SlideShare a Scribd company logo
1 of 1
Download to read offline
TIME IS MONEY!!
If Longwall lost time production is
$700 to $1,500 per minute = $336,000 to $720,000 per 8 hour shift
Sub-Technical’s average installation rate is
4,000 pounds to 5,000 pounds per 8 hour shift
Other installers average 1,000 pounds to 2,000 pounds per 8 hour shift
This means that in every day Sub-Technical is one complete shift faster
than other installers
Sub-Technical’s own Proprietary blends of polyurethanes are used on each of our projects.
We offer solutions that are less invasive, more effective and more efficiently deployed.
A savings to you per day of
$336,000.00 to $720,000.00
Sub-Technical Inc.
PO Box 1178
Mars, Pa 16046
USA
Phone: 724-625-0008 24/7 Anywhere in the USA
www.sub-technical.com
Email: stisales@sub-technical.com

More Related Content

What's hot

Business presentation Infinity 8
Business  presentation Infinity 8Business  presentation Infinity 8
Business presentation Infinity 8
Shatoura Holloman
 
NO profile -eng
NO profile -engNO profile -eng
NO profile -eng
Hoa Mai
 
CES presentation
CES presentationCES presentation
CES presentation
Eric Lee
 

What's hot (17)

Contractors glendale
Contractors glendaleContractors glendale
Contractors glendale
 
Apaco Maintenance
Apaco MaintenanceApaco Maintenance
Apaco Maintenance
 
Slug buster
Slug busterSlug buster
Slug buster
 
Landscape Installation Company Riyadh
Landscape Installation Company RiyadhLandscape Installation Company Riyadh
Landscape Installation Company Riyadh
 
Introduction about REEL TECH (1 PAGE)
Introduction about REEL TECH (1 PAGE)Introduction about REEL TECH (1 PAGE)
Introduction about REEL TECH (1 PAGE)
 
O2E MSW City Waste System
O2E MSW City Waste SystemO2E MSW City Waste System
O2E MSW City Waste System
 
CH Mobile Pilot
CH   Mobile PilotCH   Mobile Pilot
CH Mobile Pilot
 
brochure-back
brochure-backbrochure-back
brochure-back
 
The Everkleen promise
The Everkleen promiseThe Everkleen promise
The Everkleen promise
 
ACC PROFILE
ACC PROFILEACC PROFILE
ACC PROFILE
 
Custom electronic design
Custom electronic designCustom electronic design
Custom electronic design
 
Electronic design company
Electronic design companyElectronic design company
Electronic design company
 
COMPANY PROFILE - NIKISAE ENGINERING (REVISED)
COMPANY PROFILE - NIKISAE ENGINERING (REVISED)COMPANY PROFILE - NIKISAE ENGINERING (REVISED)
COMPANY PROFILE - NIKISAE ENGINERING (REVISED)
 
Business presentation Infinity 8
Business  presentation Infinity 8Business  presentation Infinity 8
Business presentation Infinity 8
 
NO profile -eng
NO profile -engNO profile -eng
NO profile -eng
 
Noise Survey
Noise SurveyNoise Survey
Noise Survey
 
CES presentation
CES presentationCES presentation
CES presentation
 

ST TimeIsMoneyFlyer

  • 1. TIME IS MONEY!! If Longwall lost time production is $700 to $1,500 per minute = $336,000 to $720,000 per 8 hour shift Sub-Technical’s average installation rate is 4,000 pounds to 5,000 pounds per 8 hour shift Other installers average 1,000 pounds to 2,000 pounds per 8 hour shift This means that in every day Sub-Technical is one complete shift faster than other installers Sub-Technical’s own Proprietary blends of polyurethanes are used on each of our projects. We offer solutions that are less invasive, more effective and more efficiently deployed. A savings to you per day of $336,000.00 to $720,000.00 Sub-Technical Inc. PO Box 1178 Mars, Pa 16046 USA Phone: 724-625-0008 24/7 Anywhere in the USA www.sub-technical.com Email: stisales@sub-technical.com