy_interim_report_opdc_hypercat_final_jan_2016_new_cover
smart_strategy_interim_report_opdc_hypercat_final_jan_2016_new_cover
 
Data Decentralisation: Efficiency, Privacy and Fair Monetisation
Data Decentralisation: Efficiency, Privacy and Fair MonetisationData Decentralisation: Efficiency, Privacy and Fair Monetisation
Data Decentralisation: Efficiency, Privacy and Fair Monetisation
 
Plan4business newsletter 01 2013
Plan4business newsletter 01 2013Plan4business newsletter 01 2013
Plan4business newsletter 01 2013
 
Artemis spring event 2013
Artemis spring event 2013Artemis spring event 2013
Artemis spring event 2013
 
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET-  	  Redevelopment of Structure with the Help of Building Information M...IRJET-  	  Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...
 
AGILE - Adoptive Gateways for dIverse MuLtiple Environments
AGILE -  Adoptive Gateways for dIverse MuLtiple EnvironmentsAGILE -  Adoptive Gateways for dIverse MuLtiple Environments
AGILE - Adoptive Gateways for dIverse MuLtiple Environments
 
Adoptive Gateways for dIverse MuLtiple Environments
Adoptive Gateways for dIverse MuLtiple EnvironmentsAdoptive Gateways for dIverse MuLtiple Environments
Adoptive Gateways for dIverse MuLtiple Environments
 
Euxdat newsletter 10_2020
Euxdat newsletter 10_2020Euxdat newsletter 10_2020
Euxdat newsletter 10_2020
 
Green Software at VU University Amsterdam
Green Software at VU University AmsterdamGreen Software at VU University Amsterdam
Green Software at VU University Amsterdam
 
Self-Improving Sustainable Intelligent Transport System (ITS) Using Video Con...
Self-Improving Sustainable Intelligent Transport System (ITS) Using Video Con...Self-Improving Sustainable Intelligent Transport System (ITS) Using Video Con...
Self-Improving Sustainable Intelligent Transport System (ITS) Using Video Con...
 
INSPIRE Data Specification - Utility and Governamental Services v3.0
INSPIRE Data Specification - Utility and Governamental Services v3.0INSPIRE Data Specification - Utility and Governamental Services v3.0
INSPIRE Data Specification - Utility and Governamental Services v3.0
 
Smart Flanders: Tackling urban challenges through Open Data
Smart Flanders: Tackling urban challenges through Open DataSmart Flanders: Tackling urban challenges through Open Data
Smart Flanders: Tackling urban challenges through Open Data
 
Mastercourse Hortibusiness
Mastercourse HortibusinessMastercourse Hortibusiness
Mastercourse Hortibusiness
 
S2 eu net@umn 2013
S2 eu net@umn 2013S2 eu net@umn 2013
S2 eu net@umn 2013
 
ATC iLab - profile & current projects
ATC iLab - profile & current projectsATC iLab - profile & current projects
ATC iLab - profile & current projects
 
Standard geodata models for Energy Performance of Buildings: experiences from...
Standard geodata models for Energy Performance of Buildings: experiences from...Standard geodata models for Energy Performance of Buildings: experiences from...
Standard geodata models for Energy Performance of Buildings: experiences from...
 
Project Development Routemap UK – Caribbean Knowledge Exchange Programme
Project Development Routemap UK – Caribbean  Knowledge Exchange  ProgrammeProject Development Routemap UK – Caribbean  Knowledge Exchange  Programme
Project Development Routemap UK – Caribbean Knowledge Exchange Programme
 
OPEN DEI Project Overview - OPEN DEI 1st Energy Domain Workshop
OPEN DEI Project Overview - OPEN DEI 1st Energy Domain WorkshopOPEN DEI Project Overview - OPEN DEI 1st Energy Domain Workshop
OPEN DEI Project Overview - OPEN DEI 1st Energy Domain Workshop
 
R2CITIES Newsletter 4/2015
R2CITIES Newsletter 4/2015R2CITIES Newsletter 4/2015
R2CITIES Newsletter 4/2015
 
Jarrar: Future Internet in Horizon 2020 Calls
Jarrar: Future Internet in Horizon 2020 CallsJarrar: Future Internet in Horizon 2020 Calls
Jarrar: Future Internet in Horizon 2020 Calls
 

Ilaria CV 2017

  • 1. ILARIA LOSA ILARIALOSA@GMAIL.COM EMAIL +39 334 507 8475 TELEPHONE HTTPS://IT.LINKEDIN.COM/IN/ILA RIA-LOSA-1446776 LINKEDIN URL SKILLS Leadership coordinating international team of researchers involvedin OBJECTIVE ENGINEER BY DEGREE, RESEARCHER BY WORK AND PIONEER BY PASSION HAS ALWAYS BEEN MY OBJECTIVE OF MY CAREER. WITH MORE THAN 15+ ENGINEERING PUBLICATIONS ON SMART GRIDS AND WITH 10 YEARS OF EXPERIENCE I AM SEEKING AN CHALLENGING OPPORTUNITIES IN ENGINEERING COMPANIES IN R&D OR PROJECTS AS LEAD RESEARCHER/ENGINEER EDUCATION MASTER OF ENGINEERING, POLYTECHNIC INSTITUTE OF MILAN (2000 – 2007) Engineering Major: Energy Engineering Grade: 103/110 Principal Exams & Subjects: Power System Architecture Energy Production
  • 2. 2 EuropeanProjects. Experience in writing and reviewing articles and papers. Participationin international working groups and initiatives. Public speaking and participation/moderation of round tables. Preparation of proposals for European funded projects. LANGUAGES Italian: Mother Tongue English: UNDERSTANDING C2 SPEAKING C2 WRITING C2 German: UNDERSTANDING B1 SPEAKING B1 WRITING B1 Spanish: UNDERSTANDING A1 SPEAKING A1 WRITING A1 INTERESTS / HOBBIES Cinema Theatre EXPERIENCE RESEARCHER / R.S.E. RICERCA SUL SISTEMA ENERGETICO 2007 – Till Present In the capacity of a Researcher. I had held various role depending on the projects assigned described in chronological descending order. Latest Role (2011)-2016: GRID4EU Work Package Coordinator Reference Web Link: http://www.grid4eu.eu/ Role Responsibilities:  Coordination of the WP related to scalability analysis and replicability potential with cost benefit analysis of 6 pilot projects of smart grids in Europe led by 6 DSOs. Previous Role 2 2011-2014: GRID+ work Package Coordinator / Assistant to Project Coordinator Reference Web Link: http://www.gridplus.eu/ Role Responsibilities:  Define & Apply “Mapping & Gap Analysis” methodology for analysis of transmission and distribution projects. This activity aims at mapping the results of the European Pilot Projects against the priorities of EEGI roadmap in accordance with ENTSO-E and EDSO4SG.  Definition of the KPIs of the EEGI initiatives.  Event Organizing/Planning of interaction and dissemination events (e.g.: INNOGRID2020+) aimed at fostering the exchange of results of the smart grids
  • 3. 3 Scuba Diving COMPUTER SKILLS • Good command of Microsoft Office™ tools; • Experience of network planning tools (DIGSILENT, SPIRA); • Experience about market simulation tools (PRIMES) ADDITIONAL INFO • Good communication skills gained through my experience as researcher involved in European projects and during my role of support to the coordinator. • Willing to Travel and Relocate • Driving Licence B pilot projects.  The revision and the approval procedure of the GRID+ deliverables. Previous Role 1 2008-2011 REALISEGRID: Power System Analyst Reference Web Link: http://realisegrid.rse-web.it/ Role Responsibilities:  Development of Pan European Models that describe the evolution of transmission networks in different scenarios up to 2030 (based on ENTSO-E Stum model winter 2008)  Cost Benefit Analysis of infrastructural projects on real-life case studies (9 electricity projects of common Interest) in order both to validate the tool and to understand the possible impact of the proposed approach.  Cooperation with different European Transmission System Operators involved in the project: TenneT, Verbund APG; Terna; RTE International
  • 4. 4 LIST OF PUBLICATIONS [1] I. Losa e O. Bertoldi, « Regulation of continuity of Supply in the electricity sector in Iltay and costs of energy not supplied in Europe,» in International Energy Workshop , Venezia, 2009 . [2] I. Losa e G. Manzoni , «About the investments on transmiossion systems and the importance of the relevant research.: positions of the most important Italian stakeholders,» L'Energia Elettrica , n. December-November, 2009. [3] I. Losa, «Impact of wind power on security of supply - contribution to DELIVERABLE No 5.5.3 of the European project SECURE: Security of Energy Considering its Uncertainty, Risk and Economic implications,» December 2009. [Online]. Available: http://www.feem-project.net/secure/. [4] I. Losa, «“Costs of electricity interruptions” contribution to DELIVERABLE No 5.6.3 - of the European project SECURE: Security of Energy Considering its Uncertainty, Risk and Economic implication,» December 2009. [Online]. Available: http://www.feem-project.net/secure/. [5] J. Kappauf, M. Urbani , A. L'Abbate e I. Losa, «REALISEGRID d 3.6.2 - Incentive schemes and regulation framework for transmission development in Europe,» April 2010 . [Online]. Available: http://realisegrid.rse- web.it/Publications-and-results.asp. [6] L. Angelo, I. Losa e G. Migliavacca , «REALISEGRID - D 3.3.1 Possible criteria to assess technical-economic and strategic benefits of specific transmission projects,» 09 2011. [Online]. Available: http://realisegrid.rse-web.it/Publications- and-results.asp. [7] I. Losa, R. Calisti e A. L'Abbate , «REALISEGRID D3.5.1 Application of the REALISEGRID framework to assess technical-economic and strategic benefits of specific transmission projects,» Jluy 2011. [Online]. Available: http://realisegrid.rse-web.it/Publications-and-results.asp. [8] I. LOSA, M. de Nigris, T. VU VAN, I. HEROLD e W. HRIBERNIK, «Analysis of the on-going Research and demonstration Efforts on Smart Grids in,» in CIRED , Stokholm, 2013. [9] G. Migliavacca, A. L'Abbate, I. Losa e R. Calisti , «Planning future transmission grid expansion investments for a sustainable pan-European energy system: the REALISEGRID approach,» in CIGRE, Paris, 2012. [10] G. Migliavacca, A. L'Abbate, I. Losa, E. M. Carlini, A. Sallati e C. Vergine, «The REALISEGRID cost-benefit methodology to rank pan-European infrastructure investments,» in IEEE PowerTech Conference, Trondheim, 2011. [11] GRID+ consortium, «D 3.1 - EEGI Labelling methodology and FIRST RELEASE of EEGI Projects,» 09 02 2012. [Online]. Available: http://www.gridplus.eu. [Consultato il giorno 10 02 2012]. [12] GRID+ consortium, «D 3.4 - Define EEGI Project and Programme KPIs,» [Online]. Available: Http://www.gridplus.eu . [Consultato il giorno 08 02 2012]. [13] GRID+ consortium, «D3.6 “Portfolio of possible financing schemes”,» 15 12 2012. [Online]. Available: Http://www.gridplus.eu. [Consultato il giorno 13 02 2013]. [14] I. Losa, M. de Nigris, T. Vu Van, C. Llanos Lecumberri, M. Galvez, N. Biegala, I. Herold e W. Hribernik, «D 1.1 - Map of initiatives: Methodology definition for gap analysis,» September 2013. [Online]. Available: http://www.gridplus.eu. [Consultato il giorno December 2013]. [15] I. Losa, G. Bissell, C. Costa Rausa, M. de Nigris, S. Galant, M. Margarone, J. Varela e T. Vu Van, «CIRED,» in Definition and practical application of Key Performance Indicators to support European grid operators to enable the energy policy goals (abstract), Rome, 2014.
  • 5. 5 [16] R. Cossent, A. Rodríguez, P. Frías, I. Losa, A. Bassini, C. Tornelli e G. Origo, «GRID4EU GWP3 Methodology for the definition of scaling up and replication rules and cost-benefit analysis of smart grids pilot projects.,» November 2013. [Online]. Available: www.grid4eu.com. [17] I. Losa, M. de Nigris, G. Bissel, J. Varela, L. Sigrist e S. Galant, «Overview of the solutions developed by the GRID+ project for supporting the European smart grids pilot projects in achieving the EEGI goals_ main findings and lessons learnt,» in CIRED 2015, Lyom, 2015. [18] I. Losa, «GRID+ D8.3 TECHNICAL PROGRESS & FINANCIAL REPORT,» November 2014. [Online]. Available: http://www.gridplus.eu/publicationsandresults/publications. [19] M. d. Nigris, G. R. Bissel, J. Varela e V. Janousek, «GRID + D 1.2 Map of initiatives and gap analysis – Second release,» September 2014. [Online]. Available: www.gridplus.eu