SlideShare a Scribd company logo
1 of 1
Download to read offline
Six Sigma in Action
                                                                                             Ticket Accuracy

Customer Profile – 41,000 employee pharmaceutical research company
Business Problem & Impact                                                                 Process Capability –fo r C 3
                                                                                                   P C ha rt Before
The customer estimated error rate of 40% in the accuracy of                    0.7
tickets logged into the client’s in-house help desk was causing
                                                                               0.6                                            3.0S L
80 person-hours of time per month to correct.
                                                                               0.5
Measure & Analyze




                                                                  Proportion
                                                                               0.4
Data Collection: Accuracy of logged calls was measured -




                                                                  defects
                                                                               0.3                                            P = 0.3
existing sigma (long term) was found to be 0.5 (31% defects)
Root Causes: Lack of operational definitions of the calls,                     0.2
differences in agent interpretation, too many options for                      0.1
classifying tickets and the accuracy of supporting databases
                                                                               0.0                                            -3.0S
were identified as root causes.
                                                                                     0                  10               20
Improve & Control                                                                                 S am p le Num b e r
Existing databases that feed the ticket system were corrected and maintenance controls were established.
The number of fields that client help desk staff had to select from was reduced, and operation definitions
were clarified and published. Sigma was increased to 2.8 and defects were reduced by 69%.
Results/Benefits
As a result of the project, the customer saved over US$26K in productivity since less time was needed to
correct ticket errors within their process.

            A savings of US$26K annual to the customer!

More Related Content

More from Steven Bonacorsi

Lean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos OnlyLean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos OnlySteven Bonacorsi
 
Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklistsSteven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate templateSteven Bonacorsi
 
Bringing program excellence to process excellence
Bringing program excellence to process excellenceBringing program excellence to process excellence
Bringing program excellence to process excellenceSteven Bonacorsi
 
14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement SummitSteven Bonacorsi
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Steven Bonacorsi
 
Performance Strategy & Change Management Brochure 11 13 2012
Performance Strategy & Change Management Brochure 11 13 2012Performance Strategy & Change Management Brochure 11 13 2012
Performance Strategy & Change Management Brochure 11 13 2012Steven Bonacorsi
 
Is There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic PlanIs There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic PlanSteven Bonacorsi
 
Make Performance Improvement Strategic
Make Performance Improvement StrategicMake Performance Improvement Strategic
Make Performance Improvement StrategicSteven Bonacorsi
 
Improve Your Performance News
Improve Your Performance NewsImprove Your Performance News
Improve Your Performance NewsSteven Bonacorsi
 
Bsci Strategic Management Maturity Model
Bsci Strategic Management Maturity ModelBsci Strategic Management Maturity Model
Bsci Strategic Management Maturity ModelSteven Bonacorsi
 
Using The Balanced Scorecard To Align
Using The Balanced Scorecard To AlignUsing The Balanced Scorecard To Align
Using The Balanced Scorecard To AlignSteven Bonacorsi
 
Ultimate Bsc Sports Metaphor
Ultimate Bsc Sports MetaphorUltimate Bsc Sports Metaphor
Ultimate Bsc Sports MetaphorSteven Bonacorsi
 
Technology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalTechnology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalSteven Bonacorsi
 
Build Innovation Into Your Strategy
Build Innovation Into Your StrategyBuild Innovation Into Your Strategy
Build Innovation Into Your StrategySteven Bonacorsi
 

More from Steven Bonacorsi (20)

Lean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos OnlyLean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos Only
 
Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate Templates
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Bringing program excellence to process excellence
Bringing program excellence to process excellenceBringing program excellence to process excellence
Bringing program excellence to process excellence
 
14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
 
Performance Strategy & Change Management Brochure 11 13 2012
Performance Strategy & Change Management Brochure 11 13 2012Performance Strategy & Change Management Brochure 11 13 2012
Performance Strategy & Change Management Brochure 11 13 2012
 
Is There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic PlanIs There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic Plan
 
Make Performance Improvement Strategic
Make Performance Improvement StrategicMake Performance Improvement Strategic
Make Performance Improvement Strategic
 
Improve Your Performance News
Improve Your Performance NewsImprove Your Performance News
Improve Your Performance News
 
A Balancing Act
A Balancing ActA Balancing Act
A Balancing Act
 
Bsci Strategic Management Maturity Model
Bsci Strategic Management Maturity ModelBsci Strategic Management Maturity Model
Bsci Strategic Management Maturity Model
 
Using The Balanced Scorecard To Align
Using The Balanced Scorecard To AlignUsing The Balanced Scorecard To Align
Using The Balanced Scorecard To Align
 
Ultimate Bsc Sports Metaphor
Ultimate Bsc Sports MetaphorUltimate Bsc Sports Metaphor
Ultimate Bsc Sports Metaphor
 
Themes Of Confusion
Themes Of ConfusionThemes Of Confusion
Themes Of Confusion
 
Technology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalTechnology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 Final
 
Build Innovation Into Your Strategy
Build Innovation Into Your StrategyBuild Innovation Into Your Strategy
Build Innovation Into Your Strategy
 

Ticket Accuracy Six Sigma Case Study

  • 1. Six Sigma in Action Ticket Accuracy Customer Profile – 41,000 employee pharmaceutical research company Business Problem & Impact Process Capability –fo r C 3 P C ha rt Before The customer estimated error rate of 40% in the accuracy of 0.7 tickets logged into the client’s in-house help desk was causing 0.6 3.0S L 80 person-hours of time per month to correct. 0.5 Measure & Analyze Proportion 0.4 Data Collection: Accuracy of logged calls was measured - defects 0.3 P = 0.3 existing sigma (long term) was found to be 0.5 (31% defects) Root Causes: Lack of operational definitions of the calls, 0.2 differences in agent interpretation, too many options for 0.1 classifying tickets and the accuracy of supporting databases 0.0 -3.0S were identified as root causes. 0 10 20 Improve & Control S am p le Num b e r Existing databases that feed the ticket system were corrected and maintenance controls were established. The number of fields that client help desk staff had to select from was reduced, and operation definitions were clarified and published. Sigma was increased to 2.8 and defects were reduced by 69%. Results/Benefits As a result of the project, the customer saved over US$26K in productivity since less time was needed to correct ticket errors within their process. A savings of US$26K annual to the customer!